Loading...
10-1175-006f t r t t t t t t ■ w t ■ U f t r - I'-E71 SETBACK 4g' -0"' j A 20' -0" 29' -0" EXISTING BRICK COURTYARD TO BE REMOVED (BRICK TO BE SALVAGED FOR NEW 1550) F�oMI V LW op 1 I � °// °/�/Z' // /° i/ °° / ° °°/ ° °/ // °// °// °0 rY LM °° ° ° °/ ° °° °°/ %% ° / a / /° / // °° / // / ° // °// �/z ° /°i /°�// //i i /i i i / ° °i °// °// °/ °/ X0 /° / //// /° //// 015 ° // / X*0, / // °/° °° / % /// ° / / °° ° ° Sri et ° °° / ° / °/ // / ° /°/cac m ea / / eeT�ac LNj / /// °/ °° °/ / ct1 I I // / / /// // /// / pop ° / // /// // °// °// °�//o /// / °// °/ / / °// // // / // °/ / //°/ ° // ° °/ ° / °/ ° °/ / / °/ °° ° °° / / / // / / / / / ° / / // / / // % % // / / /° / °� / EXISTING A/C UNIT / / / / / // // ° % % TO BE REMOVED ° °/ / ° // // / / /° % // / ID .1 j4l I I _ /,� er 01 / /° °° °° °/ l/ /° / / /° f / / % / / X/Z'o / °/ / // / // °// /// / /// / / /// / / A 21,111d / / j #01 I �//o / / / / / / / / // / ° / °// // // / / // /// / / / / / / / / / / // / / /// ° IDOTM / / /i/° / / // // "OF °// i i i/ ° ° ° °° / ° ° / °/ ° / ° / ° ° / ° / °° i / / / / I /° °°// ° i i //i °°i °/ °°i /i / / / / °/ // /// / // / / / i /% Jr / /// .4 OOF / % /// / / Ooze- / // / ° °// °°/// /// /// /% // zo / / / // / / / / / ° / ° ° / / �°// �// roe �1;z / / /° STAW 01 per A01 1001- s 0 i ma 2i' -011 18' -0" EXISTING DRIVEWAY °- TO BE DEMOLISHED AND REPLACED WITH NEW /' DRIVEWAY BY OTHERS. 31` -011 of tS� SETBACK t ■ t t f 8 I IN r • t t SALVAGE NOTES symem PEamlivrION (D �• EXIST. BRICK FLOOR TO BE SALVAGED irGiriiriiri APPLIANCE TO BE SALVAGED AND STORED IN A SAFE LOCATION DURING CONSTRUCTION OEXIST. A/C UNIT TO BE SALVAGED rd1 FIXTURES TO BE SALVAGED AND STORED IN A SAFE LOCATION DURING CONSTRUCTION � q I GENERAL NOTES I CONTRACTOR SHALL PROVIDE PROTECTION OF MATERIALS DURING ALL PHASES OF CONSTRUCTION. CONTRACTOR SHALL BE RESPONSIBLE FOR IMMEDIATE CLEANING AND REMOVAL OF ALL DEBRIS UNTIL THE PREMISES ARE ACCEPTED IN A CLEAN AND HABITABLE CONDITION BY THE ARCHITECT / INTERIOR DESIGNER. CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THAT ALL WORK OF ALL TRADES SHALL COMPLY WITH THE FLORIDA BUILDING CODES. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS IN THE FIELD AND SHALL IMMEDIATELY NOTIFY THE ARCH. /DESIGNER OF ANY CONDITION THAT DIFFER OR INTERFERES WITH THOSE SHOWN ON THIS PLAN BEFORE PROCEEDING WITH WORK ALL DIMENSIONS SUPERSEDE SCALED DRAWINGS. THE GENERAL CONTRACTOR, HIS SUB- CONTRACTOR, OR ANY OTHER CONTRACTOR INVOLVED IN THIS PROJECT SHALL TAKE NOTE THAT ANY COST CAUSED BY DEFECTIVE WORK, AS A RESULT OF, BUT NOT LIMITED TO INFERIOR WORKMANSHIP OR MATERIALS, IMPROPER SCHEDULING OR DELINQUENT ORDERING SHALL BE BORNE BY PARTY RESPONSIBLE. ALL ITEMS DAMAGED WHILE IN DEMOLITION PHASE THAT ARE TO REMAIN SHALL BE RESTORED OR REPLACED TO BE ACCEPTABLE BY THE ARCHITECT / INTERIOR DESIGNER, AT THE CONTRACTORS EXPENSE. ANY OTHER ITEMS OR MATERIALS ENCOUNTERED DURING THE DEMOLITION PHASE SHALL BE REPORTED IMMEDIATELY TO THE ARCHITECT / INTERIOR DESIGNER FOR EVALUATION. DEMOLITION NOTES: 1. ALL DEMOLITION WORK SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE 2004 FLORIDA BUILDING CODE CHAPTER 33 AND COMPLY WITH ALL GOVERNING REGULATIONS. 2. GENERAL CONTRACTOR TO SURVEY THE CONDITION OF THE BUILDING TO DETERMINE WHETHER REMOVING ANY ELEMENT MIGHT RESULT IN STRUCTURAL DEFICIENCY OR UNPLANNED COLLAPSE OF ANY PORTION OF THE STRUCTURE OR ADJACENT STRUCTURES PRIOR DEMOLITION SCHEDULE. CONTRACTOR TO CONTACT ARCHITECT IMMEDIATELY PRIOR TO REMOVING ANY CONCRETE OR OTHER STRUCTURAL ITEM. 3. PRIOR TO COMMENCEMENT OF WORK, CONTRACTOR SHALL SUBMIT A MAINTENANCE OF PEDESTRIAN TRAFFIC (M.O.TJ PLANS FOR OWNER / LANDLORD APPROVAL. CONTRACTOR SHALL INDICATE ALL TEMPORARY WALLS REQUIRED, INTERMEDIATE SIGNAGsE, AND M.O.T. INFORMATION. 4. COORDINATE ALL DEMOLTION WORK WITH ALL OTHERS TO INSURE WORK WILL PROGRESS WITHOUT INTERUPTION AND DELAYS. COORDINATE AND SCHEDULE THE WORK WITH THE OWNER / LANDLORD WHERE POSSIBLE DISTURBANCE MAY OCCUR AND OTHER POTENTIAL DISRUPTIONS OF OWNERS FUNCTIONS AND SERVICES MAY OCCUR. ALL WORK AFFECTING OWNER'S FUNCTIONS AND ACTIVITIES, INCLUDING ACCOMPLISHING WORK TO BE COMPLETED BY PHASING WITH OWNER'S APPROVAL. 5. ALL AREAS OUTSIDE OF INDICATED "SCOPE OF WORK" SHALL REMAIN UNDISTURBED UNLESS OTHERWISE NOTED. b. CONTRACTOR SHALL BE RESPONSIBLE TO FIELD CHECK AND VERIFY ALL CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITION, AND NOTIFY THE OWNER AND ARCHITECT IF ANY DISCREPANCIES ARE FOUND. 1. THE CONTRACTOR IS TO PROTECT ALL EXISTING FINISHES AND SURFACES THROUGHOUT SPACE WHICH ARE NOT PART OF DEMOLITION, INCLUDING ALL EXISTING ELEVATORS, STAIRCASES, ENTRANCE LOBBIES, STORE FRONTS, AND SERVICE AREAS. THE CONTRACTOR WILL REPLACE OR REFINISH DAMAGED AREAS. PLACE PLYWOOD OR OTHER PROTECTIVE COATING OVER GRANITE 4 FABRIC PANELS AT FLOORS AND WALLS IF DESIGNATED TO REMAIN. S. DEMOLITION DRAWINGS AND NOTES ARE ONLY TO ASSIST IN SHOWING THE SCOPE OF DEMOLITION WORK AND 15 NOT INTENDED TO INDICATE ALL DEMOLITION. CONTRACTOR SHALL REMOVE ALL EXISTING ITEMS FOR A "BROOM CLEAN" SPACE. S. CONTRACTOR SHALL PROTEGE' ALL EXISTING FACILITIES AND SITE UTILITIES FROM DAMAGE. IO.CONTRACTOR IS TO REMOVE OR CAP MECHANICAL ITEMS WHICH ARE NOT TO BE REUSED INCLUDING WIRING, CONDUITS, PIPES, DUCTWORK ETC. 1100NTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING A TRASH/DEBRIS REMOVAL SERVICE FOR REMOVAL OF ALL DEBRIS FOR ALL TRADES AND WALL WORK RELATING TO THIS PROJECT. COORDINATE LOCATION OF DUMPSTER WITH OWNER 121UIRM IS TO BE REMOVED BACK TO PANEL. WORK TO BE DONE BY AN ELECTRICAL CONTRACTOR. CARE SHOULD BE TAKEN TO IDENTIFY ALL ELECTRICAL CONDUITS WHICH WILL REMAIN FOR BUILDING SYSTEMS AND TAGGED TO REMAIN. 13.PERIMETER GLAZING TO REMAIN SHALL HAVE PRECAUTIONS TAKEN TO PROTECT MATERIALS DURING CONSTRUCTION. CONTRACTOR WILL REPLACE ALL GLASS BROKEN DURING DEMOLITION. 14.ALL LIGHTING FIXTURES ARE TO BE REMOVED AND STORED FOR POSSIBLE REUSE ON THE PROJECT UNLESS OTHERWISE NOTED. 1511PON COMPLETION OF DEMOLITION WORK CONTRACTOR SHALL REMOVE TOOLS, EQUIPMENT, AND DEMOLISHED MATERIALS FROM SITE. REMOVE PROTECTIONS, DEBRIS, RUBBISH, AND OTHER MATERIALS RESULTING FROM DEMOLITION WORK FROM BUILDING SITE. TRANSPORT AND LEGALLY DISPOSE OF MATERIALS OFF -SITE. SCALE = 1/4" = 1' -0" Revisions n A 1 Je Exisnw-, To BE • • ` DEMOLISHED irGiriiriiri • •, TO REMOVED LL I GENERAL NOTES I CONTRACTOR SHALL PROVIDE PROTECTION OF MATERIALS DURING ALL PHASES OF CONSTRUCTION. CONTRACTOR SHALL BE RESPONSIBLE FOR IMMEDIATE CLEANING AND REMOVAL OF ALL DEBRIS UNTIL THE PREMISES ARE ACCEPTED IN A CLEAN AND HABITABLE CONDITION BY THE ARCHITECT / INTERIOR DESIGNER. CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THAT ALL WORK OF ALL TRADES SHALL COMPLY WITH THE FLORIDA BUILDING CODES. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS IN THE FIELD AND SHALL IMMEDIATELY NOTIFY THE ARCH. /DESIGNER OF ANY CONDITION THAT DIFFER OR INTERFERES WITH THOSE SHOWN ON THIS PLAN BEFORE PROCEEDING WITH WORK ALL DIMENSIONS SUPERSEDE SCALED DRAWINGS. THE GENERAL CONTRACTOR, HIS SUB- CONTRACTOR, OR ANY OTHER CONTRACTOR INVOLVED IN THIS PROJECT SHALL TAKE NOTE THAT ANY COST CAUSED BY DEFECTIVE WORK, AS A RESULT OF, BUT NOT LIMITED TO INFERIOR WORKMANSHIP OR MATERIALS, IMPROPER SCHEDULING OR DELINQUENT ORDERING SHALL BE BORNE BY PARTY RESPONSIBLE. ALL ITEMS DAMAGED WHILE IN DEMOLITION PHASE THAT ARE TO REMAIN SHALL BE RESTORED OR REPLACED TO BE ACCEPTABLE BY THE ARCHITECT / INTERIOR DESIGNER, AT THE CONTRACTORS EXPENSE. ANY OTHER ITEMS OR MATERIALS ENCOUNTERED DURING THE DEMOLITION PHASE SHALL BE REPORTED IMMEDIATELY TO THE ARCHITECT / INTERIOR DESIGNER FOR EVALUATION. DEMOLITION NOTES: 1. ALL DEMOLITION WORK SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE 2004 FLORIDA BUILDING CODE CHAPTER 33 AND COMPLY WITH ALL GOVERNING REGULATIONS. 2. GENERAL CONTRACTOR TO SURVEY THE CONDITION OF THE BUILDING TO DETERMINE WHETHER REMOVING ANY ELEMENT MIGHT RESULT IN STRUCTURAL DEFICIENCY OR UNPLANNED COLLAPSE OF ANY PORTION OF THE STRUCTURE OR ADJACENT STRUCTURES PRIOR DEMOLITION SCHEDULE. CONTRACTOR TO CONTACT ARCHITECT IMMEDIATELY PRIOR TO REMOVING ANY CONCRETE OR OTHER STRUCTURAL ITEM. 3. PRIOR TO COMMENCEMENT OF WORK, CONTRACTOR SHALL SUBMIT A MAINTENANCE OF PEDESTRIAN TRAFFIC (M.O.TJ PLANS FOR OWNER / LANDLORD APPROVAL. CONTRACTOR SHALL INDICATE ALL TEMPORARY WALLS REQUIRED, INTERMEDIATE SIGNAGsE, AND M.O.T. INFORMATION. 4. COORDINATE ALL DEMOLTION WORK WITH ALL OTHERS TO INSURE WORK WILL PROGRESS WITHOUT INTERUPTION AND DELAYS. COORDINATE AND SCHEDULE THE WORK WITH THE OWNER / LANDLORD WHERE POSSIBLE DISTURBANCE MAY OCCUR AND OTHER POTENTIAL DISRUPTIONS OF OWNERS FUNCTIONS AND SERVICES MAY OCCUR. ALL WORK AFFECTING OWNER'S FUNCTIONS AND ACTIVITIES, INCLUDING ACCOMPLISHING WORK TO BE COMPLETED BY PHASING WITH OWNER'S APPROVAL. 5. ALL AREAS OUTSIDE OF INDICATED "SCOPE OF WORK" SHALL REMAIN UNDISTURBED UNLESS OTHERWISE NOTED. b. CONTRACTOR SHALL BE RESPONSIBLE TO FIELD CHECK AND VERIFY ALL CONDITIONS PRIOR TO COMMENCEMENT OF DEMOLITION, AND NOTIFY THE OWNER AND ARCHITECT IF ANY DISCREPANCIES ARE FOUND. 1. THE CONTRACTOR IS TO PROTECT ALL EXISTING FINISHES AND SURFACES THROUGHOUT SPACE WHICH ARE NOT PART OF DEMOLITION, INCLUDING ALL EXISTING ELEVATORS, STAIRCASES, ENTRANCE LOBBIES, STORE FRONTS, AND SERVICE AREAS. THE CONTRACTOR WILL REPLACE OR REFINISH DAMAGED AREAS. PLACE PLYWOOD OR OTHER PROTECTIVE COATING OVER GRANITE 4 FABRIC PANELS AT FLOORS AND WALLS IF DESIGNATED TO REMAIN. S. DEMOLITION DRAWINGS AND NOTES ARE ONLY TO ASSIST IN SHOWING THE SCOPE OF DEMOLITION WORK AND 15 NOT INTENDED TO INDICATE ALL DEMOLITION. CONTRACTOR SHALL REMOVE ALL EXISTING ITEMS FOR A "BROOM CLEAN" SPACE. S. CONTRACTOR SHALL PROTEGE' ALL EXISTING FACILITIES AND SITE UTILITIES FROM DAMAGE. IO.CONTRACTOR IS TO REMOVE OR CAP MECHANICAL ITEMS WHICH ARE NOT TO BE REUSED INCLUDING WIRING, CONDUITS, PIPES, DUCTWORK ETC. 1100NTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING A TRASH/DEBRIS REMOVAL SERVICE FOR REMOVAL OF ALL DEBRIS FOR ALL TRADES AND WALL WORK RELATING TO THIS PROJECT. COORDINATE LOCATION OF DUMPSTER WITH OWNER 121UIRM IS TO BE REMOVED BACK TO PANEL. WORK TO BE DONE BY AN ELECTRICAL CONTRACTOR. CARE SHOULD BE TAKEN TO IDENTIFY ALL ELECTRICAL CONDUITS WHICH WILL REMAIN FOR BUILDING SYSTEMS AND TAGGED TO REMAIN. 13.PERIMETER GLAZING TO REMAIN SHALL HAVE PRECAUTIONS TAKEN TO PROTECT MATERIALS DURING CONSTRUCTION. CONTRACTOR WILL REPLACE ALL GLASS BROKEN DURING DEMOLITION. 14.ALL LIGHTING FIXTURES ARE TO BE REMOVED AND STORED FOR POSSIBLE REUSE ON THE PROJECT UNLESS OTHERWISE NOTED. 1511PON COMPLETION OF DEMOLITION WORK CONTRACTOR SHALL REMOVE TOOLS, EQUIPMENT, AND DEMOLISHED MATERIALS FROM SITE. REMOVE PROTECTIONS, DEBRIS, RUBBISH, AND OTHER MATERIALS RESULTING FROM DEMOLITION WORK FROM BUILDING SITE. TRANSPORT AND LEGALLY DISPOSE OF MATERIALS OFF -SITE. SCALE = 1/4" = 1' -0" Revisions n A 1 Je LL 4 � q • L CV F ® c0 o U U. c vlAt oW to W 0 c - cy cr- i • 7o • n e6 i ■ c e i 10 1 ) W • z CL c U m Job No. 10 -003 E >a Date 11/15/10 E m Scale HOWN Sea _• `' s AA- 26001560 m Sheet No. A � 2,1 Je 4 � q Z L CV F ® c0 o U U. c vlAt oW to W 0 c - cy e 1 ,Q CL e6 e ■ c e o W � e z LL r N V co 1 < 1 L 0 t j a r C E s t � V e i L � e f e U W W o 3 ` .J Q • z CL c U m Job No. 10 -003 E >a Date 11/15/10 E m Scale HOWN Sea _• `' s AA- 26001560 m Sheet No. A � 2,1