09-193-003A C GENERAL NOTES
YES
VERIFY AT JOB SITE ALL SPACE CONDITIONS, DIMENSIONS
ALL DUCTWORK TO BE R -6. ALL DIFFUSERS ARE CEILING
AND EQUIPMENT SIZES PRIOR TO DUCT FABRICATION OR
TYPE SELECTED BY OWNER. ALL DUCT SIZES ARE CLEAR
INSTALLATION. COORDINATE REQUIREMENTS TO AVOID
INSIDE DIMENSIONS. DUCTWORK SIZED BY EQUAL FRICTION
INTERFERENCE WITH OTHER TRADES.
METHOD. (IN. WG)
GUARANTEE ALL WORK FREE OF DEFECTS IN MATERIALS
ALL BRANCH DUCTS TO HAVE VOLUME DAMPERS.
AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM
LIQUID LINE
SUCTION LINE
DATE OF ACCEPTANCE.
DUCTS FROM TOILET ROOMS SHALL DISCHARGE TO THE
VOLTAGE
OUTSIDE OF THE BUILDING, SHALL BE TERMINATED NOT
PROVIDE AIR CONDITIONING UNITS WITH MATCHING LOW
LESS THAN 6 INCHES ABOVE THE FINISH ROOF SURFACE,
VOLTAGE HEAT -COOL THERMOSTATS WITH ON -OFF AUTO
AND SHALL BE SCREENED WITH A CORROSION RESISTANT
SUB -BASE SWITCH, FURNISHED BY THE EQUIPMENT
MATERIAL HAVING A MESH OPENING >1/4" & d /2"
MANUFACTURER.
COND. MODEL NUMBER:
ALL AIR CONDITIONING COMPRESSORS SHALL BE
SCOPE OF WORK :
WARRANTED FOR A MINIMUM OF FIVE YEARS AFTER DATE
PROVIDE THE FOLLOWING COMPLETE SYSTEMS :
OF ACCEPTANCE OF THE PROJECT.
A. CONDENSER UNITS, AIR HANDLERS WITH STANDS
INSTALLATION
VOLUME DAMPERS, THERMOSTATS, REGISTERS
AND DIFFUSERS.
INSTALL ALL EQUIPMENT IN ACCORDANCE TO THE
B. ROOF CAPS FOR EXHAUST FANS FROM BATHROOMS
F.B.C., ASHRAE, SMACNA, NFPA AND LOCAL ORDINANCES.
COORDINATE INSTALLATION OF ALL ROOF FLASHING AT
PROVIDE TURNING VANES IN ELBOWS 45 DEGREES OR GREATER.
VIBRATION ISOLATION: ALL EQUIPMENT AS PER MANUFACTURER'S
ROOF PENETRATION.
RECOMMENDATIONS OR AS SCHEDULED ON DRAWINGS.
PAY FOR ALL FEES, INSPECTIONS AND CONNECTION
�
CHARGES REQUIRED
�M
LOW PROFILE GOOSE
NECK VENT. W /HEAVY
DUTY SCREEN & B.
DRAFT DAMPER
3TANT
GALV. 30 GA.
EXHAUST DUCT DETAIL.
SUPPLY AIR PLENUM
SUPPLY AIR
NEOPRENE PAD
VIBRATION—.
ISOLATOR
6 "1
/-Liu I W
I I —III ,II7'cD'RAIN " CONDENSATE
LINE
CONDENSATE DRAIN DRY WELL
NTS
6" (26 GA) SM
DAWNDRAFT E:
PROVID
BACKDRAFT DAM
SUPPLY DUCT
ATTACHED MECHANICALLY
fix'
GAS LINE AND GC I dcl
LIQUID LINE 0 Q
-COND. TRAP
PROVIDE OVERFLOW PROTECTION
S
METAL STAND LINE
CONDENSATE DRAIN TO TERMINATE 6"
ABOVE GRADE - REFER MECHANICAL
PLAN FOR LOCATION OF TERMINATION
-OF COND DRAIN
AHU MOUNTING DETAIL
CONDENSING
COND. UNIT
NOTE: TO BE
SECURED
TO CONC. 00
MECHANICAL CONTRACTOR WILL COORDINATE WITH PLUMBING CONTRACTOR SLAB W/
CONDENSATE SYSTEM INSTALLATION (TO BE PROVIDED AND INSTALLED BY 1/2" X 3"
PLUMBING CONTRACTOR) ANCHOR POWER & CONTROL
ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE ACTUAL BOLT PER 6' MIN. CONNECTIONS
FLORIDA BUILDING CODE "MECHANICAL" STRAP 4" SCHEDULE
40 PVC PIPE
HVAC DESIGN REQUIREMENTS
YES
NO
DUCT SMOKE DETECTOR
TOTAL CAPACITY (BTU /HR)
NO
FIRE DAMPERS
C.F.M. SUPPLY
NO
SMOKE DAMPERS
C.F.M. 0 /AIR
NO
FIRE RATED ENCLOSURE
LIQUID LINE
SUCTION LINE
NO
F.RATED R CEILING ASSEMBLY
VOLTAGE
NO
FIRE STOPPING
MANUFACTURER:
NO
SMOKE CONTROL
AIR HANDLER UNIT MODEL No.
NO
/1/8 "X1" GWS -
MTL STRAP
1/2 "0 EXP BOLT
d/- 4e
CONDENSING\
UNIT
2 "x2 "xt /4" STL
- 1/4"
,ANGLE
CONT1N FILLET
WELD
4" CONC SLAB
CONCRETE BASE
SEAL LINES INTO P.V C. REFRIGERANT LIQUID AND NSUNIATION SUCTION LINE W/1 -1/2'
IMPERMEABLE, RESILENT MATERIAL ARMAI`0 INSULATION
& VAPOR BARRIER
CONDENSING UNIT MOUNTAING DETAIL
N.T.S.
1/8 "X1" GWS MTL STRAP
OVER CU W/ #14 —
SCREWS
AIR FLOW
AIR FLOW CONDENSING UNIT CU -1
FILTER AND DRYER
SIGHT GLASS
rPIPEINSULATION
RE
FA IREHANDLER�, LINES
Ilk 4" CONCRETE BASE
A/C CONDENSING UNIT DETAILS
NOTES: A/C CONDENSING UNIT TO BE INSTALLED IN ACCORDANCE WITH THE FLORIDA BUILDING CODE "MECHANICAL CODE 2004" . THE STRAP
TIE -DOWNS AS INDICATED HEREIN IS IN COMPLIANCE WITH THE REQUIREMENTS OF THE CODE AND MEETS THE WIND LOAD REQUIREMENTS IN
ACCORDANCE WITH ASCE 7 -98.
NOTE:
ISOLATOR TO BE PROVIDED BY
ELECTRICAL CONTRACTOR ON
ADJACENT WALL
L - - --
I
HVAC SYSTEM SCHEDULE
A/C NUMBER:
#1 2 TON
#2 2 TON
TOTAL CAPACITY (BTU /HR)
24,800
24,800
C.F.M. SUPPLY
800
800
C.F.M. 0 /AIR
-
-
LIQUID LINE
SUCTION LINE
7/8
7/8
VOLTAGE
1- 208 -230
1- 208 -230
MANUFACTURER:
TRANE
TRANE
AIR HANDLER UNIT MODEL No.
TAM8AOB3OV21CB
TAM8AOB3OV21CB
COND. MODEL NUMBER:
5KW- BAYEVAC05BKlAA
5KW- BAYEVAC05BKlAA
SEER /EER
20/15.0
20/15.0
REFRIGERANT
R -41 OA
R -410A
I
IV 4 10 Sqq'
REFRIGERANT AND I
TIN LINES TO A/H
I
X40 COND. DRAIN
ABOVE GROUND.
SCOPE OF WORK
INTERIOR REMODELING OF EXISTING ORIGINAL HOUSE
O KITCHEN REMODELING
THE EXISTING KITCHEN LAYOUT WILL BE MODIFIED AND A NEW
® CABANA BATH WILL BE LOCATED IN THAT SPACE.
DINING REMODELING
THE EXISTING DINING ROOM WILL BE CHANGED FOR A NEW DEN
® MASTER BATH
NEW LAYOUT FOR MASTER BATH
NEW PARTITIONS WILL BE LOCATED
NEW OUTLETS WILL BE LOCATED AND LIGHTING SWITCHES AS WELL
THE FIXTURES IN CABANA BATH WILL BE LOCATED ACCORDING TH
CURRENT F.B.C.
RELOCATE EXISTING A/C
NEW RETURNS WILL BE LOCATED
CHANGED OF WINDOW IN ALL HOUSE
ELECTRICAL WORKS
THE ELECTRICAL SERVICE, METER AND DISCC. ARE EXIST TO
REMAIN
THE CIRCUITS FOR FIXTURES ARE ADEQUATE TO NEW SPACES.
THE NEW SMOKE DETECTORS WILL BE LOCATED IN COMPLY WITH
THE FBC
MECHANICAL WORKS:
2 NEW AC UNITS WILL BE LOCATED IN COMPLY WITH ACTUAL
FBC
THE BATHS WILL HAVE EXH. FAN IN COMPLY WITH THE FBC.
THE NEW CABANA BATH WILL BE COMPLY WITH THE FBC.
AND THE MASTER BATH FOR REMODELING SHALL BE IN COMPLY
WITH THE FBC
NOTE: SEE MARKS, SITE AND FLOOR PLAN
//l\ 09/10/2013
IN -FIELD REVISION BY OWNER REQUEST
NEW LOCATION FOR AHU AND CU UNITS
NEW LAYOUT FOR LIGHTS
REVISIONS
No.
1
09/10/2013
00
L0
N
t`
0
ot
c;
N
^
HESE DRAWING & SPECIFICATIONS
.RE INSTRUMENTS OF SERVICE AND
HALL REMAIN THE PROPERTY OF
UBEN JUAN PUJOLW4ETHER THE PROJECT
OR WHICH THEY WERE PREPARED
i EXECUTED OR NOT, THEY ARE NOT
0 BEUSED IN ANY MANNER ON OTHER
'ROJECTS OR EXTENSIONS TO THIS
'ROJECT EXCEPT BY AGREEMENT IN
VRITING AND WITH THE APPROPRIATE
:OMPENSATION TO RUBEN JUAN PUJOL
� ASSOCIATES
LiJ
C'
Q0
J
V)
O Q
V)
w
0
0
a
ry
Q
rZ
w
Z
Ld
LEI
m
LiJ
_I
.z 0
0
X
0
w
z n
Ld
Q
0
c` N�
DATE 06/24/2013
DRAWN BY: GPC
CHECKED BY: R.P.
SCALE: AS SHOW,*,,
mmi . 2
i ..�
sH�r s
W6 '
01
"
00
L0
N
t`
0
c;
N
^
i
D
o
EL
z
U
W
�
L0
D
L
�
W
�M
Ob
Z
—
=°
°
No
o
m
U
0
Q
cn
LL_
61
<
Q
r--
Q
Q
-
Q
T
DATE 06/24/2013
DRAWN BY: GPC
CHECKED BY: R.P.
SCALE: AS SHOW,*,,
mmi . 2
i ..�
sH�r s
W6 '
01
"