Loading...
13-748-102N.T.S. ELEC. S (in plastx GATE V; (same si; VACUUN (as Spec WATER iW I Lr LINE FLUSHING VALVE PLUMBED TO PVC OR POLY Irrigation Control Wire GENERAL NOTES: 17670 NW 78th Ave,, Sufte 214 MIAMI, FLORIDA 33015 1. SCOPE OF WORK: The Contractor shall fumish all labor, PHONE: 305-392-1016 n A \ 7 machinery, tools, supplies, and equipment as necessan, to cens, ct I Tu EMAIL: info@rosenberggardner.com CORPORATE LCO000266 15. Valve locations are schematic and shall be adjusted in the field. Techline START o REMOTE CONTROL VALVE WITH DISC and provide an operating system, as indi(.Ated in the Plans. The FILTER AND PRV CONNECTION W Each valve shall be in a separate valve box (10" x 16") min.). When F —a— MALE ADAPTER valves, sprinkler heads, fittings, controllers, electrical, wire and ✓ T PVC OR POLY EXHAUST HEADER PVC OR POLY SUPPLY HEADER fittings, primer, glue, etc.), layout, protection to the public, F– PVC OR POLY SUPPLY HEADER /V minimum of 12" apart to allow grass or groundcover to grow between Techline START 0 PLUMBED TO PVC CONNECTION TecNine STAR CONNECTION T road or pavement surfaces, controller and low voltage feed to the W --AREA PERIMETER SEE DETAIL 4 OF 4 C: CU MALE ADAPTER valves, clean-up, maintenance and guarantee, and as-built plans. —REMOTE CONTROL of 12" from edge of beds. Set all valve boxes, concrete or plastic, in VALVE WITH DISC W (D U_ Techline LATERAL TUBING FILTER AND PRV Techline TUBING LATERAL 2. Contractor shall coordinate with General Contractor or other W 0 0 z LLJ AREA PERIMETER BLANK Techline TUBING nprtinpnt rnntrqr-_tnr,-_ nn tha inh to incitra that chmmwme nrm nr^%,;,4-A < F- III `I Il of 6" of pea gravel at the bottom of the box, with at least 2" of (CENTERED ON MOUND OR BERM) AR J clearance from the bottom of the valve to the top of the gravel. TecNine TUBING LATERAL _AIR/VACUUM RELIEF VALVE L will be conducted. Conduct test in the presence of the Landscape PERIMETER LATERALS LF 2° TO 4° FROM EDGE Techline CENTER FEED LAYOUT N.T.S. AMETE FINISH N.T.S. 2" DISC FILTER N.T.S. W fiE- s 1/2" N Irrigation Control Wire GENERAL NOTES: 17670 NW 78th Ave,, Sufte 214 MIAMI, FLORIDA 33015 1. SCOPE OF WORK: The Contractor shall fumish all labor, PHONE: 305-392-1016 n A \ 7 machinery, tools, supplies, and equipment as necessan, to cens, ct I Tu EMAIL: info@rosenberggardner.com CORPORATE LCO000266 15. Valve locations are schematic and shall be adjusted in the field. cu o REMOTE CONTROL VALVE WITH DISC and provide an operating system, as indi(.Ated in the Plans. The FILTER AND PRV work shall include, but not be limited to, firnisning "terials `pioe, W Each valve shall be in a separate valve box (10" x 16") min.). When F —a— valves, sprinkler heads, fittings, controllers, electrical, wire and ✓ T PVC OR POLY SUPPLY HEADER fittings, primer, glue, etc.), layout, protection to the public, F– LF LINE FLUSHING VALVE POLY /V minimum of 12" apart to allow grass or groundcover to grow between excavation, assembly, installation, backfilling, compaction, repair of 0 PLUMBED TO PVC TecNine STAR CONNECTION T road or pavement surfaces, controller and low voltage feed to the W --AREA PERIMETER -6-0 C: CU MALE ADAPTER valves, clean-up, maintenance and guarantee, and as-built plans. X of 12" from edge of beds. Set all valve boxes, concrete or plastic, in M W (D U_ Techline LATERAL TUBING Techline TUBING LATERAL 2. Contractor shall coordinate with General Contractor or other W 0 0 z LLJ nprtinpnt rnntrqr-_tnr,-_ nn tha inh to incitra that chmmwme nrm nr^%,;,4-A < F- 2" DISC FILTER N.T.S. W fiE- s 1/2" N 6 3 PARALLEL :PACES y4" 1 PARALLE_ PACE o du S.W. 58th PLACE Irrigation Control Wire as required n A \ 7 15. Valve locations are schematic and shall be adjusted in the field. cu cu 4_0 W Each valve shall be in a separate valve box (10" x 16") min.). When FL ✓ grouping valve boxes in grass or groundcover areas, set boxes a /V minimum of 12" apart to allow grass or groundcover to grow between 0 them. When possible, hide valve boxes in shrub beds, a minimum -6-0 C: CU of 12" from edge of beds. Set all valve boxes, concrete or plastic, in M ground with cover flush with finish grade, and level, with a minimum III `I Il of 6" of pea gravel at the bottom of the box, with at least 2" of J clearance from the bottom of the valve to the top of the gravel. 16. TESTING: Notify the Landscape Architect in writing when testing will be conducted. Conduct test in the presence of the Landscape Architect. After all PVC assembly is completed the lines shall be flushed to insure that no rocks, sand, or other foreign debris remains V 1P in the lines. The mains shall be filled with water and all outlets shall be capped and plugged. The main shall be pressurized to 100 PSI RUN PIPING UP SIDE OF for a minimum of one hour. No section of the main will be approved tait f BUILDING TO F E-ED if the pressure drops more than 5 PSI at the end of the one hour "W+ JW IRRI ATION TC ROOFTO period. Leaks shall be repaired immediately and the system shall be found by Landscape PLANTERS re-tested until satisfactory the Architect. 6 3 PARALLEL :PACES y4" 1 PARALLE_ PACE o du S.W. 58th PLACE