Loading...
13-748-042+ T.O. ­77T-7 So su/ ' u -'r -I'l PARAPET KALL , P I • NOTE PROVIDE e)Xa CONC. CAP Ysll.2 # 5 CONT. EXTEND ALL VERTICAL STEEL INTO 7- sr;�Jjc' rLIF?� HI&FC--,T CONC. CAP K(-(O' HOOK (TYPICAL) 8XI6 CONTINUOUS CONC. 5M YV 6 # 5 4 # 5 TIES 6" O.C. (2 # 5 TOP, BOTT. 4 MID BARS) i rjc) + 5v-1. T.Q. CONC. 5M GONG. CAP YV 2 # 5 CONT. REFER TO ROOF PLAN FOR LOCATIONS 4 SPACING OF PARAPET WALL BRACING 4' X NV X 61 LONG, KNIFE PLATE FULLY WELDED TO STEEL TUBE 4 S X 3/a s x 1.2 a EMBED PLATE IW/ 5"X5"A/4" BRACING STEEL ANGLE I'zIJLL*r WELDED TO STEEL 4-34'0 X 5' LONG, H.5, TUBE AND CONNECT TO MASONRY HALL PV-2-514"O X LONG EXPANSION BOLT 01" APART IN (SROUTED CELL. DOWEL OUT ADDITIONAL REINFORCIN& FROM 3' X 3' X 1/4' STEEL TUBE FULLY WELDED TO 3V KNIFE PLATES TIE BEAM AS PER MASONRY NOTE # I ON 5-5 ti~ (PRovlr.>r= 1/21 SLOT THROUGH THE BRACING MEMBERS, FULLY WELD ALL THE SLOTS FOR WATER ROOFING) ro' X 3/a' X 12' LOW3, iQ41FE PLATE SAW CUT 4 REMOVE THE INTERIOR SHELL OF VERIFY GEOMETRY WITH WINDOW REPRESENTATIVE 6,0 SHALL PROP THE BEAM ABOVE THE RZ�� OPENIN& AND A012 2 # 5 LY WELDED TO CAP PLATE MASONRY BLOCK AT THE EMBED LOCATION, FOR. EVERY 12" INCREMENTS TYPICAL PLACE 2 0 5 X 32' LONG TO SECURE THE X3/81 X12 EMBED PLATE W/4 -44X5 LOWG, H.S. TO VERTICAL STEEL —WALL BRACING DETAIL ON THIS 5AW TYrICAL 4' X 4' X 1/41 STEEL TUBE W1 5,' X 4' X V X ro ' LOW--j- KNIFE PLATE FULLY WELDED 1-4" MIN. X No' BASE 4 CAP PLATES TO STEEL PLATE EXTEND 4 TERMINATE BEAM III FULLY WELDED TO STEEL TUBE \+'T.O. P4- F- TIE BEAM 1'AS 1E1 REFER TO ARCHITECTURAL III T5 REFER TO SCHEDULE FOR SIZE 4 REINFORCING j j *SEE NOTE PAS's FOR &EOMETRY II II T 5"X5"XI/4"XI2" LONGS ANGLE K/ 2-5/40 X 5/5 X 6' LONG EXPANSION BOLT IN A SOLID CELL. DO NOT PLACE BOLT AT MORTAR JOINT STIFFENER ON EACH SIDE OF THE STEEL 5"X5"XI/4" STEEL ANGLE BE STEEL N&LE (CUT THE LEG TO ACCOMMODATE JOISTS AT EACH SIDE OF STEEL TUBE (T 4 5) FOR 5X5XI/4 HORIZONTAL MEMBER le�EV TO STEEL TUBE AND STEEL JOISTS DOVEL OJT ADDITIONAL AT ALL CONTACT POINTS 71 NOM PROVIDE ADDITIONAL TWO RO)0"6 OF " X " BRACING (MIN) AS SHOWN ON THE ROOF FRAMING PLAN WITH .2 1/2" X 2 IL2" X 1/4" AFTER ALL DEAD LOAD APPLIED FOR EACH 4" 0 VERTICAL POST SUPPORTING PARAPET —REINFORCINS FROM TB AS PER KALLS. FULLY MI-V ALL BRACING AT ALL CONTACT POINTS (TYPICAL) =WFEM-03 • iii I,rl �-lAeONRV'r CONTRO1. JOIN7 l."71r=7AIL. i0a 130* STO, HOOK SEE ROOF PLAN! T.O. PARAPET YiALL aXa CONC. CAP YV-2 # 5 CONT. /441 CONCRETE BEAM 4 STEEL 5RACIW3 NOT SHOWN FOR CLARITY ra rd 0) z Al wez ;A 2 SEAL 1/2" = 1'-0" :DX FLyujoor.> sEF- ROOF SHEATHING 5tE FOR coNEcTloN I LANCHOR 2X4 BLOCKING TO BOTTOM CHORD 4 TOP CHORD K/3 -16d NAILS ON EACH SIDE. 7 CONC. BLA5 $ AALL OFENIN6 REIM=. 1:�ETAIL (PROVIDE 5RACIW-z AT MAXIMUM 20'-0' AS SHOWN ON FRAMIWa PLAN) -I I V — MEESE= TRANSITION FROM T5 K/ clOo HOOK (TYPICAL�, REINFORCIN& NOT 5HOAN FOR CLARITY 2 # 5 HORIZONTAL AS SHOM (TOTAL OF FOLIR) K/ #5 TIES a 12" O.C. BEND HORIZ. REINFORCINC7 TO &EOMErRr OF C'I AFIE !A!.&LJ- 'N 1/2' - 1' - 0' I I 2 .11-01 REFER TO ARCHITECTURAL ELEVATIONS FOR LOCATI M 1-771 ­77T-7 So su/ ' u -'r -I'l , P SYM, ABOUT Cl— 7- sr;�Jjc' rLIF?� 4A + T.O. i rjc) PARAPET WALL GONG. CAP YV 2 # 5 CONT. T.O. CONC. BM VERIFY GEOMETRY WITH WINDOW REPRESENTATIVE 6,0 SHALL PROP THE BEAM ABOVE THE RZ�� OPENIN& AND A012 2 # 5 PRIOR TO FORMING THE OPENING FOR. EVERY 12" INCREMENTS TYPICAL 8X16 CONC, BEAM SEE PARAPET —WALL BRACING DETAIL ON THIS SHEET FOR SIZE 4 REINr-oF;?i--Iwz, EXTEND 4 TERMINATE BEAM 2'0 5 ON,EAC44 SIDE OF OPENING REINFORC-IW3 AS SHOWN HERE 1'AS SHOWN (TOTAL OF a) REFER TO ARCHITECTURAL PAS's FOR &EOMETRY SEE ARC H. DOVEL OJT ADDITIONAL 71 —REINFORCINS FROM TB AS PER RA50NRY NOTE # I ON 5 ',spa, SHALL EXTEND GONG. COLUMN 4 AVV.2 * 5 VERTICAL AT EACH SIDE INS - OR TO ACCOMMODATE r ROUND OPENING. (FROM WINDOW 511-1- T.Q. TIE BEAM TO, ROOF, TI 3) 'S X O'CONC, CAP Wt/ 2 0 B, T. TB REFER TO SCHEDULE FOR --SFZE 4 REINFOCIWG-(RSINF, NOT SHOWN FOR CLARITY) 2 .11-01 REFER TO ARCHITECTURAL ELEVATIONS FOR LOCATI M 1-771