10-1131-038MECHANICAL SPECIFICATIONS
2.01 GENERAL
A. SEE GENERAL SPECIFICATION SECTION FOR ADDITIONAL REQUIREMENTS
B. COORDINATE ROUTING OF NEW DUCTWORK AND LOCATION OF DIFFUSERS WITH THE
LIGHTING FIXTURES AND HVAC DEVICES.
C. THE CONTRACTOR SHALL BALANCE THE AIR SYSTEMS AND SUBMIT THREE (3) COPIES OF THE
FINAL BALANCE REPORT TO THE ENGINEER FOR REVIEW. ALL BALANCING SHALL BE PERFORMED
IN- ACCORDANCE WITH THE PROCEDURES AS OUTLINED BY THE NATIONAL ENVIRONMENTAL
BALANCING BUREAU. (NEBB). OR THE ASSOCIATION AIR BALANCE COUNCIL (AABC). THE
CONTRACTOR SHALL FURNISH ALL LABOR, INSTRUMENTS, TOOLS AND MATERIALS AS REQUIRED
FOR ALL THE TEST.
D. THE CONTRACTOR SHALL SUBMIT SIX (6) COPIES OF SHOP DRAWINGS FOR THE FOLLOWING
EQUIPMENT AND MATERIALS FOR A THIRD PARTY REVIEW.
1. DUCTWORK 5. AIR DEVICES
2. ROOF TOP UNITS 6. MAKE -UP AIR UNITS
J. INLINE EXHAUST FANS 7. AIR BALANCE
2.02 PRODUCTS
A. DUCTWORK
1. RIGID DUCT WORK
a. RIGID DUCTWORK CONSTRUCTION AND INSTALLATION SHALL BE IN ACCORDANCE
WITH THE HVAC DUCT CONSTRUCTION STANDARDS -METAL AND FLEXIBLE -1985
EDITION PREPARED BY THE SHEET METAL AND AIR CONDITIONING CONTRACTORS
NATIONAL ASSOCIATION INC., (SMACNA). THE RIGID DUCTWORK SHALL ALSO BE IN
ACCORDANCE WITH PREVAILING LOCAL CODES, MEETING THE REQUIREMENTS OF
THE APPLICABLE SECTIONS FOR THE PARTICULAR SERVICE OF THE DUCT SYSTEMS.
FIBROUS BOARD DUCT (R6) MAY USED IF APPROVED BY OWNER.
b. DUCTWORK DIMENSIONS INDICATED ARE CLEAR INSIDE DUCT DIMENSIONS AND
SHALL BE INCREASED, AS REQUIRED, TO COMPENSATE FOR LINEAR THICKNESS
OF ANY DUCT LINING.
c. ALL EXPOSED DUCTS SHALL BE ROUND SPIRAL METAL WITH INTERIOR LINING OR AS SELECTED
BY OWNER OR ARCHITECT
2. FLEXIBLE DUCTWORK
a. FLEXIBLE DUCTWORK SHALL BE INSULATED GLASS 1 AIR DUCT LISTED BY UNDERWRITERS
LABORATORIES IN. (U.L.) PUBLICATION U.L. 181. FLEXIBLE DUCTWORK SHALL BE
THERMAFLEX.• C -KM.
b. CONNECTORS TO SHEET METAL DUCTWORK SHALL BE MADE WITH HEAVY GAUGE SPIN -IN
THE FITTINGS WITH INTEGRAL VOLUME DAMPER, SEAL THE FLEXIBLE DUCTWORK
JOINTS AT THE RIGID DUCTWORK AND CEILING DIFFUSERS TO 2° POSITIVE PRESSURE
c. FLEXIBLE DUCTWORK SHALL BE SUPPORTED FROM THE BUILDING STRUCTURE AS
REQUIRED TO REVENT SAGGING. THE MAXIMUM LENGTH OF FLEXIBLE DUCTWORK
SHALL BE 10' -0 ". ADDITIONAL REQUIRED LENGTHS SHALL BE RUN IN RIGID ROUND.
d, DUCT PRESSURE CLASSIFICATION: DUCTWORK AND JOINTS WITHIN THE PROJECT AREA
SHALL HAVE 2 INCHES POSITIVE AND NEGATIVE PRESSURE, SEAL CLASS B.
J. ROUND AND FLAT-OVAL DUCT AND FITTING FABRICATIONS
a. DIAMETER AS APPLIED TO FLAT -OVAL DUCTS IN THIS ARTICLE IS THE DIAMETER OF A
ROUND DUCT WITH A CIRCUMFERENCE EQUAL TO THE PERIMETER OF A GIVEN SIZE OF
b. RUNIA90MUBLETWALL INTERNALLY INSULATED SPIRAL DUCT.- FABRICATE SUPPLY DUCTS OF
GALVANIZED STEEL
ACCORDING TO SMACNA'S HVAC DUCT CONSTRUCTION STANDARDS -METAL AND FLEXIBLE
c. FLAT -OVAL DOUBLE WALL INTERNALLY INSULATED SPIRAL DUCT' FABRICATE SUPPLY DUCTS
ACCORDING TO SMACNA'S HVAC DUCT CONSTRUCTION STANDARDS -METAL AND FLEXIBLE
d. DUCT JOINTS:
1. ALL DUCT JOINTS SHALL BE AS PER SMACNA STANDARS,
B. DUCT INSULATION.- SUPPLY AIR DUCTWORK SHALL BE INSULATED 1 -1/2" THICK 314 POUND
DENSITY DUCT WRAP, OVERLAP SEAMS BY 2' AND SEAL WITH MASTIC. PIN INSULATION 16"
ON CENTER FOR DUCT SIZES OVER 24': INSULATION SHALL BE EQUAL TO CERTAINTEED
"STANDARD DUCT WRAP" K =0.30 AT 75 DEGREES F. INSULATE ALL SUPPLY AIR DUCTWORK
THAT IS NOT SOUND LINED.
C. DUCT SOUND LINING. SOUND LINING SHALL BE 1" THICK, 1 -112 POUND DENSITY FER CUBIC
FOOT, K =0.29 AT 75 DEGREE F MEAN TEMPERATURE WITH A COATING ON ONE SIDE FIRE
HAZARD CLASSIFICATION SHALL NOT EXCEED 25 FOR FLAME SPREAD AND 50 FOR SMOKE
DEVELOPED, LINING SHALL BE INSTALLED INSTALLED IN STRICK ACCORDANCE WITH THE REQURRMENTS
IF THE LATEST SMACNA DUCT LINER APPLICATION STANDARD. LINING SHALL BE EQUAL TO
CERTAINTEED ULTRALITE.
D. DIFFUSERS. -
1. DIFFUSERS SHALL BE SIZED AS INDICATED AND DESIGNED TO DISTRIBUTE THE AIR
QUANTITY EVENLY OVER THE SPACE INTENTED WITH ALLOWANCES FOR DIFFUSERS, SPREAD
DROP AND THROW. THE DIFFUSERS, REGISTERS, AND GRILLES SHALL BE FACTORY
FABRICATED FO STEEL AND /OR ALUMINUM CONSTRUCTION FINISHED WITH A WHITE ENAMEL
PAINT. DIFFUSERS AND GRILLES SHALL BE TESTED AND LISTED UNDER THE AIR DIFFUSION
COUNCIL. (ADC). TEST CODE AND EQUAL TO MODELS INDICATED.
2. COORDINATE EXACT LOCATION OF DIFFUSERS WITH LIGHTING FIXTURES AND
AIR CONDITIONING DEVICES.
E PIPING
1. GAS PIPING SHALL BE SCHEDULE 40 BLACK STEEL
2. CONDENSATE DRAIN SHALL BE TYPE "M" HARD DRAWN COPPER TUBING WITH
COPPER FITTINGS.
F. CONDENSATE PIPE INSULATION: SHALL BE 112" THICK CLOSED CELL INSULATION EQUAL TO
ARMSTRONG- ARMAFLEX RATED FOR CEILING PLENUM RETURN. FIRE HAZARD CLASSIFICATION
SHALL NOT EXCEED 25 FOR FLAME SPREAD AND 50 FOR SMOKE DEVELOPED.
VALVES SHALL BE GATE OR BALL TYPE EQUAL TO MILWAUKEE FIGURE 1149, 125 PSI, SWEAT
CONNECTION
2.03 EXECUTION
A. PROVIDE ALL WORK, EQUIPMENT AND MATERIALS INDICATED.
FAN SCHEDULE
MARK
AREA
PERFORMANCE DATA
lilt
MOTOR DATA
MAX WT
GENERAL SPECIFICATIONS
SEER
1.01 CODE COMPLIANCE SHALL COMPLY WITH THE LAWS, ORDINANCES, RULES
13.0
AND REGULATIONS OF ALL GOVERNMENTAL AUTHORITIES HAVING JURISDICTION OF THE NATIONAL
TYPE
FIRE PROTECTION ASSOCIATION OF THE NATIONAL ELECTRIC CODE, AND OF THE PUBLIC UTILITIES
1,2
HAVING JURISDICTION OVER ANY OF THE SYSTEMS HEREIN SPECIFIED.
SEE PLAN
1.02 PERMIT FEES THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL NECESSARY PERMITS,
-�
INSPECTIONS AND APPROVALS 70 COMPLETE THE PRODUCT WORK. ALL CERTIFICATES SHALL
SEE PLAN
BE IN DUPLICATE AND BE DELIVERED TO THE OWNER'S REPRESENTATIVE.
RCFL -H -2417
1.03 DEFINITIONS:
CFM
A. "PROVIDE" UNDER THIS CONTRACT IS DEFINED AS FURNISH AND INSTALL
RPM
B. "CONCEALED" UNDER THIS CONTRACT IS DEFINED AS HIDDEN BY ARCHITECTURAL WALLS
DRIVE
AND CEILINGS.
"EXPOSED"
�/OL T
C. UNDER THIS CONTRACT IS DEFINED AS VISIBLE TO VIEW
Q
D. INDICATED" UNDER THIS CONTRACT IS DEFINED AS SHOWN IN THE CONTRACTED DOCUMENTS
0.5
1.04 SCOPE OF WORK PROVIDE ALL WOK INDICATED IN THE CONTRACT DOCUMENTS
TOILET
1.05 EXISTING CONDITIONS THE SITE, LOCATION AND ROUTING OF SYSTEMS INDICATED TO HAVE
0.250
NEW CONNECTIONS MADE TO THEM ARE SHOWN ACCURATELY AS FIELD CONDITIONS WOULD
CENTRIFUGAL
PERMIT. BIDDING CONTRACTORS SHALL VISIT THE SITE AND THOROUGHLY EXAMINE THE CONTRACT
(37)
DRAWINGS, CONTRACTOR'S WHO DO NOT VISIT THE SITE MAY BE UNILATERAL NOT PERMITTED
1
TO SUBMIT A BID IF THE OWNER SO DECIDES. ALL EXISTING CONDITIONS SHALE EXAMINED
GREENHECK SP -125
AND THEIR EXACT LOCATIONS VERIFIED. THE CONTRACTORS SHALL REPORT TO THE OWNER,
LAY -IN CEILING
BEFORE SUBMITTING A BID, ANY CONDITIONS WHICH MIGHT MAKE THE INSTALLATION OF THE
--
REQUIRED EQUIPMENT A PROBLEM. NO CONSIDERATION OR ALLOWANCE WILL BE GRANTED FOR
a
FAILURE 70 INVESTIGATE EXISTING CONDITIONS OR MISUNDERSTANDINGS OF THE CONTRACT
800
DOCUMENTS.
SURFACE MOUN
1.06 CONTRACT DOCUMENTS THE CONTRACT DOCUMENTS SHALL BE CONSIDERED AS DIAGRAMMATIC
23,800
AND FOR BIDDING PURPOSES ONLY ATTENTION IS CALLED TO THE FACT THAT WHILE THE
�
DOCUMENTS ARE GENERALLY TO SCALE AND ARE AS ACCURATE AS THE SCALE WILL PERMIT.
TOTAL SENSIBLE B.T.U.H.
ALL IMPORTANT DIMENSIONS SHALL BE DETERMINED IN TH FIELD. THE DRAWINGS ARE NOT
C)
TO BE CONSIDERED AS CONSTRUCTION SHOP DRAWINGS. THE DRAWINGS DO NOT INDICATE EVERY
80/67
FITTING, ELBOW, OFFSET, VALVE, PULL BOX OR SIMILAR COMPONENTS WHICH ARE REQUIRED TO
26 (0.022)
COMPLETE THE PROJECT WORK. PREPARE FIELD CONSTRUCTION DRAWINGS IF NECESSARY FOR
-/55
OR AS REQUIRED TO , INSURE PROPER INSTALLATION. PROVIDE ALL NECESSARY OFFSETS AND
FITTINGS TO INSTALL THE SYSTEMS AS DIAGRAMMED AT NO ADDITIONAL COST
ELECT
1.07 DEMOLITION THE CONTRACTOR SHALL REMOVE ALL EQUIPMENT NOT INDICATED TO BE REUSED
24 (0.028)
TO A DESIGNATED LOCATION AT THE PROJECT SITE. AFTER THE EQUIPMENT HAS BEEN ASSEMBLED
4-- .8 _ --
FOR INSPECTION BY THE OWNER AND POSSIBLE RETENTION. ALL EQUIPMENT NOT TO BE RETAINED
LLJ -... -
Q NUMBER OF STEPS
BY THE OWNER SHALL BE REMOVED FROM THE SITE BY THE CONTRACTOR.
ELECTRICAL SERVICE
230 -1 -60
1.08 EQUIPMENT AND MATERIALS
(QUANTITY AND SIZE
A. ALL EQUIPMENT AND MATERIALS SHALL BE NEW, UNLESS INDICATED OTHERWISE, AND THE
18 (0.052)
CURRENT MODEL FOR WHICH REPLACEMENT PARTS ARE AVAILABLE. SUBSTITUTIONS SHALL
--
ONLY BE ACCEPTED AT THE DESCRIPTION OF THE OWNER'S REPRESENTATIVE OR THE ENGINEER
TYPE
B. THE CONTRACTOR SHALL INSTALL EQUIPMENT AND MATERIAL IN ACCORDANCE WITH THE
LOCATION
BEST ENGINEERING PRACTICE. THE CONTRACTOR SHALL FOLLOW THE MANUFACTURER'S
PUBLISHED INSTALLATION INSTRUCTIONS AND RECOMMENDATIONS, UNLESS INDICATED
212
SYSTEM
'
C. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL REQUIRED AUXILIARY ITEMS FOR A COMPLETE
OTHERWISE.
1
D. ALL EQUIPMENT SHALL BE MOUNTED VIBRATION FREE
rz
TOTAL. CAPACITY REDUCTION
1.09 SHOP DRAWINGS PROJECT EQUIPMENT AND MATERIALS SHOP DRAWINGS ARE TO BE SUBMITTED
TO OWNER OR AS REQUESTED FOR THIRD PARTY REVIEW BEFORE INSTALLATION. SUBMIT SIX
(6) COPIES OF SHOP DRAWINGS FOR THIRD PARTY REVIEW.
12.8/58.3
1.10 COORDINATION THE CONTRACTOR SHALL INSTALL ALL DUCTWORK PIPING, RACEWAYS, CIRCUITRY,
CONDUIT, ETC., AS HIGH AS POSSIBLE TO MAXIMIZE HEADROOM, RUN APRALLEL OR PERPENDICULAR
TO THE BUILDING WALLS IN A NEAT WORKMANLIKE MANNER. AVOID CONFLICT WITH EXISTING
EQUIPMENT, LIGHTS, CABLE TRAYS, ETC. IF CONFLICT WITH EXISTING DOWS OCCUR THE CONTRACTOR
SHALL REROUTE CONFLICTING PROJECT WORK AS DIRECTED BY THE OWNER'S REPRESENTATIVE AT ON
ADDITIONAL COST.
1.11 PARTITIONS AND DUCTWORK THE CONTRACTOR SHALL REPAIR ALL OPENINGS IN WALL, CEILINGS,
Izl I I,Ic11 \; \l�l I INI `
FLOORS, ETC., WHICH ARE CREATED BY DEMOLITION AND /OR NEW PROJECT WORK. THE REPAIRS
SHALL BE WITH MATERIALS AND FINSHED TO MATCH EXISTING. OPENINGS AND PENETRATIONS
IN FIRE RATED PARTITIONS OR DUCTWORK SHALL BE SEALED WITH U.L. APPROVED FIRE STOPPING
MATERIAL TO MAINTAIN FIRE RESISTANT INTERGRITY. DUCTWORK AND PIPING SHALL BE CAPPED,
SEALED AIR AND WATERTIGHT AND INSULATED TO MATCH EXISTING.
1.12 SITE CLEANUP UPON COMPLETION OF THE WORK, THE CONTRACTOR SHELL THOROUGHLY CLEAN
THE CONTRACT AREA AND ALL OTHER AREAS USED FOR STORAGE, STAGING ETC. THIS SHALL
INCLUDE, BUT NOT BE LIMITED TO WASHING AND /OR REPAIRING GLASS, REMOVING SPOTS AND
STAINS, CLEANING ALL FIXTURES AND WASHING ALL FLOORS, WALL AND CEILING IF APPROPRIATE.
1.13 GUARANTIES ALL EQUIPMENT, MATERIALS AND WORKMANSHIP SHALL BE GUARANTEED IN FILL
FORM DETECT FOR ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE OF THIS WORK BY THE
OWNER'S REPRESENTATIVE.
1.14 TESTS AND DEMONSTRATIONS THE CONTRACTOR SHALL TEST ALL EQUIPMENT INSTALLED UNDER
THIS CONTRACT AND DEMONSTRATE TO THE OWNER'S REPRESENTATIVE ITS PROPER OPERATION(S).
1.15 BUILDING SMOKE /FIRE ALARM SYSTEM PROTECT THE EXISTING BUILDING SMOKE /FIRE ALA2:4
DETECTION SYSTEM AS REQUIRED TO PREVENT FALSE ALARMS WITHIN THE PROJECT CONSTRUCTION
AREA.
1.16 EQUIPMENT SERVICE ACCESS PROVIDE ACCESS DOORS IN DRYWALL, CEILINGS AND PARTITIONS
TO SERVICE EQUIPMENT, BALANCE DIFFUSERS, AND EXPOSE JUNCTION BOXES. COORDINATE
THE EXACT LOCATIONS AND STYLE OF FLANGE LESS ACCESS DOORS WITH THE ENGINEER.
1.17 WORKING HOURS AND SYSTEM SHUTDOWN ALL WORK SHALL BE PERFORMED DURING NORMAL
WORKING HOURS AS DEFINED BY THE OWNERS REPRESENTATIVE. WORK PERFORMED OUTSIDE
OR NORMAL WORKING HOURS SHALL BE NEGOTIATED WITH OWNERS REPRESENTATIVE PRIOR TO
THE CONSTRUCTION PHASE REQUIRED EXISTING SYSTEM SHUTDOWNS SHALL BE COORDINATED
IN WRITING WITH THE OWNER'S REPRESENTATIVE A MAXIMUM OF 48 HOURS IN ADVANCED.
MECHANICAL SPECIFICATIONS
2.01 GENERAL
A. SEE GENERAL SPECIFICATION SECTION FOR ADDITIONAL REQUIREMENTS
B. COORDINATE ROUTING OF NEW DUCTWORK AND LOCATION OF DIFFUSERS WITH THE
LIGHTING FIXTURES AND HVAC DEVICES.
C. THE CONTRACTOR SHALL BALANCE THE AIR SYSTEMS AND SUBMIT THREE (3) COPIES OF THE
FINAL BALANCE REPORT TO THE ENGINEER FOR REVIEW. ALL BALANCING SHALL BE PERFORMED
IN- ACCORDANCE WITH THE PROCEDURES AS OUTLINED BY THE NATIONAL ENVIRONMENTAL
BALANCING BUREAU. (NEBB). OR THE ASSOCIATION AIR BALANCE COUNCIL (AABC). THE
CONTRACTOR SHALL FURNISH ALL LABOR, INSTRUMENTS, TOOLS AND MATERIALS AS REQUIRED
FOR ALL THE TEST.
D. THE CONTRACTOR SHALL SUBMIT SIX (6) COPIES OF SHOP DRAWINGS FOR THE FOLLOWING
EQUIPMENT AND MATERIALS FOR A THIRD PARTY REVIEW.
1. DUCTWORK 5. AIR DEVICES
2. ROOF TOP UNITS 6. MAKE -UP AIR UNITS
J. INLINE EXHAUST FANS 7. AIR BALANCE
2.02 PRODUCTS
A. DUCTWORK
1. RIGID DUCT WORK
a. RIGID DUCTWORK CONSTRUCTION AND INSTALLATION SHALL BE IN ACCORDANCE
WITH THE HVAC DUCT CONSTRUCTION STANDARDS -METAL AND FLEXIBLE -1985
EDITION PREPARED BY THE SHEET METAL AND AIR CONDITIONING CONTRACTORS
NATIONAL ASSOCIATION INC., (SMACNA). THE RIGID DUCTWORK SHALL ALSO BE IN
ACCORDANCE WITH PREVAILING LOCAL CODES, MEETING THE REQUIREMENTS OF
THE APPLICABLE SECTIONS FOR THE PARTICULAR SERVICE OF THE DUCT SYSTEMS.
FIBROUS BOARD DUCT (R6) MAY USED IF APPROVED BY OWNER.
b. DUCTWORK DIMENSIONS INDICATED ARE CLEAR INSIDE DUCT DIMENSIONS AND
SHALL BE INCREASED, AS REQUIRED, TO COMPENSATE FOR LINEAR THICKNESS
OF ANY DUCT LINING.
c. ALL EXPOSED DUCTS SHALL BE ROUND SPIRAL METAL WITH INTERIOR LINING OR AS SELECTED
BY OWNER OR ARCHITECT
2. FLEXIBLE DUCTWORK
a. FLEXIBLE DUCTWORK SHALL BE INSULATED GLASS 1 AIR DUCT LISTED BY UNDERWRITERS
LABORATORIES IN. (U.L.) PUBLICATION U.L. 181. FLEXIBLE DUCTWORK SHALL BE
THERMAFLEX.• C -KM.
b. CONNECTORS TO SHEET METAL DUCTWORK SHALL BE MADE WITH HEAVY GAUGE SPIN -IN
THE FITTINGS WITH INTEGRAL VOLUME DAMPER, SEAL THE FLEXIBLE DUCTWORK
JOINTS AT THE RIGID DUCTWORK AND CEILING DIFFUSERS TO 2° POSITIVE PRESSURE
c. FLEXIBLE DUCTWORK SHALL BE SUPPORTED FROM THE BUILDING STRUCTURE AS
REQUIRED TO REVENT SAGGING. THE MAXIMUM LENGTH OF FLEXIBLE DUCTWORK
SHALL BE 10' -0 ". ADDITIONAL REQUIRED LENGTHS SHALL BE RUN IN RIGID ROUND.
d, DUCT PRESSURE CLASSIFICATION: DUCTWORK AND JOINTS WITHIN THE PROJECT AREA
SHALL HAVE 2 INCHES POSITIVE AND NEGATIVE PRESSURE, SEAL CLASS B.
J. ROUND AND FLAT-OVAL DUCT AND FITTING FABRICATIONS
a. DIAMETER AS APPLIED TO FLAT -OVAL DUCTS IN THIS ARTICLE IS THE DIAMETER OF A
ROUND DUCT WITH A CIRCUMFERENCE EQUAL TO THE PERIMETER OF A GIVEN SIZE OF
b. RUNIA90MUBLETWALL INTERNALLY INSULATED SPIRAL DUCT.- FABRICATE SUPPLY DUCTS OF
GALVANIZED STEEL
ACCORDING TO SMACNA'S HVAC DUCT CONSTRUCTION STANDARDS -METAL AND FLEXIBLE
c. FLAT -OVAL DOUBLE WALL INTERNALLY INSULATED SPIRAL DUCT' FABRICATE SUPPLY DUCTS
ACCORDING TO SMACNA'S HVAC DUCT CONSTRUCTION STANDARDS -METAL AND FLEXIBLE
d. DUCT JOINTS:
1. ALL DUCT JOINTS SHALL BE AS PER SMACNA STANDARS,
B. DUCT INSULATION.- SUPPLY AIR DUCTWORK SHALL BE INSULATED 1 -1/2" THICK 314 POUND
DENSITY DUCT WRAP, OVERLAP SEAMS BY 2' AND SEAL WITH MASTIC. PIN INSULATION 16"
ON CENTER FOR DUCT SIZES OVER 24': INSULATION SHALL BE EQUAL TO CERTAINTEED
"STANDARD DUCT WRAP" K =0.30 AT 75 DEGREES F. INSULATE ALL SUPPLY AIR DUCTWORK
THAT IS NOT SOUND LINED.
C. DUCT SOUND LINING. SOUND LINING SHALL BE 1" THICK, 1 -112 POUND DENSITY FER CUBIC
FOOT, K =0.29 AT 75 DEGREE F MEAN TEMPERATURE WITH A COATING ON ONE SIDE FIRE
HAZARD CLASSIFICATION SHALL NOT EXCEED 25 FOR FLAME SPREAD AND 50 FOR SMOKE
DEVELOPED, LINING SHALL BE INSTALLED INSTALLED IN STRICK ACCORDANCE WITH THE REQURRMENTS
IF THE LATEST SMACNA DUCT LINER APPLICATION STANDARD. LINING SHALL BE EQUAL TO
CERTAINTEED ULTRALITE.
D. DIFFUSERS. -
1. DIFFUSERS SHALL BE SIZED AS INDICATED AND DESIGNED TO DISTRIBUTE THE AIR
QUANTITY EVENLY OVER THE SPACE INTENTED WITH ALLOWANCES FOR DIFFUSERS, SPREAD
DROP AND THROW. THE DIFFUSERS, REGISTERS, AND GRILLES SHALL BE FACTORY
FABRICATED FO STEEL AND /OR ALUMINUM CONSTRUCTION FINISHED WITH A WHITE ENAMEL
PAINT. DIFFUSERS AND GRILLES SHALL BE TESTED AND LISTED UNDER THE AIR DIFFUSION
COUNCIL. (ADC). TEST CODE AND EQUAL TO MODELS INDICATED.
2. COORDINATE EXACT LOCATION OF DIFFUSERS WITH LIGHTING FIXTURES AND
AIR CONDITIONING DEVICES.
E PIPING
1. GAS PIPING SHALL BE SCHEDULE 40 BLACK STEEL
2. CONDENSATE DRAIN SHALL BE TYPE "M" HARD DRAWN COPPER TUBING WITH
COPPER FITTINGS.
F. CONDENSATE PIPE INSULATION: SHALL BE 112" THICK CLOSED CELL INSULATION EQUAL TO
ARMSTRONG- ARMAFLEX RATED FOR CEILING PLENUM RETURN. FIRE HAZARD CLASSIFICATION
SHALL NOT EXCEED 25 FOR FLAME SPREAD AND 50 FOR SMOKE DEVELOPED.
VALVES SHALL BE GATE OR BALL TYPE EQUAL TO MILWAUKEE FIGURE 1149, 125 PSI, SWEAT
CONNECTION
2.03 EXECUTION
A. PROVIDE ALL WORK, EQUIPMENT AND MATERIALS INDICATED.
FAN SCHEDULE
MARK
AREA
PERFORMANCE DATA
CONSTRUCTION DATA
MOTOR DATA
MAX WT
MANUFACTURER
SEER
0
13.0
SEE PLAN
TYPE
HORIZ
1,2
LOCATION
SEE PLAN
0
SERVICED
LBS.
SEE PLAN
MANUFACTURER'S MODEL NUMBER COIL
RCFL -H -2417
KRUEGER -SH
CFM
W
RPM
TYPE
DRIVE
��A
�/OL T
PH
Q
_
EXTERNAL STATIC PRESS. IN. OF H20
0.5
�F
TOILET
250
0.250
1450
CENTRIFUGAL
DIRECT
(37)
120
1
23
GREENHECK SP -125
C7
NOTES:
1. GRAVITY BACK DRAFT DAMPER 5. CONTROLLED VIA WALL SWITCH 8. COORDINATE WITH OWNER FOR FAN
2. ROOF CURB 6. INTERLOCK WITH KITCHEN HOOD SPECIFICATION AND ACCESSORIES
J. STANDARD PREWIRED DISCONNECT SWITCH CONTROL PANEL
4. GREASE TROUGH Z SEE KITCHEN MANUFACTURER'S DETAILS
/'I' ✓AC ot %IK: _ f ;r__ _ Alf i
fllfc /CAI t.L %t�'UG %t t LJtlri j
CEILING AA,S MSLY
FIRE STOPPING - - --
SMOKE CONTROL
All? CONDITIONING LEGEND
SYMBOL
RL
RS
axb -
axb
I '
I
I�
HT
L -_
Sl /A
0/A
E/A
EF
( I)
DESCRIPTION
REFRIGERANT LIQUID
REFRIGERANT SUCTION
DUCT, SIZE SHOWN IN INCHES
MANUAL OPERATED DAMPER
MOTOR OPERATED DAMPER
SPLITTER DAMPER
SQUARE ELBOW W/ TURNING VANES
AIR EXTRACTOR
DUCT TRANSITION
SQ. TO ROUND TRANSITION
FLEXIBLE DUCT
BRANCH TAP WITH CONICAL FITTING
RADIUS ELBOW WITH HEEL TAP
RADIUS ELBOW, 5 PIECE IF AVAILABLE,
3PIECE OR SMOOTH OTHERWISE
DIVIDED FLOW 'Y' TYPE FITTING
SUPPLY AIR
OUTSIDE AIR
EXHAUST AIR
EXHAUST FAN
THERMOSTAT
PACKAGED SPLIT A.C. UNIT SCHEDULE
UNIT DESIGNATION
2 A NE
C
AREA
SERVED
SEE PLAN
DESIGN MANUFACTURER
RHEEM
SEER
0
13.0
SEE PLAN
TYPE
HORIZ
1,2
LOCATION
SEE PLAN
0
OPERATING WEIGHT, LBS
186
SEE PLAN
MANUFACTURER'S MODEL NUMBER COIL
RCFL -H -2417
KRUEGER -SH
SURFACE MOUN
TOTAL AIR, C.F.M.
800
OUTSIDE AIR, C.F.M.
200
SEE PLAh
1,2
KRUEGER -RM1
Q
_
EXTERNAL STATIC PRESS. IN. OF H20
0.5
SEE PLAN
1
MOTOR HP (NON - OVERLOAD)
3/4
z
FIXED
-
MOTOR SPEED, RPM
--
ELECTRICAL SERVICE
230 -1 -60
LL
LJL
C7
LAY -IN CEILING
FACE VELOC. F.P.M. MAXIMUM /DESIGN
--
SEE PLAN
a
DESIGN AIR ACROSS COIL, C.F.M.
800
KRUEGER -S80
SURFACE MOUN
TOTAL CAPACITY, B.T.U.H.
23,800
Z
�
16,900
TOTAL SENSIBLE B.T.U.H.
SEAM DUCT
C)
ENTERING AIR TEMP. DB / WB F°
80/67
z
26 (0.022)
LEAVING AIR TEMP. DB / WB F°
-/55
cr_
HEAT COIL TYPE
ELECT
19 THRU 28
24 (0.028)
TOTAL HEATING CAPACITY, KW
4-- .8 _ --
22 (0.034)
LLJ -... -
Q NUMBER OF STEPS
--
--
ELECTRICAL SERVICE
230 -1 -60
37 THRU 52
(QUANTITY AND SIZE
--
18 (0.052)
FACE VELOC. FPM, MAXIMUM /DESIGN
- - -
--
--
TYPE
LOCATION
SEE PLAN
OPERATING WEIGHT, LBS
212
MANUFACTURER'S MODEL NUMBER
RANL- 024JEZ
NUMBER OF COMPRESSORS
1
z
rz
TOTAL. CAPACITY REDUCTION
100%
li;IAI AMIa.,, IA /Tim
12.8/58.3
I
Izl I I,Ic11 \; \l�l I INI `
L I 1/t�13/8
I
DIFFUSER, REGISTER AND GRILLE SCHEDULE
TYPE
SERVICE
CFM
RANGE
FACE
DIM.
NECK
DIA.
NOTES
BASIS OF DESIGN
REMARKS
0
SUPPLY DIFFUSER
SEE PLAN
24X24"
SEE PLAA
1,2
KRUEGER -1400
LAY -IN CEILING
0
SUPPLY DIFFUSER
26 (0.022')
SEE PLAN
SEE PLAIV
1,2
KRUEGER -SH
SURFACE MOUN
®
SUPPLY DIFFUSER
SEE PLAN
SEE PLAN
SEE PLAh
1,2
KRUEGER -RM1
ROUND E MOON
®
EXHAUST
SEE PLAN
SEE PLAN
SEE PLAA
OVER 84
KRUEGER -EG 10
FIXED
�5
RETURN
SEE PLAN
24X24"
LL
LJL
KRUEGER -S80
LAY -IN CEILING
Q
RETURN
SEE PLAN
SEE PLAN
GALV. SHT: GAGE)
KRUEGER -S80
SURFACE MOUN
NOTES:
1. PROVIDE WITH OPPOSED BLADE DAMPER
2. COORDINATE WITH OWNER COLOR AND FINISH
* 0 -100 CFM - 8x8
101 -250 CFM - 12x12
251 -400 CFM - 14x14
401 -530 CFM - 16X16
531 -675 CFM - 18X18
12 -1 -10
I.L.A. aroiect # 1070.00
IPA
I. Leon & Assoc., Inc.
Consulting Engineers
15521 SW 149th. COURT
MIAMI, FLORIDA 33187
CA # 6577
ileonandassoc ®bellsouth.net
phone # 305 232 0031
seal:
Ismael Leon, P.E., # 40168
8000 NW 7 Street, Suite 101
Miami, Florida 33126
T. 3 0 5- 7 4 0 - 0 1 5 0
F. 3 0 5- 7 4 0- 0 1 5 8
e -mail: tag- dbi®tagdbi.com
corporate license AAC 002228
Copyright Notice: These drawings, designs and
ideas are the property of The Architects Group, Inc.
and are protected under the copyright laws of
Florida. No part thereof shall be copied, or used in
connection with any work other than for the specific
project for which they have been prepared without
written consent of The Architects Group, Inc.
T--
TABLE M-
I
W
W
DUCT CONSTRUCTION MINIMUM SHEET METAL GAGES
z
RECTANGULAR DUCTS
LL
MAX. SIDE
STEEL
W
W
ALUMINUM
(INCHES)
(MIN. GALV. SHT. GAGE)
(MIN. B & S GAGE)
THRU 12
26 (0.022')
Z
24 (0.020')
13 THRU 30
24 (0.028)
LL
� 1
V) V i
22 (0-025-)
31 THRU 54
22 (0.034 )
Zz
20 (0.032 )
55 THRU 84
20 (0.040)
cL L
W W
-, O
18 (0.040')
OVER 84
18 (0.052)
::D
16 (0.051)
ROUND DUCTS
LL
LJL
O
STEEL
I�Jr�
a-
DIAMETER
(MIN.
GALV. SHT: GAGE)
SPIRAL
z
LONGITUDINAL
FITTINGS
(INCHES)
WIL
SEAM DUCT
SEAM DUCT
THRU 12
28 (0.019 )
26 (0.022)
26 (0.022)
13 THRU 18
26 (0.022 )
24 (0.028)
24 (0.028)
19 THRU 28
24 (0.028)
22 (0.034)
22 (0.034)
29 THRU 36
22 (0.034)
20 (0.040')
20 (0.040')
37 THRU 52
20 (0.040)
18 (0.052)
1 18 (0.052)
12 -1 -10
I.L.A. aroiect # 1070.00
IPA
I. Leon & Assoc., Inc.
Consulting Engineers
15521 SW 149th. COURT
MIAMI, FLORIDA 33187
CA # 6577
ileonandassoc ®bellsouth.net
phone # 305 232 0031
seal:
Ismael Leon, P.E., # 40168
8000 NW 7 Street, Suite 101
Miami, Florida 33126
T. 3 0 5- 7 4 0 - 0 1 5 0
F. 3 0 5- 7 4 0- 0 1 5 8
e -mail: tag- dbi®tagdbi.com
corporate license AAC 002228
Copyright Notice: These drawings, designs and
ideas are the property of The Architects Group, Inc.
and are protected under the copyright laws of
Florida. No part thereof shall be copied, or used in
connection with any work other than for the specific
project for which they have been prepared without
written consent of The Architects Group, Inc.
T--
N
W
W
z
LL
W
W
L
75
0
_
Z
z
W
LL
LL
� 1
V) V i
W
W
� Ld
Zz
r=
uu
rig
J
cL L
W W
-, O
O
l
c, J
W
::D
DATE: I
JOB N0: J ii1
DRAWN:
CHECKED: R
REVISIONS:
r
Pedro P. Ramos, A.I.A.
FL. Lic. 1OS90
HEEL TITLE:r
MECHANICAL
SCHEDULES. r;
M- 41
W
z�
LL
®0
L
>-,
0
_
z
cn
I
W
0�
W
::D
L.L
LL
LJL
O
I�Jr�
a-
L.L
z
o rL
w
Ui
F-
z
-,
Cr'
WIL
J 1-
j (J
DATE: I
JOB N0: J ii1
DRAWN:
CHECKED: R
REVISIONS:
r
Pedro P. Ramos, A.I.A.
FL. Lic. 1OS90
HEEL TITLE:r
MECHANICAL
SCHEDULES. r;
M- 41