Loading...
02-830-013K I E 1� C _c 1� a: LL G ;n i a I �x x i DOWN IN WALL DOWN IN WALL DOWN IN WALL CONNECT TO CONNECT TO CONNECT TO CASES AS CASES AS CASES AS REQUIRED. ----- 2Q REQUIRED. 12 REQUIRED. ............................................................................................................... ............................... _ . ..,................................,,.,.,,,,,,,...,..,.................... ,...........,.... ..,.................... ...... ,i _ -_ - - L • -.,,x ..... .. , y. ,�,,.....,. 11..1.1.,.,..,.. .. ...,• ....... .. ,� "„'.". -" 1 -0.; • 3 8,_0„ M4A3 8• -0„ 12 0" D63 12' -0'" D63 8' - -0' 063 12' -D" D63 12' -0° D63 12' -0" D63 12' -0" VSV34 10'-0" V5V34 12'-6" M4A3 M4A3 12' j0M4A3 2' M4A i 4W CW - 3/4" CW- /4N CW ............................ - -- - - - - -- _ -_ ------- - - - - -- ----- - - - -__ - ----- .-- .- _- .-- .- - -._ _._------ - - - - -- _ ` -- _ - - - - - -- - - -uj -- ., w T- � EXISTING 1 1/2 "0 �3 COLD WATER LINE 0 9 TO REMAIN VERIFY _ IN FIELD. w • • ': S /EWS p z¢ „9 -,S 4£ASA tNW " OLD WATER - - - -1 39 MS1•• •..,, I i i I O O O ,NOTE: 0 i :;EXISTING 1 1/2 "0 I ' u PROVIDE 5/8" - z i ; COLD WATER LINE : i HOT &COLD WATER HAND SINK, TO REMAIN VERIFY 0 30 COMP. SINK. & I I ° ::IN FIELD. i w NEW MOP • g I SINK i m u I I MOWN IN WALL o� QONNECT TO oz u ?SES AS q i REQUIRED. ; 20 N � N O O O � 14 m , O m 0 o o _ Sm N aF W i w I _� " A PS1 PROVIDE 5/8" • HOT & COLD WATER TO 3 COMP. SINK. C z N LEXISTING WATER SUPPLY STUB UPS w I I r-, o 9 _ o- n NOT BEING REUSED ARE TO BE ° # I _ m CAPPED OFF AS REQUIRED VERIFY 0 o ° - 0,- p > LOCATIONS IN FIELD. (TYPICAL) a o a=H = • 0 A] 0 i:. ' EXISTING WATER SUPPLY STUB UPS 0 O NOT BEING REUSED ARE TO BE O CAPPED OFF AS REQUIRED VERIFY EXISTING 1 1/2 "0 I NEW ATER HEATER LOCATIONS IN FIELD. (TYPICAL) COLD WATER LINE I A E MOP SINK. 82 GALS. NOTE: T REMAIN VERIFY-:1 R AND COORDINATE W/ "W.D" VERIFY IN FIELD IF CASES IN LID. WILL REQUIRE WATER SUPPLY AND PROVIDE IF REQUIRED. REF. DELI CASE i I DEL REF, CASE DELI REF, CASE z N 1" HOT WATE HpT i „0 -,8 EOVtibd DELI CASE .,o -,e MA6FS ,0 -,8 OAKS , : 1 i i iI E � OP STINK : ; --- zI PHARMACY ......, _.. NEW 1 HOT WATER NEW HOT WATER AND SINK A, ° H i 3 COMP SINK 3/4" -� _ _� _ -- -_ 4 1 t1AND SINK Ii g OTE: I _ NEW 1" COLD WATER I _ NEW 3/4" COLD WATER NOTE: ,j, P OVIDE I m "EW 5/8 "0 CW ANEW 5/8 "0 CW PROVIDE HO & COLD WATER z TOTHAND O INK. WATER HAND SINK, MOP SINK AND WALK IN OVEN 3 COMP. SINK PROOFER 6: : ; li,,,,........ ,,,,,,,,, ,,,,, tl...... ,.,.,.,.,.,.,.,.,..,. ,..................,� o • .............. .................:.......................................................................... ............................... .,..,,,11.1.,.11..1,1,......... _ ..,..,...,..,,...,,.,.,,.. - ; NOTE: RUN WATER LINES •. DOWN IN WALL CONNECT TO SINKS AND EQUIPMENTS _ o .............. .......................... "............... .,,,,,. AS REQUIRED. (TYPICAL) 4......,., 1 ..... ............................... ........................11,1111 ---Il 1 -1/2" EMERGENCY GENERATOR (338 GPH.) SEDIMENT TRAP(TYP.) / PF8b ffR U. L. GAS COCK VALV EXIST. REU 120 GALLO GAS TANK LAMENT TRAP(TYP.) GAS PIPING ISOMETRIC DIAGRAM NOT TO SCALE NOTE: GAS PIPE LONGEST RUN 80'(LF)(338 G.P.H.) PLANS WERE PREPARED FROM EXISTING DRAWINGS BY F. EARL LEGGET ARCHITECT - TAMPA (UNDATED) GLASSER ASSOC. ARCH. DATED 6/30/72 IT IS CONTRACTOR RESPONSABILITY TO VERIFY AND COORDINATE ALL EXISTING CONDITIONS IN FIELD AND ADJUST OR PROVIDE NEW AS REQUIRED. 0, 1 2" NEW EMERGENCY GENERATOR ;o 1 -1 /' 120 GALLON GAS TANK. EXISTING M EZfMTO 1 :.,.,1 1,11.1 ......................... GAS PIPING LAYOUT SCALE 1/8" = 1' -0" C• y 33 I HS EWS i LI I EXISTING 1 1/2 "0 HOT & COLD WATER LINE I 4 TO REMAIN VERIFY I 3, IN FIELD. I c; 0 O O m ICI PROVIDE 5/8" HOT & COLD WATER TO NEW MOP SINK 21 Lp I 15 I" w - ;- PROVIDE " w I { HOT & COLD abIATR`•, ❑ c _, TO 3 COMP. SINK; I 4 I ' °= PR IDE N HOT COU i WATER TO ND 51¢IK. ; w I EXISTING RELQ6AT�DJ WATER HEATER; ; i NEW 1 0 W , {;,,,RECONNECT AS RLY UIRED. �. - ., '•MUtJNT••AB(�fE••CEILIf�G ° i AND PROVIDE METAL; 0 - _ • ••••• f SUPPORTS & SECU • D TO 5 IjE :.. . .................`,...,.,,,.... i.......CON'CRETE- BL'OCK';WALLS 15 ; AS REQUIRED. 1 16 I i NEW 3/4" C I� NEW WATER LINES W ; I ww N 1 "0 CW I RUN DOWN IN °:1300 i.,,WAL•L•••AND••GONNErT•I••I ` TO LAV. & WC EXISTING WATER SUPPLY STUB UPS ; 0 ~ NOT BEING REUSED ARE TO BE W I w I j WITH 5/8 "0 LINES CAPPED OFF AS REQUIRED VERIFY j a NEW 3 4 "0 HOT WATER LOCATIONS IN FIELD. (TYPICAL) o I • w / ' NEW WATER LINES RUN DOWN IN w,• = WALL AND CONNECT TO LAV. & URIN. WITH 5/8 "0 LINES. EXISTING PRODUCE CASES TO BE REPLACED tj 1 "0 CW NEW WATER LINES WITH NEW RECONNECT TO EXISTING WATER . I N EW RUN DOWN IN NEW 3/4" CW SUPPLY. VERIFY LOCATIONS IN FIELD. (TYP.) I ; WALL AND CONNECT TO LAV. WITH 5/8 "0 LINES _ - - - NEW 1 "0 CW ! NEW 3/4" HOT WATER I H 0- FAZH AZH 0 Zl £AZ ,Zl o -ZI £ �' ...1..1.1...1 -. - ....�„ ... ....................... ..................................................... ............................... .... •..,,...,,.,,,..., 11..11........ 11.1.1...., ... ,..... W/H NEW WATER LINES O RUN DOWN IN I 3 ' D CONNECT • WALL AN i :.,.,.1,...i TO LAV. & WC :.t.' I WITH 5/8" LINES SUPPLY PIPING PLAN SCALE 3/32" = 1' -0" SPRINKLER NOTES CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING EXISTIND SPRINKLER HEADS THROUGHOUT THE EXISTING BUILDING AS REQUIRED TO CONFORM TO NEW FINISH CEILING HEIGHTS. ANT MODIFICATION TO THE EXISTING SYSTEM SHALL CONFORM TO ALL CODES AND N.F.P.A. #13 AND SHALL BE APPROVED AND ACCEPTED BY THE INSURANCE CARRIER. CONTRACTOR TO EXTEND SPRINKLERS IN ADDITION SPACES IN A MANNER TO MEET ALL LOCAL, AND NATIONAL CODES. CONTRACTOR TO INSULATE PIPING IN THE VESTIBULE WITH 1/2" ARMAFLEX. ADJUST NEW SPRINKLER HEADS TO MEET NEW CEILING CONDITION, (SUBMIT SHOP DRAWING FOR REVIEW) PLUMBING REMODELING NOTES 1. ALL WORK PERFORMED UNDER THIS CONTRACT SHALL COMPLY WITH ALL LOCAL LAWS, THE SOUTH FLORIDA BUILDING CODE, THE RULES AND REGULATIONS OF THE LOCAL UTILITY COMPANIES AND ALL THE STANDARD OF CONSTRUCTION ESTABLISHED BY THE EXISTING INSTALLATION. 2. ALL MATERIALS AND LABOR UNDER THIS PROJECT SHALL BE IN STRICT COMPLIANCE WITH THE REQUIREMENTS ESTABLISHED BY THE EXISTING INSTALLATION. THE INTEGRITY OF ALL EXISTING SYSTEMS MUST BE MAINTAINED. 3. THE CONTRACTOR SHALL VISIT THE SITE AND FAMILIARIZE HIMSELF WITH THE LOCATION OF ALL EXISTING UTILITIES STUB OUTS, PIPING, EQUIPMENT, ETC,, AND /OR ANY CONDITION THAT MAY AFFECT HIS WORK, ALL THE NECESSARY REROUTING, RELOCATING, AND /OR REMOVAL OF EXISTING PIPING, EQUIPMENT, ETC., SHAL BE INCLUDED IN THE SCOPE OF WORK. 4. ALL SERVICES INTERRUPTIONS SHALL BE SCHEDULED WITH THE AUTHORIZED REPRESENTATIVE OF THE BUILDING MANAGEMENT ORGANIZATION. ALL REMOVAL AND DISPOSAL WORK SHALL BE COORDINATED WITH THE AITHORIZED REPRESENTATIVE OF THE BUILDING MANAGEMENT ORGANIZATION. 5. ALL PLUMBING FIXTURES SHALL BE PROVIDED WITH ALL NECESSARY ACCESSORIES SUCH AS STOP VALVES, "P" TRAPS, SUPPORTS. P do T VALVE'S, ETC. AS REQUIRED. ALL EXPOSED PIPING AT FIXTURES AND EQUIPMENT SHALL BF CHROME PLATED BRASS PIPE OR TUBE. 6. THE CONTRACTOR SHALL PAY ALL INSPECTION FEES, ALL COSTS OF PERMITS AND ALL OTHER COST'S INCIDENTAL. TO THE COMPLETION AND TESTING OF THIS WORK. UPON FINAL ACCEPTANCE, A CERTIFICATE FROM THE LOCAL INSPECTION AUTHORITY SHALL BE FURNISHED TO THE OWNER. 7- OMIT 8, CONTRACTOR SHALL VERIFY SLOPE AND DEPTHS AND LOCATIONS OF CONNECTION POINTS TO EXISTING PRESSURE OR DRAINAGE LINES BEFORE STARTING WORK, WATER DISTRIBUTION NOTES 1. PROVIDE 1/2" COLD WATER STUB -UP WITH SHUT -OFF VALVE AND CONNECT TO HOSE REEL AT PRODUCE CASES. 2. PROVIDE HOT AND COLD WATER' SUPPLY TO MEAT CUTTING ROOM, BAKERY SINKS, DELI SINKS, HAND SINKS, SEAFOOD SINK, HOSE BIBBS, MOP RECEPTORS, SERVICE FAUCETS, AND LOBSTER STEAMER 3. PROVIDE COLD WATER SUPPLY TO PRODUCE SINK (BOTH SIDES OF FAUCETS), DRINKING FOUNTAIN, STEAMER, OVENS, HOT DELI CASE, PRODUCE CASES, FLOOR AND WALL HYDRANTS, WALK -IN OVEN. 4. ALL NEW WATER LINES SHALL BE RUN OVERHEAD UNLESS OTHERWISE NOTED. INSULATE ALL WATER LINES (SEE SPECS.) INSULATE ALL FITTINGS THAT ARE NOT CHROME PLATED. 5. ALL NEW WATER PIPING SHALL BE COPPER. 6. PROVIDE AND INSTALL STOPS FOR WATER SUPPLIES AT EACH NEW FIXTURE. 7. PROVIDE AND INSTALL ADEQUATE WATER HAMMER AND ANTI - SIPHON PROTECTION ON ALL NEW FAUCETS. SIZE IN ACCORDANCE WITH LOCAL CODES. 8. CONTRACTOR SHALL FURNISH AND INSTALL WATER PRESSURE REGULATOR, STANDPIPE, AND SHUT -OFF VALVE FOR LOBSTER COOKER AND STEAMERS. 9. WATER FILTERS SHALL BE FURNISHED BY WINN -DIXIE AND INSTALLED BY CONTRACTOR FOR THE FOLLOWING EQUIPMENT. LOCATION TO BE DETERMINED BY WINN -DIXIE MAINILNANUL SUHLKVISUK (KLUUMMLNULU I-ILILK: LVLKNUKL KLLANSILAM JTJILM MODEL AR -X.) USE THIS SYSTEM IF pH EXCEEDS 7.5 ONLY. FOR ALL OTHER PURPOSES USE ONLY THE FILTER, EVERPURE FILTER QC7 -1 SINGLE HEAD W/ CV FILTER. SEE DETAIL ON SHEET P -401. A. PROOFERS B. STEAMERS C. MISTERS 10. PROVIDE CHECK VALVES ON HW AND CW LINES SERVING 2 AND 3 COMPARTMENT SINKS AND MOP RECEPTORS. 11. ALL EXPOSED COPPER PIPE IN FOOD PREP AREAS SHALL BE POLISHED WITH EMERY CLOTH AND ONE COAT CLEAR LACQUER APPLIED. GAS PIPING FOR GENERATOR 1. GAS PIPING SHALL BE INSTALLED IN ACCORDANCE WITH NFPA -54, AND THE STANDARD GAS CODE. 2. THE INSTALLING SUBCONTRACTOR SHALL BE LICENSED BY THE STATE FOR THE INSTALLATION OF GAS PIPING. 3. THE INSTALLATION SHALL BE FOR NATURAL GAS OR PROPANE. 4. GAS PIPING SHALL BE SCHEDULE 40 SEAMLESS, BLACK STEEL. GAS PIPING OUTSIDE THE BUILDING SHALL BE PAINTED WITH BLACK "RUSTOLEUM" PAINT. 5. RUNOUT PIPING, FROM THE MAIN PIPING TO APPLIANCES, SHALL BE WITH AN INVERTED TRAP CONNECTION AT THE MAIN. 6. PROVIDE THE FOLLOWING IN ORDER AT EACH PIECE OF EQUIPMENT: GAS COCK, SEDIMENT TRAP, UNION, AND FLEXIBLE CONNECTION. 7. ALL GAS EQUIPMENT SHALL BE AGA APPROVED. 8. WHERE PROPANE IS USED IN LEIU OF NATURAL GAS, ALL TANKS, PIPING, AND APPURTENANCES SHALL BE PROVIDED AND INSTALLED IN ACCORDANCE WITH NFPA 58. • c0 • N W �n cfl O W° W O O Ld O �O ry� tf7 U) 00 Lo • d" L0 N W /-`• U O Y Lo • O Z Q O O U o) /( I r- Q CI - W Lo �j LO .: :E I- SEA. P q ro,d.y w=" Y of �_ I ENGINEERS 0 r ri N oN � r7-- W op, p 0 u a- N -o) O Lw W � o w 1-- -J _w'�_ -� z Z E \11d w 0 REVISIONS: n WINN DIXIE -• COMMENTS ZIMPED LINES /C LARIFIIC�ATIONS L Z22�COMMENTS FROM CITY FIRE DEPT. NOV. 19, 02 NEW H.C. BATHROOMS JANUARY 2003 1 • f..r ►o c E Q4 r�rkk �^ I--1 O CL V) O Ln i W 1 ♦ W 00 V A� r , O W w CLI J V ti OLLJ o E o v 0 ®o DRAWING NOTES @i 3 /4 "CW DOWN IN WALL TO PHARMACY WHC AND SINK. ROUTE 1 /2 "HW FROM WHC TO SINK. w SINK AND WHC FURNISHED AND INSTALLED BY CONTRACTOR. zD 1 "CW DOWN WALL. ROUTE 3 /4 "CW TO (2) FROST PROOF WALL HYDRANTS. ROUTE 3 /4 "CW TO PHOTO WHC & SINK AND ROUTE 3 /4 "HW FROM WHC TO SINK. SINK AND WHC FURNISHED l AND INSTALLED BY CONTRACTOR. z /� 0 V 3 /4 "CW /HW DOWN TO THERMOSTATIC MIXING VALVE IN RECESSED ACCESS BOX. SET TEMP. L'- TO 857. SEE DETAIL ON P -402 ''FOR SPEC ON MIXING VALVE. 0 1 /2 "CW DOWN WALL TO "KLEANSTEAM" SYSTEM MOUNTED ON WALL. ROUTE 1 /2 "CW FROM 0 W_ "KLEANSTEAM" SYSTEM TO PROOFER. SEE WATER DISTRIBUTION NOTE 9. 3 /4 "CW DOWN, ROUTE 3 /4 "CW TO FROST PROOF WALL HYDRANT & 3 /4 "CW TO OVEN. r TERMINATE W/ BALL VALVE AT OVEN. 12 3 /4 "CW DOWN WALL TO BELOW SLAB. ROUTE 3 /4 "CW FROM BELOW SLAB IN 2" PVC Q CONDUIT TO LUNCHEON MEAT CASE (STUB -UP). TERMINATE W/ BALL VALVE. 14 1 "CW /HW DOWN WALL, ROUTE 3 /4 "CW /HW TO UTENSIL SINK, ROUTE 3 /4 "CW /HW TO HOSE BIBB, SEE WATER DISTRIBUTION NOTE 10. 15 1 /2 "CW DOWN WALL TO "KLEANSTEAM" SYSTEM MOUNTED ON WALL, ROUTE 1 /2 "CW FROM "KLEANSTEAM" SYSTEM TO LOBSTER STEAMER. SEE WATER DISTRIBUTION NOTE 9. 1s 3 /4 "CW DOWN WALL TO BELOW SLAB. ROUTE 3 /4 "CW FROM BELOW SLAB IN 2" PVC CONDUIT TO SEAFOOD CASE (STUB -UP). TERMINATE W/ BALL VALVE. 17 3 /4 "CW DOWN WALL TO BELOW SLAB. ROUTE 3 /4 "CW FROM BELOW SLAB IN 2" PVC CONDUIT TO MEAT CASE (STUB -UP). TERMINATE W/ BALL VALVE. 1a 3 /4 "CW DOWN WALL TO FROST PROOF WALL HYDRANT. 20 3 /4 "CW DOWN WALL TO BELOW SLAB. ROUTE 3 /4 "CW FROM BELOW SLAB IN 2" PVC CONDUIT TO DAIRY CASE (STUB -UP). TERMINATE W/ BALL VALVE. 21 120 GALLON U,G, PROPANE TANKS FURNISHED & INSTALLED BY PLUMBING SUBCONTRACTOR(NQT LEASED). GAS DEMAND IS FOR STAND -BY GENERATOR ONLY. 30 1 "CW /HW DOWN WALL. ROUTE 3 /4 "CW /HW TO UTENSIL SINK AND 3 /4 "CW /HW TO HOSE BIBB, SEE WATER DISTRIBUTION NOTE 10. 33 1 /2 "CW DOWN WALL TO ADF /DF. 3s 3 /4 "HW /CW DOWN WALL TO UTILITY SINK. 38 3 /4 "CW /HW, IN WALL, DOWN TO THERMOSTATIC MIXING VALVE IN ACCESS BOX. SET TEMP. TO 857, ROUTE 1 /2 "CW /HW, EXPOSED, OVER TO HS /EWS. SEE DETAIL ON P -402 FOR SPEC ON MIXING VALVE. 3s IN WALL 1 "CW /HW DOWN WALL, ROUTE 3 /4 "CW /HW TO UTENSIL SINK, ROUTE 3 /4 "CW /HW TO HOSE BIBB. SEE WATER DISTRIBUTION NOTE 10, SPRINKLER NOTES CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING EXISTIND SPRINKLER HEADS THROUGHOUT THE EXISTING BUILDING AS REQUIRED TO CONFORM TO NEW FINISH CEILING HEIGHTS. ANT MODIFICATION TO THE EXISTING SYSTEM SHALL CONFORM TO ALL CODES AND N.F.P.A. #13 AND SHALL BE APPROVED AND ACCEPTED BY THE INSURANCE CARRIER. CONTRACTOR TO EXTEND SPRINKLERS IN ADDITION SPACES IN A MANNER TO MEET ALL LOCAL, AND NATIONAL CODES. CONTRACTOR TO INSULATE PIPING IN THE VESTIBULE WITH 1/2" ARMAFLEX. ADJUST NEW SPRINKLER HEADS TO MEET NEW CEILING CONDITION, (SUBMIT SHOP DRAWING FOR REVIEW) PLUMBING REMODELING NOTES 1. ALL WORK PERFORMED UNDER THIS CONTRACT SHALL COMPLY WITH ALL LOCAL LAWS, THE SOUTH FLORIDA BUILDING CODE, THE RULES AND REGULATIONS OF THE LOCAL UTILITY COMPANIES AND ALL THE STANDARD OF CONSTRUCTION ESTABLISHED BY THE EXISTING INSTALLATION. 2. ALL MATERIALS AND LABOR UNDER THIS PROJECT SHALL BE IN STRICT COMPLIANCE WITH THE REQUIREMENTS ESTABLISHED BY THE EXISTING INSTALLATION. THE INTEGRITY OF ALL EXISTING SYSTEMS MUST BE MAINTAINED. 3. THE CONTRACTOR SHALL VISIT THE SITE AND FAMILIARIZE HIMSELF WITH THE LOCATION OF ALL EXISTING UTILITIES STUB OUTS, PIPING, EQUIPMENT, ETC,, AND /OR ANY CONDITION THAT MAY AFFECT HIS WORK, ALL THE NECESSARY REROUTING, RELOCATING, AND /OR REMOVAL OF EXISTING PIPING, EQUIPMENT, ETC., SHAL BE INCLUDED IN THE SCOPE OF WORK. 4. ALL SERVICES INTERRUPTIONS SHALL BE SCHEDULED WITH THE AUTHORIZED REPRESENTATIVE OF THE BUILDING MANAGEMENT ORGANIZATION. ALL REMOVAL AND DISPOSAL WORK SHALL BE COORDINATED WITH THE AITHORIZED REPRESENTATIVE OF THE BUILDING MANAGEMENT ORGANIZATION. 5. ALL PLUMBING FIXTURES SHALL BE PROVIDED WITH ALL NECESSARY ACCESSORIES SUCH AS STOP VALVES, "P" TRAPS, SUPPORTS. P do T VALVE'S, ETC. AS REQUIRED. ALL EXPOSED PIPING AT FIXTURES AND EQUIPMENT SHALL BF CHROME PLATED BRASS PIPE OR TUBE. 6. THE CONTRACTOR SHALL PAY ALL INSPECTION FEES, ALL COSTS OF PERMITS AND ALL OTHER COST'S INCIDENTAL. TO THE COMPLETION AND TESTING OF THIS WORK. UPON FINAL ACCEPTANCE, A CERTIFICATE FROM THE LOCAL INSPECTION AUTHORITY SHALL BE FURNISHED TO THE OWNER. 7- OMIT 8, CONTRACTOR SHALL VERIFY SLOPE AND DEPTHS AND LOCATIONS OF CONNECTION POINTS TO EXISTING PRESSURE OR DRAINAGE LINES BEFORE STARTING WORK, WATER DISTRIBUTION NOTES 1. PROVIDE 1/2" COLD WATER STUB -UP WITH SHUT -OFF VALVE AND CONNECT TO HOSE REEL AT PRODUCE CASES. 2. PROVIDE HOT AND COLD WATER' SUPPLY TO MEAT CUTTING ROOM, BAKERY SINKS, DELI SINKS, HAND SINKS, SEAFOOD SINK, HOSE BIBBS, MOP RECEPTORS, SERVICE FAUCETS, AND LOBSTER STEAMER 3. PROVIDE COLD WATER SUPPLY TO PRODUCE SINK (BOTH SIDES OF FAUCETS), DRINKING FOUNTAIN, STEAMER, OVENS, HOT DELI CASE, PRODUCE CASES, FLOOR AND WALL HYDRANTS, WALK -IN OVEN. 4. ALL NEW WATER LINES SHALL BE RUN OVERHEAD UNLESS OTHERWISE NOTED. INSULATE ALL WATER LINES (SEE SPECS.) INSULATE ALL FITTINGS THAT ARE NOT CHROME PLATED. 5. ALL NEW WATER PIPING SHALL BE COPPER. 6. PROVIDE AND INSTALL STOPS FOR WATER SUPPLIES AT EACH NEW FIXTURE. 7. PROVIDE AND INSTALL ADEQUATE WATER HAMMER AND ANTI - SIPHON PROTECTION ON ALL NEW FAUCETS. SIZE IN ACCORDANCE WITH LOCAL CODES. 8. CONTRACTOR SHALL FURNISH AND INSTALL WATER PRESSURE REGULATOR, STANDPIPE, AND SHUT -OFF VALVE FOR LOBSTER COOKER AND STEAMERS. 9. WATER FILTERS SHALL BE FURNISHED BY WINN -DIXIE AND INSTALLED BY CONTRACTOR FOR THE FOLLOWING EQUIPMENT. LOCATION TO BE DETERMINED BY WINN -DIXIE MAINILNANUL SUHLKVISUK (KLUUMMLNULU I-ILILK: LVLKNUKL KLLANSILAM JTJILM MODEL AR -X.) USE THIS SYSTEM IF pH EXCEEDS 7.5 ONLY. FOR ALL OTHER PURPOSES USE ONLY THE FILTER, EVERPURE FILTER QC7 -1 SINGLE HEAD W/ CV FILTER. SEE DETAIL ON SHEET P -401. A. PROOFERS B. STEAMERS C. MISTERS 10. PROVIDE CHECK VALVES ON HW AND CW LINES SERVING 2 AND 3 COMPARTMENT SINKS AND MOP RECEPTORS. 11. ALL EXPOSED COPPER PIPE IN FOOD PREP AREAS SHALL BE POLISHED WITH EMERY CLOTH AND ONE COAT CLEAR LACQUER APPLIED. GAS PIPING FOR GENERATOR 1. GAS PIPING SHALL BE INSTALLED IN ACCORDANCE WITH NFPA -54, AND THE STANDARD GAS CODE. 2. THE INSTALLING SUBCONTRACTOR SHALL BE LICENSED BY THE STATE FOR THE INSTALLATION OF GAS PIPING. 3. THE INSTALLATION SHALL BE FOR NATURAL GAS OR PROPANE. 4. GAS PIPING SHALL BE SCHEDULE 40 SEAMLESS, BLACK STEEL. GAS PIPING OUTSIDE THE BUILDING SHALL BE PAINTED WITH BLACK "RUSTOLEUM" PAINT. 5. RUNOUT PIPING, FROM THE MAIN PIPING TO APPLIANCES, SHALL BE WITH AN INVERTED TRAP CONNECTION AT THE MAIN. 6. PROVIDE THE FOLLOWING IN ORDER AT EACH PIECE OF EQUIPMENT: GAS COCK, SEDIMENT TRAP, UNION, AND FLEXIBLE CONNECTION. 7. ALL GAS EQUIPMENT SHALL BE AGA APPROVED. 8. WHERE PROPANE IS USED IN LEIU OF NATURAL GAS, ALL TANKS, PIPING, AND APPURTENANCES SHALL BE PROVIDED AND INSTALLED IN ACCORDANCE WITH NFPA 58. • c0 • N W �n cfl O W° W O O Ld O �O ry� tf7 U) 00 Lo • d" L0 N W /-`• U O Y Lo • O Z Q O O U o) /( I r- Q CI - W Lo �j LO .: :E I- SEA. P q ro,d.y w=" Y of �_ I ENGINEERS 0 r ri N oN � r7-- W op, p 0 u a- N -o) O Lw W � o w 1-- -J _w'�_ -� z Z E \11d w 0 REVISIONS: n WINN DIXIE -• COMMENTS ZIMPED LINES /C LARIFIIC�ATIONS L Z22�COMMENTS FROM CITY FIRE DEPT. NOV. 19, 02 NEW H.C. BATHROOMS JANUARY 2003 1 • f..r ►o c E Q4 r�rkk �^ I--1 O CL V) O Ln i W 1 ♦ W 00 V A� r , O W w CLI J V ti OLLJ o E o v 0 ®o PROJECT NO. WD#0704 DRAWING NO. P -103 of _ SHEET NO. OF - W w c-) <' l z /� 0 V L'- 1- `L7 0 W_ rj X r Ld Q 0 �. ° z Z o Lo co PROJECT NO. WD#0704 DRAWING NO. P -103 of _ SHEET NO. OF -