12-1163-003GENERAL NOTES 1. "TAI ARCHITECTURE" OR "ARCHITECT" AS USED IN THESE DRAWINGS REFERS TO: TAI ARCHITECTURE, INC. 2324 NORTH MIAMI AVE. MIAMI, FL 33127 (305) 576 -7556 info @taiarch.com 2. THE CONTRACT DOCUMENTS FOR THIS PROJECT CONSIST OF DRAWINGS AND SPECIFICATIONS PREPARED BY TAI ARCHITECTURE AS WELL AS MANUFACTURERS SPECIFICATIONS PROVIDED THE THE CONTRACTOR AS SUBMITTALS TO BE APPROVED BY TAI ARCHITECTURE. 3. ALL WORK SHALL COMPLY WITH THE APPLICABLE BUILDING CODE, THE ELECTRICAL CODE, AND THE NATIONAL BOARD OF OF FIRE UNDERWRITERS CODE, THE AMERICANS WITH DISABILITIES ACT, ACCESSIBILITY GUIDELINES AND ALL MUNICIPAL AMENDMENTS. 4. THIS DOCUMENT IS NOT INTENDED TO BE A COMPLETE SPECIFICATION. IT IS A GUIDE AND GENERAL INSTRUCTION. 5. DO NOT SCALE DRAWINGS UNLESS NOTED OTHERWISE; DIMENSIONS GOVERN. LARGE SCALE DETAILS GOVERN OVER SMALL SCALE DETAILS. ALL LOCATIONS ARE FINAL PER ARCHITECT'S DRAWINGS. 6. PLANS AND SPECIFICATIONS ARE COMPLEMENTARY AND ARE INTENDED TO INCLUDE OR IMPLY ALL THE ITEMS REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THE WORK. ANY ITEM OR WORK MENTIONED IN THE SPECIFICATIONS AND NOT SHOWN IN THE DRAWINGS, OR SHOWN IN THE DRAWINGS AND NOT MENTIONED IN THE SPECIFICATIONS SHALL BE PROVIDED BY THE CONTRACTOR AS IF INCLUDED IN BOTH. 7. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ALL PARTS OF THE WORK SO THAT NO WORK SHALL BE LEFT IN AN UNFINISHED OR INCOMPLETE CONDITION. 8. GENERAL CONTRACTOR IS TO NOTIFY ARCHITECT IMMEDIATELY OF CONFLICTS OR DISCREPANCIES BETWEEN ELECTRICAL, MECHANICAL AND STRUCTURAL ELEMENTS.P 9. ALL WORK SHALL CONFORM TO ALL INDUSTRY AND MANUFACTURER'S PUBLISHED STANDARDS AND THE BUILDING OWNER'S REQUIREMENTS FOR QUALITY OF MATERIALS AND WORKMANSHIP, AS WELL AS ALL REQUIREMENTS IN THESE DRAWINGS AND SPECIFICATIONS. CONTRACTOR SHALL BE RESPONSIBLE TO BECOME FAMILIAR AND COMPLY WITH THE BUILDING OWNER'S STANDARD DETAILS OF CONSTRUCTION. ANY CONFLICTING REQUIREMENTS OF THE SOURCES LISTED ABOVE SHALL BE BROUGHT TO THE ARCHITECT'S ATTENTION PRIOR TO PROCEEDING WITH WORK. 10. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING ALL BASE BUILDING "CONTRACT DOCUMENTS ", "SHOP DRAWINGS ", "AS BUILT DRAWINGS ", AND ANY OTHER INFORMATION OF THE BASE BUILDING IN ORDER TO COORDINATE ALL TENANT WORK WITH THE BASE BUILDING CONDITIONS. 11.THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING ALL REQUIRED PERMITS, BONDS, AND FEES. ALL NECESSARY PERMITS, LICENSES, TESTS, CERTIFICATES, ETC. SHALL BE PAID FOR BY THE CONTRACTOR. 12. GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF ALL EXISTING FIELD CONDITIONS INCLUDING SOIL TOPOGRAPHY AND LOCATION OF PROPERTY LINES, EASEMENTS AND SETBACKS. ARCHITECT TO BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCIES. 13. NO SUBSTITUTIONS FOR ITEMS SPECIFIED WILL BE ACCEPTED WITHOUT PRIOR WRITTEN APPROVAL FROM THE GC. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPLYING THE ARCHITECT WITH ALL SAMPLES AND COMPARATIVE PRODUCT DATA REQUIRED TO EVALUATE PROPOSED SUBSTITUTIONS, IN A TIMELY MANNER SO AS NOT TO PRECLUDE PROCUREMENT OF THE PRODUCT ORIGINALLY SPECIFIED OR ANY PROPOSED SUBSTITUTE. 14. THE GENERAL CONTRACTOR SHALL PROTECT EXISTING CONDITIONS OR WORK BY OTHER CONTRACTORS. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO ALL EXISTING CONDITIONS OR WORK BY OTHERS INCURRED WHILE FULFILLING THE OBLIGATIONS OF THIS CONTRACT. 15. ALL WORK NOTED "BY OTHERS" OR "N.I.C: (NOT IN CONTRACT) IS TO BE THE RESPONSIBILITY OF THE OWNER AND IS NOT TO BE PART OF THE CONSTRUCTION AGREEMENT. THE GENERAL CONTRACTOR SHALL COOPERATE WITH THE OWNER AND THE OWNER'S OUTSIDE CONTRACTORS AS REQUIRED. 16. AT THE COMPLETION OF THE JOB, PRIOR TO FINAL PAYMENT, CONTRACTOR SHALL PROVIDE ONE COMPLETE SET OF MARKED UP TRANSPARENCIES AND TWO SETS OF PRINTS WITH AS BUILT CONDITIONS NOTED AND TWO BOUND COPIES OF APPLICABLE WARRANTIES, OPERATIONS MANUALS AND /OR MAINTENANCE INSTRUCTIONS. 17. ALL CONTRACTORS, SUB - CONTRACTORS AND SUPPLIERS MUST HAUL AWAY ALL GARBAGE, DEBRIS AND SCRAPS RESULTING FROM THEIR WORK AT THE SITE. ALL GARBAGE, DEBRIS AND SCRAPS MUST BE SWEPT UP AT THE END OF EACH DAY AND HAULED AWAY. ABSOLUTELY NO GARBAGE, DEBRIS OR SCRAPS CAN BE LEFT FOR THE CITY GARBAGE COLLECTION SERVICES. ANY GARBAGE, DEBRIS OR SCRAPS LEFT BY CONTRACTORS, SUBCONTRACTORS, OR SUPPLIERS WILL BE HAULED AWAY AT THEIR EXPENSE. 18. THE GENERAL CONTRACTOR SHALL PROTECT AND SECURE THE PROJECT SITE AS REQUIRED, IN CONFORMANCE WITH ALL APPLICABLE LOCAL, STATE AND NATIONAL CODES AND REGULATIONS. 19. CONTRACTOR SHALL TAKE MEASURES TO PREVENT AIRBORNE PARTICLES IN ADJACENT SPACES NOT COVERED UNDER THE WORK OF THIS CONTRACT. 20. ALL DOORS LEADING TO EMERGENCY EXITS SHALL REQUIRE NO SPECIAL KNOWLEDGE OR KEYS FOR OPERATION. 21. ALL WORK SHALL BE OF FIRST CLASS WORKMANSHIP AND GUARANTEED BY THE CONTRACTOR AGAINST DEFECTS AND POOR WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM SUBSTANTIAL COMPLETION. 22. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR BLOCKING AND ELECTRICAL CONNECTIONS. PROVIDE ADEQUATE CONCEALED BLOCKING AND BRACING FOR ALL MILLWORK HUNG FROM CEILING AND /OR PARTITIONS; FIRE TREATED WOOD OR SHEET METAL IS ACCEPTABLE. ALL WOODWORK, BLOCKING, GROUNDS, ETC. SHALL BE FIRE TREATED IN ACCORDANCE WITH ALL APPLICABLE CODES. 23. THE GENERAL CONTRACTOR AND EACH SUBCONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING ALL DIMENSIONS, CLEARANCES AND CONDITIONS AT THE JOB SITE BEFORE FABRICATING ANY MATERIAL OR COMMENCEMENT OF CONSTRUCTION AND REPORT ANY DISCREPANCIES TO THE ARCHITECT. 24. CONTRACTOR SHALL PROVIDE "CHALK LINE" PARTITION LAYOUT FOR THE ARCHITECT'S OBSERVATION BEFORE INSTALLATION OF PARTITION FRAMING. 25. ALL MECHANICAL, ELECTRICAL AND PLUMBING CONTRACTORS SHALL BE RESPONSIBLE FOR SYSTEM ENGINEERING, LAYOUTS AND RESPECTIVE PERMITS. CONTACT ARCHITECT /OWNER WITH ANY DISCREPANCIES BEFORE STARTING WORK. 26. ALL WORK SHALL BE COMPLETE IN ALL DETAILS, INCLUDING ALL MATERIALS, LABOR, TRANSPORTATION, EQUIPMENT, SCAFFOLDING, TAXES, ETC. AS MAY BE NECESSARY TO COMPLETE THE WORK AS INTENDED, WHETHER EACH ITEM IS SPECIFICALLY SHOWN OR REFERRED TO OR NOT. H 27. CONTRACT IS AWARDED ON THE BASIS OF SUC DOCUMENTS WITH THE UNDERSTANDING THAT THE CONTRACTOR IS TO FURNISH AND INSTALL ALL ITEMS REQUIRED FOR THE PROPER COMPLETION OF HIS WORK WITHOUT ADJUSTMENTS TO THE CONTRACT PRICE. 28. THE ARCHITECT'S DECISION IN ALL MATTERS RELATING TO THE CONTRACT DOCUMENTS IS FINAL AND BINDING ON ALL PARTIES TO THE CONTRACT. 29. THE GENERAL CONTRACTOR SHALL COORDINATE WITH SUB - CONTRACTORS THE STORAGE OF BUILDING MATERIALS ON THE SITE TO AVOID OVERLOADING THE EXISTING FLOOR OR ROOF. 30. PATCH AND REPAIR ALL FIREPROOFING, IF ANY, DAMAGED OR REMOVED BY TENANT CONSTRUCTION. 31. ALL OPENINGS IN WALLS, DECKS AND SLABS, INCLUDING THOSE FOR DUCTS, CONDUIT, PIPING, ETC. (EXCEPT WHEN COMPLETELY ENCLOSED BY FIRE RESISTIVE SHAFT CONSTRUCTION) MUST BE SLEEVED OR OTHERWISE SEALED AT THEIR PERIMETER WITH APPROVED METHODS TO MAINTAIN THE FIRE - RATING CONTINUITY OF THE CONSTRUCTION. 32. WALL AND /OR CEILING ASSEMBLIES THAT ARE IDENTIFIED WITH A FIRE RESISTIVE RATING SHALL BE CONSTRUCTED PER MANUFACTURER'S SPECIFICATIONS AND THE REQUIREMENTS OF ALL APPLICABLE CURRENT CODES AND GOVERNING BODIES. 33. ALL EXPOSED EXTERIOR WOOD SHALL BE BACK PRIMED. ALL FACES OF EXPOSED WOOD SHALL BE PRIMED PRIOR TO FINAL INSTALLATION. ALL EXTERIOR TRIM TO BE PRIMED AND STAINED ON ALL SIX SIDES. PROVIDE FLASHING AT TRIM AT ALL EXTERIOR SURFACES AS REQUIRED. 34. ALL EXTERIOR HORIZONTAL SURFACES OF EXPOSED WOOD OR STONE TO SLOPE TO DRAIN. 35. ALL EXPOSED JOINTS TO BE CAULKED AND SEALED. 36. ALL DISSIMILAR METALS SHALL BE EFFECTIVELY ISOLATED FROM EACH OTHER TO AVOID MOLECULAR BREAKDOWN. 37. JUNCTURES OF NEW AND EXISTING OR OTHER WORK SHALL BE REPAIRED AND PATCHED TO MATCH ADJACENT EXISTING SURFACES. EXISTING WALLS REQUIRING MODIFICATION OF ANY KIND SHALL BE REFINISHED TO THE NEAREST OUTSIDE OR INSIDE CORNER. 38. PROVIDE 1/4 MOVEMENT AT THE TOPS OF ALL PARTITIONS THAT GO TO THE UNDERSIDE OF DECK OR STRUCTURE. DO NOT FASTEN 'STUDS OR DRYWALL TO TOP RUNNER. 39. CONTRACTOR SHALL REVIEW AND APPROVE ALL SHOP DRAWINGS AND EQUIPMENT CUTS PRIOR TO SUBMITTAL TO ARCHITECT. CONTRACTOR SHALL SUBMIT ALL APPROVED SHOP DRAWINGS AND EQUIPMENT CUTS TO TAI ARCHITECTURE FOR REVIEW PRIOR TO FABRICATION. 40. THE WORK CONTAINED IN THESE CONSTRUCTION DOCUMENTS SHALL BE PERFORMED UNDER AIA DOCUMENT A201 'GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION' (LATEST EDITION) 41. THE INFORMATION CONTAINED IN THE CONSTRUCTION DOCUMENTS IS IN ITSELF INCOMPLETE AND VOID UNLESS USED IN CONJUNCTION WITH ALL THE CONTRACT DOCUMENTS AND WITH ALL ARCHITECT'S AND MANUFACTURERS SPECIFICATIONS, TRADE ASSOCIATION RECOMMENDATIONS, ACCEPTED ENGINEERING AND CONSTRUCTION PRACTICES, AND APPLICABLE STANDARDS, CODES, ETC. INCORPORATED THEREIN BY REFERENCE WHICH THE CONTRACTOR CERTIFIES KNOWLEDGE OF BY SIGNING THE CONTRACT. 42. CONTRACTOR IS TO ASSUME FULL RESPONSIBILITY, UNRELIEVED BY THE REVIEW OF SHOP DRAWINGS AND BY PERIODIC OBSERVATION OF CONSTRUCTION BY THE ARCHITECT, FOR COMPLIANCE WITH THE CONTRACT DOCUMENTS, FOR DIMENSIONS TO BE CONFIRMED AND CORRELATED ON THE JOB SITE BETWEEN INDIVIDUAL DRAWINGS OR SETS OF DRAWINGS FOR FABRICATION PROCESSES AND CONSTRUCTION TECHNIQUES(INCLUDING EXCAVATION, SHORING, SCAFFOLDING, BRACING, ERECTION, FORM WORK, ETC,), FOR COORDINATION OF THE VARIOUS TRADES, AND FOR THE SAFE CONDITIONS ON THE JOB SITE. 43. THE ARCHITECT SHALL NOT HAVE CONTROL OVER OR CHARGE OF AND SHALL NOT BE RESPONSIBLE FOR CONSTRUCTION MEANS AND METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES, OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK, SINCE THESE ARE SOLELY THE CONTRACTOR'S RESPONSIBILITY UNDER THE CONTRACT FOR CONSTRUCTION. THE ARCHITECT SHALL NOT BE RESPONSIBLE FOR THE CONTRACTORS SCHEDULES OR FAILURE TO CARRY OUT THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. THE ARCHITECT SHALL NOT HAVE CONTROL OVER OR CHARGE OF ACTS OR OMISSIONS OF THE CONTRACTOR, SUBCONTRACTORS OR THEIR AGENTS OR EMPLOYEES OR OF ANY OTHER PERSONS PERFORMING PORTIONS OF THE WORK. 44. THE GENERAL CONTRACTOR AND SUBCONTRACTORS MUST DELIVER CERTIFICATES OF INSURANCE TO THE ARCHITECTS OFFICE PRIOR TO THE COMMENCEMENT OF CONSTRUCTION, NAMING THE ARCHITECT, TENANT AND BUILDING OWNER AS ADDITIONALLY INSURED. DEMOLITION NOTES: u 1. EXISTING WAITER STATION WALL TO BE DEMOLISHED. EXISTING SWITCHES AND RECEPTACLES TO BE DISCONNECTED AND REMOVED. 2. NEW HOLE TO BE CUT IN EXISTING WALL FOR OPEN KITCHEN LAYOUT. OPENING TO MEASURE 22" H X 80" L. BOTTOM OF OPENING AT 44" A.F.F. 3. EXISTING TRIPLE COMPARTMENT SINK TO BE RELOCATED. PLUMBING LINE TO BE CAPPED. 1 NOTES: 1. SPACE SHALL BE UNOCCUPIED AT ALL TIMES DURING SCOPE OF WORK. 2. SPACE SHALL BE UNOCCUPIED UNTIL FINAL CERTIFICATE OF OCCUPANCY IS). 3. BUILDING SHALL COMPLY WITH NFPA 1 CHAPTER 16 2009 EDITION. CITY OF SOUTH iMlM BUILDING DEPT. TRUC I R XL ^ECTlOt! ,`1L D 9Y EXISTING AND DEMOLITION FLOOR PLAN SCALE: 11/4"=V-0" COPYRIGHT ©2012 COPYRIGHT BITECTURE AND DESIGN. INC. AND FFD PRODUCT INC.THIS DRAWING SET 13 GIVEN IN CONFIDENCE. NO USE OR DISSEMINATION MAY BE MADE WITHOUT PRIOR WRITTEN CONSENT OF TAI ARCHITECTURE OR FFD PRODUCT ALL COMMON LAW RIGHTS OF COPYRIGHT AND OTHER WISE ARE HEREBY SPECIFICALLY RESERVED. Z N V M M O W - o I E^ Z) CL) a3 I` Lo � U W , C o= `ti w o " w L0 U '� co (o �u Q o Ln @j Lo Qv o 0 cc') c F- C.I Q ai U W I- _ U Q= Q 0 W � U O 0= = 2f Z H Q O C) :. Z-c J c��: = _ -ZwW zomo ��_ W c=-3 O � J F-- a- ::3 R LL.I w to W CL Q cf) Z D 1- z CD dam" Z = W H °U N O H¢ Z Z U is C) ` • t o, ,a0 W. ;ly) 0) •�'� / j LjtEAL � m C) :. N N o m W � M F-- W J W CL Q cf) Z D �- CD dam" cz C) LLJ ° mi � W V) � � E � W W U) Q LL mi Z W W - C30 0 z g w U3 O Lu W CC O dc U) Lo c � z M Lo q w ° a N a C LLJ L. rrr,� o is C) ` • t o, ,a0 W. ;ly) 0) •�'� / j LjtEAL 0 C O U 3 0 a r AC31 00 SHEET � m C) z W � M F-- W J W CL Q cf) 9= D �- CD dam" cz C) LLJ mi � W � � � E � W W J Q LL Z W W - 0 z g w O Lu W CC O dc Lo Q 00 M Lo 0 C O U 3 0 a r AC31 00 SHEET Z C) oz J W CL Ch 9= oa CD cz C) J mi y C� Z � W D 0 C O U 3 0 a r AC31 00 SHEET