14-946-024FINISH NOTr=5 I
I. ALL FLOOR FINISHES TO MEET GLASS 1 FIRE SPECIFICATIONS.
ALL WALL FINISHES TO MEET GLASS "A ' FIRE SPECIFICATIONS.
2. BOTTOM OF ALL SOFFITS SHALL BE PAINTED WITH PAINT *5 (P-3).
VERTICAL FACE OF SOFFITS SHALL BE PAINTED WITH PAINT #1 (P -1)-
U.O.N.
S. ALL DOOR FRAMES, FRAMES AND TRIMS SHALL BE PAINTED,
COLOR P -2, BUT SHALL BE SEMI -GLOSS LUSTER
4. JANITOR'S CLOSET SHALL BE FINISHED WITH FRP -1 UP TO 4' -0" A.F.F.
AND THEN CONTINUE THE REST OF THE WALLS WITH PAINT #4 (P-4)
EPDXY (AS APPLICABLE).
S. ALL AREAS TO RECEIVE CARPET SHALL BE CARPET TILE #1 (OPT -1)
ADHERED WITH TAG -TILE. MANUFACTURER TO PROVIDE
SPECIFICATIONS FOR TAG -TILE INSTALLATION PROCEDURES.
6. TELCO ROOM SHALL RECEIVE 3/4" PLYWOOD BACKBOARD AS
DESIGNATED ON FLOOR PLAN. BACK BOARD SHALL EXTEND FROM
FLOOR TO CEILING, AND SHALL BE TREATED WITH A
FIRE- RETARDENT PAINT (BLACK).
1. INDICATES LOCATIONS OF CORNER GUARDS AT ALL "OUTSIDE
CORNERS" BY INPROGORP.GOM , 4'-0" HIGH UNLESS OTHERWISE
NOTED, COLOR TO BE SELECTED BY DESIGNER. PROVIDE 2 'x2'
CORNER GUARDS 0160, BY IMPROC.ORP.COM, SEE LOCATIONS ON
SHEET A -6.0.
6. INDICATES LOCATIONS OF INPROOORP /CHAIR -RAIL . SEE FLOOR
PLAN SHEET A -8 0 FOR EXACT LOCATIONS, INPROCORP.COM, #500,
3" HIGH. COORDINATE MOUNTING HT. W i EXACT COLOR WITH
DESIGNER
01. ALL EXAM ROOMS, WORK -UP ROOMS, SPECIAL TESTS ROOMS SHALL
RECEIVE AN ACCENT PAINT COLOR LOCATION TO BE DETERMINED
BY DESIGNER
10. ALL EXAM ROOMS SHALL RECEIVE TWO (2) COLOR VGT PATTERN,
QUARTER TURNED INSTALLATION. COLORS TO BE SELECTED BY
DESIGNER MANNING,TON, DESIGNER ESSENTIALS OR EQUAL.
II. G.C. SHALL PATCH AND REPAIR ANY EXISTING WALL SURFACE TO
REMAIN. PROVIDE FLUSH, LEVEL, AND SMOOTH TRANSITION BETWEEN
NEW AND EXISTING, FINISHES.
12. GC. SHALL PATCH, SAND, LEVEL, EXISTING SLAB AS REQUIRED FOR
ALL NEW FINISHES.
G.C. SHALL PROVIDE MATERIAL AND COLOR SAMPLES FOR ALL
FINISHES SELECTED BY DESIGNER. SEE GENERAL CONDITIONS ON
SHEET A -2A FOR REQUIRED SUBMITTALS.
FINISH 50HEDULE
ROOM
NO.
LOCATION
WALLS
TRIM
FLOOR-1146
ALL BASE
CEILING
REMARKS
N I
E
5
W
_
P -2
ONE COAT PRIMER / TWO GOATS FINISH
BENJAMIN MOORE
AS SELECTED BY DE516NER
PAINT, SEMI &L.OSS
x
P -3
ONE GOAT PRIMER / TWD GOATS FINISH
BENJAMIN MOORE
141
100
ENTRY LOBBY
P -1
P -1
P -1
P -1
P -2
VGT -1
RB-I
ACT -I
141A
IOOA
EXISTING, STAIR #1
-
-
-
-
-
-
-
-
REFER TO ARCH'S DRAWIN65
IOOB
EXISTING STAIR 02
-
-
-
-
-
-
-
-
REFER TO ARCH'S DRAWINGS
IOOG
EXISTING, STAIR #3
-
-
-
-
-
-
-
-
REFER TO ARCH'S DRA104IN65
IOOD
EXISTING, ELEVATOR
-
-
-
-
-
-
-
-
REFER TO ARCH'S DRAWINGS
IOOE
HALLWAY
P -1
P -1
P -1
P -1
P -2
OPT- -1
RB-I
ACT -I
SEE FINISH PLAN FOR TRANSITIONS
BETV4EEN MATERIALS
IOOF
HALLWAY
P -1
P -1
P -1
P -1
P -2
VGT -2
RB-I
ACT -I
146
1006
HALLWAY
P -1
P -1
P -1
P -1
P -2
CPT-1
RB-1
ACT -I
141
IOOH
HALLWAY
P -1
P -1
P -1
P -1
P -2
CPT-1
RB-I
ACT -1
146
1001
FtALL WAY
P -I
P -1
P -1
P -1
P -2
GPT -1
RB-I
ACT -1
14,01
IOOJ
HALLWAY
P -1
P -1
P -1
P -1
P -2
GPT-I
RB-1
ACT -I
1441A
TOOK
HALLWAY
P -1
P -1
P -1
P -1
P -2
CPT-1
RB-I
AOT -1
AS SELECTED BY DESIGNER
TOOL
HALLWAY
P -1
P -1
P -1
P -!
P -2
GPT-1
RB-1
ACT -I
150
ZOOM
HALLWAY
P -1
P -1
P -1
P -1
P -2
OPT-1
RB-I
AGT -I
151
IOON
HALLWAY
P -1
P -1
P -1
P -1
P -2
GPT -1
RB-I
ACT -1
152
100.0
HALLWAY
P -1
P -1
P -1
P -1
P -2
GPT -1
RB-I
ACT -1
153
IOOP
HALLWAY
P -1
P -1
P -1
P -1
P -2
GPT -1
RB-I
ACT -!
154
101
WAITING
P -1
P -1
P -1
P -1
P -2
VGT -2
RB-I
ACT -1
155
IOTA
EXISTING, H.G. TOILET
P -3
P-3
P -3
P-3
P -2
SV -!
SV -I
ACT -1
INTEGRAL BASE W! CORNERS`
YVEL.DED SEAMS
1018
NEW PATIENT WAITING
P -1
P -1
P -1
P -1
P -2
VGT -2
RB-I
AGT -I
101C
WAITING AREA
P -!
P -1
P -1
P -1
P -2
QT-1
RB-I
ACT -I
IOID
WAITING AREA
P -1
P -1
P -1
P -1
P -2
OT -1
RB-I
ACT -1
IOIE
NURSES STATION
P -1
P -1
P -1
P -1
P -2
OT-1
RB-I
ACT -I
IOIF
SURGERY SC.HED. WAITING
P -1
P -1
P -1
P -1
P -2
OT -1
RB-I
ACT -1
102
WORK UP ROOM #i
P -1
P -1
P -1
P -1
P -2
VGT -I
RB-I
ACT -1
103
WORK UP ROOM #2
P -1
P -1
P -1
P -1
P -2
VGT -1
RB-I
ACT -1
104
WORK UP ROOM #3
P -1
P -1
P -1
P -1
P -2
VGT -I
RB-1
ACT -I
104A
STORAGE
P -1
P -1
P -!
P -1
P -2
VGT -!
R5-1
ACT -I
105
EXISTING H.G. TOILET
P -3
P-3
P -S
P-3
P -2
5V -I
5V -1
ACT -1
SIDE SMOOTH SEAM
AT S.V. i V.G.T.
106
SPECIAL TEST #1
P -1
P -1
P -1
P -1
P -2
VGT -I
R5-1
ACT -1
101
SPECIAL TEST 02
P -1
P -I
P -1
P -1
P -2
VGT -t
RB-I
ACT -I
106
SPECIAL TEST #3
P -1
P -1
P -1
P -1
P -2
VGT -1
RDA
ACT -1
—SEE FINISH LEGEND THIS SHEET FOR FINISH MATERIALS.
- GENERAL CONTRACTOR SHALL PROVIDE SAMPLES AND MANUFACTURERS SPECIFICATION CUT SHEETS OF FINISH MATERIALS. SEE GENERAL CONDITIONS ON
SHEET A -2.0 FOR DETAILED DESCRIPTION OF SUBMITTAL REQUIREMENTS.
—NOT ALL FINISHES ON THE FINISH LEGEND ARE SHOWN ON THIS .SCHEDULE. COORDINATE WITH FLOOR PLAN, REFLECTED CEILING PLAN, AND CABINETRY
DRAWINGS.
a✓-.
IOq
SPECIAL TEST #4
P -1
P -1
P -1
P -1
P -2
VGT -1
RB-I
ACT -1
110
SPECIAL TEST #5
P -1
P -1
P -1
P -1
P -2
VGT -1
R13-1
ACT -1
III
5PEGIAL TEST #6
P -1
P -1
P -1
P -1
P -2
VGT -I
RB-I
ACT -1
112
EXISTING H.G. TOILET
P -5
P-3
P -S
P-5
P -2
SV -1
SY -I
AGT -I
PROVIDE SMOOTH SEAM
AT S.V. i Y.G.T.
113
WORK UP ROOM #4
P -1
P -1
P -1
P -1
P -2
VGT -I
RB-I
ACT -1
114
WORK UP ROOM #5
P -1
P -1
P -1
P -1
P -2
VGT -1
RB-I
ACT -1
115
WORK UP ROOM 06
P -1
P -1
P -1
P -1
P -2
VGT -1
RB-I
ACT -I
116
SPECIAL TEST #1
P -1
P -1
P -1
P -1
P -2
VGT -1
RB-1
ACT -I
111
SPECIAL TEST #8
P -1
P -1
P -1
P -1
P -2
VGT -1
RB-I
ACT -1
116
EXAM ROOM #1
P -1
P -1
P -1
P -1
P -2
VGT -I
R5-1
ACT -I
Ilq
EXAM ROOM 02
P -1
P -1
P -1
P -1
P -2
VGT -I
RS-1
ACT -1
120
EXAM ROOM #3
P -1
P -1
P -1
P -1
P -2
VGT -I
RB-I
AGT - -I
121
EXAM ROOM #4
P -1
P -1
P -1
P -1
P -2
VGT -I
RB-I
ACT -I
122
WORKROOM
P -1
P -1
P -1
P -1
P -2
5V -I
5V -1
ACT -I
123
EXISTING, H.C. TOILET
P -3
P-3
P -3
P-3
P -2
5V -I
5V -1
ACTT -I
SIDE SMOOTH SEAM
AT S.V. i V.G.T.
124
WORKROOM
P -1
P -1
P -1
P -1
P -2
SV -I
RB-I
AGT -1
125
EXAM ROOM 05
P -1
P -1
P -1
P -1
P -2
VGT -I
R5-1
ACT -1
126
EXAM ROOM #6
P -1
P -I
P -1
P -1
P -2
VGT -I
R5-1
ACT -1
12-1
EXAM ROOM #1
P -1
P -1
P -1
P -1
P -2
VGT -I
RB-1
AGT -1
126
EXAM ROOM #8
P -1
P -1
P -1
P -I
P -2
VGT -I
RB-I
ACT -1
1201
IT ROOM
P -1
P -I
P -1
P -1
P -2
VGT -I
RB-1
ACT -I
130
TREATMENT #1
P -1
P -1
P -1
P -1
P -2
VGT -I
R5-1
ACT -1
131
TREATMENT 02
P -1
P -1
P -1
P -1
P -2
VGT -I
RB-I
ACT -1
132
TREATMENT #3
P -1
P -1
P -I
P -1
P -2
VGT -I
R5-1
ACT -I
133
TREATMENT #4
P -1
P -1
P -1
P -1
P -2
VGT -I
RB-I
ACT -1
134
JANITOR
P -3
P-3
P -2
VGT -I
RS-1
ACT -I
FRP-I AT 4'-O" A.F.F.
® MOP SINK LOCATION.
135
SURGERY SC.HED. #I
P -1
P -I
P -1
P -I
P -2
OT-1
RB-I
ACT-I
136
SURGERY SCHED. #2
P -1
P -1
P -1
P -1
P -2
QT-1
R15-1
ACT -I
151
SURGERY SC 4ED. #3
P -1
P -1
P -1
P -1
P -2
QT -I
RB-I
ACT -I
138
SURGERY SGFED. #4
P -1
P -1
P -1
P -1
P -2
QT-1
R5-1
ACT -1
1301
SURGERY SC.HED. 05
P -1
P -1
P -1
P -1
P -2
OT -1
RB-I
ACT -1
140
BUSINESS OFFICE
P -1
P -1
P -1
P -1
P -2
GPT -I
RB-I
ACT -I
140A
OFFICE SUPERVISOR
P -1
P -1
P -1
P -1
P -2
GPT -1
R13-1
ACT -I
1408
APPTS.
P -1
P -!
P -1
P -1
P -2
CPT- -I
R5-1
AGT -I
—SEE FINISH LEGEND THIS SHEET FOR FINISH MATERIALS.
--GENERAL CONTRACTOR SHALL PROVIDE SAMPLES AND MANUFACTURERS SPECIFICATION GUT SHEETS OF FINISH MATERIALS. SEE GENERAL CONDIT101SI5 ON
SHEET A -2.0 FOR DETAILED DESCRIPTION OF SUBMITTAL REQUIREMENTS.
—NOT ALL FINISHES ON THE FINISH LEGEND ARE SHOWN ON THIS SGFEDIULE. COORDINATE WITH FLOOR PLAN, REFLECTED CEILING PLAN, AND CABINETRY
DRAWINGS.
FIN 15H 5CHEDULE w
ROOM
NO.
LOCATION
YVALLS
TRIM
FLOORING
WALL BASE
CEILING
REMARKS r
A;
N
E
5
W
_
P -2
ONE COAT PRIMER / TWO GOATS FINISH
BENJAMIN MOORE
AS SELECTED BY DE516NER
PAINT, SEMI &L.OSS
x
P -3
ONE GOAT PRIMER / TWD GOATS FINISH
BENJAMIN MOORE
141
OPTICAL
P -1
P -1
P -1
P -I
P -2
GPT -1
RB-I
ACT -1
---
141A
STORAGE
P -1
P -1
P -1
P -1
P -2
VGT -I
RB-I
ACT -I
GP -I
141E
CONTACT LENSES
P -1
P -1
P -1
P -1
P -2
VGT -2
RB-I
AGT -1
u_
142
OFFICE
P -1
P -1
P -1
P -1
P -2
CPT -I
RB-I
ACT -1
speciFcdw amply with
145
EXISTING, H.G. TOILET
P-3
P -3
P-3
P-3
P -2
5Y -I
SV -I
AGT -I
SIDE SMOOTH SEAM
AT S.V. i V.G.T.
144
FINANCIAL SUPERVISOR.
P -1
P -1
P -1
P -1
P -2
GPT -1
RB-I
ACT -I
-
INTERFACE
ACCT
145
FINANCIAL SUPPORT
P -1
P -1
P -I
P -1
P -2
CPT -I
RB-I
AGT -I
4" RUBBER DOVE BASE #1
146
LOUNGE
P -1
P -1
P -1
P -1
P -2
VGT -I
RB-I
ACT - -I
141
PAYROLL
P -1
P -1
P -1
P -1
P -2
GPT -I
RB-I
ACT -1
A -8.1
146
MEDICAL RECORD
P -1
P -1
P -1
P -1
P -2
CPT-1
RB-I
ACT -I
COUNTERTOPS- SEE CABINETRY.
14,01
DRS. OFFICE
P -1
P -1
P -1
P -1
P -2
GPT -1
R13-1
ACT -I
AS SELECTED BY DESIGNER
1441A
EX. GONVENIENGE TILT ROOM
P-3
P -3
P-3
P-3
P -2
PT -!
PT-I
ACT-1
PROVIDE SMOOTH SEAM
AT S.V. i Y.C.T.
AS SELECTED BY DESIGNER
°d-IOYE:R YYVAI.LS
T -I
-
T -1
T -1
150
DRS. OFFICE
P -1
P -1
P -1
P -1
P -2
CPT -I
R5-1
ACT -I
5UR -!
151
RESEARCH ASSIST.
P -1
P -1
P -1
P -1
P -2
GPT -1
RB-I
ACT -I
z
IL
152
HUMAN RE50I.RGES
P -1
P -1
P -1
P -1
P -2
CPT -I
RB-I
ACT -1
153
ADMIN. OFFICE
P -I
P -1
P -I
P -1
P -2
CPT -I
RB-1
ACT -I
154
STUDY COORDINATOR
P -1
P -1
P -I
P -1
P -2
OPT -1
RB-I
ACT -1
155
AUDITOR
P -1
P -1
P -1
P -I
P -2
CPT -I
RB-I
ACT -I
—SEE FINISH LEGEND THIS SHEET FOR FINISH MATERIALS.
- GENERAL CONTRACTOR SHALL PROVIDE SAMPLES AND MANUFACTURERS SPECIFICATION CUT SHEETS OF FINISH MATERIALS. SEE GENERAL CONDITIONS ON
SHEET A -2.0 FOR DETAILED DESCRIPTION OF SUBMITTAL REQUIREMENTS.
—NOT ALL FINISHES ON THE FINISH LEGEND ARE SHOWN ON THIS .SCHEDULE. COORDINATE WITH FLOOR PLAN, REFLECTED CEILING PLAN, AND CABINETRY
DRAWINGS.
a✓-.
'
INTERIOR IF A,T NS ONLY
Ell (ANY EXTERIOR MODIFICATION MAY REQUIRE
A BOARD APPEARANCE)
FIN 15H LEGEND
SYMBOL
DESCRIPTION
MANUFACTURER
COLOR
REMARKS
. CC
tf�
P -1
ONE COAT PRIMER / TWO COATS FINISH
BENJAMIN MOORE
AS SELECTED BY DE516NER
PAINT, SATIN FINISH LATEX
_
P -2
ONE COAT PRIMER / TWO GOATS FINISH
BENJAMIN MOORE
AS SELECTED BY DE516NER
PAINT, SEMI &L.OSS
x
P -3
ONE GOAT PRIMER / TWD GOATS FINISH
BENJAMIN MOORE
AS SELECTED BY DESIGNER
EPDXY.
FRP -I
FIBERGLASS REINFORCED PANELS
ACROVYN
AS SELECTED BY DESIG,hER.
PROVIDE FRP TRIMS AS REOV.
a
PL4 ,
2° `
l;.4 r
04 \ k+ 4
w
�x "W`}j 0
\``�`
M `�
GP -I
ONE GOAT PRIMER / TWO GOATS FINISH
BENJAMIN MOORE
AS SELECTED BY DESIGNER
SOFFIT PAINT, SATIN FINISH LATEX
z
ACT -1
24" X 24" ACOUST. 01-6. TILE i GRID
ARMSTRONG,
WHITE
'GORTE&A' TEGULAR TILE #'104 OR EQUAL
WITH COMPATIBLE 15/16" 6RIDFACE BY
DONN OR EQUAL.
u_
THIS DRAWING IS THE PROPERTI' OF
DAVID WEW JOH &M AU ARCI4TECT
UNLESS OTHERWISE PROVIDED FOR
BY CONTRACT. THE CONTENTS OF
THIS DRAWING ARE CONFIDENTIAL
Ql
v
TO ANY OTHER PARTY EXCEPT AS
AGREED TO BY THE ARCHITECT.
In my professional j dgwwnt and
to the best of my knowledge and
berlef, these Plans acid
speciFcdw amply with
F.E.C. 2004 EDDI110N.
VGT -I
VGT -2
VINYL COMPOSITE TILE #1
6" WIDE WOOD VINYL SLAT
MANNINSTON
-
AS SELECTED BY DE516NER.
-
'DESIGNER E55ENTIAL5' 12' x 12 ", I!b"
GAUGE. COLORS AND PATTERN AS
SELECTED BY DE516NER
-
z
PT -I
PORCELAIN TILE #1
DALTILE OR EO.
AS SELECTED BY DESIGNER.
SEE PCB-I FOR MATCHING COVE BASE.
u.
9
U
GPT -1
OFT-2
CARPET TILE #1 - ACCENT
CARPET TILE 02 - ACCENT
-
INTERFACE
ACCT
AS SELECTED BY DESIGNER.
AS SELECTED BY DESIGNER.
TAG -TILE INSTALLATION. LAYOUT PATTERN
AS PER DESIGNER. ALLOWANCE: #31.00/50.
YD. FOR MATERIAL AND INSTALLATION.
TAG -TILE INSTALLATION. LAYOUT PATTERN
AS PER DESIGNER. ALLOWANCE: *31.00/50.
YD. FOR MATERIAL AND INSTALLATION.
J
SV -I
B VINYL #1 W/ 4" INTEGRAL WALL
MfANNINGTON
MANNIN&TON
NEEDED SEAMS
R15-1
4" RUBBER DOVE BASE #1
BURKE MERGER
AS SELECTED BY DESIGNER.
-
j
QQ
Ip
P65-1
PORCELAIN TILE COVE BASE #1
DALTIL.E
OR ESA
AS SELECTED BY DE516NER.
PROVIDE PORCELAIN TILE COVE BASE
'INSIDE CORNER' i 'OUTSIDE CORNER'
TRIMS AS REOD.
DATE
PERMIT SET
04/22/14
SHEET NO.
A -8.1
PL -I
PLASTIC, LAMINATE #1
-
AS SELECTED BY DESIGNER
COUNTERTOPS- SEE CABINETRY.
PL -2
PLASTIC LAMINATE #2
-
AS SELECTED BY DESIGNER.
VERTICAL SURFACES- SEE CABINETRY.
PL-5
PLASTIC LAMINATE #3
-
AS SELECTED BY DESIGNER
ACCENTS i REVEALS- SEE CABINETRY.
PL-4
PLASTIC LAMINATE #3
-
AS SELECTED BY DESIG,NER.
VERTICAL SURFACES- SEE CABINETRY.
V
PL-P5
PLASTIC, LAMINATE #3
-
AS SELECTED BY DESIGNER
ACCENTS i REVEALS - SEE CABINETRY.
F
5UR -!
SOLID SURFACE MATERIAL
CORIAN
AS SELECTED BY DESIGNER.
REST ROOM VANITIES
z
IL
— COORDINATE FINISHES WITH FLOOR PLAN, REFLECTED CEILING PLAN, AND CABINETRY DRAWINGS. SEE FINISH SCHEDULE FOR GENERAL LOCATIONS.
d
fi
f,p .gib
:t.
. CC
tf�
� O
.-4
H Wm
tD
zz ct?
Qt
o �.co
a
Ilk
+
En
�4 co
ou
U) u 0
45
M--1 0 '...r (D
�
cD
Fit U� A
en
go
x
z M a,
O
a
PL4 ,
2° `
l;.4 r
04 \ k+ 4
w
�x "W`}j 0
\``�`
M `�
AOL
�
.Q
Q} co
-F�
Lo
U
0
a
THIS DRAWING IS THE PROPERTI' OF
DAVID WEW JOH &M AU ARCI4TECT
UNLESS OTHERWISE PROVIDED FOR
BY CONTRACT. THE CONTENTS OF
THIS DRAWING ARE CONFIDENTIAL
AND SHALL NOT BE TRANSMITTED
TO ANY OTHER PARTY EXCEPT AS
AGREED TO BY THE ARCHITECT.
In my professional j dgwwnt and
to the best of my knowledge and
berlef, these Plans acid
speciFcdw amply with
F.E.C. 2004 EDDI110N.
z A
Ott
4
J
�
J
Q
Lu
2
z
Q
U
IL
A
REVISION
DATE
DATE
PERMIT SET
04/22/14
SHEET NO.
A -8.1