10-1175-006f
t
r
t
t
t
t
t
t
■
w
t
■
U
f
t
r
- I'-E71
SETBACK 4g' -0"' j
A 20' -0" 29' -0"
EXISTING BRICK COURTYARD
TO BE REMOVED (BRICK TO BE
SALVAGED FOR NEW 1550)
F�oMI V LW
op
1
I �
°// °/�/Z'
// /° i/ °° / ° °°/ ° °/ // °// °// °0
rY LM °° ° ° °/ ° °° °°/ %% ° / a / /° / // °° / // / ° // °// �/z
° /°i /°�// //i i /i i i / ° °i °// °// °/ °/ X0 /° / //// /° //// 015 ° // / X*0,
/ // °/° °° / % /// ° / /
°° ° °
Sri et ° °° / ° / °/ // / ° /°/cac m ea / / eeT�ac LNj / /// °/ °° °/ /
ct1 I I // / / /// // /// /
pop ° / // /// // °// °// °�//o /// / °// °/ / / °// // // / // °/ / //°/ ° // ° °/ °
/ °/ ° °/ / / °/ °° ° °° / / / // / / /
/ / °
/ / // / / // % % // / / /° / °� /
EXISTING A/C UNIT / / /
/ / // // °
% %
TO BE REMOVED ° °/ / ° // // / / /° % // / ID .1 j4l
I I
_
/,�
er
01 / /° °° °° °/ l/ /° / /
/° f /
/ % / / X/Z'o / °/ / // / // °// /// / /// / / /// / / A 21,111d / /
j #01 I �//o / / / / / / / / // / ° / °// // // / / // /// / / / / / / / / / / // / / ///
°
IDOTM
/ / /i/° / / // // "OF °// i i i/ ° ° ° °° / ° ° / °/
° / ° / ° ° / ° / °° i / / / /
I /° °°// ° i i //i °°i °/ °°i /i / / / / °/ // /// / // / / / i /% Jr / /// .4 OOF
/ % /// / / Ooze-
/ // / ° °// °°/// /// /// /% // zo
/ / /
// / / / / / ° / ° ° / / �°// �// roe �1;z / / /° STAW 01
per A01 1001-
s
0
i
ma
2i' -011
18' -0"
EXISTING DRIVEWAY
°- TO BE DEMOLISHED AND
REPLACED WITH NEW
/' DRIVEWAY BY OTHERS.
31` -011
of
tS�
SETBACK
t
■
t
t
f
8
I
IN
r
•
t
t
SALVAGE NOTES
symem
PEamlivrION
(D
�•
EXIST. BRICK FLOOR TO BE SALVAGED
irGiriiriiri
APPLIANCE TO BE SALVAGED AND STORED IN A SAFE LOCATION DURING
CONSTRUCTION
OEXIST.
A/C UNIT TO BE SALVAGED
rd1
FIXTURES TO BE SALVAGED AND STORED IN A SAFE LOCATION DURING
CONSTRUCTION
�
q
I GENERAL NOTES I
CONTRACTOR SHALL PROVIDE PROTECTION OF MATERIALS DURING ALL PHASES OF
CONSTRUCTION.
CONTRACTOR SHALL BE RESPONSIBLE FOR IMMEDIATE CLEANING AND REMOVAL OF ALL
DEBRIS UNTIL THE PREMISES ARE ACCEPTED IN A CLEAN AND HABITABLE CONDITION BY
THE ARCHITECT / INTERIOR DESIGNER.
CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THAT ALL WORK OF ALL TRADES SHALL
COMPLY WITH THE FLORIDA BUILDING CODES.
CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS IN THE FIELD AND SHALL
IMMEDIATELY NOTIFY THE ARCH. /DESIGNER OF ANY CONDITION THAT DIFFER OR INTERFERES
WITH THOSE SHOWN ON THIS PLAN BEFORE PROCEEDING WITH WORK ALL DIMENSIONS
SUPERSEDE SCALED DRAWINGS.
THE GENERAL CONTRACTOR, HIS SUB- CONTRACTOR, OR ANY OTHER CONTRACTOR INVOLVED
IN THIS PROJECT SHALL TAKE NOTE THAT ANY COST CAUSED BY DEFECTIVE WORK, AS A
RESULT OF, BUT NOT LIMITED TO INFERIOR WORKMANSHIP OR MATERIALS, IMPROPER
SCHEDULING OR DELINQUENT ORDERING SHALL BE BORNE BY PARTY RESPONSIBLE. ALL
ITEMS DAMAGED WHILE IN DEMOLITION PHASE THAT ARE TO REMAIN SHALL BE RESTORED
OR REPLACED TO BE ACCEPTABLE BY THE ARCHITECT / INTERIOR DESIGNER, AT THE
CONTRACTORS EXPENSE.
ANY OTHER ITEMS OR MATERIALS ENCOUNTERED DURING THE DEMOLITION PHASE SHALL BE
REPORTED IMMEDIATELY TO THE ARCHITECT / INTERIOR DESIGNER FOR EVALUATION.
DEMOLITION NOTES:
1. ALL DEMOLITION WORK SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE 2004
FLORIDA BUILDING CODE CHAPTER 33 AND COMPLY WITH ALL GOVERNING REGULATIONS.
2. GENERAL CONTRACTOR TO SURVEY THE CONDITION OF THE BUILDING TO DETERMINE
WHETHER REMOVING ANY ELEMENT MIGHT RESULT IN STRUCTURAL DEFICIENCY OR
UNPLANNED COLLAPSE OF ANY PORTION OF THE STRUCTURE OR ADJACENT STRUCTURES
PRIOR DEMOLITION SCHEDULE. CONTRACTOR TO CONTACT ARCHITECT IMMEDIATELY PRIOR
TO REMOVING ANY CONCRETE OR OTHER STRUCTURAL ITEM.
3. PRIOR TO COMMENCEMENT OF WORK, CONTRACTOR SHALL SUBMIT A MAINTENANCE OF
PEDESTRIAN TRAFFIC (M.O.TJ PLANS FOR OWNER / LANDLORD APPROVAL. CONTRACTOR
SHALL INDICATE ALL TEMPORARY WALLS REQUIRED, INTERMEDIATE SIGNAGsE, AND M.O.T.
INFORMATION.
4. COORDINATE ALL DEMOLTION WORK WITH ALL OTHERS TO INSURE WORK WILL PROGRESS
WITHOUT INTERUPTION AND DELAYS. COORDINATE AND SCHEDULE THE WORK WITH THE
OWNER / LANDLORD WHERE POSSIBLE DISTURBANCE MAY OCCUR AND OTHER POTENTIAL
DISRUPTIONS OF OWNERS FUNCTIONS AND SERVICES MAY OCCUR. ALL WORK AFFECTING
OWNER'S FUNCTIONS AND ACTIVITIES, INCLUDING ACCOMPLISHING WORK TO BE
COMPLETED BY PHASING WITH OWNER'S APPROVAL.
5. ALL AREAS OUTSIDE OF INDICATED "SCOPE OF WORK" SHALL REMAIN UNDISTURBED
UNLESS OTHERWISE NOTED.
b. CONTRACTOR SHALL BE RESPONSIBLE TO FIELD CHECK AND VERIFY ALL CONDITIONS
PRIOR TO COMMENCEMENT OF DEMOLITION, AND NOTIFY THE OWNER AND ARCHITECT IF
ANY DISCREPANCIES ARE FOUND.
1. THE CONTRACTOR IS TO PROTECT ALL EXISTING FINISHES AND SURFACES THROUGHOUT
SPACE WHICH ARE NOT PART OF DEMOLITION, INCLUDING ALL EXISTING ELEVATORS,
STAIRCASES, ENTRANCE LOBBIES, STORE FRONTS, AND SERVICE AREAS. THE CONTRACTOR
WILL REPLACE OR REFINISH DAMAGED AREAS. PLACE PLYWOOD OR OTHER PROTECTIVE
COATING OVER GRANITE 4 FABRIC PANELS AT FLOORS AND WALLS IF DESIGNATED TO
REMAIN.
S. DEMOLITION DRAWINGS AND NOTES ARE ONLY TO ASSIST IN SHOWING THE SCOPE OF
DEMOLITION WORK AND 15 NOT INTENDED TO INDICATE ALL DEMOLITION. CONTRACTOR
SHALL REMOVE ALL EXISTING ITEMS FOR A "BROOM CLEAN" SPACE.
S. CONTRACTOR SHALL PROTEGE' ALL EXISTING FACILITIES AND SITE UTILITIES FROM
DAMAGE.
IO.CONTRACTOR IS TO REMOVE OR CAP MECHANICAL ITEMS WHICH ARE NOT TO BE
REUSED INCLUDING WIRING, CONDUITS, PIPES, DUCTWORK ETC.
1100NTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING A TRASH/DEBRIS REMOVAL
SERVICE FOR REMOVAL OF ALL DEBRIS FOR ALL TRADES AND WALL WORK RELATING
TO THIS PROJECT. COORDINATE LOCATION OF DUMPSTER WITH OWNER
121UIRM IS TO BE REMOVED BACK TO PANEL. WORK TO BE DONE BY AN ELECTRICAL
CONTRACTOR. CARE SHOULD BE TAKEN TO IDENTIFY ALL ELECTRICAL CONDUITS
WHICH WILL REMAIN FOR BUILDING SYSTEMS AND TAGGED TO REMAIN.
13.PERIMETER GLAZING TO REMAIN SHALL HAVE PRECAUTIONS TAKEN TO PROTECT
MATERIALS DURING CONSTRUCTION. CONTRACTOR WILL REPLACE ALL GLASS BROKEN
DURING DEMOLITION.
14.ALL LIGHTING FIXTURES ARE TO BE REMOVED AND STORED FOR POSSIBLE REUSE ON
THE PROJECT UNLESS OTHERWISE NOTED.
1511PON COMPLETION OF DEMOLITION WORK CONTRACTOR SHALL REMOVE TOOLS,
EQUIPMENT, AND DEMOLISHED MATERIALS FROM SITE. REMOVE PROTECTIONS, DEBRIS,
RUBBISH, AND OTHER MATERIALS RESULTING FROM DEMOLITION WORK FROM BUILDING
SITE. TRANSPORT AND LEGALLY DISPOSE OF MATERIALS OFF -SITE.
SCALE = 1/4" = 1' -0"
Revisions
n
A
1
Je
Exisnw-, To BE • • ` DEMOLISHED
irGiriiriiri
• •, TO REMOVED
LL
I GENERAL NOTES I
CONTRACTOR SHALL PROVIDE PROTECTION OF MATERIALS DURING ALL PHASES OF
CONSTRUCTION.
CONTRACTOR SHALL BE RESPONSIBLE FOR IMMEDIATE CLEANING AND REMOVAL OF ALL
DEBRIS UNTIL THE PREMISES ARE ACCEPTED IN A CLEAN AND HABITABLE CONDITION BY
THE ARCHITECT / INTERIOR DESIGNER.
CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THAT ALL WORK OF ALL TRADES SHALL
COMPLY WITH THE FLORIDA BUILDING CODES.
CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS IN THE FIELD AND SHALL
IMMEDIATELY NOTIFY THE ARCH. /DESIGNER OF ANY CONDITION THAT DIFFER OR INTERFERES
WITH THOSE SHOWN ON THIS PLAN BEFORE PROCEEDING WITH WORK ALL DIMENSIONS
SUPERSEDE SCALED DRAWINGS.
THE GENERAL CONTRACTOR, HIS SUB- CONTRACTOR, OR ANY OTHER CONTRACTOR INVOLVED
IN THIS PROJECT SHALL TAKE NOTE THAT ANY COST CAUSED BY DEFECTIVE WORK, AS A
RESULT OF, BUT NOT LIMITED TO INFERIOR WORKMANSHIP OR MATERIALS, IMPROPER
SCHEDULING OR DELINQUENT ORDERING SHALL BE BORNE BY PARTY RESPONSIBLE. ALL
ITEMS DAMAGED WHILE IN DEMOLITION PHASE THAT ARE TO REMAIN SHALL BE RESTORED
OR REPLACED TO BE ACCEPTABLE BY THE ARCHITECT / INTERIOR DESIGNER, AT THE
CONTRACTORS EXPENSE.
ANY OTHER ITEMS OR MATERIALS ENCOUNTERED DURING THE DEMOLITION PHASE SHALL BE
REPORTED IMMEDIATELY TO THE ARCHITECT / INTERIOR DESIGNER FOR EVALUATION.
DEMOLITION NOTES:
1. ALL DEMOLITION WORK SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE 2004
FLORIDA BUILDING CODE CHAPTER 33 AND COMPLY WITH ALL GOVERNING REGULATIONS.
2. GENERAL CONTRACTOR TO SURVEY THE CONDITION OF THE BUILDING TO DETERMINE
WHETHER REMOVING ANY ELEMENT MIGHT RESULT IN STRUCTURAL DEFICIENCY OR
UNPLANNED COLLAPSE OF ANY PORTION OF THE STRUCTURE OR ADJACENT STRUCTURES
PRIOR DEMOLITION SCHEDULE. CONTRACTOR TO CONTACT ARCHITECT IMMEDIATELY PRIOR
TO REMOVING ANY CONCRETE OR OTHER STRUCTURAL ITEM.
3. PRIOR TO COMMENCEMENT OF WORK, CONTRACTOR SHALL SUBMIT A MAINTENANCE OF
PEDESTRIAN TRAFFIC (M.O.TJ PLANS FOR OWNER / LANDLORD APPROVAL. CONTRACTOR
SHALL INDICATE ALL TEMPORARY WALLS REQUIRED, INTERMEDIATE SIGNAGsE, AND M.O.T.
INFORMATION.
4. COORDINATE ALL DEMOLTION WORK WITH ALL OTHERS TO INSURE WORK WILL PROGRESS
WITHOUT INTERUPTION AND DELAYS. COORDINATE AND SCHEDULE THE WORK WITH THE
OWNER / LANDLORD WHERE POSSIBLE DISTURBANCE MAY OCCUR AND OTHER POTENTIAL
DISRUPTIONS OF OWNERS FUNCTIONS AND SERVICES MAY OCCUR. ALL WORK AFFECTING
OWNER'S FUNCTIONS AND ACTIVITIES, INCLUDING ACCOMPLISHING WORK TO BE
COMPLETED BY PHASING WITH OWNER'S APPROVAL.
5. ALL AREAS OUTSIDE OF INDICATED "SCOPE OF WORK" SHALL REMAIN UNDISTURBED
UNLESS OTHERWISE NOTED.
b. CONTRACTOR SHALL BE RESPONSIBLE TO FIELD CHECK AND VERIFY ALL CONDITIONS
PRIOR TO COMMENCEMENT OF DEMOLITION, AND NOTIFY THE OWNER AND ARCHITECT IF
ANY DISCREPANCIES ARE FOUND.
1. THE CONTRACTOR IS TO PROTECT ALL EXISTING FINISHES AND SURFACES THROUGHOUT
SPACE WHICH ARE NOT PART OF DEMOLITION, INCLUDING ALL EXISTING ELEVATORS,
STAIRCASES, ENTRANCE LOBBIES, STORE FRONTS, AND SERVICE AREAS. THE CONTRACTOR
WILL REPLACE OR REFINISH DAMAGED AREAS. PLACE PLYWOOD OR OTHER PROTECTIVE
COATING OVER GRANITE 4 FABRIC PANELS AT FLOORS AND WALLS IF DESIGNATED TO
REMAIN.
S. DEMOLITION DRAWINGS AND NOTES ARE ONLY TO ASSIST IN SHOWING THE SCOPE OF
DEMOLITION WORK AND 15 NOT INTENDED TO INDICATE ALL DEMOLITION. CONTRACTOR
SHALL REMOVE ALL EXISTING ITEMS FOR A "BROOM CLEAN" SPACE.
S. CONTRACTOR SHALL PROTEGE' ALL EXISTING FACILITIES AND SITE UTILITIES FROM
DAMAGE.
IO.CONTRACTOR IS TO REMOVE OR CAP MECHANICAL ITEMS WHICH ARE NOT TO BE
REUSED INCLUDING WIRING, CONDUITS, PIPES, DUCTWORK ETC.
1100NTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING A TRASH/DEBRIS REMOVAL
SERVICE FOR REMOVAL OF ALL DEBRIS FOR ALL TRADES AND WALL WORK RELATING
TO THIS PROJECT. COORDINATE LOCATION OF DUMPSTER WITH OWNER
121UIRM IS TO BE REMOVED BACK TO PANEL. WORK TO BE DONE BY AN ELECTRICAL
CONTRACTOR. CARE SHOULD BE TAKEN TO IDENTIFY ALL ELECTRICAL CONDUITS
WHICH WILL REMAIN FOR BUILDING SYSTEMS AND TAGGED TO REMAIN.
13.PERIMETER GLAZING TO REMAIN SHALL HAVE PRECAUTIONS TAKEN TO PROTECT
MATERIALS DURING CONSTRUCTION. CONTRACTOR WILL REPLACE ALL GLASS BROKEN
DURING DEMOLITION.
14.ALL LIGHTING FIXTURES ARE TO BE REMOVED AND STORED FOR POSSIBLE REUSE ON
THE PROJECT UNLESS OTHERWISE NOTED.
1511PON COMPLETION OF DEMOLITION WORK CONTRACTOR SHALL REMOVE TOOLS,
EQUIPMENT, AND DEMOLISHED MATERIALS FROM SITE. REMOVE PROTECTIONS, DEBRIS,
RUBBISH, AND OTHER MATERIALS RESULTING FROM DEMOLITION WORK FROM BUILDING
SITE. TRANSPORT AND LEGALLY DISPOSE OF MATERIALS OFF -SITE.
SCALE = 1/4" = 1' -0"
Revisions
n
A
1
Je
LL
4
�
q
•
L
CV
F
®
c0
o
U
U.
c
vlAt
oW
to
W
0
c
-
cy
cr-
i
•
7o
•
n
e6
i
■
c
e
i
10
1
)
W
• z
CL
c
U m
Job No. 10 -003 E
>a
Date 11/15/10 E
m
Scale HOWN
Sea _• `' s
AA- 26001560 m
Sheet No.
A � 2,1
Je
4
�
q
Z
L
CV
F
®
c0
o
U
U.
c
vlAt
oW
to
W
0
c
-
cy
e
1
,Q
CL
e6
e
■
c
e
o
W
�
e
z
LL
r
N
V
co
1
<
1
L
0
t
j
a
r
C
E
s
t
�
V
e
i
L
�
e
f
e
U
W
W
o
3
`
.J
Q
• z
CL
c
U m
Job No. 10 -003 E
>a
Date 11/15/10 E
m
Scale HOWN
Sea _• `' s
AA- 26001560 m
Sheet No.
A � 2,1