02-830-013K
I
E
1�
C
_c
1�
a:
LL
G
;n
i
a
I
�x
x
i
DOWN IN WALL DOWN IN WALL DOWN IN WALL
CONNECT TO CONNECT TO CONNECT TO
CASES AS
CASES AS CASES AS
REQUIRED. ----- 2Q REQUIRED. 12 REQUIRED.
............................................................................................................... ............................... _ . ..,................................,,.,.,,,,,,,...,..,.................... ,...........,.... ..,.................... ......
,i
_ -_ - - L
• -.,,x ..... .. , y. ,�,,.....,. 11..1.1.,.,..,.. .. ...,• ....... .. ,� "„'.". -" 1 -0.; • 3 8,_0„ M4A3 8• -0„
12 0" D63 12' -0'" D63 8' - -0' 063 12' -D" D63 12' -0° D63 12' -0" D63 12' -0" VSV34 10'-0" V5V34 12'-6" M4A3 M4A3 12' j0M4A3 2' M4A
i 4W CW - 3/4" CW- /4N CW ............................
- -- - - - - -- _ -_ ------- - - - - -- ----- - - - -__ - ----- .-- .- _- .-- .- - -._ _._------ - - - - -- _ ` -- _ - - - - - -- - - -uj --
.,
w T-
� EXISTING 1 1/2 "0 �3
COLD WATER LINE 0 9
TO REMAIN VERIFY _
IN FIELD. w
• • ': S /EWS p
z¢
„9 -,S 4£ASA
tNW " OLD WATER - - - -1 39 MS1•• •..,, I i i I
O O O ,NOTE:
0
i
:;EXISTING 1 1/2 "0 I ' u PROVIDE 5/8" -
z i ; COLD WATER LINE : i HOT &COLD WATER HAND SINK,
TO REMAIN VERIFY 0 30 COMP. SINK. & I I
°
::IN FIELD. i
w NEW MOP
• g I SINK i
m
u I
I MOWN IN WALL o�
QONNECT TO oz u
?SES AS
q i
REQUIRED. ; 20 N � N O O O � 14
m ,
O m 0 o o _
Sm
N
aF W i w
I _� " A PS1
PROVIDE 5/8" •
HOT & COLD WATER
TO 3 COMP. SINK.
C z
N
LEXISTING WATER SUPPLY STUB UPS w I I r-, o
9
_ o- n NOT BEING REUSED ARE TO BE ° # I _
m CAPPED OFF AS REQUIRED VERIFY 0 o ° - 0,- p
> LOCATIONS IN FIELD. (TYPICAL) a o a=H =
•
0
A]
0
i:.
' EXISTING WATER SUPPLY STUB UPS 0
O NOT BEING REUSED ARE TO BE O
CAPPED OFF AS REQUIRED VERIFY
EXISTING 1 1/2 "0 I NEW ATER HEATER LOCATIONS IN FIELD. (TYPICAL)
COLD WATER LINE I A E MOP SINK. 82 GALS. NOTE:
T REMAIN VERIFY-:1 R AND COORDINATE W/ "W.D" VERIFY IN FIELD IF CASES
IN LID. WILL REQUIRE WATER SUPPLY
AND PROVIDE IF REQUIRED.
REF. DELI CASE
i I
DEL REF, CASE DELI REF, CASE
z N 1" HOT WATE HpT
i „0 -,8 EOVtibd DELI CASE .,o -,e MA6FS ,0 -,8 OAKS ,
: 1
i
i
iI
E � OP STINK : ; ---
zI PHARMACY ......, _..
NEW 1 HOT WATER NEW HOT WATER AND SINK
A, ° H i
3 COMP SINK 3/4" -� _
_� _ -- -_ 4 1
t1AND SINK
Ii g OTE: I _ NEW 1" COLD WATER I _ NEW 3/4" COLD WATER NOTE:
,j, P OVIDE I m "EW 5/8 "0 CW ANEW 5/8 "0 CW PROVIDE
HO & COLD WATER z TOTHAND O INK. WATER
HAND SINK,
MOP SINK AND WALK IN OVEN
3 COMP. SINK
PROOFER
6:
:
;
li,,,,........ ,,,,,,,,, ,,,,, tl...... ,.,.,.,.,.,.,.,.,..,. ,..................,� o •
.............. .................:.......................................................................... ............................... .,..,,,11.1.,.11..1,1,......... _ ..,..,...,..,,...,,.,.,,.. -
;
NOTE: RUN WATER LINES •.
DOWN IN WALL CONNECT
TO SINKS AND EQUIPMENTS _ o .............. .......................... "...............
.,,,,,.
AS REQUIRED. (TYPICAL) 4......,., 1 ..... ............................... ........................11,1111
---Il 1 -1/2"
EMERGENCY
GENERATOR
(338 GPH.)
SEDIMENT TRAP(TYP.) /
PF8b ffR
U. L. GAS
COCK VALV
EXIST. REU
120 GALLO
GAS TANK
LAMENT TRAP(TYP.)
GAS PIPING ISOMETRIC DIAGRAM
NOT TO SCALE
NOTE: GAS PIPE LONGEST RUN 80'(LF)(338 G.P.H.)
PLANS WERE PREPARED FROM EXISTING DRAWINGS
BY F. EARL LEGGET ARCHITECT - TAMPA (UNDATED)
GLASSER ASSOC. ARCH. DATED 6/30/72
IT IS CONTRACTOR RESPONSABILITY TO VERIFY AND
COORDINATE ALL EXISTING CONDITIONS IN FIELD AND
ADJUST OR PROVIDE NEW AS REQUIRED.
0, 1 2"
NEW
EMERGENCY
GENERATOR
;o
1 -1 /'
120 GALLON GAS TANK.
EXISTING
M EZfMTO 1
:.,.,1 1,11.1 .........................
GAS PIPING LAYOUT
SCALE 1/8" = 1' -0"
C•
y
33 I HS EWS i LI
I
EXISTING 1 1/2 "0 HOT
& COLD WATER LINE I 4
TO REMAIN VERIFY I 3,
IN FIELD. I c;
0 O O
m
ICI
PROVIDE 5/8"
HOT & COLD WATER
TO NEW MOP SINK
21
Lp
I 15
I"
w
- ;- PROVIDE "
w I { HOT & COLD abIATR`•,
❑ c _, TO 3 COMP. SINK;
I 4
I '
°= PR IDE
N HOT COU i WATER
TO ND 51¢IK. ;
w I EXISTING RELQ6AT�DJ
WATER HEATER; ; i
NEW 1 0 W , {;,,,RECONNECT AS RLY UIRED.
�. - ., '•MUtJNT••AB(�fE••CEILIf�G
° i AND PROVIDE METAL;
0 - _ • ••••• f SUPPORTS & SECU • D TO
5 IjE
:.. . .................`,...,.,,,.... i.......CON'CRETE- BL'OCK';WALLS
15 ; AS REQUIRED.
1
16 I i
NEW 3/4" C I� NEW WATER LINES
W ; I ww N 1 "0 CW I RUN DOWN IN
°:1300 i.,,WAL•L•••AND••GONNErT•I••I `
TO LAV. & WC
EXISTING WATER SUPPLY STUB UPS ; 0 ~
NOT BEING REUSED ARE TO BE W I w I j WITH 5/8 "0 LINES
CAPPED OFF AS REQUIRED VERIFY j a NEW 3 4 "0 HOT WATER
LOCATIONS IN FIELD. (TYPICAL) o I • w /
' NEW WATER LINES
RUN DOWN IN
w,• = WALL AND CONNECT
TO LAV. & URIN. WITH
5/8 "0 LINES.
EXISTING PRODUCE CASES TO BE REPLACED tj 1 "0 CW NEW WATER LINES
WITH NEW RECONNECT TO EXISTING WATER . I N EW RUN DOWN IN
NEW 3/4" CW SUPPLY. VERIFY LOCATIONS IN FIELD. (TYP.) I ; WALL AND CONNECT
TO LAV. WITH 5/8 "0 LINES
_ - - - NEW 1 "0 CW ! NEW 3/4" HOT WATER
I
H 0- FAZH
AZH 0 Zl £AZ ,Zl
o -ZI £
�'
...1..1.1...1 -.
- ....�„ ... ....................... ..................................................... ............................... .... •..,,...,,.,,,..., 11..11........
11.1.1...., ... ,.....
W/H NEW WATER LINES
O RUN DOWN IN I 3 ' D CONNECT
• WALL AN
i :.,.,.1,...i TO LAV. & WC
:.t.' I WITH 5/8" LINES
SUPPLY PIPING PLAN
SCALE 3/32" = 1' -0"
SPRINKLER NOTES
CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING EXISTIND SPRINKLER
HEADS THROUGHOUT THE EXISTING BUILDING AS REQUIRED TO CONFORM TO
NEW FINISH CEILING HEIGHTS. ANT MODIFICATION TO THE EXISTING SYSTEM
SHALL CONFORM TO ALL CODES AND N.F.P.A. #13 AND SHALL BE APPROVED
AND ACCEPTED BY THE INSURANCE CARRIER.
CONTRACTOR TO EXTEND SPRINKLERS IN ADDITION SPACES IN A MANNER TO
MEET ALL LOCAL, AND NATIONAL CODES. CONTRACTOR TO INSULATE PIPING
IN THE VESTIBULE WITH 1/2" ARMAFLEX. ADJUST NEW SPRINKLER HEADS TO
MEET NEW CEILING CONDITION, (SUBMIT SHOP DRAWING FOR REVIEW)
PLUMBING REMODELING NOTES
1. ALL WORK PERFORMED UNDER THIS CONTRACT SHALL COMPLY WITH ALL
LOCAL LAWS, THE SOUTH FLORIDA BUILDING CODE, THE RULES AND
REGULATIONS OF THE LOCAL UTILITY COMPANIES AND ALL THE STANDARD
OF CONSTRUCTION ESTABLISHED BY THE EXISTING INSTALLATION.
2. ALL MATERIALS AND LABOR UNDER THIS PROJECT SHALL BE IN STRICT
COMPLIANCE WITH THE REQUIREMENTS ESTABLISHED BY THE EXISTING
INSTALLATION. THE INTEGRITY OF ALL EXISTING SYSTEMS MUST BE
MAINTAINED.
3. THE CONTRACTOR SHALL VISIT THE SITE AND FAMILIARIZE HIMSELF WITH
THE LOCATION OF ALL EXISTING UTILITIES STUB OUTS, PIPING, EQUIPMENT,
ETC,, AND /OR ANY CONDITION THAT MAY AFFECT HIS WORK, ALL THE
NECESSARY REROUTING, RELOCATING, AND /OR REMOVAL OF EXISTING
PIPING, EQUIPMENT, ETC., SHAL BE INCLUDED IN THE SCOPE OF WORK.
4. ALL SERVICES INTERRUPTIONS SHALL BE SCHEDULED WITH THE AUTHORIZED
REPRESENTATIVE OF THE BUILDING MANAGEMENT ORGANIZATION. ALL REMOVAL
AND DISPOSAL WORK SHALL BE COORDINATED WITH THE AITHORIZED
REPRESENTATIVE OF THE BUILDING MANAGEMENT ORGANIZATION.
5. ALL PLUMBING FIXTURES SHALL BE PROVIDED WITH ALL NECESSARY
ACCESSORIES SUCH AS STOP VALVES, "P" TRAPS, SUPPORTS. P do T VALVE'S,
ETC. AS REQUIRED. ALL EXPOSED PIPING AT FIXTURES AND EQUIPMENT
SHALL BF CHROME PLATED BRASS PIPE OR TUBE.
6. THE CONTRACTOR SHALL PAY ALL INSPECTION FEES, ALL COSTS OF PERMITS
AND ALL OTHER COST'S INCIDENTAL. TO THE COMPLETION AND TESTING OF THIS
WORK. UPON FINAL ACCEPTANCE, A CERTIFICATE FROM THE LOCAL INSPECTION
AUTHORITY SHALL BE FURNISHED TO THE OWNER.
7- OMIT
8, CONTRACTOR SHALL VERIFY SLOPE AND DEPTHS AND LOCATIONS OF
CONNECTION POINTS TO EXISTING PRESSURE OR DRAINAGE LINES
BEFORE STARTING WORK,
WATER DISTRIBUTION NOTES
1. PROVIDE 1/2" COLD WATER STUB -UP WITH SHUT -OFF VALVE AND CONNECT TO
HOSE REEL AT PRODUCE CASES.
2. PROVIDE HOT AND COLD WATER' SUPPLY TO MEAT CUTTING ROOM,
BAKERY SINKS, DELI SINKS, HAND SINKS, SEAFOOD SINK, HOSE BIBBS,
MOP RECEPTORS, SERVICE FAUCETS, AND LOBSTER STEAMER
3. PROVIDE COLD WATER SUPPLY TO PRODUCE SINK (BOTH SIDES OF FAUCETS),
DRINKING FOUNTAIN, STEAMER, OVENS, HOT DELI
CASE, PRODUCE CASES, FLOOR AND WALL HYDRANTS, WALK -IN OVEN.
4. ALL NEW WATER LINES SHALL BE RUN OVERHEAD UNLESS OTHERWISE NOTED. INSULATE
ALL WATER LINES (SEE SPECS.) INSULATE ALL FITTINGS THAT ARE NOT
CHROME PLATED.
5. ALL NEW WATER PIPING SHALL BE COPPER.
6. PROVIDE AND INSTALL STOPS FOR WATER SUPPLIES AT EACH NEW FIXTURE.
7. PROVIDE AND INSTALL ADEQUATE WATER HAMMER AND ANTI - SIPHON PROTECTION ON
ALL NEW FAUCETS. SIZE IN ACCORDANCE WITH LOCAL CODES.
8. CONTRACTOR SHALL FURNISH AND INSTALL WATER PRESSURE REGULATOR,
STANDPIPE, AND SHUT -OFF VALVE FOR LOBSTER COOKER AND STEAMERS.
9. WATER FILTERS SHALL BE FURNISHED BY WINN -DIXIE AND INSTALLED BY CONTRACTOR
FOR THE FOLLOWING EQUIPMENT. LOCATION TO BE DETERMINED BY WINN -DIXIE
MAINILNANUL SUHLKVISUK (KLUUMMLNULU I-ILILK: LVLKNUKL KLLANSILAM JTJILM
MODEL AR -X.) USE THIS SYSTEM IF pH EXCEEDS 7.5 ONLY. FOR ALL OTHER PURPOSES
USE ONLY THE FILTER, EVERPURE FILTER QC7 -1 SINGLE HEAD W/ CV FILTER. SEE
DETAIL ON SHEET P -401.
A. PROOFERS
B. STEAMERS
C. MISTERS
10. PROVIDE CHECK VALVES ON HW AND CW LINES SERVING 2 AND 3 COMPARTMENT
SINKS AND MOP RECEPTORS.
11. ALL EXPOSED COPPER PIPE IN FOOD PREP AREAS SHALL BE POLISHED WITH EMERY
CLOTH AND ONE COAT CLEAR LACQUER APPLIED.
GAS PIPING FOR GENERATOR
1. GAS PIPING SHALL BE INSTALLED IN ACCORDANCE WITH NFPA -54, AND THE
STANDARD GAS CODE.
2. THE INSTALLING SUBCONTRACTOR SHALL BE LICENSED BY THE STATE FOR THE
INSTALLATION OF GAS PIPING.
3. THE INSTALLATION SHALL BE FOR NATURAL GAS OR PROPANE.
4. GAS PIPING SHALL BE SCHEDULE 40 SEAMLESS, BLACK STEEL. GAS PIPING OUTSIDE
THE BUILDING SHALL BE PAINTED WITH BLACK "RUSTOLEUM" PAINT.
5. RUNOUT PIPING, FROM THE MAIN PIPING TO APPLIANCES, SHALL BE WITH AN
INVERTED TRAP CONNECTION AT THE MAIN.
6. PROVIDE THE FOLLOWING IN ORDER AT EACH PIECE OF EQUIPMENT: GAS COCK,
SEDIMENT TRAP, UNION, AND FLEXIBLE CONNECTION.
7. ALL GAS EQUIPMENT SHALL BE AGA APPROVED.
8. WHERE PROPANE IS USED IN LEIU OF NATURAL GAS, ALL TANKS, PIPING, AND
APPURTENANCES SHALL BE PROVIDED AND INSTALLED IN ACCORDANCE WITH NFPA 58.
•
c0
•
N
W
�n
cfl O
W° W O
O Ld O
�O ry� tf7
U)
00
Lo
• d" L0
N W /-`•
U O Y Lo
• O Z Q O
O
U o)
/( I r- Q
CI - W
Lo
�j LO .: :E I-
SEA.
P q
ro,d.y w="
Y
of �_
I
ENGINEERS
0 r
ri N oN
�
r7-- W op, p
0 u
a- N -o)
O
Lw W � o
w 1--
-J
_w'�_ -�
z Z E
\11d w 0
REVISIONS:
n WINN DIXIE -• COMMENTS
ZIMPED LINES /C LARIFIIC�ATIONS
L
Z22�COMMENTS FROM CITY
FIRE DEPT. NOV. 19, 02
NEW H.C. BATHROOMS
JANUARY 2003
1
• f..r
►o
c
E Q4 r�rkk
�^ I--1 O
CL V) O Ln
i
W
1 ♦ W 00
V
A�
r , O
W w
CLI
J
V ti OLLJ
o E
o
v
0
®o
DRAWING NOTES
@i
3 /4 "CW DOWN IN WALL TO PHARMACY WHC AND SINK. ROUTE 1 /2 "HW FROM WHC TO SINK.
w
SINK AND WHC FURNISHED AND INSTALLED BY CONTRACTOR.
zD
1 "CW DOWN WALL. ROUTE 3 /4 "CW TO (2) FROST PROOF WALL HYDRANTS. ROUTE 3 /4 "CW
TO PHOTO WHC & SINK AND ROUTE 3 /4 "HW FROM WHC TO SINK. SINK AND WHC FURNISHED
l
AND INSTALLED BY CONTRACTOR.
z /�
0
V
3 /4 "CW /HW DOWN TO THERMOSTATIC MIXING VALVE IN RECESSED ACCESS BOX. SET TEMP.
L'-
TO 857. SEE DETAIL ON P -402 ''FOR SPEC ON MIXING VALVE.
0
1 /2 "CW DOWN WALL TO "KLEANSTEAM" SYSTEM MOUNTED ON WALL. ROUTE 1 /2 "CW FROM
0
W_
"KLEANSTEAM" SYSTEM TO PROOFER. SEE WATER DISTRIBUTION NOTE 9.
3 /4 "CW DOWN, ROUTE 3 /4 "CW TO FROST PROOF WALL HYDRANT & 3 /4 "CW TO OVEN.
r
TERMINATE W/ BALL VALVE AT OVEN.
12
3 /4 "CW DOWN WALL TO BELOW SLAB. ROUTE 3 /4 "CW FROM BELOW SLAB IN 2" PVC
Q
CONDUIT TO LUNCHEON MEAT CASE (STUB -UP). TERMINATE W/ BALL VALVE.
14
1 "CW /HW DOWN WALL, ROUTE 3 /4 "CW /HW TO UTENSIL SINK, ROUTE 3 /4 "CW /HW TO HOSE
BIBB, SEE WATER DISTRIBUTION NOTE 10.
15
1 /2 "CW DOWN WALL TO "KLEANSTEAM" SYSTEM MOUNTED ON WALL, ROUTE 1 /2 "CW FROM
"KLEANSTEAM" SYSTEM TO LOBSTER STEAMER. SEE WATER DISTRIBUTION NOTE 9.
1s
3 /4 "CW DOWN WALL TO BELOW SLAB. ROUTE 3 /4 "CW FROM BELOW SLAB IN 2" PVC
CONDUIT TO SEAFOOD CASE (STUB -UP). TERMINATE W/ BALL VALVE.
17
3 /4 "CW DOWN WALL TO BELOW SLAB. ROUTE 3 /4 "CW FROM BELOW SLAB IN 2" PVC
CONDUIT TO MEAT CASE (STUB -UP). TERMINATE W/ BALL VALVE.
1a
3 /4 "CW DOWN WALL TO FROST PROOF WALL HYDRANT.
20
3 /4 "CW DOWN WALL TO BELOW SLAB. ROUTE 3 /4 "CW FROM BELOW SLAB IN 2" PVC
CONDUIT TO DAIRY CASE (STUB -UP). TERMINATE W/ BALL VALVE.
21
120 GALLON U,G, PROPANE TANKS FURNISHED & INSTALLED BY PLUMBING
SUBCONTRACTOR(NQT LEASED). GAS DEMAND IS FOR STAND -BY GENERATOR ONLY.
30
1 "CW /HW DOWN WALL. ROUTE 3 /4 "CW /HW TO UTENSIL SINK AND 3 /4 "CW /HW TO
HOSE BIBB, SEE WATER DISTRIBUTION NOTE 10.
33
1 /2 "CW DOWN WALL TO ADF /DF.
3s
3 /4 "HW /CW DOWN WALL TO UTILITY SINK.
38
3 /4 "CW /HW, IN WALL, DOWN TO THERMOSTATIC MIXING VALVE IN ACCESS BOX. SET TEMP.
TO 857, ROUTE 1 /2 "CW /HW, EXPOSED, OVER TO HS /EWS. SEE DETAIL ON P -402
FOR SPEC ON MIXING VALVE.
3s
IN WALL 1 "CW /HW DOWN WALL, ROUTE 3 /4 "CW /HW TO UTENSIL SINK, ROUTE 3 /4 "CW /HW TO HOSE
BIBB. SEE WATER DISTRIBUTION NOTE 10,
SPRINKLER NOTES
CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING EXISTIND SPRINKLER
HEADS THROUGHOUT THE EXISTING BUILDING AS REQUIRED TO CONFORM TO
NEW FINISH CEILING HEIGHTS. ANT MODIFICATION TO THE EXISTING SYSTEM
SHALL CONFORM TO ALL CODES AND N.F.P.A. #13 AND SHALL BE APPROVED
AND ACCEPTED BY THE INSURANCE CARRIER.
CONTRACTOR TO EXTEND SPRINKLERS IN ADDITION SPACES IN A MANNER TO
MEET ALL LOCAL, AND NATIONAL CODES. CONTRACTOR TO INSULATE PIPING
IN THE VESTIBULE WITH 1/2" ARMAFLEX. ADJUST NEW SPRINKLER HEADS TO
MEET NEW CEILING CONDITION, (SUBMIT SHOP DRAWING FOR REVIEW)
PLUMBING REMODELING NOTES
1. ALL WORK PERFORMED UNDER THIS CONTRACT SHALL COMPLY WITH ALL
LOCAL LAWS, THE SOUTH FLORIDA BUILDING CODE, THE RULES AND
REGULATIONS OF THE LOCAL UTILITY COMPANIES AND ALL THE STANDARD
OF CONSTRUCTION ESTABLISHED BY THE EXISTING INSTALLATION.
2. ALL MATERIALS AND LABOR UNDER THIS PROJECT SHALL BE IN STRICT
COMPLIANCE WITH THE REQUIREMENTS ESTABLISHED BY THE EXISTING
INSTALLATION. THE INTEGRITY OF ALL EXISTING SYSTEMS MUST BE
MAINTAINED.
3. THE CONTRACTOR SHALL VISIT THE SITE AND FAMILIARIZE HIMSELF WITH
THE LOCATION OF ALL EXISTING UTILITIES STUB OUTS, PIPING, EQUIPMENT,
ETC,, AND /OR ANY CONDITION THAT MAY AFFECT HIS WORK, ALL THE
NECESSARY REROUTING, RELOCATING, AND /OR REMOVAL OF EXISTING
PIPING, EQUIPMENT, ETC., SHAL BE INCLUDED IN THE SCOPE OF WORK.
4. ALL SERVICES INTERRUPTIONS SHALL BE SCHEDULED WITH THE AUTHORIZED
REPRESENTATIVE OF THE BUILDING MANAGEMENT ORGANIZATION. ALL REMOVAL
AND DISPOSAL WORK SHALL BE COORDINATED WITH THE AITHORIZED
REPRESENTATIVE OF THE BUILDING MANAGEMENT ORGANIZATION.
5. ALL PLUMBING FIXTURES SHALL BE PROVIDED WITH ALL NECESSARY
ACCESSORIES SUCH AS STOP VALVES, "P" TRAPS, SUPPORTS. P do T VALVE'S,
ETC. AS REQUIRED. ALL EXPOSED PIPING AT FIXTURES AND EQUIPMENT
SHALL BF CHROME PLATED BRASS PIPE OR TUBE.
6. THE CONTRACTOR SHALL PAY ALL INSPECTION FEES, ALL COSTS OF PERMITS
AND ALL OTHER COST'S INCIDENTAL. TO THE COMPLETION AND TESTING OF THIS
WORK. UPON FINAL ACCEPTANCE, A CERTIFICATE FROM THE LOCAL INSPECTION
AUTHORITY SHALL BE FURNISHED TO THE OWNER.
7- OMIT
8, CONTRACTOR SHALL VERIFY SLOPE AND DEPTHS AND LOCATIONS OF
CONNECTION POINTS TO EXISTING PRESSURE OR DRAINAGE LINES
BEFORE STARTING WORK,
WATER DISTRIBUTION NOTES
1. PROVIDE 1/2" COLD WATER STUB -UP WITH SHUT -OFF VALVE AND CONNECT TO
HOSE REEL AT PRODUCE CASES.
2. PROVIDE HOT AND COLD WATER' SUPPLY TO MEAT CUTTING ROOM,
BAKERY SINKS, DELI SINKS, HAND SINKS, SEAFOOD SINK, HOSE BIBBS,
MOP RECEPTORS, SERVICE FAUCETS, AND LOBSTER STEAMER
3. PROVIDE COLD WATER SUPPLY TO PRODUCE SINK (BOTH SIDES OF FAUCETS),
DRINKING FOUNTAIN, STEAMER, OVENS, HOT DELI
CASE, PRODUCE CASES, FLOOR AND WALL HYDRANTS, WALK -IN OVEN.
4. ALL NEW WATER LINES SHALL BE RUN OVERHEAD UNLESS OTHERWISE NOTED. INSULATE
ALL WATER LINES (SEE SPECS.) INSULATE ALL FITTINGS THAT ARE NOT
CHROME PLATED.
5. ALL NEW WATER PIPING SHALL BE COPPER.
6. PROVIDE AND INSTALL STOPS FOR WATER SUPPLIES AT EACH NEW FIXTURE.
7. PROVIDE AND INSTALL ADEQUATE WATER HAMMER AND ANTI - SIPHON PROTECTION ON
ALL NEW FAUCETS. SIZE IN ACCORDANCE WITH LOCAL CODES.
8. CONTRACTOR SHALL FURNISH AND INSTALL WATER PRESSURE REGULATOR,
STANDPIPE, AND SHUT -OFF VALVE FOR LOBSTER COOKER AND STEAMERS.
9. WATER FILTERS SHALL BE FURNISHED BY WINN -DIXIE AND INSTALLED BY CONTRACTOR
FOR THE FOLLOWING EQUIPMENT. LOCATION TO BE DETERMINED BY WINN -DIXIE
MAINILNANUL SUHLKVISUK (KLUUMMLNULU I-ILILK: LVLKNUKL KLLANSILAM JTJILM
MODEL AR -X.) USE THIS SYSTEM IF pH EXCEEDS 7.5 ONLY. FOR ALL OTHER PURPOSES
USE ONLY THE FILTER, EVERPURE FILTER QC7 -1 SINGLE HEAD W/ CV FILTER. SEE
DETAIL ON SHEET P -401.
A. PROOFERS
B. STEAMERS
C. MISTERS
10. PROVIDE CHECK VALVES ON HW AND CW LINES SERVING 2 AND 3 COMPARTMENT
SINKS AND MOP RECEPTORS.
11. ALL EXPOSED COPPER PIPE IN FOOD PREP AREAS SHALL BE POLISHED WITH EMERY
CLOTH AND ONE COAT CLEAR LACQUER APPLIED.
GAS PIPING FOR GENERATOR
1. GAS PIPING SHALL BE INSTALLED IN ACCORDANCE WITH NFPA -54, AND THE
STANDARD GAS CODE.
2. THE INSTALLING SUBCONTRACTOR SHALL BE LICENSED BY THE STATE FOR THE
INSTALLATION OF GAS PIPING.
3. THE INSTALLATION SHALL BE FOR NATURAL GAS OR PROPANE.
4. GAS PIPING SHALL BE SCHEDULE 40 SEAMLESS, BLACK STEEL. GAS PIPING OUTSIDE
THE BUILDING SHALL BE PAINTED WITH BLACK "RUSTOLEUM" PAINT.
5. RUNOUT PIPING, FROM THE MAIN PIPING TO APPLIANCES, SHALL BE WITH AN
INVERTED TRAP CONNECTION AT THE MAIN.
6. PROVIDE THE FOLLOWING IN ORDER AT EACH PIECE OF EQUIPMENT: GAS COCK,
SEDIMENT TRAP, UNION, AND FLEXIBLE CONNECTION.
7. ALL GAS EQUIPMENT SHALL BE AGA APPROVED.
8. WHERE PROPANE IS USED IN LEIU OF NATURAL GAS, ALL TANKS, PIPING, AND
APPURTENANCES SHALL BE PROVIDED AND INSTALLED IN ACCORDANCE WITH NFPA 58.
•
c0
•
N
W
�n
cfl O
W° W O
O Ld O
�O ry� tf7
U)
00
Lo
• d" L0
N W /-`•
U O Y Lo
• O Z Q O
O
U o)
/( I r- Q
CI - W
Lo
�j LO .: :E I-
SEA.
P q
ro,d.y w="
Y
of �_
I
ENGINEERS
0 r
ri N oN
�
r7-- W op, p
0 u
a- N -o)
O
Lw W � o
w 1--
-J
_w'�_ -�
z Z E
\11d w 0
REVISIONS:
n WINN DIXIE -• COMMENTS
ZIMPED LINES /C LARIFIIC�ATIONS
L
Z22�COMMENTS FROM CITY
FIRE DEPT. NOV. 19, 02
NEW H.C. BATHROOMS
JANUARY 2003
1
• f..r
►o
c
E Q4 r�rkk
�^ I--1 O
CL V) O Ln
i
W
1 ♦ W 00
V
A�
r , O
W w
CLI
J
V ti OLLJ
o E
o
v
0
®o
PROJECT NO.
WD#0704
DRAWING NO.
P -103 of _
SHEET NO.
OF -
W
w
c-)
<'
l
z /�
0
V
L'-
1-
`L7
0
W_
rj
X
r
Ld
Q
0 �.
° z
Z
o
Lo
co
PROJECT NO.
WD#0704
DRAWING NO.
P -103 of _
SHEET NO.
OF -