Loading...
10-1131-038MECHANICAL SPECIFICATIONS 2.01 GENERAL A. SEE GENERAL SPECIFICATION SECTION FOR ADDITIONAL REQUIREMENTS B. COORDINATE ROUTING OF NEW DUCTWORK AND LOCATION OF DIFFUSERS WITH THE LIGHTING FIXTURES AND HVAC DEVICES. C. THE CONTRACTOR SHALL BALANCE THE AIR SYSTEMS AND SUBMIT THREE (3) COPIES OF THE FINAL BALANCE REPORT TO THE ENGINEER FOR REVIEW. ALL BALANCING SHALL BE PERFORMED IN- ACCORDANCE WITH THE PROCEDURES AS OUTLINED BY THE NATIONAL ENVIRONMENTAL BALANCING BUREAU. (NEBB). OR THE ASSOCIATION AIR BALANCE COUNCIL (AABC). THE CONTRACTOR SHALL FURNISH ALL LABOR, INSTRUMENTS, TOOLS AND MATERIALS AS REQUIRED FOR ALL THE TEST. D. THE CONTRACTOR SHALL SUBMIT SIX (6) COPIES OF SHOP DRAWINGS FOR THE FOLLOWING EQUIPMENT AND MATERIALS FOR A THIRD PARTY REVIEW. 1. DUCTWORK 5. AIR DEVICES 2. ROOF TOP UNITS 6. MAKE -UP AIR UNITS J. INLINE EXHAUST FANS 7. AIR BALANCE 2.02 PRODUCTS A. DUCTWORK 1. RIGID DUCT WORK a. RIGID DUCTWORK CONSTRUCTION AND INSTALLATION SHALL BE IN ACCORDANCE WITH THE HVAC DUCT CONSTRUCTION STANDARDS -METAL AND FLEXIBLE -1985 EDITION PREPARED BY THE SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION INC., (SMACNA). THE RIGID DUCTWORK SHALL ALSO BE IN ACCORDANCE WITH PREVAILING LOCAL CODES, MEETING THE REQUIREMENTS OF THE APPLICABLE SECTIONS FOR THE PARTICULAR SERVICE OF THE DUCT SYSTEMS. FIBROUS BOARD DUCT (R6) MAY USED IF APPROVED BY OWNER. b. DUCTWORK DIMENSIONS INDICATED ARE CLEAR INSIDE DUCT DIMENSIONS AND SHALL BE INCREASED, AS REQUIRED, TO COMPENSATE FOR LINEAR THICKNESS OF ANY DUCT LINING. c. ALL EXPOSED DUCTS SHALL BE ROUND SPIRAL METAL WITH INTERIOR LINING OR AS SELECTED BY OWNER OR ARCHITECT 2. FLEXIBLE DUCTWORK a. FLEXIBLE DUCTWORK SHALL BE INSULATED GLASS 1 AIR DUCT LISTED BY UNDERWRITERS LABORATORIES IN. (U.L.) PUBLICATION U.L. 181. FLEXIBLE DUCTWORK SHALL BE THERMAFLEX.• C -KM. b. CONNECTORS TO SHEET METAL DUCTWORK SHALL BE MADE WITH HEAVY GAUGE SPIN -IN THE FITTINGS WITH INTEGRAL VOLUME DAMPER, SEAL THE FLEXIBLE DUCTWORK JOINTS AT THE RIGID DUCTWORK AND CEILING DIFFUSERS TO 2° POSITIVE PRESSURE c. FLEXIBLE DUCTWORK SHALL BE SUPPORTED FROM THE BUILDING STRUCTURE AS REQUIRED TO REVENT SAGGING. THE MAXIMUM LENGTH OF FLEXIBLE DUCTWORK SHALL BE 10' -0 ". ADDITIONAL REQUIRED LENGTHS SHALL BE RUN IN RIGID ROUND. d, DUCT PRESSURE CLASSIFICATION: DUCTWORK AND JOINTS WITHIN THE PROJECT AREA SHALL HAVE 2 INCHES POSITIVE AND NEGATIVE PRESSURE, SEAL CLASS B. J. ROUND AND FLAT-OVAL DUCT AND FITTING FABRICATIONS a. DIAMETER AS APPLIED TO FLAT -OVAL DUCTS IN THIS ARTICLE IS THE DIAMETER OF A ROUND DUCT WITH A CIRCUMFERENCE EQUAL TO THE PERIMETER OF A GIVEN SIZE OF b. RUNIA90MUBLETWALL INTERNALLY INSULATED SPIRAL DUCT.- FABRICATE SUPPLY DUCTS OF GALVANIZED STEEL ACCORDING TO SMACNA'S HVAC DUCT CONSTRUCTION STANDARDS -METAL AND FLEXIBLE c. FLAT -OVAL DOUBLE WALL INTERNALLY INSULATED SPIRAL DUCT' FABRICATE SUPPLY DUCTS ACCORDING TO SMACNA'S HVAC DUCT CONSTRUCTION STANDARDS -METAL AND FLEXIBLE d. DUCT JOINTS: 1. ALL DUCT JOINTS SHALL BE AS PER SMACNA STANDARS, B. DUCT INSULATION.- SUPPLY AIR DUCTWORK SHALL BE INSULATED 1 -1/2" THICK 314 POUND DENSITY DUCT WRAP, OVERLAP SEAMS BY 2' AND SEAL WITH MASTIC. PIN INSULATION 16" ON CENTER FOR DUCT SIZES OVER 24': INSULATION SHALL BE EQUAL TO CERTAINTEED "STANDARD DUCT WRAP" K =0.30 AT 75 DEGREES F. INSULATE ALL SUPPLY AIR DUCTWORK THAT IS NOT SOUND LINED. C. DUCT SOUND LINING. SOUND LINING SHALL BE 1" THICK, 1 -112 POUND DENSITY FER CUBIC FOOT, K =0.29 AT 75 DEGREE F MEAN TEMPERATURE WITH A COATING ON ONE SIDE FIRE HAZARD CLASSIFICATION SHALL NOT EXCEED 25 FOR FLAME SPREAD AND 50 FOR SMOKE DEVELOPED, LINING SHALL BE INSTALLED INSTALLED IN STRICK ACCORDANCE WITH THE REQURRMENTS IF THE LATEST SMACNA DUCT LINER APPLICATION STANDARD. LINING SHALL BE EQUAL TO CERTAINTEED ULTRALITE. D. DIFFUSERS. - 1. DIFFUSERS SHALL BE SIZED AS INDICATED AND DESIGNED TO DISTRIBUTE THE AIR QUANTITY EVENLY OVER THE SPACE INTENTED WITH ALLOWANCES FOR DIFFUSERS, SPREAD DROP AND THROW. THE DIFFUSERS, REGISTERS, AND GRILLES SHALL BE FACTORY FABRICATED FO STEEL AND /OR ALUMINUM CONSTRUCTION FINISHED WITH A WHITE ENAMEL PAINT. DIFFUSERS AND GRILLES SHALL BE TESTED AND LISTED UNDER THE AIR DIFFUSION COUNCIL. (ADC). TEST CODE AND EQUAL TO MODELS INDICATED. 2. COORDINATE EXACT LOCATION OF DIFFUSERS WITH LIGHTING FIXTURES AND AIR CONDITIONING DEVICES. E PIPING 1. GAS PIPING SHALL BE SCHEDULE 40 BLACK STEEL 2. CONDENSATE DRAIN SHALL BE TYPE "M" HARD DRAWN COPPER TUBING WITH COPPER FITTINGS. F. CONDENSATE PIPE INSULATION: SHALL BE 112" THICK CLOSED CELL INSULATION EQUAL TO ARMSTRONG- ARMAFLEX RATED FOR CEILING PLENUM RETURN. FIRE HAZARD CLASSIFICATION SHALL NOT EXCEED 25 FOR FLAME SPREAD AND 50 FOR SMOKE DEVELOPED. VALVES SHALL BE GATE OR BALL TYPE EQUAL TO MILWAUKEE FIGURE 1149, 125 PSI, SWEAT CONNECTION 2.03 EXECUTION A. PROVIDE ALL WORK, EQUIPMENT AND MATERIALS INDICATED. FAN SCHEDULE MARK AREA PERFORMANCE DATA lilt MOTOR DATA MAX WT GENERAL SPECIFICATIONS SEER 1.01 CODE COMPLIANCE SHALL COMPLY WITH THE LAWS, ORDINANCES, RULES 13.0 AND REGULATIONS OF ALL GOVERNMENTAL AUTHORITIES HAVING JURISDICTION OF THE NATIONAL TYPE FIRE PROTECTION ASSOCIATION OF THE NATIONAL ELECTRIC CODE, AND OF THE PUBLIC UTILITIES 1,2 HAVING JURISDICTION OVER ANY OF THE SYSTEMS HEREIN SPECIFIED. SEE PLAN 1.02 PERMIT FEES THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL NECESSARY PERMITS, -� INSPECTIONS AND APPROVALS 70 COMPLETE THE PRODUCT WORK. ALL CERTIFICATES SHALL SEE PLAN BE IN DUPLICATE AND BE DELIVERED TO THE OWNER'S REPRESENTATIVE. RCFL -H -2417 1.03 DEFINITIONS: CFM A. "PROVIDE" UNDER THIS CONTRACT IS DEFINED AS FURNISH AND INSTALL RPM B. "CONCEALED" UNDER THIS CONTRACT IS DEFINED AS HIDDEN BY ARCHITECTURAL WALLS DRIVE AND CEILINGS. "EXPOSED" �/OL T C. UNDER THIS CONTRACT IS DEFINED AS VISIBLE TO VIEW Q D. INDICATED" UNDER THIS CONTRACT IS DEFINED AS SHOWN IN THE CONTRACTED DOCUMENTS 0.5 1.04 SCOPE OF WORK PROVIDE ALL WOK INDICATED IN THE CONTRACT DOCUMENTS TOILET 1.05 EXISTING CONDITIONS THE SITE, LOCATION AND ROUTING OF SYSTEMS INDICATED TO HAVE 0.250 NEW CONNECTIONS MADE TO THEM ARE SHOWN ACCURATELY AS FIELD CONDITIONS WOULD CENTRIFUGAL PERMIT. BIDDING CONTRACTORS SHALL VISIT THE SITE AND THOROUGHLY EXAMINE THE CONTRACT (37) DRAWINGS, CONTRACTOR'S WHO DO NOT VISIT THE SITE MAY BE UNILATERAL NOT PERMITTED 1 TO SUBMIT A BID IF THE OWNER SO DECIDES. ALL EXISTING CONDITIONS SHALE EXAMINED GREENHECK SP -125 AND THEIR EXACT LOCATIONS VERIFIED. THE CONTRACTORS SHALL REPORT TO THE OWNER, LAY -IN CEILING BEFORE SUBMITTING A BID, ANY CONDITIONS WHICH MIGHT MAKE THE INSTALLATION OF THE -- REQUIRED EQUIPMENT A PROBLEM. NO CONSIDERATION OR ALLOWANCE WILL BE GRANTED FOR a FAILURE 70 INVESTIGATE EXISTING CONDITIONS OR MISUNDERSTANDINGS OF THE CONTRACT 800 DOCUMENTS. SURFACE MOUN 1.06 CONTRACT DOCUMENTS THE CONTRACT DOCUMENTS SHALL BE CONSIDERED AS DIAGRAMMATIC 23,800 AND FOR BIDDING PURPOSES ONLY ATTENTION IS CALLED TO THE FACT THAT WHILE THE � DOCUMENTS ARE GENERALLY TO SCALE AND ARE AS ACCURATE AS THE SCALE WILL PERMIT. TOTAL SENSIBLE B.T.U.H. ALL IMPORTANT DIMENSIONS SHALL BE DETERMINED IN TH FIELD. THE DRAWINGS ARE NOT C) TO BE CONSIDERED AS CONSTRUCTION SHOP DRAWINGS. THE DRAWINGS DO NOT INDICATE EVERY 80/67 FITTING, ELBOW, OFFSET, VALVE, PULL BOX OR SIMILAR COMPONENTS WHICH ARE REQUIRED TO 26 (0.022) COMPLETE THE PROJECT WORK. PREPARE FIELD CONSTRUCTION DRAWINGS IF NECESSARY FOR -/55 OR AS REQUIRED TO , INSURE PROPER INSTALLATION. PROVIDE ALL NECESSARY OFFSETS AND FITTINGS TO INSTALL THE SYSTEMS AS DIAGRAMMED AT NO ADDITIONAL COST ELECT 1.07 DEMOLITION THE CONTRACTOR SHALL REMOVE ALL EQUIPMENT NOT INDICATED TO BE REUSED 24 (0.028) TO A DESIGNATED LOCATION AT THE PROJECT SITE. AFTER THE EQUIPMENT HAS BEEN ASSEMBLED 4-- .8 _ -- FOR INSPECTION BY THE OWNER AND POSSIBLE RETENTION. ALL EQUIPMENT NOT TO BE RETAINED LLJ -... - Q NUMBER OF STEPS BY THE OWNER SHALL BE REMOVED FROM THE SITE BY THE CONTRACTOR. ELECTRICAL SERVICE 230 -1 -60 1.08 EQUIPMENT AND MATERIALS (QUANTITY AND SIZE A. ALL EQUIPMENT AND MATERIALS SHALL BE NEW, UNLESS INDICATED OTHERWISE, AND THE 18 (0.052) CURRENT MODEL FOR WHICH REPLACEMENT PARTS ARE AVAILABLE. SUBSTITUTIONS SHALL -- ONLY BE ACCEPTED AT THE DESCRIPTION OF THE OWNER'S REPRESENTATIVE OR THE ENGINEER TYPE B. THE CONTRACTOR SHALL INSTALL EQUIPMENT AND MATERIAL IN ACCORDANCE WITH THE LOCATION BEST ENGINEERING PRACTICE. THE CONTRACTOR SHALL FOLLOW THE MANUFACTURER'S PUBLISHED INSTALLATION INSTRUCTIONS AND RECOMMENDATIONS, UNLESS INDICATED 212 SYSTEM ' C. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL REQUIRED AUXILIARY ITEMS FOR A COMPLETE OTHERWISE. 1 D. ALL EQUIPMENT SHALL BE MOUNTED VIBRATION FREE rz TOTAL. CAPACITY REDUCTION 1.09 SHOP DRAWINGS PROJECT EQUIPMENT AND MATERIALS SHOP DRAWINGS ARE TO BE SUBMITTED TO OWNER OR AS REQUESTED FOR THIRD PARTY REVIEW BEFORE INSTALLATION. SUBMIT SIX (6) COPIES OF SHOP DRAWINGS FOR THIRD PARTY REVIEW. 12.8/58.3 1.10 COORDINATION THE CONTRACTOR SHALL INSTALL ALL DUCTWORK PIPING, RACEWAYS, CIRCUITRY, CONDUIT, ETC., AS HIGH AS POSSIBLE TO MAXIMIZE HEADROOM, RUN APRALLEL OR PERPENDICULAR TO THE BUILDING WALLS IN A NEAT WORKMANLIKE MANNER. AVOID CONFLICT WITH EXISTING EQUIPMENT, LIGHTS, CABLE TRAYS, ETC. IF CONFLICT WITH EXISTING DOWS OCCUR THE CONTRACTOR SHALL REROUTE CONFLICTING PROJECT WORK AS DIRECTED BY THE OWNER'S REPRESENTATIVE AT ON ADDITIONAL COST. 1.11 PARTITIONS AND DUCTWORK THE CONTRACTOR SHALL REPAIR ALL OPENINGS IN WALL, CEILINGS, Izl I I,Ic11 \; \l�l I INI ` FLOORS, ETC., WHICH ARE CREATED BY DEMOLITION AND /OR NEW PROJECT WORK. THE REPAIRS SHALL BE WITH MATERIALS AND FINSHED TO MATCH EXISTING. OPENINGS AND PENETRATIONS IN FIRE RATED PARTITIONS OR DUCTWORK SHALL BE SEALED WITH U.L. APPROVED FIRE STOPPING MATERIAL TO MAINTAIN FIRE RESISTANT INTERGRITY. DUCTWORK AND PIPING SHALL BE CAPPED, SEALED AIR AND WATERTIGHT AND INSULATED TO MATCH EXISTING. 1.12 SITE CLEANUP UPON COMPLETION OF THE WORK, THE CONTRACTOR SHELL THOROUGHLY CLEAN THE CONTRACT AREA AND ALL OTHER AREAS USED FOR STORAGE, STAGING ETC. THIS SHALL INCLUDE, BUT NOT BE LIMITED TO WASHING AND /OR REPAIRING GLASS, REMOVING SPOTS AND STAINS, CLEANING ALL FIXTURES AND WASHING ALL FLOORS, WALL AND CEILING IF APPROPRIATE. 1.13 GUARANTIES ALL EQUIPMENT, MATERIALS AND WORKMANSHIP SHALL BE GUARANTEED IN FILL FORM DETECT FOR ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE OF THIS WORK BY THE OWNER'S REPRESENTATIVE. 1.14 TESTS AND DEMONSTRATIONS THE CONTRACTOR SHALL TEST ALL EQUIPMENT INSTALLED UNDER THIS CONTRACT AND DEMONSTRATE TO THE OWNER'S REPRESENTATIVE ITS PROPER OPERATION(S). 1.15 BUILDING SMOKE /FIRE ALARM SYSTEM PROTECT THE EXISTING BUILDING SMOKE /FIRE ALA2:4 DETECTION SYSTEM AS REQUIRED TO PREVENT FALSE ALARMS WITHIN THE PROJECT CONSTRUCTION AREA. 1.16 EQUIPMENT SERVICE ACCESS PROVIDE ACCESS DOORS IN DRYWALL, CEILINGS AND PARTITIONS TO SERVICE EQUIPMENT, BALANCE DIFFUSERS, AND EXPOSE JUNCTION BOXES. COORDINATE THE EXACT LOCATIONS AND STYLE OF FLANGE LESS ACCESS DOORS WITH THE ENGINEER. 1.17 WORKING HOURS AND SYSTEM SHUTDOWN ALL WORK SHALL BE PERFORMED DURING NORMAL WORKING HOURS AS DEFINED BY THE OWNERS REPRESENTATIVE. WORK PERFORMED OUTSIDE OR NORMAL WORKING HOURS SHALL BE NEGOTIATED WITH OWNERS REPRESENTATIVE PRIOR TO THE CONSTRUCTION PHASE REQUIRED EXISTING SYSTEM SHUTDOWNS SHALL BE COORDINATED IN WRITING WITH THE OWNER'S REPRESENTATIVE A MAXIMUM OF 48 HOURS IN ADVANCED. MECHANICAL SPECIFICATIONS 2.01 GENERAL A. SEE GENERAL SPECIFICATION SECTION FOR ADDITIONAL REQUIREMENTS B. COORDINATE ROUTING OF NEW DUCTWORK AND LOCATION OF DIFFUSERS WITH THE LIGHTING FIXTURES AND HVAC DEVICES. C. THE CONTRACTOR SHALL BALANCE THE AIR SYSTEMS AND SUBMIT THREE (3) COPIES OF THE FINAL BALANCE REPORT TO THE ENGINEER FOR REVIEW. ALL BALANCING SHALL BE PERFORMED IN- ACCORDANCE WITH THE PROCEDURES AS OUTLINED BY THE NATIONAL ENVIRONMENTAL BALANCING BUREAU. (NEBB). OR THE ASSOCIATION AIR BALANCE COUNCIL (AABC). THE CONTRACTOR SHALL FURNISH ALL LABOR, INSTRUMENTS, TOOLS AND MATERIALS AS REQUIRED FOR ALL THE TEST. D. THE CONTRACTOR SHALL SUBMIT SIX (6) COPIES OF SHOP DRAWINGS FOR THE FOLLOWING EQUIPMENT AND MATERIALS FOR A THIRD PARTY REVIEW. 1. DUCTWORK 5. AIR DEVICES 2. ROOF TOP UNITS 6. MAKE -UP AIR UNITS J. INLINE EXHAUST FANS 7. AIR BALANCE 2.02 PRODUCTS A. DUCTWORK 1. RIGID DUCT WORK a. RIGID DUCTWORK CONSTRUCTION AND INSTALLATION SHALL BE IN ACCORDANCE WITH THE HVAC DUCT CONSTRUCTION STANDARDS -METAL AND FLEXIBLE -1985 EDITION PREPARED BY THE SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION INC., (SMACNA). THE RIGID DUCTWORK SHALL ALSO BE IN ACCORDANCE WITH PREVAILING LOCAL CODES, MEETING THE REQUIREMENTS OF THE APPLICABLE SECTIONS FOR THE PARTICULAR SERVICE OF THE DUCT SYSTEMS. FIBROUS BOARD DUCT (R6) MAY USED IF APPROVED BY OWNER. b. DUCTWORK DIMENSIONS INDICATED ARE CLEAR INSIDE DUCT DIMENSIONS AND SHALL BE INCREASED, AS REQUIRED, TO COMPENSATE FOR LINEAR THICKNESS OF ANY DUCT LINING. c. ALL EXPOSED DUCTS SHALL BE ROUND SPIRAL METAL WITH INTERIOR LINING OR AS SELECTED BY OWNER OR ARCHITECT 2. FLEXIBLE DUCTWORK a. FLEXIBLE DUCTWORK SHALL BE INSULATED GLASS 1 AIR DUCT LISTED BY UNDERWRITERS LABORATORIES IN. (U.L.) PUBLICATION U.L. 181. FLEXIBLE DUCTWORK SHALL BE THERMAFLEX.• C -KM. b. CONNECTORS TO SHEET METAL DUCTWORK SHALL BE MADE WITH HEAVY GAUGE SPIN -IN THE FITTINGS WITH INTEGRAL VOLUME DAMPER, SEAL THE FLEXIBLE DUCTWORK JOINTS AT THE RIGID DUCTWORK AND CEILING DIFFUSERS TO 2° POSITIVE PRESSURE c. FLEXIBLE DUCTWORK SHALL BE SUPPORTED FROM THE BUILDING STRUCTURE AS REQUIRED TO REVENT SAGGING. THE MAXIMUM LENGTH OF FLEXIBLE DUCTWORK SHALL BE 10' -0 ". ADDITIONAL REQUIRED LENGTHS SHALL BE RUN IN RIGID ROUND. d, DUCT PRESSURE CLASSIFICATION: DUCTWORK AND JOINTS WITHIN THE PROJECT AREA SHALL HAVE 2 INCHES POSITIVE AND NEGATIVE PRESSURE, SEAL CLASS B. J. ROUND AND FLAT-OVAL DUCT AND FITTING FABRICATIONS a. DIAMETER AS APPLIED TO FLAT -OVAL DUCTS IN THIS ARTICLE IS THE DIAMETER OF A ROUND DUCT WITH A CIRCUMFERENCE EQUAL TO THE PERIMETER OF A GIVEN SIZE OF b. RUNIA90MUBLETWALL INTERNALLY INSULATED SPIRAL DUCT.- FABRICATE SUPPLY DUCTS OF GALVANIZED STEEL ACCORDING TO SMACNA'S HVAC DUCT CONSTRUCTION STANDARDS -METAL AND FLEXIBLE c. FLAT -OVAL DOUBLE WALL INTERNALLY INSULATED SPIRAL DUCT' FABRICATE SUPPLY DUCTS ACCORDING TO SMACNA'S HVAC DUCT CONSTRUCTION STANDARDS -METAL AND FLEXIBLE d. DUCT JOINTS: 1. ALL DUCT JOINTS SHALL BE AS PER SMACNA STANDARS, B. DUCT INSULATION.- SUPPLY AIR DUCTWORK SHALL BE INSULATED 1 -1/2" THICK 314 POUND DENSITY DUCT WRAP, OVERLAP SEAMS BY 2' AND SEAL WITH MASTIC. PIN INSULATION 16" ON CENTER FOR DUCT SIZES OVER 24': INSULATION SHALL BE EQUAL TO CERTAINTEED "STANDARD DUCT WRAP" K =0.30 AT 75 DEGREES F. INSULATE ALL SUPPLY AIR DUCTWORK THAT IS NOT SOUND LINED. C. DUCT SOUND LINING. SOUND LINING SHALL BE 1" THICK, 1 -112 POUND DENSITY FER CUBIC FOOT, K =0.29 AT 75 DEGREE F MEAN TEMPERATURE WITH A COATING ON ONE SIDE FIRE HAZARD CLASSIFICATION SHALL NOT EXCEED 25 FOR FLAME SPREAD AND 50 FOR SMOKE DEVELOPED, LINING SHALL BE INSTALLED INSTALLED IN STRICK ACCORDANCE WITH THE REQURRMENTS IF THE LATEST SMACNA DUCT LINER APPLICATION STANDARD. LINING SHALL BE EQUAL TO CERTAINTEED ULTRALITE. D. DIFFUSERS. - 1. DIFFUSERS SHALL BE SIZED AS INDICATED AND DESIGNED TO DISTRIBUTE THE AIR QUANTITY EVENLY OVER THE SPACE INTENTED WITH ALLOWANCES FOR DIFFUSERS, SPREAD DROP AND THROW. THE DIFFUSERS, REGISTERS, AND GRILLES SHALL BE FACTORY FABRICATED FO STEEL AND /OR ALUMINUM CONSTRUCTION FINISHED WITH A WHITE ENAMEL PAINT. DIFFUSERS AND GRILLES SHALL BE TESTED AND LISTED UNDER THE AIR DIFFUSION COUNCIL. (ADC). TEST CODE AND EQUAL TO MODELS INDICATED. 2. COORDINATE EXACT LOCATION OF DIFFUSERS WITH LIGHTING FIXTURES AND AIR CONDITIONING DEVICES. E PIPING 1. GAS PIPING SHALL BE SCHEDULE 40 BLACK STEEL 2. CONDENSATE DRAIN SHALL BE TYPE "M" HARD DRAWN COPPER TUBING WITH COPPER FITTINGS. F. CONDENSATE PIPE INSULATION: SHALL BE 112" THICK CLOSED CELL INSULATION EQUAL TO ARMSTRONG- ARMAFLEX RATED FOR CEILING PLENUM RETURN. FIRE HAZARD CLASSIFICATION SHALL NOT EXCEED 25 FOR FLAME SPREAD AND 50 FOR SMOKE DEVELOPED. VALVES SHALL BE GATE OR BALL TYPE EQUAL TO MILWAUKEE FIGURE 1149, 125 PSI, SWEAT CONNECTION 2.03 EXECUTION A. PROVIDE ALL WORK, EQUIPMENT AND MATERIALS INDICATED. FAN SCHEDULE MARK AREA PERFORMANCE DATA CONSTRUCTION DATA MOTOR DATA MAX WT MANUFACTURER SEER 0 13.0 SEE PLAN TYPE HORIZ 1,2 LOCATION SEE PLAN 0 SERVICED LBS. SEE PLAN MANUFACTURER'S MODEL NUMBER COIL RCFL -H -2417 KRUEGER -SH CFM W RPM TYPE DRIVE ��A �/OL T PH Q _ EXTERNAL STATIC PRESS. IN. OF H20 0.5 �F TOILET 250 0.250 1450 CENTRIFUGAL DIRECT (37) 120 1 23 GREENHECK SP -125 C7 NOTES: 1. GRAVITY BACK DRAFT DAMPER 5. CONTROLLED VIA WALL SWITCH 8. COORDINATE WITH OWNER FOR FAN 2. ROOF CURB 6. INTERLOCK WITH KITCHEN HOOD SPECIFICATION AND ACCESSORIES J. STANDARD PREWIRED DISCONNECT SWITCH CONTROL PANEL 4. GREASE TROUGH Z SEE KITCHEN MANUFACTURER'S DETAILS /'I' ✓AC ot %IK: _ f ;r__ _ Alf i fllfc /CAI t.L %t�'UG %t t LJtlri j CEILING AA,S MSLY FIRE STOPPING - - -- SMOKE CONTROL All? CONDITIONING LEGEND SYMBOL RL RS axb - axb I ' I I� HT L -_ Sl /A 0/A E/A EF ( I) DESCRIPTION REFRIGERANT LIQUID REFRIGERANT SUCTION DUCT, SIZE SHOWN IN INCHES MANUAL OPERATED DAMPER MOTOR OPERATED DAMPER SPLITTER DAMPER SQUARE ELBOW W/ TURNING VANES AIR EXTRACTOR DUCT TRANSITION SQ. TO ROUND TRANSITION FLEXIBLE DUCT BRANCH TAP WITH CONICAL FITTING RADIUS ELBOW WITH HEEL TAP RADIUS ELBOW, 5 PIECE IF AVAILABLE, 3PIECE OR SMOOTH OTHERWISE DIVIDED FLOW 'Y' TYPE FITTING SUPPLY AIR OUTSIDE AIR EXHAUST AIR EXHAUST FAN THERMOSTAT PACKAGED SPLIT A.C. UNIT SCHEDULE UNIT DESIGNATION 2 A NE C AREA SERVED SEE PLAN DESIGN MANUFACTURER RHEEM SEER 0 13.0 SEE PLAN TYPE HORIZ 1,2 LOCATION SEE PLAN 0 OPERATING WEIGHT, LBS 186 SEE PLAN MANUFACTURER'S MODEL NUMBER COIL RCFL -H -2417 KRUEGER -SH SURFACE MOUN TOTAL AIR, C.F.M. 800 OUTSIDE AIR, C.F.M. 200 SEE PLAh 1,2 KRUEGER -RM1 Q _ EXTERNAL STATIC PRESS. IN. OF H20 0.5 SEE PLAN 1 MOTOR HP (NON - OVERLOAD) 3/4 z FIXED - MOTOR SPEED, RPM -- ELECTRICAL SERVICE 230 -1 -60 LL LJL C7 LAY -IN CEILING FACE VELOC. F.P.M. MAXIMUM /DESIGN -- SEE PLAN a DESIGN AIR ACROSS COIL, C.F.M. 800 KRUEGER -S80 SURFACE MOUN TOTAL CAPACITY, B.T.U.H. 23,800 Z � 16,900 TOTAL SENSIBLE B.T.U.H. SEAM DUCT C) ENTERING AIR TEMP. DB / WB F° 80/67 z 26 (0.022) LEAVING AIR TEMP. DB / WB F° -/55 cr_ HEAT COIL TYPE ELECT 19 THRU 28 24 (0.028) TOTAL HEATING CAPACITY, KW 4-- .8 _ -- 22 (0.034) LLJ -... - Q NUMBER OF STEPS -- -- ELECTRICAL SERVICE 230 -1 -60 37 THRU 52 (QUANTITY AND SIZE -- 18 (0.052) FACE VELOC. FPM, MAXIMUM /DESIGN - - - -- -- TYPE LOCATION SEE PLAN OPERATING WEIGHT, LBS 212 MANUFACTURER'S MODEL NUMBER RANL- 024JEZ NUMBER OF COMPRESSORS 1 z rz TOTAL. CAPACITY REDUCTION 100% li;IAI AMIa.,, IA /Tim 12.8/58.3 I Izl I I,Ic11 \; \l�l I INI ` L I 1/t�13/8 I DIFFUSER, REGISTER AND GRILLE SCHEDULE TYPE SERVICE CFM RANGE FACE DIM. NECK DIA. NOTES BASIS OF DESIGN REMARKS 0 SUPPLY DIFFUSER SEE PLAN 24X24" SEE PLAA 1,2 KRUEGER -1400 LAY -IN CEILING 0 SUPPLY DIFFUSER 26 (0.022') SEE PLAN SEE PLAIV 1,2 KRUEGER -SH SURFACE MOUN ® SUPPLY DIFFUSER SEE PLAN SEE PLAN SEE PLAh 1,2 KRUEGER -RM1 ROUND E MOON ® EXHAUST SEE PLAN SEE PLAN SEE PLAA OVER 84 KRUEGER -EG 10 FIXED �5 RETURN SEE PLAN 24X24" LL LJL KRUEGER -S80 LAY -IN CEILING Q RETURN SEE PLAN SEE PLAN GALV. SHT: GAGE) KRUEGER -S80 SURFACE MOUN NOTES: 1. PROVIDE WITH OPPOSED BLADE DAMPER 2. COORDINATE WITH OWNER COLOR AND FINISH * 0 -100 CFM - 8x8 101 -250 CFM - 12x12 251 -400 CFM - 14x14 401 -530 CFM - 16X16 531 -675 CFM - 18X18 12 -1 -10 I.L.A. aroiect # 1070.00 IPA I. Leon & Assoc., Inc. Consulting Engineers 15521 SW 149th. COURT MIAMI, FLORIDA 33187 CA # 6577 ileonandassoc ®bellsouth.net phone # 305 232 0031 seal: Ismael Leon, P.E., # 40168 8000 NW 7 Street, Suite 101 Miami, Florida 33126 T. 3 0 5- 7 4 0 - 0 1 5 0 F. 3 0 5- 7 4 0- 0 1 5 8 e -mail: tag- dbi®tagdbi.com corporate license AAC 002228 Copyright Notice: These drawings, designs and ideas are the property of The Architects Group, Inc. and are protected under the copyright laws of Florida. No part thereof shall be copied, or used in connection with any work other than for the specific project for which they have been prepared without written consent of The Architects Group, Inc. T-- TABLE M- I W W DUCT CONSTRUCTION MINIMUM SHEET METAL GAGES z RECTANGULAR DUCTS LL MAX. SIDE STEEL W W ALUMINUM (INCHES) (MIN. GALV. SHT. GAGE) (MIN. B & S GAGE) THRU 12 26 (0.022') Z 24 (0.020') 13 THRU 30 24 (0.028) LL � 1 V) V i 22 (0-025-) 31 THRU 54 22 (0.034 ) Zz 20 (0.032 ) 55 THRU 84 20 (0.040) cL L W W -, O 18 (0.040') OVER 84 18 (0.052) ::D 16 (0.051) ROUND DUCTS LL LJL O STEEL I�Jr� a- DIAMETER (MIN. GALV. SHT: GAGE) SPIRAL z LONGITUDINAL FITTINGS (INCHES) WIL SEAM DUCT SEAM DUCT THRU 12 28 (0.019 ) 26 (0.022) 26 (0.022) 13 THRU 18 26 (0.022 ) 24 (0.028) 24 (0.028) 19 THRU 28 24 (0.028) 22 (0.034) 22 (0.034) 29 THRU 36 22 (0.034) 20 (0.040') 20 (0.040') 37 THRU 52 20 (0.040) 18 (0.052) 1 18 (0.052) 12 -1 -10 I.L.A. aroiect # 1070.00 IPA I. Leon & Assoc., Inc. Consulting Engineers 15521 SW 149th. COURT MIAMI, FLORIDA 33187 CA # 6577 ileonandassoc ®bellsouth.net phone # 305 232 0031 seal: Ismael Leon, P.E., # 40168 8000 NW 7 Street, Suite 101 Miami, Florida 33126 T. 3 0 5- 7 4 0 - 0 1 5 0 F. 3 0 5- 7 4 0- 0 1 5 8 e -mail: tag- dbi®tagdbi.com corporate license AAC 002228 Copyright Notice: These drawings, designs and ideas are the property of The Architects Group, Inc. and are protected under the copyright laws of Florida. No part thereof shall be copied, or used in connection with any work other than for the specific project for which they have been prepared without written consent of The Architects Group, Inc. T-- N W W z LL W W L 75 0 _ Z z W LL LL � 1 V) V i W W � Ld Zz r= uu rig J cL L W W -, O O l c, J W ::D DATE: I JOB N0: J ii1 DRAWN: CHECKED: R REVISIONS: r Pedro P. Ramos, A.I.A. FL. Lic. 1OS90 HEEL TITLE:r MECHANICAL SCHEDULES. r; M- 41 W z� LL ®0 L >-, 0 _ z cn I W 0� W ::D L.L LL LJL O I�Jr� a- L.L z o rL w Ui F- z -, Cr' WIL J 1- j (J DATE: I JOB N0: J ii1 DRAWN: CHECKED: R REVISIONS: r Pedro P. Ramos, A.I.A. FL. Lic. 1OS90 HEEL TITLE:r MECHANICAL SCHEDULES. r; M- 41