Loading...
09-1027-003ABBREVIATIONS AB ANCHOR BOLT LB POUND AGGR AGGREGATE LL LIVE LOAD AL, ALUM ALUMINUM LT LIGHT AP ACCESS PANEL LG LONG APVD APPROVED MAX MAXIMUM APPROX APPROXIMATE MECH MECHANICAL ARCH ARCHITECTURAL) MEMB MEMBRANE ASPH ASPHALT MET METAL AUTO AUTOMATIC MFR MANUFACTURER AVE AVENUE MH MAN HOLE AVG AVERAGE MIN MINIMUM AL. CD. WD. ALUMINUM CLAD WOOD MISC MISCELLANEOUS BD BOARD MO MASONRY OPENING BITUM BITUMINOUS MOD MODULE/ MODULAR BLDG BUILDING MATL MATERIAL BLK BLOCK N NORTH BM BENCH MARK NIC NOT IN CONTRACT BOT BOTTOM NO NUMBER BRG BEARING NOM NOMINAL BLVD BOULEVARD NTS NOT TO SCALE CAB CABINET OA OVERALL CEM CEMENT OB OBSCURE CER CERAMIC OC ON CENTER CFLG COUNTER FLASHING OD OUTSIDE DIAMETER CFM CUBIC FEET PER MINUTE OPNG OPENING CI CAST IRON OPP OPPOSITE CIRC CIRCULAR, CIRCUMFERENCE OVHD OVERHEAD C.JT CONTROL JOINT OZ OUNCE CLG CEILING PSF POUNDS PER SQUARE FOOT CLO CLOSET PSI POUNDS PER SQUARE INCH CMU CONCRETE MASONRY UNIT PVC POLYVINYL CHLORIDE CO CLEAN OUT PC PIECE COL COLUMN PERP PERPENDICULAR CONC CONCRETE PL PLATE CONT CONTINUOUS- CONTINUED P/L PROPERTY LINE C to C CENTER TO CENTER PLAS PLASTER CCTV CLOSED CIRCUIT TELEVISION PLYWD PLYWOOD DET DETAIL PROP PROPERTY DIAG DIAGONAL PRCST PRECAST DIA DIAMETER PREFAB PREFABRICATED DIM DIMENSION PT POINT DL DEAD LOAD PTN PARTITION DN DOWN QTY QUANTITY DR DOOR RA RETURN AIR DBL DOUBLE RAD RADIUS DW DUMBWAITER CAR RD ROOF DRAIN DWG DRAWING READ REQUIRED DWR DRAWER REV REVERSE, REVISION E EAST RGD RIGID EA EACH RH RIGHT HAND EL ELEVATION RM ROOM ELEC ELECTRICAL, ELECTRIC RO ROUGH OPENING ELEV ELEVATOR RR RAILROAD EMER EMERGENCY R/W RIGHT OF WAY EQPT EQUIPMENT RECT RECTANGLE, RECTANGULAR EQUIV EQUIVALENT REINF REINFORCE, REINFORCING EXH EXHAUST S SOUTH EXST EXISTING SA SUPPLYAIR EXP JT EXPANSION JOINT SECT SECTION EXT EXTERIOR, EXTERNAL SIM SIMILAR EW EACH WAY SHT SHEET EWC ELECTRIC WATER COOLER SPEC SPECIFICATION FAB FABRICATED SPKR SPEAKER FD FLOOR DRAIN SQ SQUARE FIN FINISH SST STAINLESS STEEL FXTR FIXTURE ST STREET FL FLOOR STA STATION FLOUR FLUORESCENT STD STANDARD FDN FOUNDATION STL STEEL FT FOOT, FEET STR STRUCTURAL FTG FOOTING SURF SURFACE FUT FUTURE SUSP SUSPEND,SUSPENDED FEXT FIRE EXTINGUISHER SYS SYSTEM FH FIRE HYDRANT UL UNDERWRITER'S LABORATORY FEC FIRE EXTINGUISHING CABINET TEL TELEPHONE FHC FIRE HOSE CABINET TEMP TEMPERATURE GA GAGE, GAUGE T &G TONGUE AND GROOVE GAL GALLON THK THICK, THICKNESS GALV GALVANIZED T/R TOP OF RAIL GEN CONT GENERAL CONTRACTOR T /STL TOP OF STEEL GALVI GALVANIZED IRON TV TELEVISION GL GLASS T/W TOP OF WALL GYP. BD. GYPSUM BOARD TYP TYPICAL HC HOLLOW CORE T/S TOP OF SLAB HDW HARDWARE UGND UNDERGROUND HDWD HARDWOOD UNF UNFINISHED HR HOUR XHCI EXTRA HEAVY CAST IRON HM HOLLOW METAL VERT VERTICAL HORIZ HORIZONTAL V JT VEE JOINT H. PT HIGH POINT VOL VOLUME HGT HEIGHT W WEST HVAC HEATING/ VENTILATING W/ WITH A/C AIR CONDITIONING WC WATER CLOSET HWY HIGHWAY WD WOOD ID INSIDE DIAMETER W/O WITHOUT IN INCH WTRPRF WATERPROOF INCAND INCANDESCENT WT WEIGHT INSUL INSULATE, INSULATED, INSULATION WWF WELDED WIRE FABRIC INTR INTERIOR WP WORK POINT INVT INVERT YD YARD JT JOINT 1 GRAPHIC LEGEND O WU -101 1 A -115 tl 1 A-401 1 A -301 TB W -1 2 1 -118 3 0 4 WU -101 101 101 "m A I EXISTING WALL TO BE REMOVED 8" CONCRETE BLOCK WALL CAST -IN -PLACE CONCRETE WALL CONC. COL. REFER TO STRUCTURAL DRAWINGS FILLED CELL W/ CONC. 1 # 5 REFER TO STRUCTURAL DRAWINGS 4" OR 6" PARTITION WALL INSULATED PAR- PARTITION WALL STEEL COL. REFER TO STRUCTURAL DRAWINGS GLASS BLOCK UNIFORM DRAWING SYSTEM DISCIPLINE DESIGNATORS G GENERAL H HAZARDOUS MATERIALS C CIVIL L imnm�nnnnm�nnnn� S STRUCTURAL A ARCHITECTURAL I INTERIORS Q EQUIPMENT F FIRE PROTECTION P PLUMBING M MECHANICAL E ELECTRICAL T TELECOMMUNICATIONS R RESOURCE X, OTHER DISCIPLINES Z CONTRACTOR/SHOP DRAWINGS O WU -101 1 A -115 tl 1 A-401 1 A -301 TB W -1 2 1 -118 3 0 4 WU -101 101 101 "m A I EXISTING WALL TO BE REMOVED 8" CONCRETE BLOCK WALL CAST -IN -PLACE CONCRETE WALL CONC. COL. REFER TO STRUCTURAL DRAWINGS FILLED CELL W/ CONC. 1 # 5 REFER TO STRUCTURAL DRAWINGS 4" OR 6" PARTITION WALL INSULATED PAR- PARTITION WALL STEEL COL. REFER TO STRUCTURAL DRAWINGS GLASS BLOCK UNIFORM DRAWING SYSTEM DISCIPLINE DESIGNATORS G GENERAL H HAZARDOUS MATERIALS C CIVIL L LANDSCAPE S STRUCTURAL A ARCHITECTURAL I INTERIORS Q EQUIPMENT F FIRE PROTECTION P PLUMBING M MECHANICAL E ELECTRICAL T TELECOMMUNICATIONS R RESOURCE X, OTHER DISCIPLINES Z CONTRACTOR/SHOP DRAWINGS SHEET TYPE DESIGNATORS WALL SECTION BUILDING SECTION ELEVATION INDICATOR BORING INDICATOR BENCHMARK INDICATOR WALL TYPE CENTER LINE PROPERTY LINE OR BOUNDARY LINE INTERIOR ROOM ELEVATIONS WINDOW TYPE DOOR TYPE ROOM NUMBER REVISION INDICATOR GRID LINE INDICATOR MATCH LINE INDICATOR SHEET SEQUENCE NUMBER F-- DISCIPLINE DESIGNATORS -IEET SEQUENCE NUMBER SHEET TYPE DESIGNATOR GENERAL NOTES INSTRUCTION TO BIDDERS THE "INSTRUCTION TO BIDDERS ", DOCUMENTA -701 AND STANDARD FORM OF "AGREEMENT BETWEEN OWNERS AND CONTRACTOR ", DOCUMENT A- 101, ISSUED BY THE AMERICAN INSTITUTE OF ARCHITECTS, 1997 (AND ITS SUPPLEMENT IF ANY) RELATES DIRECTLY TO THE WORK OF THIS PROJECT AND IS HEREBY MADE PART OF THE CONTRACT AS THOUGH FULLY CONTAINED IN THESE SPECIFICATIONS. GENERAL CONDITIONS THE "GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION: DOCUMENT 201, ISSUED BY THE AMERICAN INSTITUTE OF ARCHITECTS, 1997, FOURTEENTH EDITION (AND ITS SUPPLEMENTS IF ANY) RELATED DIRECTLY TO THE WORK OF THIS PROJECT AND IS HEREBY MADE PART OF THE CONTRACT AS THOUGH FULLY CONTAINED IN THESE SPECIFICATIONS. THE CONTRACTOR IS HEREBY SPECIFICALLY DIRECTED, AS A CONDITION OF THE CONTRACT, TO OBTAIN THE NECESSARY NUMBER OF COPIES OF DOCUMENT A -201, TO ACQUAINT HIMSELF WITH THE ARTICLES CONTAINED THEREIN AND TO NOTIFY AND APPRAISE ALL SUBCONTRACTORS, SUPPLIERS, AND ANY OTHER PARTIES TO THE CONTRACTORS OR INDIVIDUALS OR AGENCIES ENGAGED ON THE WORKAS TO ITS CONTENTS. NO CONTRACTUAL ADJUSTMENTS SHALL BE DUE OR BECOME EXIGENT AS A RESULT OF FAILURE OF THE PART OF THE CONTRACTOR TO FULLY ACQUAINT HIMSELF AND ALL OTHER PARTIES TO THE CONTRACT WITH THE CONDITIONS OF DOCUMENT A -201. SHOULD THE NOTES OR DETAILS ON THE DRAWINGS DIRECTLY CONFLICT WITH PROVISIONS OF THE SPECIFICATIONS, SPECIFICATIONS SHALL SUPERCEDE UNLESS THE ARCHITECT SPECIFICALLY DIRECTS OTHERWISE. IN THE EVENT OF INCONSISTENCY WITHIN EITHER DOCUMENT, NOT CLARIFIED BY ADDENDUM, PROVIDE THE BETTER QUALITY OR GREATER QUANTITY OF WORK AS INTERPRETED BY THE ARCHITECT. EXECUTION, CORRELATION, INTENT AND INTERPRETATION BY EXECUTING THE CONTRACT, THE CONTRACTOR REPRESENTS THAT HE HAS VISITED THE SITE AND FAMILIARIZED HIMSELF WITH THE LOCAL CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED. THE DRAWINGS AND THE OUTLINE SPECIFICATIONS ARE INTENDED TO AGREE AND BE MUTUALLY EXPLANATORY AND SHALL BE ACCEPTED AND USED AS A WHOLE AND NOT SEPARATELY. SHOULD ANY ITEM BE OMITTED FROM THE DRAWINGS AND BE SPECIFIED IN THE OUTLINE SPECIFICATIONS, OR VICEVERSA, IT SHALL BE EXECUTED THE SAME AS IF SHOWN AS CONTAINED IN BOTH AT NO EXTRA COST TO THE OWNER, SHOULD ANYTHING BE OMITTED FROM THE DRAWINGS AND THE SPECIFICATIONS NECESSARY FOR THE PROPER CONSTRUCTION OF THE WORK HEREIN SPECIFIED, OR SHOULD ANY ERROR OR DISAGREEMENT BETWEEN THE SPECIFICATIONS AND DRAWINGS EXIST OR APPEAR TO EXIST, THE CONTRACTOR SHALL NOT AVAIL HIMSELF OF SUCH MANIFESTLY UNINTENTIONALLY ERROR OR OMISSION, BUT MUST HAVE SAME EXPLAINED OR ADJUSTED BY THE ARCHITECT BEFORE PROCEEDING WITH THE WORK IN QUESTION. THE ARCHITECT RESERVES THE RIGHT TO CHANGE THE DESIGN OF ANY DETAILS SHOWN IN THE ARCHITECTS DOCUMENTS WITHOUT ADDITIONAL COST, PROVIDED THAT THERE IS NO INCREASE IN THE AMOUNT OF MATERIALS, WORKMANSHIP AND COST TO THE CONTRACTOR, ANY CONFLICT OR INCONSISTENCY BETWEEN DRAWINGS AND SPECIFICATION, AND ANY DISCREPANCY BETWEEN THE FIGURES AND DRAWINGS SHALL BE SUBMITTED BY THE CONTRACTOR TO THE ARCHITECT, WHOSE DECISION THEREON SHALL BE CONCLUSIVE. DURING THE COURSE OF THE WORK, SHOULD ANY ERRORS, AMBIGUITIES, OR DISCREPANCIES BE FOUND ON THE DRAWINGS OR IN THE SPECIFICATIONS OR SHOULD THERE BE FOUND ANY DISCREPANCIES BETWEEN THE DRAWINGS AND THE SPECIFICATIONS TO WHICH THE CONTRACTOR HAS FAILED TO CALL ATTENTION BEFORE SUBMITTING HIS BID, THEN THE ARCHITECT WILL INTERPRET THE INTENT OF THE DRAWINGS AND SPECIFICATIONS AND THE CONTRACTOR HEREBY AGREES TO ABIDE BY THE ARCHITECTS INTERPRETATION AND AGREES TO CARRY OUT THE WORK IN ACCORDANCE WITH THE DECISION OF THE ARCHITECT. THE CONTRACTOR WILL BE HELD TO HAVE INCLUDED IN HIS PROPOSAL - AGREEMENT THE MOST EXPENSIVE MATERIAL AND OR METHOD OF CONSTRUCTION WHEREVER THE INTENT OF THE DRAWINGS OF SPECIFICATION IS NOT INDICATED CLEARLY. CONTRACTOR'S CONSTRUCTION SCHEDULE COMPLETE CONSTRUCTION SCHEDULE SHALL BE SUBMITTED TO THE ARCHITECT NO LATER THAN THIRTY (30) CALENDAR DAYS AFTER THE DATE OF THE AGREEMENT AND SHALL BE UPDATED DURING CONSTRUCTION AS REQUIRED TO KEEP IT CURRENT. NOTHING IN THIS REQUIREMENT SHALL BE DEEMED TO BE AN USURPATION OF THE CONTRACTOR'S AUTHORITY AND RESPONSIBILITY TO PLAN AND SCHEDULE THE WORK AS HE SEES IT FIT, SUBJECT TO ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS. SCHEDULE OF VALUES PREPARE SCHEDULES OF VALUES, AS REQUIRED BY GENERAL CONDITIONS, IN COORDINATION WITH PREPARATION OF PROGRESS SCHEDULE. PROVIDE BREAKDOWN OF CONTRACT SUM IN SUFFICIENT DETAIL TO FACILITATE CONTINUED EVALUATION OF PAYMENT REQUESTS AND PROGRESS REPORTS, BREAKDOWN PRINCIPAL SUBCONTRACT AMOUNTS INTO SEVERAL LINE ITEMS. ROUND OFF TO NEAREST WHOLE DOLLAR, BUT WITH TOTAL EQUAL TO CONTRACT SUM. SUBMIT THREE COPIES OF SCHEDULE OF VALUES TO ARCHITECT AND OWNER FOR REVIEW AND APPROVAL. COORDINATION AND MEETINGS WEEKLY COORDINATING MEETING - IN ADDITION TO SPECIFIC PRE - INSTALLATION MEETINGS, COORDINATION MEETINGS FOR EACH MAJOR ELEMENT OF WORK, REGULAR MEETINGS FOR THE PURPOSES, HOLD MONTHLY GENERAL PROJECT COORDINATION MEETINGS AT REGULARLY SCHEDULED TIMES ARE CONVENIENT FOR EVERYONE INVOLVED. REQUEST REPRESENTATION (AT EACH MEETING) BY EVERY ENTITY CURRENTLY INVOLVED IN COORDINATION OR PLANNING FOR WORK OF ENTIRE PROJECT. CONDUCT MEETINGS IN MANNER WHICH WILL RESOLVE COORDINATION PROBLEMS. RECORD RESULTS OF MEETINGS, DISTRIBUTE COPIES TO EVERYONE IN ATTENDANCE, TO OTHERS AFFECTED BY DECISIONS OR ACTIONS RESULTING FROM EACH MEETING. ARCHITECT/ ENGINEER SITE VISITS IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO REQUEST IN WRITING WITH 24 HRS. NOTICE IN ORDER FOR THE ARCHITECT/ ENGINEER TO PROVIDE THE NECESSARY SITE OBSERVATIONS AND ISSUE A COMPLIANCE LETTER. SHOP DRAWINGS AND SAMPLES THE CONTRACTOR SHALL APPROVE ALL SHOP DRAWINGS PRIOR TO SUBMITTING SHOP DRAWING AND SAMPLES, THEREBY REPRESENTING THAT HE HAS DETERMINED AND VERIFIED ALL FIELD MEASUREMENTS, FIELD CONSTRUCTION CRITERIA, MATERIALS, CATALOGS NUMBERS AND SIMILAR DATA, AND THAT HE HAS CHECKED AND COORDINATED EACH SHOP DRAWING AND SAMPLE WITH THE REQUIREMENTS OF THE CONTRACT DOCUMENT. THE ARCHITECT WILL REVIEW AND APPROVE SHOP DRAWINGS AND SAMPLES WITH REASONABLE PROMPTNESS SO AS TO CAUSE NO DELAY, BUT ONLY FOR CONFORMANCE WITH DESIGN CONCEPT OF THE PROJECT AND WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS. THE ARCHITECT'S APPROVAL OF A SEPERATE ITEM SHAL NOT INDICATE APPROVAL OF AN ASSEMBLY IN WHICH THE ITEM FUNCTIONS. THE ARCHITECT'S APPROVAL OF SHOP DRAWING OR SAMPLES SHALL NOT RELIEVE THE CONTRACTOR OF RESPONSIBILTY FOR ANY DEVIATION FROM THE REQUIREMENTS OF THE CONTRACT DOCUMENTS UNLESS THE CONTRACTOR HAS INFORMED THE ARCHITECT IN WRITING OF SUCH DEVIATION AT THE TIME OF SUBMISSION AND THE ARCHITECT HAS GIVEN WRITTEN APPROVAL TO THE SPECIFIC DEVIATION, NOR SHALL THE ARCHITECTS APPROVAL RELIEVE THE CONTRACTOR FROM RESPONSIBILTY FOR ERRORS OR OMISSIONS IN THE SHOP DRAWINGS OR SAMPLES. NO PORTION OF THE WORK REQUIRING A SHOP DRAWING OR SAMPLES SUBMISSION SHALL BE COMMENCED UNTIL THE SUBMISSION HAS BEEN APPROVED BY THE ARCHITECT. ALL SUCH PORTIONS OF THE WORK SHALL BE IN ACCORDANCE WITH APPROVED SHOP DRAWINGS AND SAMPLES. CONTRACTOR SHALL SUBMIT FOUR SETS OF PRINTS OF ALL SHOP DRAWINGS. CLEANING UP THE CONTRACTOR AT ALL TIMES SHALL KEEP THE PREMISES FREE FROM ACCUMULATION OF WASTE MATERIALS OR RUBBISH CAUSED BY HIS OPERATIONS. AT LEAST WEEKLY, DURING THE CONSTRUCTION PHASE, AND AT THE COMPLETION OF THE WORK HE SHALL REMOVE ALL HIS WASTE MATERIALS AND RUBBISH FROM AND ABOUT THE PROJECT AS WELL AS ALL HIS TOOLS, CONSTRUCTION EQUIPMENT, MACHINERY AND SURPLUS MATERIALS, AND SHALL CLEAN ALL GLASS SURFACES AND LEAVE THE WORKS "BROOM CLEAN ", EXCEPT AS OTHERWISE SPECIFIED. TEMPORARY UTILITIES AND FACILITIES CONTRACTOR SHALL MAINTAIN ALL TEMPORARY UTILITIES, FACILITIES, FIELD OFFICES, SHEDS AND STORAGE AS REQUIRED AS LONG AS NEEDED FOR THE COMPLETION OF THE WORK. REMOVE ALL SUCH TEMPORARY INSTALLATION AT COMPLETION OF THE WORK AND RESTORE AREAS TO ORIGINAL CONDITIONS. MATERIALS FOR TEMPORARY UTILITIES MAY BE NEW OR USED, BUT MUST BE SUITABLE FOR INTENDED PURPOSE AND ADEQUATE IN APPLICABLE CODES AND STANDARDS. ARRANGE WITH UTILITY COMPANY, PROVIDE SERVICE REQUIRED FOR POWER AND LIGHTING, WATER, TELEPHONE AND PAY ALL COSTS FOR SERVICE AND FOR UTILITIES USED. TEMPORARY SUPPORT FACILITIES TYPES OF TEMPORARY FACILITIES REQUIRED INCLUDE, BUT NOT BY WAY OF LIMITATION, FIELD OFFICES, STORAGE SHEDS, FABRICATION SHEDS, SANITARY FACILITIES, BULLETIN BOARD, PRIVATE, PUBLIC PHONE, CLOCKS, THERMOMETER, PROJECT IDENTIFICATION SIGNS, CLEAN UP FACILITIES, WASTE DISPOSAL SERVICE, RODENT AND PEST CONTROL, SIMILAR MISCELLANEOUS GENERAL SERVICES, ALL AS MAY BE REASONABLY REQUIRED FOR PROFICIENT PERFORMANCE OF WORK. ACCOMODATION OF PERSONNEL AT SITE INCLUDING OWNER'S, ARCHITECT'S PERSONNEL. LOCATE TEMPORARY SUPPORT FACILITIES FOR CONVENIENCE OF USERS, FOR MINIMUM INTERFERENCE WITH CONSTRUCTION ACTIVITIES. PROJECT RECORD DOCUMENTS MAINTAIN AT THE SITE OF THE OWNER, ONE RECORD OF: DRAWINGS ADDENDA(S) SPECIFICATIONS CHANGE ORDERS AND OTHERS MODIFICATIONS TO THE CONTRACT ARCHITECT FIELD ORDERED OR WRITTEN INSTRUCTIONS APPROVED SHOP DRAWINGS, PRODUCT DATA AND SAMPLES FIELD TEST RECORDS CONSTRUCTION PHOTOGRAPHS MAKE DOCUMENTS AND SAMPLES AVAILABLE AT ALL TIMES FOR INSPECTION BY ARCHITECT, OR ARCHITECTS FIELD REPPRESENTATIVE, OR OWNER. RECORD DRAWINGS - MAINTAIN A WHITE -PRINT SET ( BLUE -LINE OR BLACK -LINE) OF CONTRACT DRAWINGS AND SHOP DRAWINGS IN CLEAN UNDAMAGED CONDITION, WITH MARK -UP OF ACTUAL INSTALLATIONS WHICH VARY SUBSTANTIALLY FROM WORK AS ORIGINALLY SHOWN. MARK WHICH EVER DRAWING IS MOST CAPABLE OF SHOWING "FIELD" CONDITION FULLY, ACCURATELY, HOWEVER WHERE SHOP DRAWINGS ARE USED FOR MARK -UP, RECORD CROSS REFERENCE AT CORRESPONDING LOCATION OF WORKING DRAWINGS. MARK WITH RED ERASABLE PENCIL, WHERE FEASIBLE, USE OTHER COLORS TO DISTINGUISH BETWEEN VARIATIONS IN SEPERATE CATEGORIES OF WORK, MARK UP NEW INFORMATION WHICH IS RECOGNIZED TO BE OF IMPORTANCE TO OWNER, BUT WAS FOR SOME REASON NOT SHOWN ON EITHER CONTRACT DRAWINGS OR SHOP DRAWINGS. GIVE PARTICULAR ATTENTION TO CONCEALED WORK, WHICH WOULD BE DIFFICULT TO MEASURE, RECORD AT A LATER DATE. NOTE RELATED CHANGE ORDER NUMBERS WHERE APPLICABLE. ORGANIZE RECORD DRAWINGS SHEET INTO MANAGEABLE SETS, BIND WITH DURABLE PAPER COVER SHEETS, PRINT SUITABLE TITLES, DATES AND OTHER IDENTIFICATINS ON COVER OF EACH SET. AT CONTRACT CLOSE -OUT, DELIVER RECORD DOCUMENTS TO ARCHITECT FOR THE OWNER. C;I.I,,i ;r: i j iV11Al4tl BUILDING DEPT. STRUCTURfikt SECTION APPROVED BY: v re 0 GENERAL (SYMBOLS LEGEND, NOTES, ETC.) 1 PLANS (HORIZONTAL VIEWS) DOOR, REFER TO 2 ELEVATIONS (VERTICAL VIEWS) SCHEDULE 3 SECTIONS (SECTIONAL VIEWS) LG 4 LARGE SCALE VIEWS (PLANS, ELEVATIONS, OR SECTIONS, NOT DETAILS) 5 DETAILS 6 SCHEDULES AND DIAGRAMS WINDOW, REFER TO 7 USER DEFINED (FOR TYPES WHICH DO NOT FALL IN OTHER CATEGORIES) SCHEDULE cn o 8 USER DEFINED (FOR TYPES WHICH DO NOT FALL IN OTHER CATEGORIES) l^ ^�� 9 END PAGE RESERVED FOR CITY COMMENTS DETAIL ~ o L F- WALL SECTION BUILDING SECTION ELEVATION INDICATOR BORING INDICATOR BENCHMARK INDICATOR WALL TYPE CENTER LINE PROPERTY LINE OR BOUNDARY LINE INTERIOR ROOM ELEVATIONS WINDOW TYPE DOOR TYPE ROOM NUMBER REVISION INDICATOR GRID LINE INDICATOR MATCH LINE INDICATOR SHEET SEQUENCE NUMBER F-- DISCIPLINE DESIGNATORS -IEET SEQUENCE NUMBER SHEET TYPE DESIGNATOR GENERAL NOTES INSTRUCTION TO BIDDERS THE "INSTRUCTION TO BIDDERS ", DOCUMENTA -701 AND STANDARD FORM OF "AGREEMENT BETWEEN OWNERS AND CONTRACTOR ", DOCUMENT A- 101, ISSUED BY THE AMERICAN INSTITUTE OF ARCHITECTS, 1997 (AND ITS SUPPLEMENT IF ANY) RELATES DIRECTLY TO THE WORK OF THIS PROJECT AND IS HEREBY MADE PART OF THE CONTRACT AS THOUGH FULLY CONTAINED IN THESE SPECIFICATIONS. GENERAL CONDITIONS THE "GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION: DOCUMENT 201, ISSUED BY THE AMERICAN INSTITUTE OF ARCHITECTS, 1997, FOURTEENTH EDITION (AND ITS SUPPLEMENTS IF ANY) RELATED DIRECTLY TO THE WORK OF THIS PROJECT AND IS HEREBY MADE PART OF THE CONTRACT AS THOUGH FULLY CONTAINED IN THESE SPECIFICATIONS. THE CONTRACTOR IS HEREBY SPECIFICALLY DIRECTED, AS A CONDITION OF THE CONTRACT, TO OBTAIN THE NECESSARY NUMBER OF COPIES OF DOCUMENT A -201, TO ACQUAINT HIMSELF WITH THE ARTICLES CONTAINED THEREIN AND TO NOTIFY AND APPRAISE ALL SUBCONTRACTORS, SUPPLIERS, AND ANY OTHER PARTIES TO THE CONTRACTORS OR INDIVIDUALS OR AGENCIES ENGAGED ON THE WORKAS TO ITS CONTENTS. NO CONTRACTUAL ADJUSTMENTS SHALL BE DUE OR BECOME EXIGENT AS A RESULT OF FAILURE OF THE PART OF THE CONTRACTOR TO FULLY ACQUAINT HIMSELF AND ALL OTHER PARTIES TO THE CONTRACT WITH THE CONDITIONS OF DOCUMENT A -201. SHOULD THE NOTES OR DETAILS ON THE DRAWINGS DIRECTLY CONFLICT WITH PROVISIONS OF THE SPECIFICATIONS, SPECIFICATIONS SHALL SUPERCEDE UNLESS THE ARCHITECT SPECIFICALLY DIRECTS OTHERWISE. IN THE EVENT OF INCONSISTENCY WITHIN EITHER DOCUMENT, NOT CLARIFIED BY ADDENDUM, PROVIDE THE BETTER QUALITY OR GREATER QUANTITY OF WORK AS INTERPRETED BY THE ARCHITECT. EXECUTION, CORRELATION, INTENT AND INTERPRETATION BY EXECUTING THE CONTRACT, THE CONTRACTOR REPRESENTS THAT HE HAS VISITED THE SITE AND FAMILIARIZED HIMSELF WITH THE LOCAL CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED. THE DRAWINGS AND THE OUTLINE SPECIFICATIONS ARE INTENDED TO AGREE AND BE MUTUALLY EXPLANATORY AND SHALL BE ACCEPTED AND USED AS A WHOLE AND NOT SEPARATELY. SHOULD ANY ITEM BE OMITTED FROM THE DRAWINGS AND BE SPECIFIED IN THE OUTLINE SPECIFICATIONS, OR VICEVERSA, IT SHALL BE EXECUTED THE SAME AS IF SHOWN AS CONTAINED IN BOTH AT NO EXTRA COST TO THE OWNER, SHOULD ANYTHING BE OMITTED FROM THE DRAWINGS AND THE SPECIFICATIONS NECESSARY FOR THE PROPER CONSTRUCTION OF THE WORK HEREIN SPECIFIED, OR SHOULD ANY ERROR OR DISAGREEMENT BETWEEN THE SPECIFICATIONS AND DRAWINGS EXIST OR APPEAR TO EXIST, THE CONTRACTOR SHALL NOT AVAIL HIMSELF OF SUCH MANIFESTLY UNINTENTIONALLY ERROR OR OMISSION, BUT MUST HAVE SAME EXPLAINED OR ADJUSTED BY THE ARCHITECT BEFORE PROCEEDING WITH THE WORK IN QUESTION. THE ARCHITECT RESERVES THE RIGHT TO CHANGE THE DESIGN OF ANY DETAILS SHOWN IN THE ARCHITECTS DOCUMENTS WITHOUT ADDITIONAL COST, PROVIDED THAT THERE IS NO INCREASE IN THE AMOUNT OF MATERIALS, WORKMANSHIP AND COST TO THE CONTRACTOR, ANY CONFLICT OR INCONSISTENCY BETWEEN DRAWINGS AND SPECIFICATION, AND ANY DISCREPANCY BETWEEN THE FIGURES AND DRAWINGS SHALL BE SUBMITTED BY THE CONTRACTOR TO THE ARCHITECT, WHOSE DECISION THEREON SHALL BE CONCLUSIVE. DURING THE COURSE OF THE WORK, SHOULD ANY ERRORS, AMBIGUITIES, OR DISCREPANCIES BE FOUND ON THE DRAWINGS OR IN THE SPECIFICATIONS OR SHOULD THERE BE FOUND ANY DISCREPANCIES BETWEEN THE DRAWINGS AND THE SPECIFICATIONS TO WHICH THE CONTRACTOR HAS FAILED TO CALL ATTENTION BEFORE SUBMITTING HIS BID, THEN THE ARCHITECT WILL INTERPRET THE INTENT OF THE DRAWINGS AND SPECIFICATIONS AND THE CONTRACTOR HEREBY AGREES TO ABIDE BY THE ARCHITECTS INTERPRETATION AND AGREES TO CARRY OUT THE WORK IN ACCORDANCE WITH THE DECISION OF THE ARCHITECT. THE CONTRACTOR WILL BE HELD TO HAVE INCLUDED IN HIS PROPOSAL - AGREEMENT THE MOST EXPENSIVE MATERIAL AND OR METHOD OF CONSTRUCTION WHEREVER THE INTENT OF THE DRAWINGS OF SPECIFICATION IS NOT INDICATED CLEARLY. CONTRACTOR'S CONSTRUCTION SCHEDULE COMPLETE CONSTRUCTION SCHEDULE SHALL BE SUBMITTED TO THE ARCHITECT NO LATER THAN THIRTY (30) CALENDAR DAYS AFTER THE DATE OF THE AGREEMENT AND SHALL BE UPDATED DURING CONSTRUCTION AS REQUIRED TO KEEP IT CURRENT. NOTHING IN THIS REQUIREMENT SHALL BE DEEMED TO BE AN USURPATION OF THE CONTRACTOR'S AUTHORITY AND RESPONSIBILITY TO PLAN AND SCHEDULE THE WORK AS HE SEES IT FIT, SUBJECT TO ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS. SCHEDULE OF VALUES PREPARE SCHEDULES OF VALUES, AS REQUIRED BY GENERAL CONDITIONS, IN COORDINATION WITH PREPARATION OF PROGRESS SCHEDULE. PROVIDE BREAKDOWN OF CONTRACT SUM IN SUFFICIENT DETAIL TO FACILITATE CONTINUED EVALUATION OF PAYMENT REQUESTS AND PROGRESS REPORTS, BREAKDOWN PRINCIPAL SUBCONTRACT AMOUNTS INTO SEVERAL LINE ITEMS. ROUND OFF TO NEAREST WHOLE DOLLAR, BUT WITH TOTAL EQUAL TO CONTRACT SUM. SUBMIT THREE COPIES OF SCHEDULE OF VALUES TO ARCHITECT AND OWNER FOR REVIEW AND APPROVAL. COORDINATION AND MEETINGS WEEKLY COORDINATING MEETING - IN ADDITION TO SPECIFIC PRE - INSTALLATION MEETINGS, COORDINATION MEETINGS FOR EACH MAJOR ELEMENT OF WORK, REGULAR MEETINGS FOR THE PURPOSES, HOLD MONTHLY GENERAL PROJECT COORDINATION MEETINGS AT REGULARLY SCHEDULED TIMES ARE CONVENIENT FOR EVERYONE INVOLVED. REQUEST REPRESENTATION (AT EACH MEETING) BY EVERY ENTITY CURRENTLY INVOLVED IN COORDINATION OR PLANNING FOR WORK OF ENTIRE PROJECT. CONDUCT MEETINGS IN MANNER WHICH WILL RESOLVE COORDINATION PROBLEMS. RECORD RESULTS OF MEETINGS, DISTRIBUTE COPIES TO EVERYONE IN ATTENDANCE, TO OTHERS AFFECTED BY DECISIONS OR ACTIONS RESULTING FROM EACH MEETING. ARCHITECT/ ENGINEER SITE VISITS IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO REQUEST IN WRITING WITH 24 HRS. NOTICE IN ORDER FOR THE ARCHITECT/ ENGINEER TO PROVIDE THE NECESSARY SITE OBSERVATIONS AND ISSUE A COMPLIANCE LETTER. SHOP DRAWINGS AND SAMPLES THE CONTRACTOR SHALL APPROVE ALL SHOP DRAWINGS PRIOR TO SUBMITTING SHOP DRAWING AND SAMPLES, THEREBY REPRESENTING THAT HE HAS DETERMINED AND VERIFIED ALL FIELD MEASUREMENTS, FIELD CONSTRUCTION CRITERIA, MATERIALS, CATALOGS NUMBERS AND SIMILAR DATA, AND THAT HE HAS CHECKED AND COORDINATED EACH SHOP DRAWING AND SAMPLE WITH THE REQUIREMENTS OF THE CONTRACT DOCUMENT. THE ARCHITECT WILL REVIEW AND APPROVE SHOP DRAWINGS AND SAMPLES WITH REASONABLE PROMPTNESS SO AS TO CAUSE NO DELAY, BUT ONLY FOR CONFORMANCE WITH DESIGN CONCEPT OF THE PROJECT AND WITH THE INFORMATION GIVEN IN THE CONTRACT DOCUMENTS. THE ARCHITECT'S APPROVAL OF A SEPERATE ITEM SHAL NOT INDICATE APPROVAL OF AN ASSEMBLY IN WHICH THE ITEM FUNCTIONS. THE ARCHITECT'S APPROVAL OF SHOP DRAWING OR SAMPLES SHALL NOT RELIEVE THE CONTRACTOR OF RESPONSIBILTY FOR ANY DEVIATION FROM THE REQUIREMENTS OF THE CONTRACT DOCUMENTS UNLESS THE CONTRACTOR HAS INFORMED THE ARCHITECT IN WRITING OF SUCH DEVIATION AT THE TIME OF SUBMISSION AND THE ARCHITECT HAS GIVEN WRITTEN APPROVAL TO THE SPECIFIC DEVIATION, NOR SHALL THE ARCHITECTS APPROVAL RELIEVE THE CONTRACTOR FROM RESPONSIBILTY FOR ERRORS OR OMISSIONS IN THE SHOP DRAWINGS OR SAMPLES. NO PORTION OF THE WORK REQUIRING A SHOP DRAWING OR SAMPLES SUBMISSION SHALL BE COMMENCED UNTIL THE SUBMISSION HAS BEEN APPROVED BY THE ARCHITECT. ALL SUCH PORTIONS OF THE WORK SHALL BE IN ACCORDANCE WITH APPROVED SHOP DRAWINGS AND SAMPLES. CONTRACTOR SHALL SUBMIT FOUR SETS OF PRINTS OF ALL SHOP DRAWINGS. CLEANING UP THE CONTRACTOR AT ALL TIMES SHALL KEEP THE PREMISES FREE FROM ACCUMULATION OF WASTE MATERIALS OR RUBBISH CAUSED BY HIS OPERATIONS. AT LEAST WEEKLY, DURING THE CONSTRUCTION PHASE, AND AT THE COMPLETION OF THE WORK HE SHALL REMOVE ALL HIS WASTE MATERIALS AND RUBBISH FROM AND ABOUT THE PROJECT AS WELL AS ALL HIS TOOLS, CONSTRUCTION EQUIPMENT, MACHINERY AND SURPLUS MATERIALS, AND SHALL CLEAN ALL GLASS SURFACES AND LEAVE THE WORKS "BROOM CLEAN ", EXCEPT AS OTHERWISE SPECIFIED. TEMPORARY UTILITIES AND FACILITIES CONTRACTOR SHALL MAINTAIN ALL TEMPORARY UTILITIES, FACILITIES, FIELD OFFICES, SHEDS AND STORAGE AS REQUIRED AS LONG AS NEEDED FOR THE COMPLETION OF THE WORK. REMOVE ALL SUCH TEMPORARY INSTALLATION AT COMPLETION OF THE WORK AND RESTORE AREAS TO ORIGINAL CONDITIONS. MATERIALS FOR TEMPORARY UTILITIES MAY BE NEW OR USED, BUT MUST BE SUITABLE FOR INTENDED PURPOSE AND ADEQUATE IN APPLICABLE CODES AND STANDARDS. ARRANGE WITH UTILITY COMPANY, PROVIDE SERVICE REQUIRED FOR POWER AND LIGHTING, WATER, TELEPHONE AND PAY ALL COSTS FOR SERVICE AND FOR UTILITIES USED. TEMPORARY SUPPORT FACILITIES TYPES OF TEMPORARY FACILITIES REQUIRED INCLUDE, BUT NOT BY WAY OF LIMITATION, FIELD OFFICES, STORAGE SHEDS, FABRICATION SHEDS, SANITARY FACILITIES, BULLETIN BOARD, PRIVATE, PUBLIC PHONE, CLOCKS, THERMOMETER, PROJECT IDENTIFICATION SIGNS, CLEAN UP FACILITIES, WASTE DISPOSAL SERVICE, RODENT AND PEST CONTROL, SIMILAR MISCELLANEOUS GENERAL SERVICES, ALL AS MAY BE REASONABLY REQUIRED FOR PROFICIENT PERFORMANCE OF WORK. ACCOMODATION OF PERSONNEL AT SITE INCLUDING OWNER'S, ARCHITECT'S PERSONNEL. LOCATE TEMPORARY SUPPORT FACILITIES FOR CONVENIENCE OF USERS, FOR MINIMUM INTERFERENCE WITH CONSTRUCTION ACTIVITIES. PROJECT RECORD DOCUMENTS MAINTAIN AT THE SITE OF THE OWNER, ONE RECORD OF: DRAWINGS ADDENDA(S) SPECIFICATIONS CHANGE ORDERS AND OTHERS MODIFICATIONS TO THE CONTRACT ARCHITECT FIELD ORDERED OR WRITTEN INSTRUCTIONS APPROVED SHOP DRAWINGS, PRODUCT DATA AND SAMPLES FIELD TEST RECORDS CONSTRUCTION PHOTOGRAPHS MAKE DOCUMENTS AND SAMPLES AVAILABLE AT ALL TIMES FOR INSPECTION BY ARCHITECT, OR ARCHITECTS FIELD REPPRESENTATIVE, OR OWNER. RECORD DRAWINGS - MAINTAIN A WHITE -PRINT SET ( BLUE -LINE OR BLACK -LINE) OF CONTRACT DRAWINGS AND SHOP DRAWINGS IN CLEAN UNDAMAGED CONDITION, WITH MARK -UP OF ACTUAL INSTALLATIONS WHICH VARY SUBSTANTIALLY FROM WORK AS ORIGINALLY SHOWN. MARK WHICH EVER DRAWING IS MOST CAPABLE OF SHOWING "FIELD" CONDITION FULLY, ACCURATELY, HOWEVER WHERE SHOP DRAWINGS ARE USED FOR MARK -UP, RECORD CROSS REFERENCE AT CORRESPONDING LOCATION OF WORKING DRAWINGS. MARK WITH RED ERASABLE PENCIL, WHERE FEASIBLE, USE OTHER COLORS TO DISTINGUISH BETWEEN VARIATIONS IN SEPERATE CATEGORIES OF WORK, MARK UP NEW INFORMATION WHICH IS RECOGNIZED TO BE OF IMPORTANCE TO OWNER, BUT WAS FOR SOME REASON NOT SHOWN ON EITHER CONTRACT DRAWINGS OR SHOP DRAWINGS. GIVE PARTICULAR ATTENTION TO CONCEALED WORK, WHICH WOULD BE DIFFICULT TO MEASURE, RECORD AT A LATER DATE. NOTE RELATED CHANGE ORDER NUMBERS WHERE APPLICABLE. ORGANIZE RECORD DRAWINGS SHEET INTO MANAGEABLE SETS, BIND WITH DURABLE PAPER COVER SHEETS, PRINT SUITABLE TITLES, DATES AND OTHER IDENTIFICATINS ON COVER OF EACH SET. AT CONTRACT CLOSE -OUT, DELIVER RECORD DOCUMENTS TO ARCHITECT FOR THE OWNER. C;I.I,,i ;r: i j iV11Al4tl BUILDING DEPT. STRUCTURfikt SECTION APPROVED BY: v re a G tL ui 0 0 V) V) F_ LG Q _co cn o C E l^ ^�� 0 ~ o L F- _o v LL 9- �i v0 w 0 o c .r- p � c c :) °' W (L 0 Q m rn o- a m , o Q O M 75 ° N ` 0 a Z Apr O n ai T L n 1� I— L0 O d 0 0 0 0 W a� o N 0 Lp - o 0 0 U Lu LL! w ❑ ~ M CO LL Lu n- ~ � U) 3 � ti F- ~ 0 oes 0 co n 00 LO t 0 0 0 0 w w Md mm M Z o 3: > O o w0 ? �w o _I =- Q O c� co 0 0 0 0 DATE: 10/20/2009 DRAWN BY: ABA CHECKED BY: JLGP REVISIONS: PROJECT NUMBER: 2009 -08 SHEET: A -002 OF 0 © COPYRIGHT 2009 0 a G tL ui 0 0 V) V)