Loading...
14-946-023I FINISH NOTES I 1. ALL FLOOR FINISHES TO MEET GLASS I FIRE SPECIFICATIONS. ALL WALL FINISI TO MEET GLASS "A ' FIRE SPECIFICATIONS. BOTTOM OF ALL SOFFITS SHALL BE PAINTED WITH PAINT #3 (P -3). VERTICAL FACE OF SOFFITS SHALL BE PAINTED WITH PAINT #1 (P-0- U.O.N. ALL DOOR FRAMES, FRAMES AND TRIMS SHALL BE PAINTED, COLOR P -2, BUT SHALL BE SEMI -GLOSS LUSTER. JANITORS CLOSET SHALL BE FINISHED WITH FRP -I UP TO 4' -0' A.F.F. AND THEN CONTINUE THE REST OF THE WALLS WITH PAINT #4 (P-4) EPDXY (AS APPLICABLE). ALL AREAS TO RECEIVE CARPET SHALL BE CARPET TILE #1 (VGT -2) ADHERED WITH TAG -TILE. MANUFACTURER TO PROVIDE SPECIFICATIONS FOR TAG -TILE INSTALLATION PROCEDURES. TEL CO ROOM SHALL RECEIVE 3/4" PLYWOOD BACKBOARD AS DESIGNATED ON FLOOR PLAN. BACK BOARD SHALL EXTEND FROM FLOOR TO CEILING AND SHALL BE TREATED WITH A FIRE- RETAIRDENT PAINT (BLACK). INDICATES LOCATIONS OF INPROGORP /CHAIR -RAIL . SEE FLOOR PLAN SHEET A -6.0 FOR EXACT LOCATIONS, INPROGORP.COM, #500, 3' HIGH. COORDINATE MOUNTING HT. W 4 EXACT COLOR WITH DESIGNER ALL EXAM ROOMS, WORK -UP ROOMS, SPECIAL TESTS ROOMS SHALL. RECEIVE AN ACCENT PAINT COLOR. LOCATION TO BE DETERMINED BY DESIGNER. ALL EXAM ROOMS SHALL. RECEIVE TWO (2) COLOR VGT PATTERN, QUARTER TURNED INSTALLATION. COLORS TO BE SELECTED BY DE516NER. MANNIN&TON, DESIGNER ESSENTIALS OR EQUAL. G.G. SHALL PATCH AND REPAIR ANY EXISTING WALL SURFACE TO REMAIN. PROVIDE FLUSH, LEVEL, AND SMOOTH TRANSITION BETPEEN NEW AND EXISTING FINISHES. 12. 60. SHALL PATCH, SAND, LEVEL, EXISTING SLAB AS REQUIRED FOR ALL NEW FINI51-ES. 6.0. SHALL PROVIDE MATERIAL AND COLOR SAMPLES FOR ALL FINISf SELECTED BY DESIGNER SEE &ENERAL CONDITIONS ON SHEET A -2A FOR REQUIRED SUBMITTALS. FIN 15H SCHEDULE ROOM NO. LOCATION WALLS TRIM FLOORING WALL BASE CEILING REMARKS N E S W _ P -2 ONE GOAT PRIMER / TWO GOATS FINISH BENJAMIN MOORE AS SELECTED BY DESIGNER PAINT, SEMI GLOSS z P-3 ONE GOAT PRIMER / TWO GOATS FINISH BENJAMIN MOORE AS SELECTED BY DE516NER 100 ENTRY LOBBY P -1 P -1 P -1 P -1 P -2 PT -I 1 RB-I ACT -1 t lvl IOOA EXISTING STAIR #1 - - - - - - - - RFM TO ARCH'S DRAWINGS IOOB EXISTING STAIR #2 - - - - - - - - REFER TO ARCHS DRAWIN65 IOOC EXISTING STAIR #3 - - - - - - - - REFER TO ARCH'S DRAWINGS IOOD EXISTING ELEVATOR - _ _ _ _ _ - - REFER TO ARCHS DRAWINGS IOOE HiALLWAY P -I P -I P -I P -I P -2 P -2 VGT -2 PT-I RB-I AGT -1 SEE FINISH PLAN FOR TRANSITIONS BETMEN MATERIALS IOOF HALLWAY P -1 P -1 P -1 P -1 P -2 P -2 P'T -I VGT -2 R3-1 ACT -I ACT -1 1006 14AL.L.WAY P -1 P -1 P -1 P -1 P -2 P -2 VGT -2 VGT -2 RB-I ACT -1 ACT -1 IOOH HALLWAY P -1 P -1 P -1 P -I P -2 P -2 VGT -2 VGT -2 RB-1 ACT -I ACT -I 1001 HALLWAY P -1 P -I P -1 P -1 P -2 P -2 VGT -2 'VCT-2 RB-1 ACT -1 ACT -1 IOOJ HALLWAY P -1 P -1 P -1 P -1 P -2 P -2 VGT -2 V RB-1 ACT -I ACT -I TOOK HALLWAY P -1 P -1 P -1 P -1 P -2 P -2 VGT -2 RB-I ACT -1 IDOL HALLWAY P -1 P -1 P -1 P -I P -2 PIN VGT -2 ACT -I RB-I ACT -1 SHOVER WALLS ZOOM HALLWAY P -1 P -1 P -1 P -1 P -2 VGT -2 150 RB-I ACT -1 P -1 IOON HALLWAY P -1 P -1 P -1 P -1 P -2 151 VGT -2 P -1 RB-I ACT -I P -1 100.0 14AL.L LAY P -1 P -1 P -1 P -I P -2 P -1 VGT -2 P -1 RS-1 ACT -I VGT -2 IOOP HALLWAY P -1 P -i P -1 P -1 P -2 P -1 VGT -2 P -2 RB-I ACT -1 ACT -1 101 WAITING P -1 P -I P -1 P -1 P -2 VGT -2 RB-I AC-T-1 ACT -1 IOTA EXISTING H.G. TOILET P -3 P-3 P -3 P-3 P -2 P -2 PT -I RB-I PT-1 1 ACT -I INTEGRAL BASE W/ CORNERS, WELDED SEAMS 1015 NEW PATIENT WAITING P -1 P -1 P -1 P -1 P -2 PT -I PT-I 1 ACT -1 1010 WAITING AREA P -1 P -1 P -1 P -1 P -2 VGT -2 RB-I ACT -I 1010 WAITING AREA P -1 P -1 P -1 P -1 P -2 VGT -2 RB-I ACT-[ IOIE NURSES STATION P -1 P -I P -1 P -1 P -2 VGT -2 RB-I ACT -I IOIF Y SGHED. WAITING P -1 P -1 P -1 P -1 P -2 VGT -2 RB-I ACT -1 102 WORK UP ROOM 01 P -1 P -1 P -1 P -1 P -2 VGT -2 RB-I ACT -1 103 WORK UP ROOM #2 P -1 P -1 P -1 P -1 P -2 VGT -2 R5-1 ACT -1 104 WORK UP ROOM 03 P -1 P -1 P -1 P -1 P -2 VGT -2 RB-I ACT - -I 104.A CLOSET 1 P -1 P -1 P -1 P -1 P -2 VGT -2 R5-1 AGT -I 105 EXISTING H.G. TOILET P -3 P-3 P -3 P-3 P -2 PT-1 PT-I 1 ACT -1 106 SPECIAL TEST #1 P -1 P -1 P -1 P -1 P -2 VGT -2 RB-I AGT -1 1011 SPECIAL TEST #2 P -1 P -1 P -1 P -1 P -2 VGT -2 RB-1 ACT -I 108 SPECIAL TEST 03 P -1 P -1 P -1 P -1 P -2 VGT -2 RB-I ACT -I IOq SPECIAL TEST #4 P -1 P -1 P -1 P -1 P -2 VGT -2 R5-1 ACT -I 110 SPECIAL TEST #5 P -1 P -1 P -1 P -1 P -2 VGT -2 RB-I ACT -1 III SPECIAL TEST #6 P -1 P -1 P -1 P -I P -2 VGT -2 R13-1 ACT -I 112 EXISTING H.G. TOILET P -3 P-5 P -3 P-3 P -2 PT-) PT -I 1 ACT -1 113 WORK UP ROOM #4 P -1 P -1 P -1 P -1 P -2 VGT -2 RB-I ACT -I 114 WORK UP ROOM #5 P -1 P -1 P -1 P -I P -2 VGT -2 REA ACT -1 115 WORK UP ROOM 06 P -1 P -1 P -1 P -1 P -2 VGT -2 RB-I ACT -1 104A CLOSET P -1 P -1 P -1 P -I P -2 VGT -2 R5-1 ACT -1 1 116 SPECIAL TEST #? P -1 P -1 P -1 P -1 P -2 VGT -2 RB-1 ACT -1 II'1 SPECIAL TEST #6 P -1 P -1 P -1 P -1 P -2 VGT -2 R5-1 ACT -I 116 EXAM ROOM 01 P -1 P -1 P -1 P -1 P -2 VGT -2 RB-I ACT -I Ilq EXAM ROOM 02 P -1 P -1 P -1 P -1 P -2 VGT -2 RB-I ACT -1 120 EXAM ROOM 03 P -1 P -1 P -1 P -1 P -2 VGT -2 RB-I ACT -1 121 EXAM ROOM #4 P -1 P -1 P -1 P -1 P -2 VGT -2 RB-I ACT -I 122 WORKROOM P -1 P -1 P -1 P -1 P -2 SV - -1 5V -I ACT -1 123 EXISTING H.G. TOILET P -3 P-3 P -3 P-3 P -2 PT -I 1 PT -I ACT -1 124 WORKROOM P -1 P -1 P -1 P -1 P -2 SV -I 5V -1 1 ACT -I 125 EXAM ROOM #5 P -1 P -1 P -1 P -1 P -2 VGT -2 1 RB-I ACT -I 126 EXAM ROOM #6 P -1 P -1 P -1 P -1 P -2 VGT -2 RB-1 AGT -I 127 EXAM ROOM #T P -1 P -1 P -1 P -I P -2 VGT -2 RB-1 ACT -1 126 EXAM ROOM #6 P -1 P -1 P -1 P -I P -2 VGT -2 R13-1 ACT -I 12q IT ROOM P -1 P -1 P -1 P -1 P -2 VGT -2 REA ACT -I 130 TREATMENT #1 P -1 P -1 P -1 P -1 P -2 VGT -2 RB-I PCT -1 131 TREATMENT #2 P -1 P -1 P -1 P -1 P -2 VGT -2 RB-1 ACT -1 132 'TREATMENT 03 P -1 P -1 P -1 P -1 P -2 VGT -2 RB-1 ACT -I 133 TREATMENT #4 P -1 P -1 P -1 P -1 P -2 VGT -2 RB-I ACT -I 134 JANITOR P -3 FfUq4 FRPLI P-3 P -2 VGT -2 RS-I ACT-1 FRP -I AT 4'-O" A F.F. • MOP SING LOCATION. 135 SURGERY SGHED. #1 P -1 P -1 P -1 P -1 P -2 VGT -2 R5-1 ACT -1 136 SURGERY SGHED. #2 P -1 P -1 P -1 P -1 P -2 VGT -2 RB-1 A4,T -1 137 SURGERY SGHED. #5 P -1 P -1 P -1 P -1 P -2 VGT -2 RB-I ACT -1 136 SURGERY SC -ED. #4 P -1 P -1 P -1 P -1 P -2 VGT -2 RB-1 ACT -1 13q SURGERY SGHED. #5 P -1 P -1 P -1 P -1 P -2 VGT -2 RB-1 ACT -I 140 BUSINESS OFFICE P -1 P -1 P -1 P -1 P -2 VGT -2 RB-1 ACT -I 140A OFFICE SUPERVISOR P -1 P -I P -I P -1 P -2 VGT -2 RB-I ACT -1 -,SEE FINISH LEGEND THIS SHEET FOR FINISH MATERIALS. h6ENERAL CONTRACTOR SHALL PROVIDE SAMPLES AND MANUFACTURERS SPECIFICATION CUT SHEETS OF FINISH MATERIALS. SEE GENERAL CONDITIONS ON SHEET A -2.0 FOR DETAILED DESCRIPTION OF SUBMITTAL REQUIREMENTS. -NOT ALL FINISHES ON THE FINISH LEGEND ARE SHOWN ON THIS SCHEDULE. COORDINATE WITH FLOOR PLAN, REFLECTED CEILING PLAN, AND CABINETRY DRAWINGS. FIN 15H SCHEDULE ROOM 140• LOCATION DESCRIPTION TRIM FLOORING WALL BASE CEILING REMARKS N E S W _ P -2 ONE GOAT PRIMER / TWO GOATS FINISH BENJAMIN MOORE AS SELECTED BY DESIGNER PAINT, SEMI GLOSS z P-3 ONE GOAT PRIMER / TWO GOATS FINISH BENJAMIN MOORE AS SELECTED BY DE516NER 1408 APPTS. P -1 P -1 P -I P -1 P -2 VGT -2 RS-1 ACT -I t lvl 141 OPTICAL P -1 P -1 P -1 P -1 P -2 PT-I RB-I ACT -1 ONE GOAT PRIMER / TWO GOATS FINISH 141A CL�OSE'1 1 P -I P -1 P -1 P -1 P -2 VGT -2 1 RB-I AGT -1 THIS DRWNG IS THE PROPERTY OF 1415 CONTACT LENSES P -I P -1 P -1 P -1 P -2 VGT -2 RB-I ACT -I F.B.C. 2004 EDIX110N. 142 OFFICE P -1 P -1 P -1 P -1 P -2 VINYL COMPOSITE TILE 01 b" WIDE WOOD/ VINYL 1 VGT -2 RB-1 ACT-[ z 143 EXISTIN6 H.G. TOILET P-5 P-6 P-3 P-3 P -2 CARPET TILE #1 - ACCENT CARPET TILE #2 - ACCENT PT-I AS SELECTED BY DESI&NL'Z-R . AS SELECTED BY DESIGNER PT-I 1 ACT -1 SV -1 144 FINANCIAL SUPERVISOR P -1 P -1 P -1 P -1 P -2 BURLGE MERGER VGT -2 - RB-I ACT -1 PORCELAIN TILE COVE BASE #) 145 FINANCIAL SUPPORT P -1 P -1 P -1 P -1 P -2 DATE VGT -2 PERMIT SET R5-1 ACT -1 SHEET NO. 146 LOUNGE P -1 P -1 P -1 P -1 P -2 VGT -2 PL -1 RB-1 ACT -I AS SELECTED BY DE516NER 14'1 PAYROLL P -1 P -1 P -1 P -1 P -2 'VCT-2 PLASTIC LAMINATE #3 RB-I ACT -1 AGGENTS 4 REVEALS- SEE CABINETRY. 146 MEDICAL RECORD P -1 P -1 P -I P -1 P -2 PL-5 V - RB-1 ACT -I 1441 ORS. OFFICE P -1 P -1 P -1 P -1 P -2 RB-I ACT -1 1441A EX. CONVENIENCE TLT ROOM P-3 P-3 P-3 P-3 P -2 PIN PT -I ACT -I REST ROOM VANITIES SHOVER WALLS T -1 - T -I T -1 z E 150 DRS.OFPIGE P -1 P -1 P -1 P -1 P -2 F\ICT-2 RB-1 ACT -1 151 RESEARCH ASSIST. P -1 P -1 P -I P -1 P -2 VGT -2 RB-I ACT -I 152 HUMAN RESOURCES P -1 P -1 P -1 P -1 P -2 VGT -2 RDA ACT -1 153 ADMIN. OFFICE P -1 P -1 P -1 P -1 P -2 VGT -2 R5-1 ACT -1 154 STUDY COORDINATOR P -1 P -1 P -1 P -1 P -2 VGT -2 RB-I ACT -1 155 AUDITOR P -1 P -1 P -1 P -1 P -2 VGT -2 1 RB-I ACT -1 1 --7 -SEE FINISH 1.E.GEND THIS SHEET FOR FINISH MATERIALS. h6ENERAL CONTRACTOR SHALL PROVIDE SAMPLES AND MANUFACTURERS SPECIFICATION OUT SHEETS OF FINISH MATERIALS. SEE GENERAL CONDITIONS ON SHEET A -20 FOR DETAILED DESCRIPTION OF SUBMITTAL REQUIREMENTS. -NOT ALL FINISHES ON THE FINISH LEGEND ARE SHOWN ON THIS SCHEDULE. COORDINATE WITH FLOOR PLAN, REFLECTED CEILING PLAN, AND CABINETRY DRAWINGS. FINISH LEGEND SYMBOL. DESCRIPTION MANUFACTURER COLOR �S CO P-1 ONE GOAT PRIMER / TWO COATS FINISH BENJAMIN MOORE AS SELECTED BY VESI&NER. PAINT, SATIN FINISH LATEX _ P -2 ONE GOAT PRIMER / TWO GOATS FINISH BENJAMIN MOORE AS SELECTED BY DESIGNER PAINT, SEMI GLOSS z P-3 ONE GOAT PRIMER / TWO GOATS FINISH BENJAMIN MOORE AS SELECTED BY DE516NER EPDXY. �a FRP-1 FIBEROLA55 REINFORCED PANELS AGROVYN AS SELECTED BY DESIGNER. PROVIDE FRP TRIMS AS REQ`D. a wk ,..a. �i � .*, t lvl i �zi� Agg c � I Q—t a P4 a UZI Ln I~ GP -1 ONE GOAT PRIMER / TWO GOATS FINISH BENJAMIN MOORE AS SELECTED BY DESIGNER SOFFIT PAINT, SATIN FINISH LATEX Z ACT -I 24" X 24" AC.OLW. GL6. TILE # 6RID ARMSTRONG WHITE 'GORTE&A' TESULAR TILE #'104 OR EQUAL WITH GOMPATIBLF r IDFACE BY DONN OR EQUAL (GLA55- u- THIS DRWNG IS THE PROPERTY OF DWD WK JOIfifSON AIA AR1g#W UNLESS OTHERWISE PROVIDED FOR BY CONTRACT. THE CONIENIS OF THIS DRAWING ARE CONFlDEMIAL V TO ANY OTHER PARTY EXCEPT AS AGREED TO BY THE ARCHITECT. In my professional judgement and to the best of my bowledge and beief, these plons and qedrations comply with F.B.C. 2004 EDIX110N. R z I1 VGT -I VGT -2 VINYL COMPOSITE TILE 01 b" WIDE WOOD/ VINYL 1 MANNIN&TON - AS SELECTED 5Y DESIGNER. - `VE516NER ESSENTIALS' 12' x 12 ", I /6" GAUGE. COLOR. AND ; SELECTED BY DESI6 (GLASS -1) (GLASS -I) 1 1 z PT—I PORCELAIN TILE 01 DALTILE OR EQ. AS SELECTED BY DESIGNER SEE PGB-1 FOR MATCHING DOVE BASE. (GL.A i LL 9 4 l� VGT -2 CPT -2 CARPET TILE #1 - ACCENT CARPET TILE #2 - ACCENT - INTERFACE ACCENT AS SELECTED BY DESI&NL'Z-R . AS SELECTED BY DESIGNER TAG —TILE INSTALLATION. LAYOUT PATTERN AS PER Di-.51SNB2. ALLOWANCE: $5100 FOR MATERIAL AND INSTALLATION (GLASS -I TAG -TILE INSTALLATION. LAYOUT PATTERN AS PER DESIbtM ALLOWANCE: $3'1 FOR MATERIAL AND INSTALLATION. LA55 -1' Lu 3: 2 SV -1 35� VINYL #1 W/ 4" INTEGRAL WALL MANNIN&TON MANNIN&TON YIELDED SEAMS (GLASS -I) 1 RB-1 4" RUBBER COVE BASE #1 BURLGE MERGER AS SELECTED BY DE5I6NM - �j ID P05-1 PORCELAIN TILE COVE BASE #) DALTILE OR EQUAL AS SELECTED BY DESIGN. PROVIDE PORCELAIN TILE COVE BASE 'INSIDE CORNER' t NER' TRIMS AS RE0%7 (GLASS -I 1 I DATE PERMIT SET 04/22/14 SHEET NO. A -8.1 PL -1 PLASTIC LAMINATE #1 - AS SELECTED BY DE516NER COUNTERTOPS- SEE CABINETRY. PL -2 PLASTIC, LAMINATE #2 - AS SELECTED BY DESIGNER. VERTICAL SURFACES- SEE CABINETRY. PL-3 PLASTIC LAMINATE #3 - AS SELECTED BY DESIGNER AGGENTS 4 REVEALS- SEE CABINETRY. 4 PL-4 PLASTIC LAMINATE #3 - AS SELECTED BY DE516NER VERTICAL SURFACES- SEE CABINETRY. .� PL-5 PLASTIC LAMINATE #3 - AS SELECTED BY DESIGNER. ACCENTS 4 REVEAL-15- SEE CABINETRY. SUR -1 SOLID SURFACE MATERIAL CORIAN AS SELECTED BY DESI6NER. REST ROOM VANITIES z E - COORDINATE FINISHES WITH FLOOR PLAN, REFLECTED CEILING PLAN, AND CABINETRY DRAWINGS. SEE FINISH 5C MDULE FOR 6EN ERAL. LOCATIONS. i\ 1\ ,B CO Cr? p►-,a^ W � �o PT4 a V-4 co to C�� 41 .; O-Z -<4 + O U2 CD i--4 0 +� D ou I--la� W O G M �a Z i�- Z` a wk ,..a. �i � .*, t lvl i �zi� Agg c � I Q—t a P4 a UZI Ln I~ E-4 0 Pail -N f�0 P U O LYi P4 THIS DRWNG IS THE PROPERTY OF DWD WK JOIfifSON AIA AR1g#W UNLESS OTHERWISE PROVIDED FOR BY CONTRACT. THE CONIENIS OF THIS DRAWING ARE CONFlDEMIAL AND SHALL NOT BE TRANSMITTED TO ANY OTHER PARTY EXCEPT AS AGREED TO BY THE ARCHITECT. In my professional judgement and to the best of my bowledge and beief, these plons and qedrations comply with F.B.C. 2004 EDIX110N. R z N Z p ~ oij 9 !°q <QQ J Lu 3: 2 O v IL ra REVISION DATE 1 COMIDUM. 06/18/14 DATE PERMIT SET 04/22/14 SHEET NO. A -8.1