02-830-006N
x
Q
M
W
V
Q
U
CL
N
Y.
O
U
J
IL
u
0
0
CL
a-
CT)
0
CV
N
r`7
O
O
N
N
0
T
O
C
3z
N
O
a
i
co
ro
N
S
QO
N
S'
1
i
M
1. EXPOSED
CONCRETE
INSULATED
EXPOSED
CONCRETE n
+2 A.F.F.L I FXPOSFD
—INSTALL NEW 45' V VIVI CG C
BASE TO MATCH EXISTING.
EXISTING FLOOR I
TILE TO REMAIN i
PATCH AND RE IR EXPOSED
AS REQUIRED LFE CONCRETE
AS NEW CONDI?I
EXPOSED
CONCRETE ;
— INSTALL NEW 45' I I
BASE TO MATCH EXIST] `
25
MOP STATION TO
RECEIVE QUARRY TILE
EXPOSED REF.: 5/A -503
CONCRETE
..........................
Oj 4" WIDE St TRANSITION PLATE
O I SEE: DTL '$-A501
11- --•4" WIDE SS TRANSITION
PLATE AT WOO OF V.C. TILE
O PRODUCE PRrFj ARE
TO RECEIV4 TYPE 1
V.C.T. ON EPDXY MAS
I .I
- —4° WIDE S� T•;F�ANSITION PLATE
SEE: DTL 'I -.601
it
li
25 it
EXISTING
25 '1 EXPOSED ji `
II CONCRETE
II TO REMIAN
+2" A.F.F.Lfl
1
MARBLE
THRESHOLD
EXPOSED
CONCRETE
23
�... .. W
, .;....•.,..,.,••......•......•..• ................•. .................•............•
..............................
xx —REFER T0:
DRAWING A -601 (FINISH SCHEDULE)
GENERAL NOTES
1.) LAY GRAIN OF VINYL COMPOSITION TILE (VCT) IN A BASKET
WEAVE TYPE PATTERN)
2.) CONTRACTOR TO FURNISH WINN - -DIXIE WITH (6) BOXES OF
FIELD VCT COLOR AND (1) BOX OF EACH OTHER COLOR
OF VCT AT THE END OF CONSTRUCTION.
3.) ALL VCT INSTALLED SHALL BE FROM THE SAME VCT
MANUFACTURER.
4.) APPROXIMATELY NINETYI (90) DAYS AFTER GRAND OPENING
WINN-DIXIE WILL INSPECT STORE AND MARK IN INDELIBLE
INK AREAS OF TILE IN] NEED OF REPLACEMENT OR REPAIR.
VCT AND QUARRY TILE MATERIALS WILL BE FROM WINN -DIXIE
STOCK SUPPLIED BY CONTRACTOR AT END OF CONSTRUCTION.
AREAS OF CONCERN TO INCLUDE BUT NOT LIMITED TO
EXPANSION JOINTS, TICIE TRANSITION EDGES AT CARPET AND
QUARRY TILES, DRAINS IN PREP AREAS, VOIDS UNDER QUARRY
TILE, AND ROUGH AREAS DUE TO CONCRETE, UNDERLAYMENT,
QUARRY TILES, SMALL PEBBLES, ETC.
5.) CONTRACTOR TO COORDINATE LOCATION OF ALL RECESSED SLABS
WITH FLOORING MATERIAL SPECIFIED.
6.) QUARRY TILES SHALL BE 6" x 6" x 1/2" SET IN
MORTAR BED WITH 1/4" EPDXY JOINTS,
SOME AREAS (DELI, BAKERY, CUTTING ROOM, ETC.)
ANGLE QUARRY TILE ® 45' BASE
7.) CONTRACTOR TO FURNISH WINN -DIXIE WITH (2) BOXES OF
EACH KIND OF QUARRY TILES AT THE END OF CONSTRUCTION,
8.) RESTROOM BASE SHALL MATCH CERAMIC WALL TILE.
(EXISTING TO REMAIN)
9.) REF.: 3/A -501 FOR STAINLESS STEEL TRANSITION PLATE DETAIL,
10.) FLOORING NOTE:
THE FLOORING LAYOUT DESIGNED IS AS
ACCURATE AS THE FIXTURE PLAN
USED TO CREATE THIS DOCUMENT. THE ACTUAL
LAYOUT OF THE FLOORING MATERIALS IS THE RESPONSIBILITY OF
THE FLOORING CONTRACTOR.
THESE LAYOUTS ARE BASED ON EQUIPMENT LAYOUT.
WINN -DIXIE WILL NOT BE HELD RESPONSIBLE IF CONFLICTS
OR INACCURACIES ARISE DURING INSTALLATION.
FOR CIRCUMSTANCES WHERE EQUIPMENT IS NOT SET,
VERIFICATION OF EQUIPMENT LOCATION MUST BE MADE BY THE
FLOORING CONTRACTOR. THESE LOCATIONS SHOULD BE VERIFIED
WITH WINN DIXIE COINSTRUCTION SUPERVISOR.
UPON RECEIVING VERIFICATION OF EQUIPMENT LOCATION,
THE FLOORING CONTRACTOR SHOULD THEN "CHALK" THE
LOCATIONS ONTO THE FLOOR (TO ENSURE THERE WILL BE
NO CONFLICTS WITH THE DESIGN).
NOTE: CONTRACTOR SHALL NOT INSTALL ANY V.C.T. LESS THAN
4" WIDE.
FLOOR
FINISH SCHEDULE
TILE
MANUFACTURER
MARK
SIZE
I ARMSTRONG
TARKETT
KENTILE
M
0
W
�- X
O12
"x12 "x1 /8"
COOL MITE
2015
STONE WHITE
co
�
C>
�� ��
1 X12 X1 /8
DUTCH DELFT
51916
CHARCOAL MULTI
51902
STEEL GRAY
15150
co
C
MARK
SIZE
SUMMITVILLE
W
AMERICAN OLEAN
�n
V!
23
„ " "
[ 12 X12 X5/16
d�
CRYSTAL FLAME
R102 KORJAKI
_
APPROVED GROUT: SUMMITVILLE 9�6 CERULEAN
I�
6' X6 , Xl /2 �,
QUARRY
F ELEPHANT GRAY
Ld
APPROVED GROUT: SUMMITVILLE -i EPDXY S -600 -#962 NATURAL
IMARKI
SIZE
MATWORKS
E
31
19 "X19 "X3 /8"
CARPET: ATLAS EZE
#708 (GREEN)
o
v
32
Q=
MATWORKs 3
C�h
33
3" WIDE
REDUCER STRIP
TRANSITION STRIP
COLOR BLACf
q
O
®,
\
34
19 1/2 "x19 1/2"018"
MATWORKS #
TACFAST
MARCH.
_ SIZE
ARMSTRONG
ROPPE
40
4" VINYL
WALL BASE
71
MID GRAY
877
STEEL BLUE
I
CO
aN
W
U(D o
CO I-
O W O
W
O c Q Lo
I to I
NQ uj
Lo
• Lo
N W r,
U Y.
O Z O
O
<J
Ld
Lo :�i
SEAL
ENGINEERS
REVISION
WINN DIXI - COMMENTS
RED LINES CLARIFI ATIONS
�b- 27= U�F�fL)
LNEW H.C. BATHROOMS
JANUARY 2003
CHANGE COOLER FREEZE
/ \ JANUARY 2003
F
C)
W
t
W
_ �
c
o
rn
F- V
M
0
W
�- X
0 0
D'
+l
U)
co
�
00
0
E
co
C
Y) Lo
1�
W
W �
�n
V!
N
A�
I�
Ld
o
E
o
v
®
0
o
C�h
q
O
®,
\
ko
to
F
C)
W
n
z
W
_ �
c
o
rn
F- V
0
W
�- X
0 0
D'
+l
U)
Z
Z
O
Lo
00
0
DRAWING TITLE
FLOOR
T � L [:
LAYOUT
DATE:
JUNE 17, 2002
DRAWN BY:
CHECKED BY.
DIVISION
MIAMI
LOCATION NO.
285
W.D. GUIDE PLAN
ol
PROJECT N0.
WD #0704
DRAWING NO.
A -102 OF-
SHEET NO.
OF