Loading...
09-929-0291 1/4" STRAP IR NUTS,BOLT, FENDER -ATION STRAP DUCT HANGING DETAIL NTS NOTE: HANG DUCTS ACCORDING TO SMACNA STANDARDS TYPICAL Z —BAR & WIRE DUCT HANGING DETAIL TYPICAL HANGING STRAP & SADDLE DUCT HANGING DETAIL 0 TYPICAL CHANNEL & STRAP DUCT HANGING DETAIL GENERAL MECHANICAL NOTES AC UNIT — EXISTING AC UNIT DUCTWORK: RIGID FOILFACED 1.5" R =6.0 SUPPORT 48" O.C. ALL TURNS AND TRANSITIONS PRESSURE TAPE AND MASTIC SEAL ALL SEAMS AND JOINTS, FLEX UL CLASS ONE AIR DUCT, R =6 SUPPORT 48 "O.C.. SPIN IN COLLARS WITH M.V.D. TIE WRAP INNER LINER AND PRESSURE TAPE AND MASTIC SEAL OUTER LINER WITHOUT COMPRESSING INSULATION EXHAUST: GALVANIZED SNAP LOCK SUPPORT, R =6 48" O.C. AND AT ALL TURNS, NO SUPPORT OR WEIGHT TO LAY ON EXHAUST FAN HOUSING INSULATION R =6 DIFFUSERS: METALAIRE SERIE 5800 RETURNS: METAL *AIRE SERIES RH EXHAUST FAN :NA THERMOSTAT: REUSE EXISTING NEW USE BUILDING STANDARD . « •� , iii OFFICE AREA 5PEOPLE /1000SF X 17CFM /PERSON X 11129CFM = 946 CFM 12 IM 01 am W-11 I mom :10611ki N 1 .,• Ll 1— ALL WORK EXECUTED UNDER THESE OFFICIAL DOCUMENTS SHOULD BE P�RFCRMEG BY A s. LICENSED AND INSURED MECHANICAL CONTRACTOR AND BE IN COMPLIANCE WITH THE LATEST FLORIDA BUILDING CODE (FBC), SHEET METAL & AIR CONDITIONING CONTRACTORS ASSOCIATION (SMACNA) STANDARDS, AND ALL OTHER APPLICABLE STATE AND LOCAL CODE. 2— ALL WORK SHALL BE PERFORMED IN A FIRST CLASS WORKMANSHIP MANNER TO PRODUCE A COMPLETE SYSTEM THAT IS FULLY BALANCED, AND ADHERES TO ALL APPLICABLE CODES AND REGULATIONS. 3— MECHANICAL CONTRACTOR SHALL PROVIDE A WRITTEN GUARANTEE THAT THE COMPLETE SYSTEM INSTALLED IS FREE OF DEFECTS OF MATERIALS AND WORKMANSHIP FOR A PERIOD OF A YEAR AFTER THE WORK IS COMPLETE AND TURNED OVER TO THE OWNER. 4— THE MECHANICAL CONTRACTOR IS RESPONSIBLE TO OBTAIN HIS OWN PERMIT AND PAY ALL PERMIT AND INSPECTION FEES. 5— AT THE COMPLETION OF THE PROJECT THE CONTRACTOR IS RESPONSIBLE TO PROVIDE A SET OF PRINTS CLEARLY MARKED, DEPICTING ALL AS —BUILT CONDITIONS TO THE ENGINEER FOR RECORD. 6— CONTRACTOR SHALL PAY SPECIAL ATTENTION TO OWNER EQUIPMENT, FURNITURE, AND CARPETING TO PREVENT CONTAMINATION BY COVERING AND WRAPPING FURNITURE AND EQUIPMENT. ALL WASTE AND DEBRIS SHALL BE REMOVED AT THE END OF EACH DAY TO MAINTAIN ACCEPTABLE INDOOR AIR QUALITY LEVEL DURING THE CONSTRUCTION. 7— ANY PORTION OF EXISTING BUILDING (FLOOR, WALL, CEILING, OR ROOF) THAT IS AFFECTED BY EITHER REMOVAL, RELOCATION OR INSTALLATION OF A NEW EQUIPMENT SHALL BE REPAIRED AND MATCHED FINISHED EXISTING CONDITIONS ACCORDING TO ARCHITECTURAL DRAWINGS OR SPECIFICATIONS. 8— WHEREVER DUCT RUNS THROUGH STRUCTURAL ELEMENT SUCH AS BEAM PRECAUTION SHALL BE TAKEN TO COORDINATE WITH OTHER TRADES TO RELOCATE OR TO PROVIDE NECESSARY SLEEVE BEFORE CONCRETE IS BEING POURED. 9— SUPPLY 6 COPIES OF SHOP DRAWINGS FOR REVIEW TO ARCHITECT, NO EQUIPMENT IS TO BE ORDERED PRIOR TO THEIR APPROVAL. 10— MECHANICAL CONTRACTOR TO PROVIDE TWO (2) COMFORT BALANCE VISITS TO SUIT THE NEEDS OF THE CLIENTS. 11— OPENINGS AND DUCT TRAVELING THROUGH FIRE RATED WALL, TENANT DEMISING WALL, MECHANICAL AND ELECTRICAL ROOM, WALL AND FLOOR PARTITION, FLOOR AND ROOF SLAB SHALL BE INSTALLED WITH "B" —FIRE DAMPER. 12 —NOT USED 13— MOTORIZED DAMPERS REQUIRED ON EXHAUST AND OUTDOOR SUPPLY WHERE AIR FLOW IS GREATER THAN 300 CFM, PER F.B.C. 2004, SECTION 13 -409, VENTILATION, PARAGRAPH 13- 409.1.ABC.3 VENTILATION CONTROLS. 14— H.V.A.C, CONTRACTOR IS RESPONSIBLE FOR PROVIDING A FULLY OPERATIONAL AND BALANCED SYSTEM THAT ADHERES TO ALL APPLICABLE CODES AND REGULATIONS. 15— CONTRACTOR TO PROVIDE CERTIFIED TEST AND BALANCE FOR ALL SYSTEMS 16 —IN CEILINGS BEING USED AS A PLENUM, COMBUSTIBLES OR COMBUSTIBLE CONTRUCTION SHALL NOT BE ALLOWED. SITE VISIT 1— MECHANICAL CONTRACTOR IS DULY REQUIRED TO VISIT PROJECT SITE AND VERIFY EXISTING CONDITIONS PRIOR TO SUBMITTING BIDS. HE OR SHE SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCY AT ONCE. FAILURE TO DO SO, THE MECHANICAL CONTRACTOR IS PROCEEDING AT HIS OWN RISK. 2— DESIGN THAT IS CALLED FOR NEW DUCT OR PIPING TO BE CONNECTED TO EXISTING SYSTEM REQUIRES THE CONTRACTOR TO VERIFY EXISTING DUCT & PIPING SIZE BEFORE FABRICATION AND INSTALLATION. 3— WHENEVER INTERFERENCE OR CONFLICT OCCURS WITH THE PROPOSED DESIGN, BEFORE PROCEEDING TO ANY CHANGE OR DEVIATION FROM THE EXISTING BID, THE CONTRACTOR SHALL SUBMIT A WRITTEN REQUEST FOR THE CHANGE INCLUDED A DETAILED DRAWING FOR APPROVAL FROM ARCHITECT/ ENGINEER. 4— CONTRACTOR SHALL CONSULT WITH STRUCTURAL ENGINEER WHEN CUTTING OR MAKING OPENING IN ANY BUILDING COMPONENT. CONTRACTOR SHALL VERIFY THAT STRUCTURAL INTEGRITY OF THE BUILDING IS NOT BEING COMPROMISED. 5— POST TENSION STRUCTURAL SLAB: NO CUTTING OR DRILLING SHALL BE TAKEN PLACE WITHOUT THE X —RAY OF THE SLAB AND THE WRITTEN APPROVAL OF THE STRUCTURAL ENGINEER OF THE BUILDING. EXISTING HVAC SYSTEM 1— MECHANICAL CONTRACTOR MUST CHANGE THE AIR FILTER IN ALL WORKING AIR CONDITIONING UNIT DURING CONSTRUCTION EVERY 21 DAYS OR LESS DEPENDING ON THE AMBIENT ENVIRONMENT TO PREVENT AIR CONTAMINATION, EQUIPMENT FAILURE SUCH AS BEARING FAILURE, DAMPER MALFUNCTION, ETC.,. 2— AFTER CONSTRUCTION MECHANICAL CONTRACTOR IS TO VACUUM THOROUGHLY THE MECHANICAL ROOM TO REMOVE ALL DUSTY PARTICLES, INSPECT AND REPLACE AIR FILTERS, BEARINGS OR BELTS FOR OPTIMAL UNIT OPERATION. 3— WHEN REUSING EXISTING AIR CONDITIONING THE CONTRACTOR MUST CLEAN THE COOLING AND THE CONDENSER COILS, CHECK AND ADJUST REFRIGERANT CHARGE TO ENSURE PROPER UNIT FUNCTION, VERIFY THE EXISTING CONDENSATE PIPING IS IN GOOD WORKING CONDITION, AND MAKE NECESSARY REPAIR. CONTRACTOR SHALL CHECK ALL ELECTRICAL COMPONENTS, TIGHTEN ALL ELECTRICAL CONNECTIONS FOR PROPER OPERATION. 4— DETERIORATED DUCTWORK AND CEILING INSULATION SHALL BE REPLACED. ALL EXISTING DUCTWORK SHALL BE THOROUGHLY INSPECTED AND REPAIRED REMOVED EQUIPMENT THAT IS NOT BEING USED SHALL BE RETURNED TO THE OWNER. 5— ANY EQUIPMENT THAT WAS TEMPORARILY DISCONNECTED WITH RESPECT TO A REMOVAL OF ANY OTHER DEVICE IT SHALL BE RECONNECTED TO THE EXISTING SYSTEM AND VERIFIED THAT IT IS FULLY OPERATIONAL. 6— CONTRACTOR SHALL VERIFY EXISTING AIR CONDITIONING AND HEATING SYSTEMS ARE FUNCTIONING PROPERLY, ITS PERFORMANCE RANGE WITH RESPECT TO ITS VOLUME CAPACITY. 7— EQUIPMENT THAT IS LOCATED EXTERIOR OF THE BUILDING SHALL BE PROPERLY TIED DOWN AND BE ABLE TO WITHSTAND A 140 MILES /HR FORCE WIND. SMOKE TEST READINESS (IF APPLICABLE) 1— BEFORE SCHEDULING SMOKE TEST CONTRACTOR IS TO BE FAMILIAR WITH EXISTING BUILDING SMOKE EVACUATION SYSTEM BY COORDINATING WITH BUILDING MANAGER, VERIFY ALL MOTORIZED DAMPERS, SUPPLY AND EXHAUST FAN ARE FULLY OPERATED, MAKE ALL NECESSARY REPAIR FOR THE TEST READINESS. I�ucc J EnuncErin J mc •f II. g E .I , _L i _ 49832 F. DESnOR P.E. RES E2459 �-r ■ - TEL (95AD 938-IBM FLA. REM *EB-00133309 W CL tn m W� �� cn CL w t- � C~Wfl FIL ■, U) < , LL La Lo 0 , ■ LL o lipy r , i tn tn to Ir U FIL W IL Z i ■ r I r W Q ❑ 4 ■ U LL cc w ■ IL LL ■ ■ ((11) Lo 3 in in to cn Ln ■, U) < , LL La Lo 0 , ■ LL o lipy r , i tn to Ir U W Z i r I r W Q ❑ 4 ■, U) < , LL La Lo 0 , ■ LL o lipy r , i tn i r r � -r