Loading...
14-1164-002i- -Area of work it I( n -05 ii t I II 1 1 EXISTING BEDROOM I' I IIII IIII n -01 illl IIII ( I a n -07 �Jj I C i iI I� , I t t L - -- ---------- - - - - -� n-03! - - - - - - n -03 (TYPICAL) Floor Plan I Existing Scale: 1/4": 1' -0" —/ AREA of We FiRE DAMAGED AREA OF WORK LOH existing top m n of roof _ n m_ LUIS 0. DE LA H o z ,9' -2 " -a PEA' 73932 8857 NW 17BTH ST MIAMI, FL 33018 PHONE: (305) 903-8816 LODELAHOZ @YAHOO.E5 ••••`S`. k 8 000 •• existing finish •.•! "Zi ..... y�1 ••• floor elev 4•OP•.•• N S '••.• ; 01 -011 • :Ws LU A .•' •• •• IQ • - • • ••••�•• Q� •• . I1 -I�• �r„stwe�o� ' Luis 0. de la Hoz, PE Lic# 73932 East Elevations Existing Scale: 1/4,,: 1' -0" cxisl.ing area no work East Elevations Existing Scale: 1/4": 1' -0" North Elevations Existin L------ - - - - - -- - - - -- --- -- ------ - - - -J Roof Plan I Existing Scale: 1/4": 1' -0" FIRE I) AMAGE RE FA i R SCOFF OF: WORK ARC: HITECTURAL STRUCTURAL Provide new foundation and exterior conc. block wall due fire damage of existing bearing wall. l: Existing window fire damaged to be replaced. Existing roof framing to be replaced. 2: Existing interior partition fire damaged to be replaced. LECTRiCAL Existing exterior bldg shell to be removed. New cone. block wall J 9 be provide. All existing electrical fixtures, wires and panels to be replaced. 3: Existing plumbing fixtures to be replaced. New electrical service for this area. 4; kitchen counter top and cabinets to be replaced. PLUMBING 5: All existing doors to be replaced. Existing drainage pipes and water supplies lines are existing to Interior furring and insulation to be replaced. remain, no fire damage for this items. 7: Existing roof to be replaced. MECHANiCAL g: All interior finishes to be replaced. Existing wall mounted A/C unit to be replaced. 9: Existing roofing to be replaced. 10: Existing floor tiles to be replaced. ID EMOL. i T i ON LEGEND Gypsum board partition to be removed r� �E Door to be removed Existing concrete Block wall to remain Alteration level -2 and Repair (FB.0 Existing 2010) (Existing building) Asbestos Notes This notice is provided for information only. Asbestos abatement is not covered under the scope of services provided and is not addressed in these drawings. Services relating to asbestos abatement, demolition, removal, abatement planning, etc. shall be by others and shall be coordinated between the Owner and Owner retained specialist. I )EMOI_ITION NOTES: N- 01:AII existing exterior wall to be removed due fire damage New cone. block wall to be provided. N- 02Existing kitchen counter and cabinets to be replaced. N- 03Existing exterior windows and doors to be replaced. N- 04Ex1sting plumbing fixtures to be replaced. N- 05Existing floor the to be replaced. N- 06Existing roof framing and roofing system to be replaced due fire damage N- OiExisting wall mounted ac unit to be replaced. existing top of roof - 91- 2" qu existing finish floor elev 0' -0" Area of work L•�.� I. Neither the owner, nor the Professional, shall be responsible for damages resulting from the Contractor's work 2. Contractor is responsible for coordination of access to site and acceptable times of work schedule with building management prior to commencement of work 3. Under no circumstances shall the Contractor leave excavated trenches, or parts of, exposed or open at the end of the working day, weekends, holidays, or other times when the contractor is not Present on site. 4. All debris from demolition work shall be disposed off site. 5. Contractor to comply with all OSHA, Federal, State, County, and City ordinances and Safety requirements. 6. Contractor to verify location, elevation and condition of all existing utilities prior to the start of demolition work -1. Contractor to cap all plumbing lines as required. a. Contractor to label all cut or disconnected electrical lines to identify circuit on existing electrical panel. S. Contractor to have approved Demolition permit prior to commencement of demolition work 10. Contractor /Owner to have service disconnect letter from all required utility companies prior to commencement of work 11. Contractor is solely responsible for complying with all Federal, State, County, and Clty regulations for securing site. 12. Contractor "it be responsible for visiting the site prior to bidding and familiarizing himself with all existing conditions affecting the work, including but not limited to private and public utilities and other support facilities. 13. Contractor shall comply with all applicable local, state and federal building codes. Permit shall be posted in a visible place at all times. 14. Contractor shall avoid interference with the normal work flow and proper functioning of all surrounding properties. 15. if the normal work flow of an area must be interrupted In order to proceed with the schedule, proper notice must be given the adjacent property owners being affected by such work, 3 days in advance, and permission to be obtained prior to commencement of such work 16. Contractor to shore as required during demolition. Notify Architect/Engineer of any problems and /or discrepancies or inconsistencies immediately. 1 -7. Contractor shall be responsible for removing debris and construction material from the site. Contractor shall also be responsible for properly cleaning all areas both on a daily basis and prior to final acceptance by the Owner. Ia. items indicated by the Owner to be relocated and /or stored must be carefully removed and stored to avoid damage. IS. Contractor is responsible for including in his bid, work and material costs for any change or alteration of adjacent areas to be disturbed during demolition and constructions. 20. Contractor must notify immediately of any un- expected or unknown conditions, any discrepancies with the drawings and /or contract documents and any errors and omissions on the drawings prior to bidding and proceeding with work 21. Contractor to inform t of discovery of any mold found. Contractor to provide remediation options to Owner. 22. Contractor to inform of discovery of any asbestos found. Contractor to provide abatement options to Owner. W a4: Z4a.�.� a w N i, 14 u, 0 CO) 4 tiQ�� CO 00 W Project Number issue Date Revisions Drawing Title Demolition Cad File Name Sheet Number 0