09-10-016s i d I NOTE: HANG DUCTS ACCORDING TO SMACNA STANDARDS TYPICAL HAN ...._ STRAP & SADDLE DUCT HANGING DETAIL TYPICAL Z -BAR & WIRE DUCT HANGING DETAIL `AL CHANNEL RAP DUCT HANGING DETAIL DUCT HANGHNG DETAIL NTS OUTLET DUCT — BACK DRAFT DAMPER FAN HOUSING ADJUSTABLE MOUNTED FLANGES CEILING 1 1/4" STRAP )RD 5 NUTS,BOLT, FENDER WASHERS LATION STRAP ROUND FLEX DUCT HANGING DETAIL NTS `r TOP DISCHARGE NAILOR -HART INDUSTRIES INC. MASONRY WALLA OR PROPERLY FRAMED DRY WALL EXPANSION CLEARANCE TOP HAT SECTION FOR TYPE DAMPER FIRE DAMPER BLADES HELD OPEN BY FUSIBLE LINK BOLT, SCREW OR TACK WELD FIRE DAMPER FRAME SLEEVE T rpcq 38) J SCREW OR TACK WELD BOTH SIDES a ° r2Qa } �b / 2 g (SO) MAXIMUM 8g (�QQ) �) DIMENSIONS FASTENING OF DAMPER IN SLEEVE TYPICAL INSTALLATION OF FIRE DAMPER .TOP HAT HEIGHT PLUS 1 1/2" (38) V 4 S �� • RETAINING ANGLE FASTENED I� TO SLEEVE - ALL 4 SIDES. BOTH SIDES OF WALL. (DO NOT ATTACH TO WALL.) SLEEVE (NOT LESS THAN DUCT GAUGE). -""" BREAKWAY JOINT DUCT ACCESS DOOR OPENING NOTES: 1. MODEL 0120 - TYPE 'B' SHOWN. 2. VERTICAL INSTALLATION ILLUSTRATED. HORIZONTAL INSTALLATION SIMILAR. 3. INSTALLATION COMPLIES WITH U.L. AND U.L.C. STANDARDS. 4. FOR COMPLETE DETAILS AND VARIOUS MODELS SEE INSTALLATION INSTRUCTIONS PROVIDED WITH UNITS. DIMENSIONS IN INCHES (MM). HN.A.C. DETAILS & SPECIFICATIONS M2 SCALE: NITS H.V.A.C. NOTES AC EQUIPMENT: EXISTING DUCTWORK: RIGID FOILFACED 1.0" R =4.2 SUPPORT 48" O.C. ALL TURNS AND TRANSITIONS PRESSURE TAPE AND MASTIC SEAL ALL SEAMS AND JOINTS. FLEX UL CLASS ONE AIR DUCT R =4.2 SUPPORT 48 "Q.C.. SPIN IN COLLARS WITH M.V.D. TIE WRAP INNER LINER AND PRESSURE TAPE AND MASTIC SEAL OUTER LINER WITHOUT COMPRESSING INSULATION EXHAUST: GALVANIZED SNAP LOCK SUPPORT 48" O.C. AND AT ALL TURNS. NO SUPPORT OR WEIGHT TO LAY ON EXHAUST FAN HOUSING DIFFUSERS: REUSE EXISTING, NEW MATCH BUILDING STANDARD LINEAR DIFFUSER: MODEL ASD METAL AIR SERIES V4004 WITH MVD 3 RETURNS: REUSE EXISTING, NEW MATCH BUILDING STANDARD 4 EXHAUST FAN EF1: PENN MODEL Z6S 101CFM 00.125CP I 120V 47 WATTS, 1050 RPM EF2: PANASONIC WHISPERLINE MODEL FV- 10NLF1. 120CFM ® 0.2 SP, 120V, 0.31AMPS THERMOSTAT: REUSE EXISTINHG._NEW MATCH BUILDING STANDARD FRESH AIR REQUIREMENTS PER FMC TABLE 403.3 CORRIDOR 0.05CFM /SF X 724SF = 36 CFM ELECTRICAL ROOM 0.15CFM /SF X 48SF = 7 CFM FRESH AIR REQUIRED 43 CFM FRESH AIR PROVIDED 43 CFM EXHAUST CALCULATIONS RESTROOM 50CFM /WC -UR X 1 X = 50 CFM 100CFM PROVIDED ELECTRICAL ROOM - 6 AC PER HOUR 500CF X(1 /60) X 6 = 50CFM 100CFM PROVIDED HVAC DESIGN REQUIRES: YES NO DUCT SMOKE DETECTOR FIRE DAMPER (S) U) SMOKE DAMPER (S) i- FIRE RATED ENCLOSURE J FIRE RATED ROOF /FLOOR CEILING ASSEMBLY W O FIRE STOPPING SMOKE CONTROL ❑ r- o GENERAL MECHANICAL NOTES m I 1- ALL WORK EXECUTED UNDER THESE OFFICIAL DOCUMENTS SHOULD BE .n PERFORMED BY A LICENSED AND INSURED MECHANICAL CONTRACTOR AND BE IN COMPLIANCE WITH THE LATEST FLORIDA BUILDING CODE (FBC), SHEET METAL & AIR CONDITIONING CONTRACTOR'S ASSOCIATION (SMACNA) n 1 STANDARDS, AND ALL OTHER APPLICABLE STATE AND LOCAL CODE. 2- ALL WORK SHALL BE PERFORMED IN A FIRST CLASS WORKMANSHIP I MANNER TO PRODUCE A COMPLETE SYSTEM THAT IS FULLY BALANCED, AND ADHERES TO ALL APPLICABLE CODES AND REGULATIONS. 3- MECHANICAL CONTRACTOR SHALL PROVIDE A WRITTEN GUARANTEE THAT j THE COMPLETE SYSTEM INSTALLED IS FREE OF DEFECTS OF MATERIALS AND I WORKMANSHIP FOR A PERIOD OF A YEAR AFTER THE WORK IS COMPLETE AND TURNED OVER TO THE OWNER. 4- THE MECHANICAL CONTRACTOR IS RESPONSIBLE TO OBTAIN HIS OWN PERMIT AND PAY ALL PERMIT AND INSPECTION FEES. 5- AT THE COMPLETION OF THE PROJECT THE CONTRACTOR IS RESPONSIBLE TO PROVIDE A SET OF PRINTS CLEARLY MARKED AND DEPICTED ALL AS -BUILT CONDITIONS }} TO THE ENGINEER FOR RECORD. I 6- CONTRACTOR SHALL PAY SPECIAL ATTENTION TO OWNER EQUIPMENT, FURNITURE. AND CARPETING TO PREVENT CONTAMINATION BY COVERING AND WRAPPING FURNITURE AND EQUIPMENT. ALL WASTE AND DEBRIS SHALL BE REMOVED AT THE END OF EACH DAY TO MAINTAIN ACCEPTABLE INDOOR AIR QUALITY LEVEL DURING THE CONSTRUCTION. 7- ANY PORTION OF EXISTING BUILDING (FLOOR, WALL, CEILING, OR ROOF) THAT IS AFFECTED BY EITHER REMOVAL, RELOCATION OR INSTALLATION OF A NEW EQUIPMENT SHALL BE REPAIRED AND MATCHED FINISHED EXISTING CONDITIONS ACCORDING TO ARCHITECTURAL DRAWINGS OR SPECIFICATIONS. 8- WHEREVER DUCT RUNS THROUGH STRUCTURAL ELEMENT SUCH AS BEAM PRECAUTION SHALL BE TAKEN TO COORDINATE WITH OTHER TRADES TO RELOCATE OR TO PROVIDE NECESSARY SLEEVE BEFORE CONCRETE IS BEING POURED. 9- SUPPLY 6 COPIES OF SHOP DRAWINGS FOR REVIEW TO ARCHITECT. NO EQUIPMENT IS TO BE ORDERED PRIOR TO THEIR APPROVAL. 10-MECHANICAL CONTRACTOR TO PROVIDE TWO (2) COMFORT BALANCE VISITS TO SUIT THE NEEDS OF THE CLIENTS. 11- OPENINGS AND DUCT TRAVELING THROUGH FIRE RATED WALL, TENANT DEMISING WALL, j MECHANICAL AND ELECTRICAL ROOM. WALL AND FLOOR PARTITION, FLOOR AND , ROOF SLAB SHALL BE INSTALLED WITH "B" -FIRE DAMPER. 12- MOTORIZED DAMPERS REQUIRED ON EXHAUST AND FRESH AIR SUPPLY WHERE AIR FLOW GREATER THAN 300 CFM, PER 13- 409.1.ABC.3 13- H.V.A.C. CONTRACTOR IS RESPONSIBLE FOR PROVIDING A FULLY OPERATIONAL AND BALANCED SYSTEM THAT ADHERES TO ALL APPLICABLE CODES AND REGULATIONS. 14- CONTRACTOR TO PROVIDE CERTIFIED TEST AND BALANCE FOR ALL SYSTEMS 15 -IN CEILINGS BEING USED AS A PLENUM, COMBUSTIBLES OR COMBUSTIBLE CONTRUCTION SHALL NOT BE ALLOWED. SITE VISIT 1- MECHANICAL CONTRACTOR IS DULY REQUIRED TO VISIT PROJECT SITE AND VERIFY EXISTING CONDITIONS PRIOR TO SUBMITTING BIDS. HE OR SHE SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCY AT ONCE. FAILURE TO DO SO. THE MECHANICAL CONTRACTOR IS PROCEEDING AT HIS OWN RISK. 2- DESIGN THAT IS CALLED FOR NEW DUCT OR PIPING TO BE CONNECTED TO EXISTING SYSTEM REQUIRES THE CONTRACTOR TO VERIFY EXISTING DUCT & PIPING SIZE BEFORE FABRICATION AND INSTALLATION. 3- WHENEVER INTERFERENCE OR CONFLICT OCCURS WITH THE PROPOSED DESIGN, BEFORE PROCEEDING TO ANY CHANGE OR DEVIATION FROM THE EXISTING BID. THE CONTRACTOR SHALL SUBMIT A WRITTEN REQUEST FOR THE CHANGE INCLUDED A DETAILED DRAWING FOR APPROVAL FROM ARCHITECT/ ENGINEER. 4- CONTRACTOR SHALL CONSULT WITH STRUCTURAL ENGINEER WHEN CUTTING OR MAKING OPENING IN ANY BUILDING COMPONENT. CONTRACTOR SHALL VERIFY THAT STRUCTURAL INTEGRITY OF THE BUILDING IS NOT BEING COMPROMISED. 5- POST TENSION STRUCTURAL SLAB: NO CUTTING OR DRILLING SHALL BE TAKEN PLACE WITHOUT THE X -RAY OF THE SLAB AND THE WRITTEN APPROVAL OF THE STRUCTURAL ENGINEER OF THE BUILDING. EXISTING HVAC SYSTEM 1- MECHANICAL CONTRACTOR MUST CHANGE THE AIR FILTER IN ALL WORKING AIR CONDITIONING UNIT DURING CONSTRUCTION EVERY 21 DAYS OR LESS DEPENDING ON THE AMBIENT ENVIRONMENT TO PREVENT AIR CONTAMINATION, EQUIPMENT FAILURE SUCH AS BEARING FAILURE, DAMPER MALFUNCTION, ETC... 2- AFTER CONSTRUCTION MECHANICAL CONTRACTOR IS TO VACUUM THOROUGHLY THE MECHANICAL ROOM TO REMOVE ALL DUSTY PARTICLES, INSPECT AND REPLACE AIR FILTERS, BEARINGS OR BELTS FOR OPTIMAL UNIT OPERATION. 3- WHEN REUSING EXISTING AIR CONDITIONING THE CONTRACTOR MUST CLEAN THE COOLING AND THE CONDENSER COILS, CHECK AND ADJUST REFRIGERANT CHARGE TO ENSURE PROPER UNIT FUNCTION, VERIFY THE EXISTING CONDENSATE PIPING IS IN GOOD WORKING CONDITION, AND MAKE NECESSARY REPAIR. CONTRACTOR SHALL CHECK ALL ELECTRICAL COMPONENTS, TIGHTEN ALL ELECTRICAL CONNECTIONS FOR PROPER OPERATION. DETERIORATED DUCTWORK AND CEILING INSULATION SHALL BE REPLACED. 4- ALL EXISTING DUCTWORK SHALL BE THOROUGHLY INSPECTED AND REPAIRED REMOVED EQUIPMENT THAT IS NOT BEING USED SHALL BE RETURNED TO THE OWNER. 5- ANY EQUIPMENT THAT WAS TEMPORARILY DISCONNECTED WITH RESPECT TO A REMOVAL OF ANY OTHER DEVICE IT SHALL BE RECONNECTED TO THE EXISTING SYSTEM AND VERIFIED THAT IT IS FULLY OPERATIONAL. 6- CONTRACTOR SHALL VERIFY EXISTING AIR CONDITIONING AND HEATING SYSTEMS ARE FUNCTIONING PROPERLY. ITS PERFORMANCE RANGE WITH RESPECT TO ITS VOLUME CAPACITY. 7- EQUIPMENT THAT IS LOCATED EXTERIOR OF THE BUILDING SHALL BE PROPERLY TIED DOWN AND BE ABLE TO WITHSTAND A 140 MILES /HR FORCE WIND. SMOKE TEST READINESS (IF APPLICABLE 1- BEFORE SCHEDULING SMOKE TEST CONTRACTOR IS TO BE FAMILIAR WITH EXISTING BUILDING SMOKE EVACUATION SYSTEM BY COORDINATING WITH BUILDING MANAGER, VERIFY ALL MOTORIZED DAMPERS, SUPPLY AND EXHAUST FAN ARE FULLY OPERATED, MAKE ALL NECESSARY REPAIR FOR THE TEST READINESS. L WuCkE5 EnoinccMc inc cormuft uareem / MHW PE FL WS 4MM _ ", •�-±�■ rm W ave she WQ - " .: - R Ott i W 2—: tp , 0 U7 i Y (-9 g U) U3Lo i- J w W O U:,. E3 ❑ r- o `^ Z Z w ® 1�_ W a� W Q Z U Z 0 Ill 4 Q w V K 39 ED r m w (-9 g U) U3Lo i- w Q W U:,. ❑ r- Z W w r :. N I El W D Ill 4 Q w + qt U W O i4 td U) j d a � liqe' �2! �1 I rr❑ rU) .. V,^ I,/ Q Q o 8 OR A .,... O Q I— 0 am W . I— Eu O °R4' CC W a4 LL zw (-9 g U) w ❑ r- w Q w U W O i4 td U) j U a � liqe' �2! �1 I fy 1- .. V,^ I,/ Q Q o 8 OR A .,... O I— 0 am W . I— Eu O °R4' CC W a4