Loading...
13-391-002CODE STATEMENT TO THE BEST OF THE ARCHITECT'S OR ENGINEER'S KNOWLEDGE, THE PLANS AND SPECIFICATIONS COMPLY WITH THE APPLICABLE MINIMUM BUILDING CODES AND THE APPLICABLE FIRE - SAFETY STANDARDS AS DETERMINED BY THE LOCAL AUTHORITY IN ACCORDANCE WITH THIS SECTION AND 633 FLORIDA STATUTES. SCOPE OF U ORK: THE SCOPE OF WORK FOR THIS PROJECT CONSISTS OF: I.THE REMOVAL OF THE EXISTING ASPHALT DRIVEWAY. 2NEW PERVIOUS DRIVEWAY AT THE FRONT AND SIDE OF THE EXISTING RESIDENCE. 3. NEW PERVIOUS PATHWAY CONNECTING DRIVEWAY(S). 4. NEW CORAL STONE DECK LOCATED AT THE BACK OF THE EXISTING RESIDENCE. 5. NEW 6' -0" HIGH WOOD FENCE TO RUN ALONG THE SACK AND SIDE YARD. 6. NEW CONCRETE PORCH WITH CORAL STONE VENEER. 1. NEW CONCRETE PAVERS LOCATED AT THE SIDE OF THE EXISTING RESIDENCE. GOVERNING CODES ALL CONSTRUCTION WORK, ACTIVITIES AND ALTERATIONS SHALL COMPLY WITH THE 2010 FLORIDA EXISTING BUILDING CODE ALL CONSTRUCTION WORK, ACTIVITES AND ALTERATIONS SHALL COMPLY WITH THE LATTEST EDITION OF O.S.HA. REQUIREMENTS ALL CONSTRUCTION WORK, ACTIVITIES AND ALTERATIONS SHALL COMPLY WITH THE 2010 FLORIDA BUILDING CODE ALL CONSTRUCTION WORK, ACTIVITIES AND ALTERATIONS SHALL COMPLY WITH THE 2010 NATIONAL FIRE PROTECTION CODE AFFLICABLE CODES 4 REGULATIONS: BUILDING CODE- FLORIDA BUILDING CODE, 2010 EDITION PLUMBING CODE- FLORIDA PLUMBING CODE, 2010 EDITION ELECTRICAL CODE- FLORIDA ELECTRICAL CODE, 2010 EDITION MECHANICAL CODE- FLORIDA MECHANICAL CODE, 2010 EDITION FIRE PROTECTION- FLORIDA FIRE PREVENTION CODE, JAN. 1, 2010 ENERGY CODE- FLORIDA BUILDING CODE, CH. 13, 2010 EDITION HANDICAP CODE- FLORIDA BUILDING CODE, CH. 11, 2010 EDITION A.B. ANCHOR BOLT A/C AIR CONDITIONER ACCOM. ACCOMMODATE APP. ABOVE FINISH FLOOR A.H.U. AIR HANDLING UNIT ALUM. ALUMINUM AUX. AUXILLARY BLDG. BUILDING BLK. BLOCK BM. BEAM BM. BENCH MARK BOTT. BOTTOM BRD. BOARD BTWN. BETWEEN C.B CATCH BASIN C.I.P. CAST -IN -PLACE G.J. CONTROL JOINT C.L. CHAIN LINK CLG. CEILING G CENTER LINE CLO. CLOSET CMU CONC. MASONRY UNIT CNTR. COUNTER CO CLEANOUT COL. COLUMN CONC. CONCRETE CONN. CONNECTION CONSTR. CONSTRUCTION CONT. CONTINUOUS CONTR. CONTRACTOR CPT CARPET G.T. CERAMIC TILE DBL. DOUBLE DEMO. DEMOLITION DET. DETAIL A55REVIATIONS DIA. DIAMETER HC. HANDICAP / HOLLOW CORE DIM. DIMENSION HDWR. HARDWARE D.F. DRINKING FOUNTAIN H.M. HOLLOW METAL DOGS. DOCUMENTS HORIZ. HORIZONTAL DWG. DRAWINGS HT. HEIGHT DWN. DOWN H.VA.C. HEATING VENTILATING EA. EACH SPECS. t AIR CONDITIONING EL ELEVATION I.D. INSIDE DIAMETER ELEC. ELECTRICAL INFO. INFORMATION ELEV. ELEVATION / ELEVATOR INSUL. INSULATION EQ. EQUAL INT. INTERIOR EQUIP. EQUIPMENT INTERM. INTERMEDIATE ESC ESCULATOR JAN. JANITOR E.W. EACH WAY JT. JOINT EXH. EXHAUST JST. JOIST EXIST. EXISTING LAM. LAMINENT EXP EXPOSED / EXPANSION LAV, LAVATORY EXT EXTERIOR L.P. LIGHT POLE EXTING. EXTINGUISHER (FIRE) MAT. MATERIAL FAB. FABRICATE MAX. MAXIMUM F.D. FLOOR DRAIN MECH MECHANICAL FE FIRE EXTINGUISHER MFR. MANUFACTURER FIN. FINISH M.H. MAN HOLE FIXT. FIXTURE MIN. MINIMUM FF. FINISH FLOOR MISG. MISCELLANEOUS FLR. FLOOR MTL. METAL FTG. FOOTING N. NORTH F.V. FIELD VERIFY NiS.V.D. NATIONAL GEODESIC VERTICAL GA. GAUGE DATUM GALV. GALVANIZED N.I.G. NOT IN CONTRACT G.B. GRAB BAR NO. NUMBER G.C. GENERAL CONTRACTOR N.T.S. NOT TO SCALE GL GLASS O.G. ON CENTER GYP. 5D-GYPSUM WALL BOARD O.D. OUTSIDE DIAMETER HB. HOSE BIBS PART. PARTITION GENERAL NOTES GENERAL NOTES 1. THE CONTRACTOR SHALL FURNISH ALL MATERIALS, EQUIPMENT LABOR AND OTHER FACILITIES NECESSARY FOR THE EXECUTION OF THE WORK ALL MATERIALS SHALL BE NEW AND BOTH WORKMANSHIP AND MATERIALS SHALL BE OF GOOD QUALITY. THE CONTRACTOR SHALL, IF REQUIRED, FURNISH SATISFACTORY EVIDENCE AS TO THE MATREIALS USED. 2. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY ERRORS, INCONSISTENCES, OR OMISSIONS HE /SHE MAY DISCOVER ON DRAWINGS. 3. THE GENERAL CONTRACTOR SHALL COORDINATE AND ASSURE ALL CLEARANCES REQUIRED FOR LIGHT FIXTURES, PLUMBING, STRUCTURAL, ETC., PRIOR TO INSTALLATION. 4. ALL SPECIFIC INFORMATION OMITTED FROM THESE DWGS. AS THEY RELATE TO CONSTRUCTION SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE OWNER WITH SUFFICIENT LEAD TIME SO AS NOT TO DELAY THE PROGRESS OF THE PROJECT. 5. ALL NEW CONSTRUCTION FINISHES BOTH INTERIOR AND EXTERIOR SHALL MATCH THE ADJACENT FINISHES UA.0. 6. ALL WORK SHALL COMPLY WITH THE LATEST APPLICABLE CODE AND ALL MATERIAL SHALL COMLPY WITH LATEST APPLICABLE STANDARDS. -1. CONTRACTOR IS TO REVIEW THE EXISTING AREA OF WORK AND FAMILIARIZE THEMSELVES WITH ALL EXISTING CONDITIONS. S. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ASSURE THAT THE BUILDING COMPONENTS UTILIZED ARE INSTALLED IN STRICT ACCORDANCE WITH THESE DW35. AND ALL PREVAILING PERTINENT BUILDING CODES. 9. ALL WOOD FRAMING ETC. TO BE PRESSURE TREATED (TYPE "C ") 10. THE CONTRACTOR IS TO PATCH AND REPAIR AS REQUIRED AFTER ALL TRADES. 11. ALL DRAWINGS AND WORK MUST COMPLY WITH THE A.D.A. GUIDELINES. 12. THIS SET OF WORKING DRAWINGS SHALL BE ADDRESSED AS A COMPLETE SET, AND IT SHALL NOT BE USED IN PARTS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE THE SET OF DRAWINGS WITH ALL TRADES, SO THAT THE WORK WILL BE PERFORMED CORRECTLY AND COORDINATED AMONG ALL TRADES. 13. NO ASSUMPTION SHALL BE MADE BY THE CONTRACTORS. ANY CLARIFICATIONS NEEDED IN THE PLANS SHALL NEVER BE ASSUMED BY THE CONTRACTOR THE ARCHITECT WILL CLARIFY ANY QUESTIONS, IF AND WHEN NEEDED IN A REASON- ABLE ANDTIMELY MANNER 14. THE CONTRACTOR IS TO COORDINATE THE WORK OF ALL OTHER SUBCONTRACTORS EPNTRR�ACTORTS ACQUIRED BYRTHE OOWNER THOSE OF ANY 15. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL MINOR ITEMS WHICH ARE OBVIOUS, REASONABLE AND NECESSARY TO COMPLETE ANY INSTALLA110N. 16. THE ARCHITECT ACCEPTS NO RESPONSIBILITY FOR THE QUALITY OF MATERIALS SELECTED AS REQUIRED BY THESE DWGS., NOR FOR THE WORKMANSHIP PROVIDED IN THE INSTALLATION OF THE SAME. 1-1. DRAWINGS FROM VARIOUS DISCIPLINES ARE INTERRELATED, WHAT IS REQUIRED BY ONE SHALL BE AS BINDING AS IF REQUIRED BY ALL. COMPLEMENTARY COMPONENTS BETWEEN DISCIPLINES REASONABLY INFERRED AS BEING NECESSARY TO PRODUCE INTENDED RESULTS SHALL BE DEEMED PART OF THE CONTRACTOR'S EXPECTED PERFORM- ANCE. LL � � 18. CLEANOC� AND REMOYAIL O1 ,AL.1 SD BRISLUNTI FOR IMMEDIATE ARE ACDGEIPTED IN A CLEAN, HABITABLE CONDITION BY OWNER 19. THE CONTRACTOR SHALL PROVIDE PROPER SAFEGUARD IN COMPLIANCE WITH LOCAL CODE AND ALL APPLICABLE CODES DURING ALL PHASES OF CONSTRUCTION. PLYWD. PLYWOOD PNT. PAINT P.T. PRESSURE TREATED REINF. REINFORCING REQ. REQUIRED RM. ROOM R.D. ROOF DRAIN Sc. SOLID CORE SCHED. SCHEDULE SECT. SECTION SF. SQUARE FOOTAGE SHT. SHEET SIM. SIMILAR SPECS. SPECIFICATIONS S.S. STAINLESS STEEL STD. STANDARD STL. STEEL STRUCT. STRUCTURE 80. FT. SQUARE FOOTAGE TEL TELEPHONE TEMP. TEMPERED / TEMPORARY THK. THICK TYP. TYPICAL U.C. UNDERCUT U.N.O. UNLESS NOTED OTHERWISE V.B VINYL BASE V.C.T. VINYL COMPOSITE TILE VERT. VERTICLE VEST. VESTIBULE V.T.R. VENT THRU ROOF W/ WITH WD. WOOD WG WATER CLOSET GENERAL NOTES (CONTINUED) CONTRACTOR SHALL PROVIDE PROTECTION OF MATERIALS DURING ALL PHASES OF CONSTRUCTION. CONTRACTOR SHALL BE RESPONSIBLE FOR IMMEDIATE CLEANING AND REMOVAL OF ALL DEBRIS UNTIL THE PREMISES ARE ACCEPTED IN A CLEAN AND HABITABLE CONDITION BY THE ARCHITECT / INTERIOR DESIGNER CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THAT ALL WORK OF ALL TRADES SHALL COMPLY WITH THE FLORIDA BUILDING CODES. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS IN THE FIELD AND SHALL IMMEDIATELY NOTIFY THE ARCH. /DESIGNER OF ANY CONDITION THAT DIFFER OR INTERFERES WITH THOSE SHOWN ON THIS PLAN BEFORE PROCEEDING WITH WORK ALL DIMENSIONS SUPERSEDE SCALED DRAWINGS. THE GENERAL CONTRACTOR, HIS SUB - CONTRACTOR, OR ANY OTHER CONTRACTOR INVOLVED IN THIS PROJECT SHALL TAKE NOTE THAT ANY COST CAUSED BY DEFECTIVE WORK, AS A RESULT OF, BUT NOT LIMITED TO INFERIOR WORKMANSHIP OR MATERIALS, IMPROPER SCHEDULING OR DELINQUENT ORDERING SHALL BE BORNE BY PARTY RESPONSIBLE. ALL ITEMS DAMAGED WHILE IN DEMOLITION PHASE THAT ARE TO REMAIN SHALL BE RESTORED OR REPLACED TO BE ACCEPTABLE BY THE ARCHITECT / INTERIOR DESIGNER, AT THE CONTRACTORS EXPENSE. ANY OTHER ITEMS OR MATERIALS ENCOUNTERED DURING THE DEMOLITION PHASE SHALL BE REPORTED IMMEDIATELY TO THE ARCHITECT / INTERIOR DESIGNER FOR EVALUATION. SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL LEGEND NTS DEMOLITION NOTES I. ALL AREAS OUTSIDE OF INDICATED "SCOPE OF WORK" SHALL REMAIN UNDISTURBED UNLESS OTHERWISE NOTED. 2. CONTRACTOR SHALL BE RESPONSIBLE TO FIELD CHECK AND VERIFY ALL CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITION, AND NOTIFY THE OWNER AND ARCHITECT IF ANY DISCREPANCIES ARE FOUND. 3. THE CONTRACTOR IS TO PROTECT ALL EXISTING FENCES / SITE CONDITIONS. 4. CONTRACTOR SHALL PROTECT ALL EXISTING FACILITIES AND SITE UTILITIES FROM DAMAGE. 5. CONTRACTOR IS TO REMOVE OR CAP MECHANICAL ITEMS WHICH ARE NOT TO BE REUSED INCLUDING WIRING, CONDUITS, PIPES, DUCTWORK, ETC. 6. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING A TRASH/DEBRIS REMOVAL SERVICE FOR REMOVAL OF ALL DEBRIS FOR ALL TRADES AND WALL WORK RELATING TO THIS PROJECT. COORDINATE LOCATION OF DUMPSTER WITH OWNER -1. ALL DEMOLITION WORK SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE 2009 FLORIDA BUILDING CODE CHAPTER 33 AND COMPLY WITH ALL GOVERNING REGULATIONS. 8. GENERAL CONTRACTOR TO SURVEY THE CONDITION OF THE BUILDING TO DETERMINE WHETHER REMOVING ANY ELEMENT MIGHT RESLLT IN STRUCTURAL DEFICIENCY OR UNPLANNED COLLAPSE OF ANY PORTION OF THE STRUCTURE OR ADJACENT STRUCTURES PRIOR DEMOLITION SCHEDULE. CONTRACTOR TO CONTACT ARCHITECT IMMEDIATELY PRIOR TO REMOVING ANY CONCRETE OR OTHER STRUCTURAL ITEM. S. PRIOR TO COMMENCEMENT OF WORK, CONTRACTOR SHALL SUBMIT A MAINTENANCE OF PEDESTRIAN TRAFFIC (M.O.T.) PLANS FOR OWNER / LANDLORD APPROVAL. CONTRACTOR SHALL INDICATE ALL TEMPORARY WALLS REQUIRED, INTERMEDIATE SIGNAGE, AND M.O.T. INFORMATION. 10. COORDINATE ALL DEMOLTION WORK WITH ALL OTHERS TO INSURE WORK WILL PROGRESS WITHOUT INTERUPTION AND DELAYS. COORDINATE AND SCHEDULE THE WORK WITH THE OWNER / LANDLORD WHERE POSSIBLE DISTURBANCE MAY OCCUR AND OTHER POTENTIAL DISRUPTIONS OF OWNERS FUNCTIONS AND SERVICES MAY OCCUR ALL WORK AFFECTING OWNER'S FUNCTIONS AND ACTIVITIES, INCLUDING ACCOMPLISHING WORK, TO BE COMPLETED BY PHASING WITH OWNER'S APPROVAL. 11. ALL AREAS OUTSIDE OF INDICATED "SCOPE OF WORK" SHALL REMAIN UNDISTURBED UNLESS OTHERWISE NOTED. 12. CONTRACTOR SHALL BE RESPONSIBLE TO FIELD CHECK AND VERIFY ALL CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITION, AND NOTIFY THE OWNER AND ARCHITECT IF ANY DISCREPANCIES ARE FOUND. 13. THE CONTRACTOR IS TO PROTECT ALL EXISTING FINISHES AND SURFACES THROUGHOUT SPACE WHICH ARE NOT PART OF DEMOLITION, INCLUDING ALL EXISTING ELEVATORS, STAIRCASES, ENTRANCE LOBBIES, STORE FRONTS, AND SERVICE AREAS. THE CONTRACTOR WILL REPLACE OR REFINISH DAMAGED AREAS. PLACE PLYWOOD OR OTHER PROTECTIVE COATING OVER GRANITE t FABRIC PANELS AT FLOORS AND WALLS IF DESIGNATED TO REMAIN. 14. DEMOLITION DRAWINGS AND NOTES ARE ONLY TO ASSIST IN SHOWING THE SCOPE OF DEMOLITION WORK AND IS NOT INTENDED TO INDICATE ALL DEMOLITION. CONTRACTOR SHALL REMOVE ALL EXISTING ITEMS FOR A "BROOM CLEAN" SPACE. 15. CONTRACTOR SHALL PROTECT ALL EXISTING FACILITIES AND SITE UTILITIES FROM DAMAGE. 1(o.CONTRACTOR IS TO REMOVE OR CAP MECHANICAL ITEMS WHICH ARE NOT TO BE REUSED INCLUDING WIRING, CONDUITS, PIPES, DUCTWORK, ETC. 1- .CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING A TRASH/DEBRIS REMOVAL SERVICE FOR REMOVAL OF ALL DEBRIS FOR ALL TRADES AND WALL WORK RELATING TO THIS PROJECT. COORDINATE LOCATION OF DUMPSTER WITH OWNER 18- WIRING IS TO BE REMOVED BACK TO PANEL. WORK TO BE DONE BY AN ELECTRICAL CONTRACTOR CARE SHOULD BE TAKEN TO IDENTIFY ALL ELECTRICAL CONDUITS WHICH WILL REMAIN FOR BUILDING SYSTEMS AND TAGGED TO REMAIN. IS- PERIMETER GLAZING TO REMAIN SHALL HAVE PRECAUTIONS TAKEN TO PROTECT MATERIALS DURING CONSTRUCTION. CONTRACTOR WILL REPLACE ALL GLASS BROKEN DURING DEMOLITION. 20ALL LIGHTING FIXTURES ARE TO BE REMOVED AND STORED FOR POSSIBLE REUSE ON THE PROJECT UNLESS OTHERWISE NOTED. 21.UPON COMPLETION OF DEMOLITION WORK, CONTRACTOR SHALL REMOVE TOOLS, EQUIPMENT, AND DEMOLISHED MATERIALS FROM SITE. REMOVE PROTECTIONS, DEBRIS, RUBBISH, AND OTHER MATERIALS RESULTING FROM DEMOLITION WORK FROM BUILDING SITE. TRANSPORT AND LEGALLY DISPOSE OF MATERIALS OFF -SITE. r Revisions rr 0 I..L z 0 0 z w or x cy) w H p �� U � Q flu 0 V) (D " 0 - Fn 00 Ef 0 H 0 w Cn Ez oc 1-- 07 0 n � L� v J Q Z L 00 N N 0 O tC1 o co n N N U LL N oW� o 0 �I. oO W � O c m to co 0 Q I- a C CO a o E > a 0 =oWLo r N u� / Q0 W O L 0 ro � O LL 0 4L C E QU V o V Z Q Q\ y � 0 N � ' Q U ) 3 W W � m ' J Q 00 0 r C) z a U a Job No. 12 -014 Date 04/08/13 Sca e' ' SHOWN ' Seal) lr AA- 26001560 Sheet No. - r,:T 1. 0 CL Z coc c w C co 0- W cn t Y c a 0 U dh co co .Q a 0 C 0 c 0 U 0 c �u U U) rn .5 x 0 0 CO CIS U U a 0 cz C U, C6 C N cn CKS cz U co cm 0 12 o �o 0 E 0 U U) cz CO 0