Loading...
09-193-003A C GENERAL NOTES YES VERIFY AT JOB SITE ALL SPACE CONDITIONS, DIMENSIONS ALL DUCTWORK TO BE R -6. ALL DIFFUSERS ARE CEILING AND EQUIPMENT SIZES PRIOR TO DUCT FABRICATION OR TYPE SELECTED BY OWNER. ALL DUCT SIZES ARE CLEAR INSTALLATION. COORDINATE REQUIREMENTS TO AVOID INSIDE DIMENSIONS. DUCTWORK SIZED BY EQUAL FRICTION INTERFERENCE WITH OTHER TRADES. METHOD. (IN. WG) GUARANTEE ALL WORK FREE OF DEFECTS IN MATERIALS ALL BRANCH DUCTS TO HAVE VOLUME DAMPERS. AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM LIQUID LINE SUCTION LINE DATE OF ACCEPTANCE. DUCTS FROM TOILET ROOMS SHALL DISCHARGE TO THE VOLTAGE OUTSIDE OF THE BUILDING, SHALL BE TERMINATED NOT PROVIDE AIR CONDITIONING UNITS WITH MATCHING LOW LESS THAN 6 INCHES ABOVE THE FINISH ROOF SURFACE, VOLTAGE HEAT -COOL THERMOSTATS WITH ON -OFF AUTO AND SHALL BE SCREENED WITH A CORROSION RESISTANT SUB -BASE SWITCH, FURNISHED BY THE EQUIPMENT MATERIAL HAVING A MESH OPENING >1/4" & d /2" MANUFACTURER. COND. MODEL NUMBER: ALL AIR CONDITIONING COMPRESSORS SHALL BE SCOPE OF WORK : WARRANTED FOR A MINIMUM OF FIVE YEARS AFTER DATE PROVIDE THE FOLLOWING COMPLETE SYSTEMS : OF ACCEPTANCE OF THE PROJECT. A. CONDENSER UNITS, AIR HANDLERS WITH STANDS INSTALLATION VOLUME DAMPERS, THERMOSTATS, REGISTERS AND DIFFUSERS. INSTALL ALL EQUIPMENT IN ACCORDANCE TO THE B. ROOF CAPS FOR EXHAUST FANS FROM BATHROOMS F.B.C., ASHRAE, SMACNA, NFPA AND LOCAL ORDINANCES. COORDINATE INSTALLATION OF ALL ROOF FLASHING AT PROVIDE TURNING VANES IN ELBOWS 45 DEGREES OR GREATER. VIBRATION ISOLATION: ALL EQUIPMENT AS PER MANUFACTURER'S ROOF PENETRATION. RECOMMENDATIONS OR AS SCHEDULED ON DRAWINGS. PAY FOR ALL FEES, INSPECTIONS AND CONNECTION � CHARGES REQUIRED �M LOW PROFILE GOOSE NECK VENT. W /HEAVY DUTY SCREEN & B. DRAFT DAMPER 3TANT GALV. 30 GA. EXHAUST DUCT DETAIL. SUPPLY AIR PLENUM SUPPLY AIR NEOPRENE PAD VIBRATION—. ISOLATOR 6 "1 /-Liu I W I I —III ,II7'cD'RAIN " CONDENSATE LINE CONDENSATE DRAIN DRY WELL NTS 6" (26 GA) SM DAWNDRAFT E: PROVID BACKDRAFT DAM SUPPLY DUCT ATTACHED MECHANICALLY fix' GAS LINE AND GC I dcl LIQUID LINE 0 Q -COND. TRAP PROVIDE OVERFLOW PROTECTION S METAL STAND LINE CONDENSATE DRAIN TO TERMINATE 6" ABOVE GRADE - REFER MECHANICAL PLAN FOR LOCATION OF TERMINATION -OF COND DRAIN AHU MOUNTING DETAIL CONDENSING COND. UNIT NOTE: TO BE SECURED TO CONC. 00 MECHANICAL CONTRACTOR WILL COORDINATE WITH PLUMBING CONTRACTOR SLAB W/ CONDENSATE SYSTEM INSTALLATION (TO BE PROVIDED AND INSTALLED BY 1/2" X 3" PLUMBING CONTRACTOR) ANCHOR POWER & CONTROL ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE ACTUAL BOLT PER 6' MIN. CONNECTIONS FLORIDA BUILDING CODE "MECHANICAL" STRAP 4" SCHEDULE 40 PVC PIPE HVAC DESIGN REQUIREMENTS YES NO DUCT SMOKE DETECTOR TOTAL CAPACITY (BTU /HR) NO FIRE DAMPERS C.F.M. SUPPLY NO SMOKE DAMPERS C.F.M. 0 /AIR NO FIRE RATED ENCLOSURE LIQUID LINE SUCTION LINE NO F.RATED R CEILING ASSEMBLY VOLTAGE NO FIRE STOPPING MANUFACTURER: NO SMOKE CONTROL AIR HANDLER UNIT MODEL No. NO /1/8 "X1" GWS - MTL STRAP 1/2 "0 EXP BOLT d/- 4e CONDENSING\ UNIT 2 "x2 "xt /4" STL - 1/4" ,ANGLE CONT1N FILLET WELD 4" CONC SLAB CONCRETE BASE SEAL LINES INTO P.V C. REFRIGERANT LIQUID AND NSUNIATION SUCTION LINE W/1 -1/2' IMPERMEABLE, RESILENT MATERIAL ARMAI`0 INSULATION & VAPOR BARRIER CONDENSING UNIT MOUNTAING DETAIL N.T.S. 1/8 "X1" GWS MTL STRAP OVER CU W/ #14 — SCREWS AIR FLOW AIR FLOW CONDENSING UNIT CU -1 FILTER AND DRYER SIGHT GLASS rPIPEINSULATION RE FA IREHANDLER�, LINES Ilk 4" CONCRETE BASE A/C CONDENSING UNIT DETAILS NOTES: A/C CONDENSING UNIT TO BE INSTALLED IN ACCORDANCE WITH THE FLORIDA BUILDING CODE "MECHANICAL CODE 2004" . THE STRAP TIE -DOWNS AS INDICATED HEREIN IS IN COMPLIANCE WITH THE REQUIREMENTS OF THE CODE AND MEETS THE WIND LOAD REQUIREMENTS IN ACCORDANCE WITH ASCE 7 -98. NOTE: ISOLATOR TO BE PROVIDED BY ELECTRICAL CONTRACTOR ON ADJACENT WALL L - - -- I HVAC SYSTEM SCHEDULE A/C NUMBER: #1 2 TON #2 2 TON TOTAL CAPACITY (BTU /HR) 24,800 24,800 C.F.M. SUPPLY 800 800 C.F.M. 0 /AIR - - LIQUID LINE SUCTION LINE 7/8 7/8 VOLTAGE 1- 208 -230 1- 208 -230 MANUFACTURER: TRANE TRANE AIR HANDLER UNIT MODEL No. TAM8AOB3OV21CB TAM8AOB3OV21CB COND. MODEL NUMBER: 5KW- BAYEVAC05BKlAA 5KW- BAYEVAC05BKlAA SEER /EER 20/15.0 20/15.0 REFRIGERANT R -41 OA R -410A I IV 4 10 Sqq' REFRIGERANT AND I TIN LINES TO A/H I X40 COND. DRAIN ABOVE GROUND. SCOPE OF WORK INTERIOR REMODELING OF EXISTING ORIGINAL HOUSE O KITCHEN REMODELING THE EXISTING KITCHEN LAYOUT WILL BE MODIFIED AND A NEW ® CABANA BATH WILL BE LOCATED IN THAT SPACE. DINING REMODELING THE EXISTING DINING ROOM WILL BE CHANGED FOR A NEW DEN ® MASTER BATH NEW LAYOUT FOR MASTER BATH NEW PARTITIONS WILL BE LOCATED NEW OUTLETS WILL BE LOCATED AND LIGHTING SWITCHES AS WELL THE FIXTURES IN CABANA BATH WILL BE LOCATED ACCORDING TH CURRENT F.B.C. RELOCATE EXISTING A/C NEW RETURNS WILL BE LOCATED CHANGED OF WINDOW IN ALL HOUSE ELECTRICAL WORKS THE ELECTRICAL SERVICE, METER AND DISCC. ARE EXIST TO REMAIN THE CIRCUITS FOR FIXTURES ARE ADEQUATE TO NEW SPACES. THE NEW SMOKE DETECTORS WILL BE LOCATED IN COMPLY WITH THE FBC MECHANICAL WORKS: 2 NEW AC UNITS WILL BE LOCATED IN COMPLY WITH ACTUAL FBC THE BATHS WILL HAVE EXH. FAN IN COMPLY WITH THE FBC. THE NEW CABANA BATH WILL BE COMPLY WITH THE FBC. AND THE MASTER BATH FOR REMODELING SHALL BE IN COMPLY WITH THE FBC NOTE: SEE MARKS, SITE AND FLOOR PLAN //l\ 09/10/2013 IN -FIELD REVISION BY OWNER REQUEST NEW LOCATION FOR AHU AND CU UNITS NEW LAYOUT FOR LIGHTS REVISIONS No. 1 09/10/2013 00 L0 N t` 0 ot c; N ^ HESE DRAWING & SPECIFICATIONS .RE INSTRUMENTS OF SERVICE AND HALL REMAIN THE PROPERTY OF UBEN JUAN PUJOLW4ETHER THE PROJECT OR WHICH THEY WERE PREPARED i EXECUTED OR NOT, THEY ARE NOT 0 BEUSED IN ANY MANNER ON OTHER 'ROJECTS OR EXTENSIONS TO THIS 'ROJECT EXCEPT BY AGREEMENT IN VRITING AND WITH THE APPROPRIATE :OMPENSATION TO RUBEN JUAN PUJOL � ASSOCIATES LiJ C' Q0 J V) O Q V) w 0 0 a ry Q rZ w Z Ld LEI m LiJ _I .z 0 0 X 0 w z n Ld Q 0 c` N� DATE 06/24/2013 DRAWN BY: GPC CHECKED BY: R.P. SCALE: AS SHOW,*,, mmi . 2 i ..� sH�r s W6 ' 01 " 00 L0 N t` 0 c; N ^ i D o EL z U W � L0 D L � W �M Ob Z — =° ° No o m U 0 Q cn LL_ 61 < Q r-- Q Q - Q T DATE 06/24/2013 DRAWN BY: GPC CHECKED BY: R.P. SCALE: AS SHOW,*,, mmi . 2 i ..� sH�r s W6 ' 01 "