14-946-023I FINISH NOTES I
1. ALL FLOOR FINISHES TO MEET GLASS I FIRE SPECIFICATIONS.
ALL WALL FINISI TO MEET GLASS "A ' FIRE SPECIFICATIONS.
BOTTOM OF ALL SOFFITS SHALL BE PAINTED WITH PAINT #3 (P -3).
VERTICAL FACE OF SOFFITS SHALL BE PAINTED WITH PAINT #1 (P-0-
U.O.N.
ALL DOOR FRAMES, FRAMES AND TRIMS SHALL BE PAINTED, COLOR
P -2, BUT SHALL BE SEMI -GLOSS LUSTER.
JANITORS CLOSET SHALL BE FINISHED WITH FRP -I UP TO 4' -0' A.F.F.
AND THEN CONTINUE THE REST OF THE WALLS WITH PAINT #4 (P-4)
EPDXY (AS APPLICABLE).
ALL AREAS TO RECEIVE CARPET SHALL BE CARPET TILE #1 (VGT -2)
ADHERED WITH TAG -TILE. MANUFACTURER TO PROVIDE
SPECIFICATIONS FOR TAG -TILE INSTALLATION PROCEDURES.
TEL CO ROOM SHALL RECEIVE 3/4" PLYWOOD BACKBOARD AS
DESIGNATED ON FLOOR PLAN. BACK BOARD SHALL EXTEND FROM
FLOOR TO CEILING AND SHALL BE TREATED WITH A
FIRE- RETAIRDENT PAINT (BLACK).
INDICATES LOCATIONS OF INPROGORP /CHAIR -RAIL . SEE FLOOR PLAN
SHEET A -6.0 FOR EXACT LOCATIONS, INPROGORP.COM, #500, 3'
HIGH. COORDINATE MOUNTING HT. W 4 EXACT COLOR WITH DESIGNER
ALL EXAM ROOMS, WORK -UP ROOMS, SPECIAL TESTS ROOMS SHALL.
RECEIVE AN ACCENT PAINT COLOR. LOCATION TO BE DETERMINED
BY DESIGNER.
ALL EXAM ROOMS SHALL. RECEIVE TWO (2) COLOR VGT PATTERN,
QUARTER TURNED INSTALLATION. COLORS TO BE SELECTED BY
DE516NER. MANNIN&TON, DESIGNER ESSENTIALS OR EQUAL.
G.G. SHALL PATCH AND REPAIR ANY EXISTING WALL SURFACE TO
REMAIN. PROVIDE FLUSH, LEVEL, AND SMOOTH TRANSITION BETPEEN
NEW AND EXISTING FINISHES.
12. 60. SHALL PATCH, SAND, LEVEL, EXISTING SLAB AS REQUIRED FOR
ALL NEW FINI51-ES.
6.0. SHALL PROVIDE MATERIAL AND COLOR SAMPLES FOR ALL
FINISf SELECTED BY DESIGNER SEE &ENERAL CONDITIONS ON
SHEET A -2A FOR REQUIRED SUBMITTALS.
FIN 15H SCHEDULE
ROOM
NO.
LOCATION
WALLS
TRIM
FLOORING
WALL BASE
CEILING
REMARKS
N
E
S
W
_
P -2
ONE GOAT PRIMER / TWO GOATS FINISH
BENJAMIN MOORE
AS SELECTED BY DESIGNER
PAINT, SEMI GLOSS
z
P-3
ONE GOAT PRIMER / TWO GOATS FINISH
BENJAMIN MOORE
AS SELECTED BY DE516NER
100
ENTRY LOBBY
P -1
P -1
P -1
P -1
P -2
PT -I 1
RB-I
ACT -1
t lvl
IOOA
EXISTING STAIR #1
-
-
-
-
-
-
-
-
RFM TO ARCH'S DRAWINGS
IOOB
EXISTING STAIR #2
-
-
-
-
-
-
-
-
REFER TO ARCHS DRAWIN65
IOOC
EXISTING STAIR #3
-
-
-
-
-
-
-
-
REFER TO ARCH'S DRAWINGS
IOOD
EXISTING ELEVATOR
-
_
_
_
_
_
-
-
REFER TO ARCHS DRAWINGS
IOOE
HiALLWAY
P -I
P -I
P -I
P -I
P -2
P -2
VGT -2
PT-I
RB-I
AGT -1
SEE FINISH PLAN FOR TRANSITIONS
BETMEN MATERIALS
IOOF
HALLWAY
P -1
P -1
P -1
P -1
P -2
P -2
P'T -I
VGT -2
R3-1
ACT -I
ACT -1
1006
14AL.L.WAY
P -1
P -1
P -1
P -1
P -2
P -2
VGT -2
VGT -2
RB-I
ACT -1
ACT -1
IOOH
HALLWAY
P -1
P -1
P -1
P -I
P -2
P -2
VGT -2
VGT -2
RB-1
ACT -I
ACT -I
1001
HALLWAY
P -1
P -I
P -1
P -1
P -2
P -2
VGT -2
'VCT-2
RB-1
ACT -1
ACT -1
IOOJ
HALLWAY
P -1
P -1
P -1
P -1
P -2
P -2
VGT -2
V
RB-1
ACT -I
ACT -I
TOOK
HALLWAY
P -1
P -1
P -1
P -1
P -2
P -2
VGT -2
RB-I
ACT -1
IDOL
HALLWAY
P -1
P -1
P -1
P -I
P -2
PIN
VGT -2
ACT -I
RB-I
ACT -1
SHOVER WALLS
ZOOM
HALLWAY
P -1
P -1
P -1
P -1
P -2
VGT -2
150
RB-I
ACT -1
P -1
IOON
HALLWAY
P -1
P -1
P -1
P -1
P -2
151
VGT -2
P -1
RB-I
ACT -I
P -1
100.0
14AL.L LAY
P -1
P -1
P -1
P -I
P -2
P -1
VGT -2
P -1
RS-1
ACT -I
VGT -2
IOOP
HALLWAY
P -1
P -i
P -1
P -1
P -2
P -1
VGT -2
P -2
RB-I
ACT -1
ACT -1
101
WAITING
P -1
P -I
P -1
P -1
P -2
VGT -2
RB-I
AC-T-1
ACT -1
IOTA
EXISTING H.G. TOILET
P -3
P-3
P -3
P-3
P -2
P -2
PT -I
RB-I
PT-1 1
ACT -I
INTEGRAL BASE W/ CORNERS,
WELDED SEAMS
1015
NEW PATIENT WAITING
P -1
P -1
P -1
P -1
P -2
PT -I
PT-I 1
ACT -1
1010
WAITING AREA
P -1
P -1
P -1
P -1
P -2
VGT -2
RB-I
ACT -I
1010
WAITING AREA
P -1
P -1
P -1
P -1
P -2
VGT -2
RB-I
ACT-[
IOIE
NURSES STATION
P -1
P -I
P -1
P -1
P -2
VGT -2
RB-I
ACT -I
IOIF
Y SGHED. WAITING
P -1
P -1
P -1
P -1
P -2
VGT -2
RB-I
ACT -1
102
WORK UP ROOM 01
P -1
P -1
P -1
P -1
P -2
VGT -2
RB-I
ACT -1
103
WORK UP ROOM #2
P -1
P -1
P -1
P -1
P -2
VGT -2
R5-1
ACT -1
104
WORK UP ROOM 03
P -1
P -1
P -1
P -1
P -2
VGT -2
RB-I
ACT - -I
104.A
CLOSET 1
P -1
P -1
P -1
P -1
P -2
VGT -2
R5-1
AGT -I
105
EXISTING H.G. TOILET
P -3
P-3
P -3
P-3
P -2
PT-1
PT-I 1
ACT -1
106
SPECIAL TEST #1
P -1
P -1
P -1
P -1
P -2
VGT -2
RB-I
AGT -1
1011
SPECIAL TEST #2
P -1
P -1
P -1
P -1
P -2
VGT -2
RB-1
ACT -I
108
SPECIAL TEST 03
P -1
P -1
P -1
P -1
P -2
VGT -2
RB-I
ACT -I
IOq
SPECIAL TEST #4
P -1
P -1
P -1
P -1
P -2
VGT -2
R5-1
ACT -I
110
SPECIAL TEST #5
P -1
P -1
P -1
P -1
P -2
VGT -2
RB-I
ACT -1
III
SPECIAL TEST #6
P -1
P -1
P -1
P -I
P -2
VGT -2
R13-1
ACT -I
112
EXISTING H.G. TOILET
P -3
P-5
P -3
P-3
P -2
PT-)
PT -I 1
ACT -1
113
WORK UP ROOM #4
P -1
P -1
P -1
P -1
P -2
VGT -2
RB-I
ACT -I
114
WORK UP ROOM #5
P -1
P -1
P -1
P -I
P -2
VGT -2
REA
ACT -1
115
WORK UP ROOM 06
P -1
P -1
P -1
P -1
P -2
VGT -2
RB-I
ACT -1
104A
CLOSET
P -1
P -1
P -1
P -I
P -2
VGT -2
R5-1
ACT -1 1
116
SPECIAL TEST #?
P -1
P -1
P -1
P -1
P -2
VGT -2
RB-1
ACT -1
II'1
SPECIAL TEST #6
P -1
P -1
P -1
P -1
P -2
VGT -2
R5-1
ACT -I
116
EXAM ROOM 01
P -1
P -1
P -1
P -1
P -2
VGT -2
RB-I
ACT -I
Ilq
EXAM ROOM 02
P -1
P -1
P -1
P -1
P -2
VGT -2
RB-I
ACT -1
120
EXAM ROOM 03
P -1
P -1
P -1
P -1
P -2
VGT -2
RB-I
ACT -1
121
EXAM ROOM #4
P -1
P -1
P -1
P -1
P -2
VGT -2
RB-I
ACT -I
122
WORKROOM
P -1
P -1
P -1
P -1
P -2
SV - -1
5V -I
ACT -1
123
EXISTING H.G. TOILET
P -3
P-3
P -3
P-3
P -2
PT -I
1
PT -I
ACT -1
124
WORKROOM
P -1
P -1
P -1
P -1
P -2
SV -I
5V -1 1
ACT -I
125
EXAM ROOM #5
P -1
P -1
P -1
P -1
P -2
VGT -2
1
RB-I
ACT -I
126
EXAM ROOM #6
P -1
P -1
P -1
P -1
P -2
VGT -2
RB-1
AGT -I
127
EXAM ROOM #T
P -1
P -1
P -1
P -I
P -2
VGT -2
RB-1
ACT -1
126
EXAM ROOM #6
P -1
P -1
P -1
P -I
P -2
VGT -2
R13-1
ACT -I
12q
IT ROOM
P -1
P -1
P -1
P -1
P -2
VGT -2
REA
ACT -I
130
TREATMENT #1
P -1
P -1
P -1
P -1
P -2
VGT -2
RB-I
PCT -1
131
TREATMENT #2
P -1
P -1
P -1
P -1
P -2
VGT -2
RB-1
ACT -1
132
'TREATMENT 03
P -1
P -1
P -1
P -1
P -2
VGT -2
RB-1
ACT -I
133
TREATMENT #4
P -1
P -1
P -1
P -1
P -2
VGT -2
RB-I
ACT -I
134
JANITOR
P -3
FfUq4
FRPLI
P-3
P -2
VGT -2
RS-I
ACT-1
FRP -I AT 4'-O" A F.F.
• MOP SING LOCATION.
135
SURGERY SGHED. #1
P -1
P -1
P -1
P -1
P -2
VGT -2
R5-1
ACT -1
136
SURGERY SGHED. #2
P -1
P -1
P -1
P -1
P -2
VGT -2
RB-1
A4,T -1
137
SURGERY SGHED. #5
P -1
P -1
P -1
P -1
P -2
VGT -2
RB-I
ACT -1
136
SURGERY SC -ED. #4
P -1
P -1
P -1
P -1
P -2
VGT -2
RB-1
ACT -1
13q
SURGERY SGHED. #5
P -1
P -1
P -1
P -1
P -2
VGT -2
RB-1
ACT -I
140
BUSINESS OFFICE
P -1
P -1
P -1
P -1
P -2
VGT -2
RB-1
ACT -I
140A
OFFICE SUPERVISOR
P -1
P -I
P -I
P -1
P -2
VGT -2
RB-I
ACT -1
-,SEE FINISH LEGEND THIS SHEET FOR FINISH MATERIALS.
h6ENERAL CONTRACTOR SHALL PROVIDE SAMPLES AND MANUFACTURERS SPECIFICATION CUT SHEETS OF FINISH MATERIALS. SEE GENERAL CONDITIONS ON
SHEET A -2.0 FOR DETAILED DESCRIPTION OF SUBMITTAL REQUIREMENTS.
-NOT ALL FINISHES ON THE FINISH LEGEND ARE SHOWN ON THIS SCHEDULE. COORDINATE WITH FLOOR PLAN, REFLECTED CEILING PLAN, AND CABINETRY
DRAWINGS.
FIN 15H SCHEDULE
ROOM
140•
LOCATION
DESCRIPTION
TRIM
FLOORING
WALL BASE
CEILING
REMARKS
N
E
S
W
_
P -2
ONE GOAT PRIMER / TWO GOATS FINISH
BENJAMIN MOORE
AS SELECTED BY DESIGNER
PAINT, SEMI GLOSS
z
P-3
ONE GOAT PRIMER / TWO GOATS FINISH
BENJAMIN MOORE
AS SELECTED BY DE516NER
1408
APPTS.
P -1
P -1
P -I
P -1
P -2
VGT -2
RS-1
ACT -I
t lvl
141
OPTICAL
P -1
P -1
P -1
P -1
P -2
PT-I
RB-I
ACT -1
ONE GOAT PRIMER / TWO GOATS FINISH
141A
CL�OSE'1 1
P -I
P -1
P -1
P -1
P -2
VGT -2 1
RB-I
AGT -1
THIS DRWNG IS THE PROPERTY OF
1415
CONTACT LENSES
P -I
P -1
P -1
P -1
P -2
VGT -2
RB-I
ACT -I
F.B.C. 2004 EDIX110N.
142
OFFICE
P -1
P -1
P -1
P -1
P -2
VINYL COMPOSITE TILE 01
b" WIDE WOOD/ VINYL 1
VGT -2
RB-1
ACT-[
z
143
EXISTIN6 H.G. TOILET
P-5
P-6
P-3
P-3
P -2
CARPET TILE #1 - ACCENT
CARPET TILE #2 - ACCENT
PT-I
AS SELECTED BY DESI&NL'Z-R .
AS SELECTED BY DESIGNER
PT-I 1
ACT -1
SV -1
144
FINANCIAL SUPERVISOR
P -1
P -1
P -1
P -1
P -2
BURLGE MERGER
VGT -2
-
RB-I
ACT -1
PORCELAIN TILE COVE BASE #)
145
FINANCIAL SUPPORT
P -1
P -1
P -1
P -1
P -2
DATE
VGT -2
PERMIT SET
R5-1
ACT -1
SHEET NO.
146
LOUNGE
P -1
P -1
P -1
P -1
P -2
VGT -2
PL -1
RB-1
ACT -I
AS SELECTED BY DE516NER
14'1
PAYROLL
P -1
P -1
P -1
P -1
P -2
'VCT-2
PLASTIC LAMINATE #3
RB-I
ACT -1
AGGENTS 4 REVEALS- SEE CABINETRY.
146
MEDICAL RECORD
P -1
P -1
P -I
P -1
P -2
PL-5
V
-
RB-1
ACT -I
1441
ORS. OFFICE
P -1
P -1
P -1
P -1
P -2
RB-I
ACT -1
1441A
EX. CONVENIENCE TLT ROOM
P-3
P-3
P-3
P-3
P -2
PIN
PT -I
ACT -I
REST ROOM VANITIES
SHOVER WALLS
T -1
-
T -I
T -1
z
E
150
DRS.OFPIGE
P -1
P -1
P -1
P -1
P -2
F\ICT-2
RB-1
ACT -1
151
RESEARCH ASSIST.
P -1
P -1
P -I
P -1
P -2
VGT -2
RB-I
ACT -I
152
HUMAN RESOURCES
P -1
P -1
P -1
P -1
P -2
VGT -2
RDA
ACT -1
153
ADMIN. OFFICE
P -1
P -1
P -1
P -1
P -2
VGT -2
R5-1
ACT -1
154
STUDY COORDINATOR
P -1
P -1
P -1
P -1
P -2
VGT -2
RB-I
ACT -1
155
AUDITOR
P -1
P -1
P -1
P -1
P -2
VGT -2 1
RB-I
ACT -1
1 --7
-SEE FINISH 1.E.GEND THIS SHEET FOR FINISH MATERIALS.
h6ENERAL CONTRACTOR SHALL PROVIDE SAMPLES AND MANUFACTURERS SPECIFICATION OUT SHEETS OF FINISH MATERIALS. SEE GENERAL CONDITIONS ON
SHEET A -20 FOR DETAILED DESCRIPTION OF SUBMITTAL REQUIREMENTS.
-NOT ALL FINISHES ON THE FINISH LEGEND ARE SHOWN ON THIS SCHEDULE. COORDINATE WITH FLOOR PLAN, REFLECTED CEILING PLAN, AND CABINETRY
DRAWINGS.
FINISH LEGEND
SYMBOL.
DESCRIPTION
MANUFACTURER
COLOR
�S
CO
P-1
ONE GOAT PRIMER / TWO COATS FINISH
BENJAMIN MOORE
AS SELECTED BY VESI&NER.
PAINT, SATIN FINISH LATEX
_
P -2
ONE GOAT PRIMER / TWO GOATS FINISH
BENJAMIN MOORE
AS SELECTED BY DESIGNER
PAINT, SEMI GLOSS
z
P-3
ONE GOAT PRIMER / TWO GOATS FINISH
BENJAMIN MOORE
AS SELECTED BY DE516NER
EPDXY.
�a
FRP-1
FIBEROLA55 REINFORCED PANELS
AGROVYN
AS SELECTED BY DESIGNER.
PROVIDE FRP TRIMS AS REQ`D.
a
wk ,..a.
�i � .*,
t lvl
i �zi� Agg
c
� I
Q—t a
P4 a
UZI
Ln
I~
GP -1
ONE GOAT PRIMER / TWO GOATS FINISH
BENJAMIN MOORE
AS SELECTED BY DESIGNER
SOFFIT PAINT, SATIN FINISH LATEX
Z
ACT -I
24" X 24" AC.OLW. GL6. TILE # 6RID
ARMSTRONG
WHITE
'GORTE&A' TESULAR TILE #'104 OR EQUAL
WITH GOMPATIBLF r IDFACE BY
DONN OR EQUAL (GLA55-
u-
THIS DRWNG IS THE PROPERTY OF
DWD WK JOIfifSON AIA AR1g#W
UNLESS OTHERWISE PROVIDED FOR
BY CONTRACT. THE CONIENIS OF
THIS DRAWING ARE CONFlDEMIAL
V
TO ANY OTHER PARTY EXCEPT AS
AGREED TO BY THE ARCHITECT.
In my professional judgement and
to the best of my bowledge and
beief, these plons and
qedrations comply with
F.B.C. 2004 EDIX110N.
R
z
I1
VGT -I
VGT -2
VINYL COMPOSITE TILE 01
b" WIDE WOOD/ VINYL 1
MANNIN&TON
-
AS SELECTED 5Y DESIGNER.
-
`VE516NER ESSENTIALS' 12' x 12 ", I /6"
GAUGE. COLOR. AND ;
SELECTED BY DESI6 (GLASS -1)
(GLASS -I) 1 1
z
PT—I
PORCELAIN TILE 01
DALTILE OR EQ.
AS SELECTED BY DESIGNER
SEE PGB-1 FOR MATCHING DOVE BASE. (GL.A i
LL
9
4
l�
VGT -2
CPT -2
CARPET TILE #1 - ACCENT
CARPET TILE #2 - ACCENT
-
INTERFACE
ACCENT
AS SELECTED BY DESI&NL'Z-R .
AS SELECTED BY DESIGNER
TAG —TILE INSTALLATION. LAYOUT PATTERN AS
PER Di-.51SNB2. ALLOWANCE: $5100
FOR MATERIAL AND INSTALLATION (GLASS -I
TAG -TILE INSTALLATION. LAYOUT PATTERN AS
PER DESIbtM ALLOWANCE: $3'1
FOR MATERIAL AND INSTALLATION. LA55 -1'
Lu
3:
2
SV -1
35� VINYL #1 W/ 4" INTEGRAL WALL
MANNIN&TON
MANNIN&TON
YIELDED SEAMS (GLASS -I) 1
RB-1
4" RUBBER COVE BASE #1
BURLGE MERGER
AS SELECTED BY DE5I6NM
-
�j
ID
P05-1
PORCELAIN TILE COVE BASE #)
DALTILE
OR EQUAL
AS SELECTED BY DESIGN.
PROVIDE PORCELAIN TILE COVE BASE
'INSIDE CORNER' t NER'
TRIMS AS RE0%7 (GLASS -I 1
I
DATE
PERMIT SET
04/22/14
SHEET NO.
A -8.1
PL -1
PLASTIC LAMINATE #1
-
AS SELECTED BY DE516NER
COUNTERTOPS- SEE CABINETRY.
PL -2
PLASTIC, LAMINATE #2
-
AS SELECTED BY DESIGNER.
VERTICAL SURFACES- SEE CABINETRY.
PL-3
PLASTIC LAMINATE #3
-
AS SELECTED BY DESIGNER
AGGENTS 4 REVEALS- SEE CABINETRY.
4
PL-4
PLASTIC LAMINATE #3
-
AS SELECTED BY DE516NER
VERTICAL SURFACES- SEE CABINETRY.
.�
PL-5
PLASTIC LAMINATE #3
-
AS SELECTED BY DESIGNER.
ACCENTS 4 REVEAL-15- SEE CABINETRY.
SUR -1
SOLID SURFACE MATERIAL
CORIAN
AS SELECTED BY DESI6NER.
REST ROOM VANITIES
z
E
- COORDINATE FINISHES WITH FLOOR PLAN, REFLECTED CEILING PLAN, AND CABINETRY DRAWINGS. SEE FINISH 5C MDULE FOR 6EN ERAL. LOCATIONS.
i\
1\
,B
CO
Cr?
p►-,a^
W �
�o
PT4 a V-4 co to
C�� 41
.;
O-Z -<4 + O
U2 CD
i--4
0 +� D ou
I--la�
W O G M
�a
Z
i�-
Z`
a
wk ,..a.
�i � .*,
t lvl
i �zi� Agg
c
� I
Q—t a
P4 a
UZI
Ln
I~
E-4
0
Pail
-N f�0
P
U
O
LYi
P4
THIS DRWNG IS THE PROPERTY OF
DWD WK JOIfifSON AIA AR1g#W
UNLESS OTHERWISE PROVIDED FOR
BY CONTRACT. THE CONIENIS OF
THIS DRAWING ARE CONFlDEMIAL
AND SHALL NOT BE TRANSMITTED
TO ANY OTHER PARTY EXCEPT AS
AGREED TO BY THE ARCHITECT.
In my professional judgement and
to the best of my bowledge and
beief, these plons and
qedrations comply with
F.B.C. 2004 EDIX110N.
R
z
N
Z
p
~ oij
9
!°q
<QQ
J
Lu
3:
2
O
v
IL
ra
REVISION
DATE
1 COMIDUM.
06/18/14
DATE
PERMIT SET
04/22/14
SHEET NO.
A -8.1