Loading...
14-946-024FINISH NOTr=5 I I. ALL FLOOR FINISHES TO MEET GLASS 1 FIRE SPECIFICATIONS. ALL WALL FINISHES TO MEET GLASS "A ' FIRE SPECIFICATIONS. 2. BOTTOM OF ALL SOFFITS SHALL BE PAINTED WITH PAINT *5 (P-3). VERTICAL FACE OF SOFFITS SHALL BE PAINTED WITH PAINT #1 (P -1)- U.O.N. S. ALL DOOR FRAMES, FRAMES AND TRIMS SHALL BE PAINTED, COLOR P -2, BUT SHALL BE SEMI -GLOSS LUSTER 4. JANITOR'S CLOSET SHALL BE FINISHED WITH FRP -1 UP TO 4' -0" A.F.F. AND THEN CONTINUE THE REST OF THE WALLS WITH PAINT #4 (P-4) EPDXY (AS APPLICABLE). S. ALL AREAS TO RECEIVE CARPET SHALL BE CARPET TILE #1 (OPT -1) ADHERED WITH TAG -TILE. MANUFACTURER TO PROVIDE SPECIFICATIONS FOR TAG -TILE INSTALLATION PROCEDURES. 6. TELCO ROOM SHALL RECEIVE 3/4" PLYWOOD BACKBOARD AS DESIGNATED ON FLOOR PLAN. BACK BOARD SHALL EXTEND FROM FLOOR TO CEILING, AND SHALL BE TREATED WITH A FIRE- RETARDENT PAINT (BLACK). 1. INDICATES LOCATIONS OF CORNER GUARDS AT ALL "OUTSIDE CORNERS" BY INPROGORP.GOM , 4'-0" HIGH UNLESS OTHERWISE NOTED, COLOR TO BE SELECTED BY DESIGNER. PROVIDE 2 'x2' CORNER GUARDS 0160, BY IMPROC.ORP.COM, SEE LOCATIONS ON SHEET A -6.0. 6. INDICATES LOCATIONS OF INPROOORP /CHAIR -RAIL . SEE FLOOR PLAN SHEET A -8 0 FOR EXACT LOCATIONS, INPROCORP.COM, #500, 3" HIGH. COORDINATE MOUNTING HT. W i EXACT COLOR WITH DESIGNER 01. ALL EXAM ROOMS, WORK -UP ROOMS, SPECIAL TESTS ROOMS SHALL RECEIVE AN ACCENT PAINT COLOR LOCATION TO BE DETERMINED BY DESIGNER 10. ALL EXAM ROOMS SHALL RECEIVE TWO (2) COLOR VGT PATTERN, QUARTER TURNED INSTALLATION. COLORS TO BE SELECTED BY DESIGNER MANNING,TON, DESIGNER ESSENTIALS OR EQUAL. II. G.C. SHALL PATCH AND REPAIR ANY EXISTING WALL SURFACE TO REMAIN. PROVIDE FLUSH, LEVEL, AND SMOOTH TRANSITION BETWEEN NEW AND EXISTING, FINISHES. 12. GC. SHALL PATCH, SAND, LEVEL, EXISTING SLAB AS REQUIRED FOR ALL NEW FINISHES. G.C. SHALL PROVIDE MATERIAL AND COLOR SAMPLES FOR ALL FINISHES SELECTED BY DESIGNER. SEE GENERAL CONDITIONS ON SHEET A -2A FOR REQUIRED SUBMITTALS. FINISH 50HEDULE ROOM NO. LOCATION WALLS TRIM FLOOR-1146 ALL BASE CEILING REMARKS N I E 5 W _ P -2 ONE COAT PRIMER / TWO GOATS FINISH BENJAMIN MOORE AS SELECTED BY DE516NER PAINT, SEMI &L.OSS x P -3 ONE GOAT PRIMER / TWD GOATS FINISH BENJAMIN MOORE 141 100 ENTRY LOBBY P -1 P -1 P -1 P -1 P -2 VGT -1 RB-I ACT -I 141A IOOA EXISTING, STAIR #1 - - - - - - - - REFER TO ARCH'S DRAWIN65 IOOB EXISTING STAIR 02 - - - - - - - - REFER TO ARCH'S DRAWINGS IOOG EXISTING, STAIR #3 - - - - - - - - REFER TO ARCH'S DRA104IN65 IOOD EXISTING, ELEVATOR - - - - - - - - REFER TO ARCH'S DRAWINGS IOOE HALLWAY P -1 P -1 P -1 P -1 P -2 OPT- -1 RB-I ACT -I SEE FINISH PLAN FOR TRANSITIONS BETV4EEN MATERIALS IOOF HALLWAY P -1 P -1 P -1 P -1 P -2 VGT -2 RB-I ACT -I 146 1006 HALLWAY P -1 P -1 P -1 P -1 P -2 CPT-1 RB-1 ACT -I 141 IOOH HALLWAY P -1 P -1 P -1 P -1 P -2 CPT-1 RB-I ACT -1 146 1001 FtALL WAY P -I P -1 P -1 P -1 P -2 GPT -1 RB-I ACT -1 14,01 IOOJ HALLWAY P -1 P -1 P -1 P -1 P -2 GPT-I RB-1 ACT -I 1441A TOOK HALLWAY P -1 P -1 P -1 P -1 P -2 CPT-1 RB-I AOT -1 AS SELECTED BY DESIGNER TOOL HALLWAY P -1 P -1 P -1 P -! P -2 GPT-1 RB-1 ACT -I 150 ZOOM HALLWAY P -1 P -1 P -1 P -1 P -2 OPT-1 RB-I AGT -I 151 IOON HALLWAY P -1 P -1 P -1 P -1 P -2 GPT -1 RB-I ACT -1 152 100.0 HALLWAY P -1 P -1 P -1 P -1 P -2 GPT -1 RB-I ACT -1 153 IOOP HALLWAY P -1 P -1 P -1 P -1 P -2 GPT -1 RB-I ACT -! 154 101 WAITING P -1 P -1 P -1 P -1 P -2 VGT -2 RB-I ACT -1 155 IOTA EXISTING, H.G. TOILET P -3 P-3 P -3 P-3 P -2 SV -! SV -I ACT -1 INTEGRAL BASE W! CORNERS` YVEL.DED SEAMS 1018 NEW PATIENT WAITING P -1 P -1 P -1 P -1 P -2 VGT -2 RB-I AGT -I 101C WAITING AREA P -! P -1 P -1 P -1 P -2 QT-1 RB-I ACT -I IOID WAITING AREA P -1 P -1 P -1 P -1 P -2 OT -1 RB-I ACT -1 IOIE NURSES STATION P -1 P -1 P -1 P -1 P -2 OT-1 RB-I ACT -I IOIF SURGERY SC.HED. WAITING P -1 P -1 P -1 P -1 P -2 OT -1 RB-I ACT -1 102 WORK UP ROOM #i P -1 P -1 P -1 P -1 P -2 VGT -I RB-I ACT -1 103 WORK UP ROOM #2 P -1 P -1 P -1 P -1 P -2 VGT -1 RB-I ACT -1 104 WORK UP ROOM #3 P -1 P -1 P -1 P -1 P -2 VGT -I RB-1 ACT -I 104A STORAGE P -1 P -1 P -! P -1 P -2 VGT -! R5-1 ACT -I 105 EXISTING H.G. TOILET P -3 P-3 P -S P-3 P -2 5V -I 5V -1 ACT -1 SIDE SMOOTH SEAM AT S.V. i V.G.T. 106 SPECIAL TEST #1 P -1 P -1 P -1 P -1 P -2 VGT -I R5-1 ACT -1 101 SPECIAL TEST 02 P -1 P -I P -1 P -1 P -2 VGT -t RB-I ACT -I 106 SPECIAL TEST #3 P -1 P -1 P -1 P -1 P -2 VGT -1 RDA ACT -1 —SEE FINISH LEGEND THIS SHEET FOR FINISH MATERIALS. - GENERAL CONTRACTOR SHALL PROVIDE SAMPLES AND MANUFACTURERS SPECIFICATION CUT SHEETS OF FINISH MATERIALS. SEE GENERAL CONDITIONS ON SHEET A -2.0 FOR DETAILED DESCRIPTION OF SUBMITTAL REQUIREMENTS. —NOT ALL FINISHES ON THE FINISH LEGEND ARE SHOWN ON THIS .SCHEDULE. COORDINATE WITH FLOOR PLAN, REFLECTED CEILING PLAN, AND CABINETRY DRAWINGS. a✓-. IOq SPECIAL TEST #4 P -1 P -1 P -1 P -1 P -2 VGT -1 RB-I ACT -1 110 SPECIAL TEST #5 P -1 P -1 P -1 P -1 P -2 VGT -1 R13-1 ACT -1 III 5PEGIAL TEST #6 P -1 P -1 P -1 P -1 P -2 VGT -I RB-I ACT -1 112 EXISTING H.G. TOILET P -5 P-3 P -S P-5 P -2 SV -1 SY -I AGT -I PROVIDE SMOOTH SEAM AT S.V. i Y.G.T. 113 WORK UP ROOM #4 P -1 P -1 P -1 P -1 P -2 VGT -I RB-I ACT -1 114 WORK UP ROOM #5 P -1 P -1 P -1 P -1 P -2 VGT -1 RB-I ACT -1 115 WORK UP ROOM 06 P -1 P -1 P -1 P -1 P -2 VGT -1 RB-I ACT -I 116 SPECIAL TEST #1 P -1 P -1 P -1 P -1 P -2 VGT -1 RB-1 ACT -I 111 SPECIAL TEST #8 P -1 P -1 P -1 P -1 P -2 VGT -1 RB-I ACT -1 116 EXAM ROOM #1 P -1 P -1 P -1 P -1 P -2 VGT -I R5-1 ACT -I Ilq EXAM ROOM 02 P -1 P -1 P -1 P -1 P -2 VGT -I RS-1 ACT -1 120 EXAM ROOM #3 P -1 P -1 P -1 P -1 P -2 VGT -I RB-I AGT - -I 121 EXAM ROOM #4 P -1 P -1 P -1 P -1 P -2 VGT -I RB-I ACT -I 122 WORKROOM P -1 P -1 P -1 P -1 P -2 5V -I 5V -1 ACT -I 123 EXISTING, H.C. TOILET P -3 P-3 P -3 P-3 P -2 5V -I 5V -1 ACTT -I SIDE SMOOTH SEAM AT S.V. i V.G.T. 124 WORKROOM P -1 P -1 P -1 P -1 P -2 SV -I RB-I AGT -1 125 EXAM ROOM 05 P -1 P -1 P -1 P -1 P -2 VGT -I R5-1 ACT -1 126 EXAM ROOM #6 P -1 P -I P -1 P -1 P -2 VGT -I R5-1 ACT -1 12-1 EXAM ROOM #1 P -1 P -1 P -1 P -1 P -2 VGT -I RB-1 AGT -1 126 EXAM ROOM #8 P -1 P -1 P -1 P -I P -2 VGT -I RB-I ACT -1 1201 IT ROOM P -1 P -I P -1 P -1 P -2 VGT -I RB-1 ACT -I 130 TREATMENT #1 P -1 P -1 P -1 P -1 P -2 VGT -I R5-1 ACT -1 131 TREATMENT 02 P -1 P -1 P -1 P -1 P -2 VGT -I RB-I ACT -1 132 TREATMENT #3 P -1 P -1 P -I P -1 P -2 VGT -I R5-1 ACT -I 133 TREATMENT #4 P -1 P -1 P -1 P -1 P -2 VGT -I RB-I ACT -1 134 JANITOR P -3 P-3 P -2 VGT -I RS-1 ACT -I FRP-I AT 4'-O" A.F.F. ® MOP SINK LOCATION. 135 SURGERY SC.HED. #I P -1 P -I P -1 P -I P -2 OT-1 RB-I ACT-I 136 SURGERY SCHED. #2 P -1 P -1 P -1 P -1 P -2 QT-1 R15-1 ACT -I 151 SURGERY SC 4ED. #3 P -1 P -1 P -1 P -1 P -2 QT -I RB-I ACT -I 138 SURGERY SGFED. #4 P -1 P -1 P -1 P -1 P -2 QT-1 R5-1 ACT -1 1301 SURGERY SC.HED. 05 P -1 P -1 P -1 P -1 P -2 OT -1 RB-I ACT -1 140 BUSINESS OFFICE P -1 P -1 P -1 P -1 P -2 GPT -I RB-I ACT -I 140A OFFICE SUPERVISOR P -1 P -1 P -1 P -1 P -2 GPT -1 R13-1 ACT -I 1408 APPTS. P -1 P -! P -1 P -1 P -2 CPT- -I R5-1 AGT -I —SEE FINISH LEGEND THIS SHEET FOR FINISH MATERIALS. --GENERAL CONTRACTOR SHALL PROVIDE SAMPLES AND MANUFACTURERS SPECIFICATION GUT SHEETS OF FINISH MATERIALS. SEE GENERAL CONDIT101SI5 ON SHEET A -2.0 FOR DETAILED DESCRIPTION OF SUBMITTAL REQUIREMENTS. —NOT ALL FINISHES ON THE FINISH LEGEND ARE SHOWN ON THIS SGFEDIULE. COORDINATE WITH FLOOR PLAN, REFLECTED CEILING PLAN, AND CABINETRY DRAWINGS. FIN 15H 5CHEDULE w ROOM NO. LOCATION YVALLS TRIM FLOORING WALL BASE CEILING REMARKS r A; N E 5 W _ P -2 ONE COAT PRIMER / TWO GOATS FINISH BENJAMIN MOORE AS SELECTED BY DE516NER PAINT, SEMI &L.OSS x P -3 ONE GOAT PRIMER / TWD GOATS FINISH BENJAMIN MOORE 141 OPTICAL P -1 P -1 P -1 P -I P -2 GPT -1 RB-I ACT -1 --- 141A STORAGE P -1 P -1 P -1 P -1 P -2 VGT -I RB-I ACT -I GP -I 141E CONTACT LENSES P -1 P -1 P -1 P -1 P -2 VGT -2 RB-I AGT -1 u_ 142 OFFICE P -1 P -1 P -1 P -1 P -2 CPT -I RB-I ACT -1 speciFcdw amply with 145 EXISTING, H.G. TOILET P-3 P -3 P-3 P-3 P -2 5Y -I SV -I AGT -I SIDE SMOOTH SEAM AT S.V. i V.G.T. 144 FINANCIAL SUPERVISOR. P -1 P -1 P -1 P -1 P -2 GPT -1 RB-I ACT -I - INTERFACE ACCT 145 FINANCIAL SUPPORT P -1 P -1 P -I P -1 P -2 CPT -I RB-I AGT -I 4" RUBBER DOVE BASE #1 146 LOUNGE P -1 P -1 P -1 P -1 P -2 VGT -I RB-I ACT - -I 141 PAYROLL P -1 P -1 P -1 P -1 P -2 GPT -I RB-I ACT -1 A -8.1 146 MEDICAL RECORD P -1 P -1 P -1 P -1 P -2 CPT-1 RB-I ACT -I COUNTERTOPS- SEE CABINETRY. 14,01 DRS. OFFICE P -1 P -1 P -1 P -1 P -2 GPT -1 R13-1 ACT -I AS SELECTED BY DESIGNER 1441A EX. GONVENIENGE TILT ROOM P-3 P -3 P-3 P-3 P -2 PT -! PT-I ACT-1 PROVIDE SMOOTH SEAM AT S.V. i Y.C.T. AS SELECTED BY DESIGNER °d-IOYE:R YYVAI.LS T -I - T -1 T -1 150 DRS. OFFICE P -1 P -1 P -1 P -1 P -2 CPT -I R5-1 ACT -I 5UR -! 151 RESEARCH ASSIST. P -1 P -1 P -1 P -1 P -2 GPT -1 RB-I ACT -I z IL 152 HUMAN RE50I.RGES P -1 P -1 P -1 P -1 P -2 CPT -I RB-I ACT -1 153 ADMIN. OFFICE P -I P -1 P -I P -1 P -2 CPT -I RB-1 ACT -I 154 STUDY COORDINATOR P -1 P -1 P -I P -1 P -2 OPT -1 RB-I ACT -1 155 AUDITOR P -1 P -1 P -1 P -I P -2 CPT -I RB-I ACT -I —SEE FINISH LEGEND THIS SHEET FOR FINISH MATERIALS. - GENERAL CONTRACTOR SHALL PROVIDE SAMPLES AND MANUFACTURERS SPECIFICATION CUT SHEETS OF FINISH MATERIALS. SEE GENERAL CONDITIONS ON SHEET A -2.0 FOR DETAILED DESCRIPTION OF SUBMITTAL REQUIREMENTS. —NOT ALL FINISHES ON THE FINISH LEGEND ARE SHOWN ON THIS .SCHEDULE. COORDINATE WITH FLOOR PLAN, REFLECTED CEILING PLAN, AND CABINETRY DRAWINGS. a✓-. ' INTERIOR IF A,T NS ONLY Ell (ANY EXTERIOR MODIFICATION MAY REQUIRE A BOARD APPEARANCE) FIN 15H LEGEND SYMBOL DESCRIPTION MANUFACTURER COLOR REMARKS . CC tf� P -1 ONE COAT PRIMER / TWO COATS FINISH BENJAMIN MOORE AS SELECTED BY DE516NER PAINT, SATIN FINISH LATEX _ P -2 ONE COAT PRIMER / TWO GOATS FINISH BENJAMIN MOORE AS SELECTED BY DE516NER PAINT, SEMI &L.OSS x P -3 ONE GOAT PRIMER / TWD GOATS FINISH BENJAMIN MOORE AS SELECTED BY DESIGNER EPDXY. FRP -I FIBERGLASS REINFORCED PANELS ACROVYN AS SELECTED BY DESIG,hER. PROVIDE FRP TRIMS AS REOV. a PL4 , 2° ` l;.4 r 04 \ k+ 4 w �x "W`}j 0 \``�` M `� GP -I ONE GOAT PRIMER / TWO GOATS FINISH BENJAMIN MOORE AS SELECTED BY DESIGNER SOFFIT PAINT, SATIN FINISH LATEX z ACT -1 24" X 24" ACOUST. 01-6. TILE i GRID ARMSTRONG, WHITE 'GORTE&A' TEGULAR TILE #'104 OR EQUAL WITH COMPATIBLE 15/16" 6RIDFACE BY DONN OR EQUAL. u_ THIS DRAWING IS THE PROPERTI' OF DAVID WEW JOH &M AU ARCI4TECT UNLESS OTHERWISE PROVIDED FOR BY CONTRACT. THE CONTENTS OF THIS DRAWING ARE CONFIDENTIAL Ql v TO ANY OTHER PARTY EXCEPT AS AGREED TO BY THE ARCHITECT. In my professional j dgwwnt and to the best of my knowledge and berlef, these Plans acid speciFcdw amply with F.E.C. 2004 EDDI110N. VGT -I VGT -2 VINYL COMPOSITE TILE #1 6" WIDE WOOD VINYL SLAT MANNINSTON - AS SELECTED BY DE516NER. - 'DESIGNER E55ENTIAL5' 12' x 12 ", I!b" GAUGE. COLORS AND PATTERN AS SELECTED BY DE516NER - z PT -I PORCELAIN TILE #1 DALTILE OR EO. AS SELECTED BY DESIGNER. SEE PCB-I FOR MATCHING COVE BASE. u. 9 U GPT -1 OFT-2 CARPET TILE #1 - ACCENT CARPET TILE 02 - ACCENT - INTERFACE ACCT AS SELECTED BY DESIGNER. AS SELECTED BY DESIGNER. TAG -TILE INSTALLATION. LAYOUT PATTERN AS PER DESIGNER. ALLOWANCE: #31.00/50. YD. FOR MATERIAL AND INSTALLATION. TAG -TILE INSTALLATION. LAYOUT PATTERN AS PER DESIGNER. ALLOWANCE: *31.00/50. YD. FOR MATERIAL AND INSTALLATION. J SV -I B VINYL #1 W/ 4" INTEGRAL WALL MfANNINGTON MANNIN&TON NEEDED SEAMS R15-1 4" RUBBER DOVE BASE #1 BURKE MERGER AS SELECTED BY DESIGNER. - j QQ Ip P65-1 PORCELAIN TILE COVE BASE #1 DALTIL.E OR ESA AS SELECTED BY DE516NER. PROVIDE PORCELAIN TILE COVE BASE 'INSIDE CORNER' i 'OUTSIDE CORNER' TRIMS AS REOD. DATE PERMIT SET 04/22/14 SHEET NO. A -8.1 PL -I PLASTIC, LAMINATE #1 - AS SELECTED BY DESIGNER COUNTERTOPS- SEE CABINETRY. PL -2 PLASTIC LAMINATE #2 - AS SELECTED BY DESIGNER. VERTICAL SURFACES- SEE CABINETRY. PL-5 PLASTIC LAMINATE #3 - AS SELECTED BY DESIGNER ACCENTS i REVEALS- SEE CABINETRY. PL-4 PLASTIC LAMINATE #3 - AS SELECTED BY DESIG,NER. VERTICAL SURFACES- SEE CABINETRY. V PL-P5 PLASTIC, LAMINATE #3 - AS SELECTED BY DESIGNER ACCENTS i REVEALS - SEE CABINETRY. F 5UR -! SOLID SURFACE MATERIAL CORIAN AS SELECTED BY DESIGNER. REST ROOM VANITIES z IL — COORDINATE FINISHES WITH FLOOR PLAN, REFLECTED CEILING PLAN, AND CABINETRY DRAWINGS. SEE FINISH SCHEDULE FOR GENERAL LOCATIONS. d fi f,p .gib :t. . CC tf� � O .-4 H Wm tD zz ct? Qt o �.co a Ilk + En �4 co ou U) u 0 45 M--1 0 '...r (D � cD Fit U� A en go x z M a, O a PL4 , 2° ` l;.4 r 04 \ k+ 4 w �x "W`}j 0 \``�` M `� AOL � .Q Q} co -F� Lo U 0 a THIS DRAWING IS THE PROPERTI' OF DAVID WEW JOH &M AU ARCI4TECT UNLESS OTHERWISE PROVIDED FOR BY CONTRACT. THE CONTENTS OF THIS DRAWING ARE CONFIDENTIAL AND SHALL NOT BE TRANSMITTED TO ANY OTHER PARTY EXCEPT AS AGREED TO BY THE ARCHITECT. In my professional j dgwwnt and to the best of my knowledge and berlef, these Plans acid speciFcdw amply with F.E.C. 2004 EDDI110N. z A Ott 4 J � J Q Lu 2 z Q U IL A REVISION DATE DATE PERMIT SET 04/22/14 SHEET NO. A -8.1