Loading...
09-177-003J O I S T S C H E D U L E SHT # I (SECOND FLOOR MARK QTY. LENGTH TYPE STRAND PATTERN REL. CROWN SNORE LOAD S.I.L. SLAB Vu SPECIAL CONDITION SPECIAL SHEAR STEEL ONE END OTHER END OTHER JIOO 4 24' -2' 12'J 38H -PL 25, 45, 65 0.65 3500 3/4' 1 1W 3S 4.8 15 4- 129 STD. STD. TYPE MK# QTY. .1101 10 22' -6' CROWN FULL Mu Vu MK • CONDITION RELEASE 3500 x M -200 1 -3' 24'Xbii2' 5 ,52' +20504' 5*4' x20' MIDSPAN j Iii' 36' 650 215 55-1 STD- STD - M -201 2 J102 3 19'-10' 24 '5 ®4` •4 ®8' BAL 1�2' 800 225 SB -2 1 '/2' 3.9 5®4' #2"45X38' MIDSPAN STD. STD. J103 2 14-1' -2925'X35' MIDSPAN 3 /8' 1 4, 31 105 STD. STD. 4300 J104 3 19 ° -10' - 2g.45>�5' MIDBPAN 1/2' I%3 3.9 105/15 X BRACING STD. STD. ALL PANELS 20K 20K 20K 20K WPg SCAFF. TOWER SCAFF. TOUTER SCAFF. TOUTER SCAFF. TOWER HEAVY DUTY HEAVY DUTY HEAVY DUTY J200 2 12' -10' 16'J 38H -PL 3,5'-1 0.65 3500 1i4' 1�WPS 3.6 105 4' 13.1 STD- STD - J2 @1 25 31' -I' SI3H -1PT 3, 5, 1, 9, Il (15') 134' ®lj3 1.1 15/105 2@5 STD. STD. J202 4 36' -9' ❑ ❑ 15/05 STD. SF_ J203 1 31' -0' 15/105 STD. SF_ J204 21 29' -3" 48H-PL 3, 5, 1, 9 y8' 6 0 105 16.1 STD. STD. J205 5 28' -11' + 105 , STD. SF- J206 1 23' -8' 361 -1 -PL 3, 5, 1 lie ®Ijg 4.9 105 13.1 STD. SF- SECOND FLOOR (SHT. #1) rVlCI- IIIYG3 VC I AAIL- GONG. SLAB rBYOW ARCH ITECT /ENGINEER- OF- RECORD/TILT -UP SPECIALTY ENGINEER/G.Q. NOTE:° MELF-W a"e°D IT 15 THE RESPONSIBILITY OF THE TILT -UP SPECIALTY ENGINEER TO.D- ESil.�i�l A�J.p ;�CTA' -THE CONCRETE BY SPJ. LEDGERS AS PER PCI DESIGN HANDBOOK LATEST EDITION. SPECIAL ATTENTION IS REQUIRED WHEN DESIGNING AND DETAILING THE REINFORCING AT THE END OF THE LEDGER SINCE JOISTS WILL BEAR ON OR NEAR THE END OF THESE LEDGERS. THE FOLLOWING ARE TWO OF TF� $TAtiCA�D FCi.,DET:^15 FOR SUCH • , CONDITION. THESE ARE ONLY RECOMMENDATIONS, THE TILT -UP 5PEC'ALTY ENGINEER IS REaJIRED TO DESIGN EACH CONDITION AS JOB SPECIFIC. r 5' 2' 2' -3' I n L # �GR� n 2 # 4 GR 60 # GR-60 SHEAR FRICTION CONNECTION DETAIL 16° JOIST -0' -TO EQUAL EQUAL ' -0' -TO I WPS SHORE A 1 T -0' J103, J200 SHORING BEAM— BY OTHERS (TYP.) SHORING LAYOUT WPS = WOOD POST SHORE EQUAL EQUAL EQUAL ' -0' -TO 2 UPS 0 SHORE 0 1/3 T -0' J201, J202, J203, J204, J205 SHORING BEAM— BY OTHERS (TYP.) SHORING LAYOUT SOFFIT SCAFFOLD LAYOUT M -201, M -202 EQUAL EQUAL EQUAL ' -0' -TO I WPS SHORE ® 1/3 21-01 J100, J101, J102, J104, J206 SHORING BEAM BY OTHERS (TYP.) SHORING LAYOUT WPS = WOOD POST SHORE ELEVATION X BRACING ALL PANELS 20K SCAFF. TOWER HEAVY DUTY (TYP.) r —WPS NAILER F F I T B E A M S C H E D n•�uc,!•! ouT. rTYPa BY OTiffR55 T4T -LIP cEL ANGLE BY SPJ. PLYWOOD AFFIXED (BY or TYP. (U.O.N.) TO TILT -UP PANEL a BY OTF$Ra I'-� FORMINGS DETAIL r 5' 2' 2' -3' I n L # �GR� n 2 # 4 GR 60 # GR-60 SHEAR FRICTION CONNECTION DETAIL 16° JOIST -0' -TO EQUAL EQUAL ' -0' -TO I WPS SHORE A 1 T -0' J103, J200 SHORING BEAM— BY OTHERS (TYP.) SHORING LAYOUT WPS = WOOD POST SHORE EQUAL EQUAL EQUAL ' -0' -TO 2 UPS 0 SHORE 0 1/3 T -0' J201, J202, J203, J204, J205 SHORING BEAM— BY OTHERS (TYP.) SHORING LAYOUT SOFFIT SCAFFOLD LAYOUT M -201, M -202 EQUAL EQUAL EQUAL ' -0' -TO I WPS SHORE ® 1/3 21-01 J100, J101, J102, J104, J206 SHORING BEAM BY OTHERS (TYP.) SHORING LAYOUT WPS = WOOD POST SHORE ELEVATION X BRACING ALL PANELS 20K SCAFF. TOWER HEAVY DUTY (TYP.) r —WPS S O F F I T B E A M S C H E D U L E PULL TYP. (U.O.N.) 5' 14" 5" a I'-� 3.60 (REL. 3,000 TYP. U.O.N.) STIRR T'A'E ENG. SPECIAL REL. TYPE MK# QTY. LENGTH SIZE STRANDS STIRRUPS CROWN FULL Mu Vu MK • CONDITION RELEASE 3500 1 M -200 1 -3' 24'Xbii2' 5 ,52' +20504' 5*4' x20' MIDSPAN 18 05 *4' 04 08' BAL Iii' 36' 650 215 55-1 RELEASE M -201 2 38' -4` 502'- 2g.25'XW' MIDSP.4N 24 '5 ®4` •4 ®8' BAL 1�2' 800 225 SB -2 4300 5®4' #2"45X38' MIDSPAN - RELEASE -2925'X35' MIDSPAN 4300 M -202 1 35' -4" - 2g.45>�5' MIDBPAN 1215 254 S -3 X BRACING ALL PANELS 20K 20K 20K 20K WPg SCAFF. TOWER SCAFF. TOUTER SCAFF. TOUTER SCAFF. TOWER HEAVY DUTY HEAVY DUTY HEAVY DUTY HEAVY DUTY A ( TYP) CTYPJ CTYPJ (TYR) �/ ❑ ❑ r 5' 2' 2' -3' I n L # �GR� n 2 # 4 GR 60 # GR-60 SHEAR FRICTION CONNECTION DETAIL 16° JOIST -0' -TO EQUAL EQUAL ' -0' -TO I WPS SHORE A 1 T -0' J103, J200 SHORING BEAM— BY OTHERS (TYP.) SHORING LAYOUT WPS = WOOD POST SHORE EQUAL EQUAL EQUAL ' -0' -TO 2 UPS 0 SHORE 0 1/3 T -0' J201, J202, J203, J204, J205 SHORING BEAM— BY OTHERS (TYP.) SHORING LAYOUT SOFFIT SCAFFOLD LAYOUT M -201, M -202 EQUAL EQUAL EQUAL ' -0' -TO I WPS SHORE ® 1/3 21-01 J100, J101, J102, J104, J206 SHORING BEAM BY OTHERS (TYP.) SHORING LAYOUT WPS = WOOD POST SHORE ELEVATION X BRACING ALL PANELS 20K SCAFF. TOWER HEAVY DUTY (TYP.) r —WPS TOP OF SLAB E!��`J / = MM. TWO E 4R5 Q TI-M STIR LLI 5' 14" 5" a I'-� 24' T'A'E r 5' 2' 2' -3' I n L # �GR� n 2 # 4 GR 60 # GR-60 SHEAR FRICTION CONNECTION DETAIL 16° JOIST -0' -TO EQUAL EQUAL ' -0' -TO I WPS SHORE A 1 T -0' J103, J200 SHORING BEAM— BY OTHERS (TYP.) SHORING LAYOUT WPS = WOOD POST SHORE EQUAL EQUAL EQUAL ' -0' -TO 2 UPS 0 SHORE 0 1/3 T -0' J201, J202, J203, J204, J205 SHORING BEAM— BY OTHERS (TYP.) SHORING LAYOUT SOFFIT SCAFFOLD LAYOUT M -201, M -202 EQUAL EQUAL EQUAL ' -0' -TO I WPS SHORE ® 1/3 21-01 J100, J101, J102, J104, J206 SHORING BEAM BY OTHERS (TYP.) SHORING LAYOUT WPS = WOOD POST SHORE ELEVATION X BRACING ALL PANELS 20K SCAFF. TOWER HEAVY DUTY (TYP.) r —WPS '►' -0' j. L T -0' SOFFIT SCAFFOLD L,4`I'"OUT M -200 REVIEW OF STRUCTURAL SUBN,11 AL N0 EXEPTi0:N Tr"1KEIi n,LU` E CC I.TZECiiONS DNDTCATED II 1.22 EJECT1`D r . sU �«.T 5--- SCOP C . "Ex F- CGt NIS£ TS0 . I. T14'1" yyT''IK, ' a�gy. S1° ;C URAL SUM 11T'771L HVE SEt'!z .. 2T 717+0'44 LD L C _ k a3 ,2IFw3Z5 ELEVATION -SPI FIELD OPERATIONS DEPARThENT NOTE: It is the responsibility or SPI Field Personnel, to check all shoring material /equipment for conformance with manufacturer's specifications and industry standards. t ! SHORING NOTES r I ! I G. C. NOTES: ` STD 1 —THE SOIL SHOULD BE PREPARED & COMPACTED TO SUPPORT SHORING LOADS INDICATED (BY G.C.) SEE SHORING DETAIL. r 2- MAINTAIN SHORING LAYOUT IN DWG. SEE SHORING DETAIL. SHIM 3 —END SHORES WILL BE REMOVED BY SPI ONE DAY AFTER SLAB PLACEMENT (TYP.). 4— SCAFFOLDING FOR FORMING BM. MUST SUPPORT JOIST, SLAB AND CONSTRUCTION LOAD APPLIED TO BM. WHEN END SHORES ' ARE REMOVED. BN. 5— SINGLE STORY SHORES MAY BE REMOVED 7 DAYS AFTER CONCRETE POUR OR AFTER 3 DAYS WHEN SLAB HAS ATTAINED 3/4 OF DESIGN STRENGTH. NOTIFY S.P.I. ENG. BEFORE NO END SHORES REQUIRED REMOVAL AT 7 DAYS IF SLAB IS NOT AT AT JOIST ENDS 3/4 STRENGTH. 6— SHORING DESIGN ALLOWS FOR JOIST WITH SHIMS MADE OF CONCRETE, STEEL OR REBAR ALONG WITH BOTTOM NOTCHES (DAPPED ENDS) AND STANDARD ENDS THAT HAVE CONTANCT SURFACES WHICH ARE DIRECTLY ABOVE THE PRECAST SECTION OF THE SOFFIT BEAM. THESE JOIST DO NOT REQUIRED END SHORES AT THEIR APPROPIATE JOIST END, THE SHORING DESIGN FOR THE SOFFIT BEAMS HAVE ACCOUNTED FOR THE LOADS APPLIED DUE TO THE OMISSION OF THE END SHORES OF THE JOIST. SUBMITTED FOR APPROVAL THUS, THE END SHORES FROM THE JOIST Aej�, 88 BY WMAMI (SEE SKETCH) BUIL0,IN ' 0WNTt Fta 2 3 `tuU9 STFtUCTU AL ECTION STRUCTURAL PRESTRESSED INDUSTRIES APPROVED BY: RFA 7F r OF ST T tg ,'IT Rt'-' T sun —? MTTAL 1G` t ° e 4iG 4 v sE:-4 CI f. ekiiiG tcis•. �. t.t.<):tiu 1Nr-11CU D i aCw; tit "' it CGiiSim OF. a. WATi1T- zP'_O MEDSTRUC- 1bT AIL SU73M ITV, t1AVv' v- \? R1nPN RED, I TR AT Tixri' SL'aRa T i ;i 1 kvz aaa; s,,-- ` r ra t� -ALM xY A EI m- a y 1,s 'i t^..^'T a 1„"' '^t; -•g.g ,ii�'`is€`�r..'� 'F.F sl: �`'•% COP., =.L GA,,3L �s FLORIDA 33134 PFO,�E: rc5 -e45 -5,00 E!��`J I'-� '►' -0' j. L T -0' SOFFIT SCAFFOLD L,4`I'"OUT M -200 REVIEW OF STRUCTURAL SUBN,11 AL N0 EXEPTi0:N Tr"1KEIi n,LU` E CC I.TZECiiONS DNDTCATED II 1.22 EJECT1`D r . sU �«.T 5--- SCOP C . "Ex F- CGt NIS£ TS0 . I. T14'1" yyT''IK, ' a�gy. S1° ;C URAL SUM 11T'771L HVE SEt'!z .. 2T 717+0'44 LD L C _ k a3 ,2IFw3Z5 ELEVATION -SPI FIELD OPERATIONS DEPARThENT NOTE: It is the responsibility or SPI Field Personnel, to check all shoring material /equipment for conformance with manufacturer's specifications and industry standards. t ! SHORING NOTES r I ! I G. C. NOTES: ` STD 1 —THE SOIL SHOULD BE PREPARED & COMPACTED TO SUPPORT SHORING LOADS INDICATED (BY G.C.) SEE SHORING DETAIL. r 2- MAINTAIN SHORING LAYOUT IN DWG. SEE SHORING DETAIL. SHIM 3 —END SHORES WILL BE REMOVED BY SPI ONE DAY AFTER SLAB PLACEMENT (TYP.). 4— SCAFFOLDING FOR FORMING BM. MUST SUPPORT JOIST, SLAB AND CONSTRUCTION LOAD APPLIED TO BM. WHEN END SHORES ' ARE REMOVED. BN. 5— SINGLE STORY SHORES MAY BE REMOVED 7 DAYS AFTER CONCRETE POUR OR AFTER 3 DAYS WHEN SLAB HAS ATTAINED 3/4 OF DESIGN STRENGTH. NOTIFY S.P.I. ENG. BEFORE NO END SHORES REQUIRED REMOVAL AT 7 DAYS IF SLAB IS NOT AT AT JOIST ENDS 3/4 STRENGTH. 6— SHORING DESIGN ALLOWS FOR JOIST WITH SHIMS MADE OF CONCRETE, STEEL OR REBAR ALONG WITH BOTTOM NOTCHES (DAPPED ENDS) AND STANDARD ENDS THAT HAVE CONTANCT SURFACES WHICH ARE DIRECTLY ABOVE THE PRECAST SECTION OF THE SOFFIT BEAM. THESE JOIST DO NOT REQUIRED END SHORES AT THEIR APPROPIATE JOIST END, THE SHORING DESIGN FOR THE SOFFIT BEAMS HAVE ACCOUNTED FOR THE LOADS APPLIED DUE TO THE OMISSION OF THE END SHORES OF THE JOIST. SUBMITTED FOR APPROVAL THUS, THE END SHORES FROM THE JOIST Aej�, 88 BY WMAMI (SEE SKETCH) BUIL0,IN ' 0WNTt Fta 2 3 `tuU9 STFtUCTU AL ECTION STRUCTURAL PRESTRESSED INDUSTRIES APPROVED BY: RFA 7F r OF ST T tg ,'IT Rt'-' T sun —? MTTAL 1G` t ° e 4iG 4 v sE:-4 CI f. ekiiiG tcis•. �. t.t.<):tiu 1Nr-11CU D i aCw; tit "' it CGiiSim OF. a. WATi1T- zP'_O MEDSTRUC- 1bT AIL SU73M ITV, t1AVv' v- \? R1nPN RED, I TR AT Tixri' SL'aRa T i ;i 1 kvz aaa; s,,-- ` r ra t� -ALM xY A EI m- a y 1,s 'i t^..^'T a 1„"' '^t; -•g.g ,ii�'`is€`�r..'� 'F.F sl: �`'•% COP., =.L GA,,3L �s FLORIDA 33134 PFO,�E: rc5 -e45 -5,00