10-1175-0069
s
�1
M• in
•
s
t
•
•
Lr
1
AUTOMATIC •
WATER DEMAND / ZONE REFER TO PLAN
WATER SOURCE « E1'
PRESSURE REQUIRED r PSI
• s r • •� . • • «� -
i t � I _i •�iil.. • /f � ti •
CONTRACTOR SHALL VERIFY THAT PRESSURE • ABOVE 50 PSI WHEN I
IZTIG*IION IS PROGRAMMED TO OPERATE.
BACKFLOW PREVENTION SHALL BE INSTALLEr TO MEET LOCAL,:f� •.
REQUIREMENTS •- CROSS CONNECT10N CONTROL - VACUUM
BREAKER HAS BEEN SPECIFIED.
TO ENSURE PROPER OPERATION, SOURCE
SIZES, • SPRINKLER .: • • AND DETAILS, • SPECIFICATIONS SHALL BE FOLLOWED
4_
v
PIPE ROUTING IS SCHEMA71C ONLY AND SHALJ_ BE ADJUSTED FOR ON SITE
CONDITIONS.
MANUFACTURERS PIPE SHALL BE INSTALLED IN ACCORDANCE WITH LOCAL CODES AND PIPE
INSTRUCTIONS.
PIPE ROUTED UNDER HARDSCAPED - s IN SCH 0
EACH • TO A MINIMUM DEPTH OF
BE • PIPE SIMS - AND • • D
U LOCATION OF
PIPE AND FITTINGS INSTALLED ABOVE GRADE FOR THE BACKFLOW PREVEN71ER
SHALL BE SCH r GALVANIZED OTHER PIPE AND FITTINGS SHALL BE
TYPE 1120 PVC. MAIN I LINE SHALL BE SCH - i • AND LARGER
SHALL BE SDR 28, CLASS 160; LATERALS SIZED Wr SHALL BE SDR 21, CLASS 200
Bt 7111ED 111, '«
PIPE SIZED TO LIMIT FLOW •« • «• r .Tt• A.
FRICTION •' t NETWORK
APPLICABLE DETAIL FOR ADDITIONALINFORMATION.
BACKFILL SHALL BE OF SUITABLE MATERIAL, FREE OF ROCKS, STONES, AND
OTHER DEBRIS THAT WOULD DAMAGE IRRIGATION COMPONENTS.
3 7i s
SPRINKLER • • ARE SCHEMATIC ONLY r SHALL BE ADJUSTED
FOR • ti CAPING, SITE LIGHTING, PREVAILING WIND, MOUNDING,
WALLS, ETC., TO ENSURE PROPER COVERAGE WITH MINIMAL UNit
OVERTHROW. I OBJECTIVE SHALL BETO ELIMINATE UNDESIRABLE OVERTHROW.
SPRAY HEADS • • 570 SERIES. FOUR INCH •
INSTALLED INSTALLED IN AREAS LANDSCAPED WITH SOD AND ROCKS, TWELVE INCH POPUP
TYPE SHALL BE IN AREAS LANDSCAPED WTTH GROUND COVER AND
LOW SHRUBS, AND SHRUB HEADS SHALL BE INSTALLED IN AREAS LANDSCAPED NTH
TALL SHRUBS.
ON t JOINTS CONSISTING OF « • POLY PIPE AND
ELBOWS. INSERT
TIF-UP TYPE LOCATED IN SHRUBS SHALL BE INS7XILIFUE11) !Ti Itr .T•; ■ rr
PVC RISERS TO A HEIGHT SO SPRINKLERS ARE CONCEALED FROM MEW EXCEPT
DURING
SHRUB TYPE SHALL BE INSTALLED ON 11r SCH PVC RISERS AND AT THE BASE
OF TALL SHRUBS FOR LOW LEVEL WATERING. RISERS SHALL BE BLACK TO BE
LESS VISIBLE.
TYPE PRECN34ON &PRAY NOZZLE AND THE X410W
SPRINKLERS SHALL BE INSTALLED AND MAINTAINED AT THE PROPER HEIGHT
TO ELIMINATE THE CHANCE OF
ADJUSTMENT FEATURES OF 1 RS SPECIFIED SHALL BE U1711 r1 E • TO
ENSURE -•- COVERAGE WTTH MINIMAL UNr E- -• •
ANGLE, RAT SPRAY, AND ADJUSTABLE ARC • �Z r TO
CONTROL
A TORO TMC: SERIES 24 VAC ELECTRIC CONTROL SYSTEM SHALL BE
• ! 4 "11IN CONTROLLER
INSTALLED TO CONSERVE -
CONTROLLER SHALL BE INSTALLED IN ACCORDANCE • CODES
AND MANUFACTURERS INSTRUCTIONS. PROPER GROUNDING EQUIPMENT
SHALL BE PROVIDED.
CONTROLLER • s N SHALL BE APPROVED BY THE OWNERS
REPRESENTATIVE. A 110 VAC ELECTRIC SOURCE IS REQUIRED PER
L(WrATION.
it «
«• •- ♦•s • • « -• : _ •• • -- *fir � .
1• 1 i «• -• r
• 9111L, 1, Lv-C a I -• -! all • I =fit; • r1jo lyl o
s • • zi =Fzlo,!: U1
;Lai • r - :• • - -• • • -:
TIMING AND f
TIMING OF EACH H • FIELD MATCH LOCAL
IPF4f - • • «. • -1 «• • • i «
PROGRAMMIPvV
SYSTEM SHALL BE PROGRAMMED • INSURE IRRIGATED
lffl-101N THE TIME DEFINED IN PHASE 11 WATER RESTRICTIONS.
llh- SHRUB/BUBBLER
:!II
SPRINKLER
POP—UP SPRAY ON POLY PIPE
SWING JOINT LOCATED OR MULCH
4.
MASS
1
SHRUB MASS
SHRUB MASS
4.
a• o o
\
�
o
o
BCH 40
cf__41CH 40 GALV WYE 87RADIER
Tx0
c I!'
/
1 • E SCREEN
—
\
SHALL BE
12 /
\
12 PmL LIP SPRNCI.ER
\ /
'
\
LLENG HHTTO BE
�1�1�Ir
A ELL
HEAD AND NK
OF
DETERMINE ON SITE
o/
\
o
,•
o/
w 1
X
GROUNDING
ROD INSTALLATION
GALV UNION
,w r -
- I Clio
• . �.
c •
TRENCHING DETAIL
MASS
1
4•
SHRUB MASS
w1 • • UNIT
INCLUDES TWO GATE VALVES
AND TWO GALV. NIPPLES
BCH 40
cf__41CH 40 GALV WYE 87RADIER
Tx0
c I!'
RESISTANCE 70 EARTH
1 • E SCREEN
—
\
SHALL BE
\
`
I
'
\
LLENG HHTTO BE
�1�1�Ir
A ELL
HEAD AND NK
OF
DETERMINE ON SITE
HIGHERc11
\
�
o
c •
TRENCHING DETAIL
MASS
1
NON—TRAFFIC AREAS
w1 • • UNIT
INCLUDES TWO GATE VALVES
AND TWO GALV. NIPPLES
BCH 40
cf__41CH 40 GALV WYE 87RADIER
Tx0
c I!'
RESISTANCE 70 EARTH
1 • E SCREEN
—
WIHOGE :I• FOR FLUfIHING
SHALL BE
;. w ,
GALVNIPPLE
`
I
'
THAN E:
�1�1�Ir
A ELL
HEAD AND NK
OF
HIGHERc11
THANFINISH
w 1
GRADE
GROUNDING
ROD INSTALLATION
GALV UNION
BCH 40
NTS
:w r
3ALV N113PLI
c- r
GALVNIPPLE
PRESSURE VACUUM' r
s
wSHRUB
MASS
GIB' DIAMETER
COPPER AD ROD.
CL.[
Tx0
RESISTANCE 70 EARTH
,-- 12' POP -UP SPRINKLER
Ad
1
!"
GATE VALVE ,
�II•�
"IZZIMTS"i AZWx
•
TRENCHING DETAIL I
�• •� c• . IIIIIIIINpIll
i
SPRINKLER DETAIL
JOINT O 1 IN PLANTS MAINTAINED TO NTs
�� i
im • •- • r •
a a.��xK' ,`.r:••+- �•,�'"�, fir:
PIPE SLEEVE DETAIL
6
'ns
?
GIB' DIAMETER
COPPER AD ROD.
CL.[
RESISTANCE 70 EARTH
SHALL BE
r
/y�WIITRH/I�NLLL ®STS
'
9
IwRIfN-/'ICTURER.
GROUNDING
ROD INSTALLATION
NTS
i4
I �1
f
i eary
f 1 . !
Design
Associ7ates,
Ambitenturm
Planitin
rw
hft. & m. mmd $QOM
5827 SW 77$t Teum
Mlont FL 33143
r
iii•
K-