Loading...
09-1072-032A/C EQUIPMENT Flowelml @ ROOF MTD. EXH. FAN - DUCT TURN DOWN s TOTA L SENS. i# ••4 s TURNING VANE FLEXIBLE DUCT UNIT MANUFACTURER NEW SUPPLY HORIZONTAL FIRE DAMPER DnRN& STATIC PRESS. • , , • V_ FIRE DAMPER "+` REMARKS: REF. PIPING RS/RL __D 4- CU -3 410 17.9/112 NW..fa l LTl�iilii DISTRIBUTION AIR MODEL NUMBER _7111111111:44,TWIN.5-M r • NOTES: 1. REFER TO PLAN FOR QUANTITY, LOCATION AIR THROW PATTERN AND 14:11 vi M11101.011 101011MY11110•.. . . ii (� Flowelml @ ROOF MTD. EXH. FAN - DUCT TURN DOWN s TOTA L SENS. i# ••4 s TURNING VANE FLEXIBLE DUCT UNIT MANUFACTURER NEW SUPPLY HORIZONTAL FIRE DAMPER ME M.V.D. MANUAL VOLUME DAMPER V_ FIRE DAMPER "+` REMARKS: REF. PIPING RS/RL __D 4- VALVE ER SUPPLY DIFFUSER `_CWS --- CONDENSING WATER SUPPLY �-Ei9 RETURN AIR GRILLE �--- CWR- --� CONDENSING WATER RETURN --- 0 AIR FLOW DIRECTION - } POINT OF CONNECTION BETWEEN NEW & EXISTING WORK COMP./COND. larm-FIF , %mi 1 MODEL NUMBER M REMARKS SEER/NOTES STEPS OF ELEC. HEAT NO. MODEL : R- NOTES: 1. PROVIDE `• MOUNTED HORIZONTALLY MOUNTED CU -3 410 17.9/112 NW..fa l LTl�iilii DISTRIBUTION AIR MODEL NUMBER _7111111111:44,TWIN.5-M r • NOTES: 1. REFER TO PLAN FOR QUANTITY, LOCATION AIR THROW PATTERN AND 14:11 vi M11101.011 101011MY11110•.. . . ii (� THERMOSTAT @ ROOF MTD. EXH. FAN DUCT SMOKE DETECTOR DUCT TURN DOWN TRANSITION DUCT TURN UP TURNING VANE FLEXIBLE DUCT 45' BRANCH DUCT TAKE -OFF NEW SUPPLY HORIZONTAL FIRE DAMPER NEW RETURN M.V.D. MANUAL VOLUME DAMPER V_ FIRE DAMPER "+` RETURN REGISTER __D 4- VALVE ER SUPPLY DIFFUSER `_CWS --- CONDENSING WATER SUPPLY �-Ei9 RETURN AIR GRILLE �--- CWR- --� CONDENSING WATER RETURN --- 0 AIR FLOW DIRECTION - } POINT OF CONNECTION BETWEEN NEW & EXISTING WORK HVAC DESIGN REQUIRES: DUCT r DETECTOR FIRE DAMPER(S) AHU -2 (B AY-B) O/A CFM REQUIRED: 15 CFM 415 SQFT (CLASS ROOM) � 1000ESQFf) ` PERSON ) - 315 CFM 0/A CFM PROVIDED: 315 CFM AHU -3 BAY -B) 0/A CFM REQUIRED: 1190 SQFT (OFFICE) ( PERSONS 20 CFM \PERSON/ - 180 CFM 0/A CFM PROVIDED: 180 CFM AHU -4 (BAY -C) 0/A CFM REQUIRED: 1600 SQFT (OFFICE) ( 1 PERSONS 20 CFIVI ` PERSON 240 CFM 0/A CFM PROVIDED: 240 CFM AHU -5 (BAY -D) O/A CFM REQUIRED: 640 SQFT (MULTI - PURPOSE) (1000 E SQFT� `PERSON - 285 CFM 0/A CFM PROVIDED: 285 CFM AHU -6 (BAY -D) O/A CFM REQUIRED: 640 SQFT (MULTI - PURPOSE) (1000 ESQFf� ( PERSON ) - 285 CFM 0/A CFM PROVIDED: 285 CFM FAN SCHEDULE UNIT NUMBER I EF--1 EF-2 • r rev, DUTY SUPPLY/EXH DRIVE r FAN SPEED .• •� �r AIR QUAN11TY TOTAL STATIC PRESS.- •Ifiii� OPENING REQUIRED FAN MOTOR ELECTRICAL CHAR. V/0/60 r ar r .r MANUFACTURER . MODEL • •: :r I aq TIN rr WEIGHT LBS.� V, on 1. FANS EF-1 SHALL BE CONNECTED TO ROOM FIXTURE 2. FANS EF-2 SHALL BE r r TO ROOM LIGHT FIXTURE INTAKE /RELIEF VENT SCHEDULE MARK MANUFACTURER MODEL # THROAT AREA IV -1 GREENHECK GRSI -10 10 *0 RV -1 GREENHECK GRSR -8 8.0 1. PROVIDE PREMANUFACTURED ROOF CURBS TO EACH AIR INTAKE /REIJEF VENT 2. PROVIDE AIR INTAKE /RELIEF VENT WITH ALUMINUM HOUSING do GALVANIZED BIRDSCREEN 1111 _ A y 1.0 QENE • r AND INSTALL NECESSARY IERLAI AND LABOR FOR A COM4&Y OPERATIONAL AIR CONDITIONING, AND VENTILATING SHOWN ON DRAWINGS a- a ar ACCORDANCE 1.2 INSTALL IN •- r BUILDING •i AND LOCAL ORDINANCES. SCOPE OF •. PROVIDE r ! WING COMPLETE SYSTEMS A. SUPPLY AND RETURN DUCT SYSTEM. B. EXHAUST SYSTEM FOR TOILET ROOMS. C. AIR CONDITIONING UNITS WITH REFRIGERANT AND CONTROLS FOR OFFICES. D. INDEPENDENT TEST AND 1,4 CONTRACTOR MUST BE FAMILIAR WITH THIS TYPE OF INSTALLATION AND THOROUGHLY UNDERSTAND ALL THE REQUIREMENTS FOR THE INSTALLATION OF EACH PIECE OF EQUIPMENT HEREIN SHOWN. ITS PROPER OPERATION REQUIREMENTS AND TESTING PROCEDURES FOR CITY APPROVALS. 1.5 PAY FOR ALL FEES, INSPECTIONS AND CONNECTION CHARGES REQUIRED 1.6 VERIFY AT JOB SITE ALL SPACE CONDITIONS, DIMENSIONS AND EQUIPMENT SIZES PRIOR TO DUCT FABRICATION OR INSTALLATION, COORDINATE REQUIREMENTS TO AVOID INTERFERENCE WITH OTHER TRADES. 1.7 NATURE OF DESIGN DRAWINGS: DESIGN DRAWINGS ARE DIAGRAMMATIC AND DO NOT INTEND TO SHOW EVERY FITTING, ELBOW. TRANSITION, ETC. THAT WILL BE NECESSARY FOR A COMPLETE OPERATIONAL SYSTEM AS REQUIRED BY THESE SPECIFICATIONS. 1,8 COORDINATION DRAWINGS: PREPARE 1/4 , SCALE COORDINATION DRAWINGS SHOWING MAJOR SYSTEM COMPONENTS FOR A/E APPROVAL. 1.9 SUBMIT SHOP DRAWINGS FOR ARCHITECT1 ENGINEER APPROVAL BEFORE PROCEEDING WITH THE PPURCHASE OR INSTALLATION OF EQUIPMENT AND MATERIALS. SUBMIT AL AT ONCE IN A BINDER WITH AN INDEX AND DIVIDERS AS REQUIRED TO SEPARATE ALL DIFFERENT MATERIALS AND EQUIPMENT. 1.10 GUARANTEE ALL WORK FREE OF DEFECTS IN MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM DATE OF ACCEPTANCE. 2.0 MA1:E131A1a 2.1 DUCTWORK: ALL JOINTS SEALED WITH HIGH PRESSURE MASTIC. 2.1.1 GENERAL. ALL DUCT SIZES SHOWN ARE CLEAR INSIDE DIMENSIONS. 2.1.2 DUCTWORK MATERIALS: A: TOILETS ROOM EXHAUST AND FRESH AIR INTAKES: GALVANIZED SHEET METAL. CONSTRUCTED, AND INSTALLED ACCORDING TO LATEST EDITION OF SMACNA'S. LOW PRESSURE CONSTRUCTION STD. 0.5" W.G. SEAL ALL JOINTS WITH APPROVED FIRE RATED MASTIC. B: SUPPLY AND RETURN AIR GALVANIZED SHEET METAL. CONSTRUCTED, AND INSTALLED ACCORDING TO LATEST EDITION OF SMACNA'S. LOW VELOCITY CONSTRUCTION STD. FOR 2" STATIC PRESSURE. INSULATE WITH 1 -1/2" THICK FIBERGLASS BLANKET INSULATION WITH APPROVED FIRE & SMOKE REINFORCED ALUMINUM JACKET. C: ROUND INSULATED FLEXIBLE DUCT PROVIDE AS SHOWN ON PLANS, WIREMOL.D WCK W 1-1/2* INSULATION do REINFORCED ALUM. VAPOR (Y9 APPROVED EQUAL MAXIMUM LENGTH PERMITTED PER RUNOUT = 5' -0" 2.1.3 DUCT INSULATION: A LL A/C SUPPLY d RETURN) /LB D LDVPR ER BLANKET WITH REINFORCED ALUMINUM DENSITY GLASS ER, SEAL ALL JOINTS WITH APPROVED FIRE RATED MASTIC. 2.1.4 ACOUSTICAL LINING: (ALL A/C SUPPLY do RETURN) LINE FIRST 10 FT FROM UNIT WITH 1" THICK GLASS FIBER MATT FACED. PAINT WITH ANTIBACTERIAL COATING. ATTACH TO DUCT WITH APPROVED SMACNA PROCEDURE. 2.1.5 DUCTWORK ACCESSORIES: A. PROVIDE DOUBLE THICKNESS TURNING VANES AT ALL SQUARE ELBOWS. WHERE THE ELBOWS ARE RECTANGULAR INSTALL SINGLE THICKNESS INSTEAD. .1 ALTERNATE A. PROVIDE 3 -PIECE ELBOWS IN LIEU OF TURNING VANES FOR GLASS FIBER DUCTS ONLY. .2 ALTERNATE A: PROVIDE FULL RADIUS ELBOWS IN LIEU OF TURNING VANES. B. PROVIDE VOLUME EXTRACTORS BEHIND EACH SUPPLY OUTLET AND AT EACH DUCT BRANCH. 2.2 AIR DISTRIBUTION PRODUCTS : 2.2.1 PROVIDE SUPPLY AND RETURN GRILLES AND DIFFUSERS AS INDICATED ON THE DRAWINGS. 2.2.2 PROVIDE EXTRUDED ALL ALUMINUM AIR DISTRIBUTION PRODUCTS. 2,2.3 PROVIDE FINISHES AND TYPES OF MOUNT IN COORDINATION WITH THE CEILING TYPES AS SHOWN ON ARCHITECTURAL DRAWINGS. 2.2.4 PROVIDE OPPOSED BLADE, KEY OPERATED DAMPERS BEHIND ALL AIR SUPPLY OUTLETS. 2.3 PIPING: REFRIGERANT l..a. mij r WROUGHT HARD OR SOFr DRAWN ON ACR COPPER TUBING WITH • . a- BRAZED JOINT a- CONTAINING BRAZING ! LESS THAN 49X SILVER. NOT USED 2.5 INSULATION: 2.5.1 INSULATE ALL REFRIGERANT ! • Ei CELL POLYETHYLENE PRE MOLDED INSULATION, APPROVED , SMOKE JACKET. PAINT ALL EXPOSED INSULATION WITH TWO COATS OF E► NOT ar NOT Ei 2.6 ALL AIR CONDITIONING COMPRESSORS WARRANTED FOR A MINIMUM OF a OF OF PROJECT. CONTROLS: 2.7.1 GENERAL PROVIDE THE NECESSARY AUTOMATIC CON OLS •-r•a• OPERATION OF ALL EQUIPMENT SPECIFIED HEREIN. FURNISH MAGNETIC a AND INTERLOCK INDICATED FOR EACH « OF • a 2.7.2 PUBLIC AREA DX • PROVIDE AIR CONDITIONING PROGRAMMABLE LOW VOLTAGE #• • ON-O ON-OFF AUTO SUB-BASE SWITCH, FURNISHED 13Y THE EQUIPMENT MANUFACTURER WITH HEAT-COOL STEPS AS REQUIRED. CONTROL PROVIDE (FURNISH & INSTALL) POWER SUPPLY WRING SOURCE TO POWER O t INCLUDE DISCONNECTS i REQUIRED ELECTRICAL DEVICES, INTERLOCK RACEWAY. CONDUITS, PULL WIRES AND EXPOSED CONDUITS FOR 'TEMPERATURE • -• SYSTEM. IN CONDUITS, NO EXCEPTION • CONTROL PROVIDE (FURNM & INSTALL) POWER SUPPLY WRING SOURCE TO POWER CONNECTION, INCLUDE STARTERS, DISCONNECTS D REQUIRED ELECTRICAL DEVICES, • • r EXPOSED CONDUITS FOR TEMPERATURE CONTROL IN CONDUITS, NO EXCEPTION - STARTERS. PROVIDE r a• FOR ALL MECHANICAL EQUIPMENT IN THIS SECTION, OF DESCRIBED • SCHEDULES WITH HAND-OFF-AUTO BUTTON POSITIONS ON THE COVER AND RED-GREEN PILOT LIGHTS. PROVIDE • -a r CLOSED CONTACTS INTENDED FOR THE #•- .« IDENTIFICATION: LABEL • • a ENGRAVED BLACK PLASTIC PLAQUES r LETTERS. 3.0 EXECUTION 3.1 INSTALL ALL EQUIPMENT AND MATERIALS IN STRICT ACCORDANCE WITH THE MANUFACTURER'S MANUALS AND RECOMMENDATIONS. a • •D. PAYING •- INSTALLATION. OPERATION AND SERVICE. S THERMOSTAT s • • THERMOSTAT ! TO PROPER EQUIPMENT OPERATION. INSTALL THERMOSTAT AT LOCATIONS • ON RELOCATE ONLY •• • BY THE A/E IN WRITING. 3.4 WHERE R/A IS PROPOSED BY WAY OF DOOR UNDS?CUTS, PROVIDE A MINIMUM CLEAR SPACE BETWEEN BOTTOM OF #••• AND THE FLOOR •. TILE. 3.5 EQUIPMENT MUST OPERATE FREE OF OBJECTIONABLE NOISE AND VIBRATION REPAIR AND/OR REPLACE ALL SOURCES OF NOISE AND VIBRATION FOUND TO BE OBJECTIONABLE, TO THE SATISFACTION OF THE A /E. 3.6 BALANCE ALL SYSTEMS 1 PROVIDE AIR QUANTITIES AND CAPACITIES TO MATCH SPECIFIED FLOWS NOTIFY OF DEFICIENCIES • ai DURING TESTING FLOWS CALIBRATE • NEW EQUIPMENT PER MANUFACTURER'S . a a ALLOW BEFORE COMPLETING TEST & BALANCE PROCEDURES. aSSA FOR IMPLEMENTING PROPOSED SOLUTIONS BEFORE • AT END OF TEST AND BALANCE ISSUE A COMPLETE REPORT FOR A/E APPROVAL AND ALLOW TIME AND PROVIDE S INSTRUMENTS FOR SPOT SUBMIT FINAL TEST AND BALANCE REPORT TO FOR a- AIR QUANTITIES SHOWN ARE TO BE ADJUSTED AS REQUIRED TO MEET SPECIFIC JOB CONDITIONS. 3.9 STRICTLY FOLLOW ALL MANUFACTURERS • • INSTRUCTIONS l OF • OBTAIN. -! M EACH MANUFACTURER, PROPER CERTIFICATION FOR THE ADEQUACY OF • OF OF + BEFORE OPERATION. 3.10 PROVIDE MAINTENANCE AND OPERA11ON MANUAL PROVIDE AS-BUILT REPRODUCIBLE DRAWINGS. PROVIDE INSTRUC7• TO OWNER'S DESIGNATED PERSONNEL _ A w " m tQMIN 0 RAW W ON =_� N �<- ti a wz � <Q Tb V cn � NyW V'-! V . A PN =Z v •�•,+ O Nvw�W °g.p� a =a s , , i rt tn .. • 0 C4 Le • • • ' ' 0 r In ., to i .a r .- . 9 lit �� � • t CONTRACTOR SHALL VERFY ALL PROCEEDING VATH ANY WOWL . .�, , .. UNLESS APPROVED BY ARCHITECT. CLIENT APPROVAL DATE PREPARED APPROVED BY: DAIE ISSUED DATE ..., NUMBER TRP PROJECT FILE NAME FAN SCHEDULE UNIT NUMBER I EF--1 EF-2 • r rev, DUTY SUPPLY/EXH DRIVE r FAN SPEED .• •� �r AIR QUAN11TY TOTAL STATIC PRESS.- •Ifiii� OPENING REQUIRED FAN MOTOR ELECTRICAL CHAR. V/0/60 r ar r .r MANUFACTURER . MODEL • •: :r I aq TIN rr WEIGHT LBS.� V, on 1. FANS EF-1 SHALL BE CONNECTED TO ROOM FIXTURE 2. FANS EF-2 SHALL BE r r TO ROOM LIGHT FIXTURE INTAKE /RELIEF VENT SCHEDULE MARK MANUFACTURER MODEL # THROAT AREA IV -1 GREENHECK GRSI -10 10 *0 RV -1 GREENHECK GRSR -8 8.0 1. PROVIDE PREMANUFACTURED ROOF CURBS TO EACH AIR INTAKE /REIJEF VENT 2. PROVIDE AIR INTAKE /RELIEF VENT WITH ALUMINUM HOUSING do GALVANIZED BIRDSCREEN 1111 _ A y 1.0 QENE • r AND INSTALL NECESSARY IERLAI AND LABOR FOR A COM4&Y OPERATIONAL AIR CONDITIONING, AND VENTILATING SHOWN ON DRAWINGS a- a ar ACCORDANCE 1.2 INSTALL IN •- r BUILDING •i AND LOCAL ORDINANCES. SCOPE OF •. PROVIDE r ! WING COMPLETE SYSTEMS A. SUPPLY AND RETURN DUCT SYSTEM. B. EXHAUST SYSTEM FOR TOILET ROOMS. C. AIR CONDITIONING UNITS WITH REFRIGERANT AND CONTROLS FOR OFFICES. D. INDEPENDENT TEST AND 1,4 CONTRACTOR MUST BE FAMILIAR WITH THIS TYPE OF INSTALLATION AND THOROUGHLY UNDERSTAND ALL THE REQUIREMENTS FOR THE INSTALLATION OF EACH PIECE OF EQUIPMENT HEREIN SHOWN. ITS PROPER OPERATION REQUIREMENTS AND TESTING PROCEDURES FOR CITY APPROVALS. 1.5 PAY FOR ALL FEES, INSPECTIONS AND CONNECTION CHARGES REQUIRED 1.6 VERIFY AT JOB SITE ALL SPACE CONDITIONS, DIMENSIONS AND EQUIPMENT SIZES PRIOR TO DUCT FABRICATION OR INSTALLATION, COORDINATE REQUIREMENTS TO AVOID INTERFERENCE WITH OTHER TRADES. 1.7 NATURE OF DESIGN DRAWINGS: DESIGN DRAWINGS ARE DIAGRAMMATIC AND DO NOT INTEND TO SHOW EVERY FITTING, ELBOW. TRANSITION, ETC. THAT WILL BE NECESSARY FOR A COMPLETE OPERATIONAL SYSTEM AS REQUIRED BY THESE SPECIFICATIONS. 1,8 COORDINATION DRAWINGS: PREPARE 1/4 , SCALE COORDINATION DRAWINGS SHOWING MAJOR SYSTEM COMPONENTS FOR A/E APPROVAL. 1.9 SUBMIT SHOP DRAWINGS FOR ARCHITECT1 ENGINEER APPROVAL BEFORE PROCEEDING WITH THE PPURCHASE OR INSTALLATION OF EQUIPMENT AND MATERIALS. SUBMIT AL AT ONCE IN A BINDER WITH AN INDEX AND DIVIDERS AS REQUIRED TO SEPARATE ALL DIFFERENT MATERIALS AND EQUIPMENT. 1.10 GUARANTEE ALL WORK FREE OF DEFECTS IN MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM DATE OF ACCEPTANCE. 2.0 MA1:E131A1a 2.1 DUCTWORK: ALL JOINTS SEALED WITH HIGH PRESSURE MASTIC. 2.1.1 GENERAL. ALL DUCT SIZES SHOWN ARE CLEAR INSIDE DIMENSIONS. 2.1.2 DUCTWORK MATERIALS: A: TOILETS ROOM EXHAUST AND FRESH AIR INTAKES: GALVANIZED SHEET METAL. CONSTRUCTED, AND INSTALLED ACCORDING TO LATEST EDITION OF SMACNA'S. LOW PRESSURE CONSTRUCTION STD. 0.5" W.G. SEAL ALL JOINTS WITH APPROVED FIRE RATED MASTIC. B: SUPPLY AND RETURN AIR GALVANIZED SHEET METAL. CONSTRUCTED, AND INSTALLED ACCORDING TO LATEST EDITION OF SMACNA'S. LOW VELOCITY CONSTRUCTION STD. FOR 2" STATIC PRESSURE. INSULATE WITH 1 -1/2" THICK FIBERGLASS BLANKET INSULATION WITH APPROVED FIRE & SMOKE REINFORCED ALUMINUM JACKET. C: ROUND INSULATED FLEXIBLE DUCT PROVIDE AS SHOWN ON PLANS, WIREMOL.D WCK W 1-1/2* INSULATION do REINFORCED ALUM. VAPOR (Y9 APPROVED EQUAL MAXIMUM LENGTH PERMITTED PER RUNOUT = 5' -0" 2.1.3 DUCT INSULATION: A LL A/C SUPPLY d RETURN) /LB D LDVPR ER BLANKET WITH REINFORCED ALUMINUM DENSITY GLASS ER, SEAL ALL JOINTS WITH APPROVED FIRE RATED MASTIC. 2.1.4 ACOUSTICAL LINING: (ALL A/C SUPPLY do RETURN) LINE FIRST 10 FT FROM UNIT WITH 1" THICK GLASS FIBER MATT FACED. PAINT WITH ANTIBACTERIAL COATING. ATTACH TO DUCT WITH APPROVED SMACNA PROCEDURE. 2.1.5 DUCTWORK ACCESSORIES: A. PROVIDE DOUBLE THICKNESS TURNING VANES AT ALL SQUARE ELBOWS. WHERE THE ELBOWS ARE RECTANGULAR INSTALL SINGLE THICKNESS INSTEAD. .1 ALTERNATE A. PROVIDE 3 -PIECE ELBOWS IN LIEU OF TURNING VANES FOR GLASS FIBER DUCTS ONLY. .2 ALTERNATE A: PROVIDE FULL RADIUS ELBOWS IN LIEU OF TURNING VANES. B. PROVIDE VOLUME EXTRACTORS BEHIND EACH SUPPLY OUTLET AND AT EACH DUCT BRANCH. 2.2 AIR DISTRIBUTION PRODUCTS : 2.2.1 PROVIDE SUPPLY AND RETURN GRILLES AND DIFFUSERS AS INDICATED ON THE DRAWINGS. 2.2.2 PROVIDE EXTRUDED ALL ALUMINUM AIR DISTRIBUTION PRODUCTS. 2,2.3 PROVIDE FINISHES AND TYPES OF MOUNT IN COORDINATION WITH THE CEILING TYPES AS SHOWN ON ARCHITECTURAL DRAWINGS. 2.2.4 PROVIDE OPPOSED BLADE, KEY OPERATED DAMPERS BEHIND ALL AIR SUPPLY OUTLETS. 2.3 PIPING: REFRIGERANT l..a. mij r WROUGHT HARD OR SOFr DRAWN ON ACR COPPER TUBING WITH • . a- BRAZED JOINT a- CONTAINING BRAZING ! LESS THAN 49X SILVER. NOT USED 2.5 INSULATION: 2.5.1 INSULATE ALL REFRIGERANT ! • Ei CELL POLYETHYLENE PRE MOLDED INSULATION, APPROVED , SMOKE JACKET. PAINT ALL EXPOSED INSULATION WITH TWO COATS OF E► NOT ar NOT Ei 2.6 ALL AIR CONDITIONING COMPRESSORS WARRANTED FOR A MINIMUM OF a OF OF PROJECT. CONTROLS: 2.7.1 GENERAL PROVIDE THE NECESSARY AUTOMATIC CON OLS •-r•a• OPERATION OF ALL EQUIPMENT SPECIFIED HEREIN. FURNISH MAGNETIC a AND INTERLOCK INDICATED FOR EACH « OF • a 2.7.2 PUBLIC AREA DX • PROVIDE AIR CONDITIONING PROGRAMMABLE LOW VOLTAGE #• • ON-O ON-OFF AUTO SUB-BASE SWITCH, FURNISHED 13Y THE EQUIPMENT MANUFACTURER WITH HEAT-COOL STEPS AS REQUIRED. CONTROL PROVIDE (FURNISH & INSTALL) POWER SUPPLY WRING SOURCE TO POWER O t INCLUDE DISCONNECTS i REQUIRED ELECTRICAL DEVICES, INTERLOCK RACEWAY. CONDUITS, PULL WIRES AND EXPOSED CONDUITS FOR 'TEMPERATURE • -• SYSTEM. IN CONDUITS, NO EXCEPTION • CONTROL PROVIDE (FURNM & INSTALL) POWER SUPPLY WRING SOURCE TO POWER CONNECTION, INCLUDE STARTERS, DISCONNECTS D REQUIRED ELECTRICAL DEVICES, • • r EXPOSED CONDUITS FOR TEMPERATURE CONTROL IN CONDUITS, NO EXCEPTION - STARTERS. PROVIDE r a• FOR ALL MECHANICAL EQUIPMENT IN THIS SECTION, OF DESCRIBED • SCHEDULES WITH HAND-OFF-AUTO BUTTON POSITIONS ON THE COVER AND RED-GREEN PILOT LIGHTS. PROVIDE • -a r CLOSED CONTACTS INTENDED FOR THE #•- .« IDENTIFICATION: LABEL • • a ENGRAVED BLACK PLASTIC PLAQUES r LETTERS. 3.0 EXECUTION 3.1 INSTALL ALL EQUIPMENT AND MATERIALS IN STRICT ACCORDANCE WITH THE MANUFACTURER'S MANUALS AND RECOMMENDATIONS. a • •D. PAYING •- INSTALLATION. OPERATION AND SERVICE. S THERMOSTAT s • • THERMOSTAT ! TO PROPER EQUIPMENT OPERATION. INSTALL THERMOSTAT AT LOCATIONS • ON RELOCATE ONLY •• • BY THE A/E IN WRITING. 3.4 WHERE R/A IS PROPOSED BY WAY OF DOOR UNDS?CUTS, PROVIDE A MINIMUM CLEAR SPACE BETWEEN BOTTOM OF #••• AND THE FLOOR •. TILE. 3.5 EQUIPMENT MUST OPERATE FREE OF OBJECTIONABLE NOISE AND VIBRATION REPAIR AND/OR REPLACE ALL SOURCES OF NOISE AND VIBRATION FOUND TO BE OBJECTIONABLE, TO THE SATISFACTION OF THE A /E. 3.6 BALANCE ALL SYSTEMS 1 PROVIDE AIR QUANTITIES AND CAPACITIES TO MATCH SPECIFIED FLOWS NOTIFY OF DEFICIENCIES • ai DURING TESTING FLOWS CALIBRATE • NEW EQUIPMENT PER MANUFACTURER'S . a a ALLOW BEFORE COMPLETING TEST & BALANCE PROCEDURES. aSSA FOR IMPLEMENTING PROPOSED SOLUTIONS BEFORE • AT END OF TEST AND BALANCE ISSUE A COMPLETE REPORT FOR A/E APPROVAL AND ALLOW TIME AND PROVIDE S INSTRUMENTS FOR SPOT SUBMIT FINAL TEST AND BALANCE REPORT TO FOR a- AIR QUANTITIES SHOWN ARE TO BE ADJUSTED AS REQUIRED TO MEET SPECIFIC JOB CONDITIONS. 3.9 STRICTLY FOLLOW ALL MANUFACTURERS • • INSTRUCTIONS l OF • OBTAIN. -! M EACH MANUFACTURER, PROPER CERTIFICATION FOR THE ADEQUACY OF • OF OF + BEFORE OPERATION. 3.10 PROVIDE MAINTENANCE AND OPERA11ON MANUAL PROVIDE AS-BUILT REPRODUCIBLE DRAWINGS. PROVIDE INSTRUC7• TO OWNER'S DESIGNATED PERSONNEL _ A w " m tQMIN 0 RAW W ON =_� N �<- ti a wz � <Q Tb V cn � NyW V'-! V . A PN =Z v •�•,+ O Nvw�W °g.p� a =a s , , i rt tn .. • 0 C4 Le • • • ' ' 0 r In ., to i .a r .- . 9 lit �� � • t CONTRACTOR SHALL VERFY ALL PROCEEDING VATH ANY WOWL . .�, , .. UNLESS APPROVED BY ARCHITECT. CLIENT APPROVAL DATE PREPARED APPROVED BY: DAIE ISSUED DATE ..., NUMBER TRP PROJECT FILE NAME V, on 1. FANS EF-1 SHALL BE CONNECTED TO ROOM FIXTURE 2. FANS EF-2 SHALL BE r r TO ROOM LIGHT FIXTURE INTAKE /RELIEF VENT SCHEDULE MARK MANUFACTURER MODEL # THROAT AREA IV -1 GREENHECK GRSI -10 10 *0 RV -1 GREENHECK GRSR -8 8.0 1. PROVIDE PREMANUFACTURED ROOF CURBS TO EACH AIR INTAKE /REIJEF VENT 2. PROVIDE AIR INTAKE /RELIEF VENT WITH ALUMINUM HOUSING do GALVANIZED BIRDSCREEN 1111 _ A y 1.0 QENE • r AND INSTALL NECESSARY IERLAI AND LABOR FOR A COM4&Y OPERATIONAL AIR CONDITIONING, AND VENTILATING SHOWN ON DRAWINGS a- a ar ACCORDANCE 1.2 INSTALL IN •- r BUILDING •i AND LOCAL ORDINANCES. SCOPE OF •. PROVIDE r ! WING COMPLETE SYSTEMS A. SUPPLY AND RETURN DUCT SYSTEM. B. EXHAUST SYSTEM FOR TOILET ROOMS. C. AIR CONDITIONING UNITS WITH REFRIGERANT AND CONTROLS FOR OFFICES. D. INDEPENDENT TEST AND 1,4 CONTRACTOR MUST BE FAMILIAR WITH THIS TYPE OF INSTALLATION AND THOROUGHLY UNDERSTAND ALL THE REQUIREMENTS FOR THE INSTALLATION OF EACH PIECE OF EQUIPMENT HEREIN SHOWN. ITS PROPER OPERATION REQUIREMENTS AND TESTING PROCEDURES FOR CITY APPROVALS. 1.5 PAY FOR ALL FEES, INSPECTIONS AND CONNECTION CHARGES REQUIRED 1.6 VERIFY AT JOB SITE ALL SPACE CONDITIONS, DIMENSIONS AND EQUIPMENT SIZES PRIOR TO DUCT FABRICATION OR INSTALLATION, COORDINATE REQUIREMENTS TO AVOID INTERFERENCE WITH OTHER TRADES. 1.7 NATURE OF DESIGN DRAWINGS: DESIGN DRAWINGS ARE DIAGRAMMATIC AND DO NOT INTEND TO SHOW EVERY FITTING, ELBOW. TRANSITION, ETC. THAT WILL BE NECESSARY FOR A COMPLETE OPERATIONAL SYSTEM AS REQUIRED BY THESE SPECIFICATIONS. 1,8 COORDINATION DRAWINGS: PREPARE 1/4 , SCALE COORDINATION DRAWINGS SHOWING MAJOR SYSTEM COMPONENTS FOR A/E APPROVAL. 1.9 SUBMIT SHOP DRAWINGS FOR ARCHITECT1 ENGINEER APPROVAL BEFORE PROCEEDING WITH THE PPURCHASE OR INSTALLATION OF EQUIPMENT AND MATERIALS. SUBMIT AL AT ONCE IN A BINDER WITH AN INDEX AND DIVIDERS AS REQUIRED TO SEPARATE ALL DIFFERENT MATERIALS AND EQUIPMENT. 1.10 GUARANTEE ALL WORK FREE OF DEFECTS IN MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM DATE OF ACCEPTANCE. 2.0 MA1:E131A1a 2.1 DUCTWORK: ALL JOINTS SEALED WITH HIGH PRESSURE MASTIC. 2.1.1 GENERAL. ALL DUCT SIZES SHOWN ARE CLEAR INSIDE DIMENSIONS. 2.1.2 DUCTWORK MATERIALS: A: TOILETS ROOM EXHAUST AND FRESH AIR INTAKES: GALVANIZED SHEET METAL. CONSTRUCTED, AND INSTALLED ACCORDING TO LATEST EDITION OF SMACNA'S. LOW PRESSURE CONSTRUCTION STD. 0.5" W.G. SEAL ALL JOINTS WITH APPROVED FIRE RATED MASTIC. B: SUPPLY AND RETURN AIR GALVANIZED SHEET METAL. CONSTRUCTED, AND INSTALLED ACCORDING TO LATEST EDITION OF SMACNA'S. LOW VELOCITY CONSTRUCTION STD. FOR 2" STATIC PRESSURE. INSULATE WITH 1 -1/2" THICK FIBERGLASS BLANKET INSULATION WITH APPROVED FIRE & SMOKE REINFORCED ALUMINUM JACKET. C: ROUND INSULATED FLEXIBLE DUCT PROVIDE AS SHOWN ON PLANS, WIREMOL.D WCK W 1-1/2* INSULATION do REINFORCED ALUM. VAPOR (Y9 APPROVED EQUAL MAXIMUM LENGTH PERMITTED PER RUNOUT = 5' -0" 2.1.3 DUCT INSULATION: A LL A/C SUPPLY d RETURN) /LB D LDVPR ER BLANKET WITH REINFORCED ALUMINUM DENSITY GLASS ER, SEAL ALL JOINTS WITH APPROVED FIRE RATED MASTIC. 2.1.4 ACOUSTICAL LINING: (ALL A/C SUPPLY do RETURN) LINE FIRST 10 FT FROM UNIT WITH 1" THICK GLASS FIBER MATT FACED. PAINT WITH ANTIBACTERIAL COATING. ATTACH TO DUCT WITH APPROVED SMACNA PROCEDURE. 2.1.5 DUCTWORK ACCESSORIES: A. PROVIDE DOUBLE THICKNESS TURNING VANES AT ALL SQUARE ELBOWS. WHERE THE ELBOWS ARE RECTANGULAR INSTALL SINGLE THICKNESS INSTEAD. .1 ALTERNATE A. PROVIDE 3 -PIECE ELBOWS IN LIEU OF TURNING VANES FOR GLASS FIBER DUCTS ONLY. .2 ALTERNATE A: PROVIDE FULL RADIUS ELBOWS IN LIEU OF TURNING VANES. B. PROVIDE VOLUME EXTRACTORS BEHIND EACH SUPPLY OUTLET AND AT EACH DUCT BRANCH. 2.2 AIR DISTRIBUTION PRODUCTS : 2.2.1 PROVIDE SUPPLY AND RETURN GRILLES AND DIFFUSERS AS INDICATED ON THE DRAWINGS. 2.2.2 PROVIDE EXTRUDED ALL ALUMINUM AIR DISTRIBUTION PRODUCTS. 2,2.3 PROVIDE FINISHES AND TYPES OF MOUNT IN COORDINATION WITH THE CEILING TYPES AS SHOWN ON ARCHITECTURAL DRAWINGS. 2.2.4 PROVIDE OPPOSED BLADE, KEY OPERATED DAMPERS BEHIND ALL AIR SUPPLY OUTLETS. 2.3 PIPING: REFRIGERANT l..a. mij r WROUGHT HARD OR SOFr DRAWN ON ACR COPPER TUBING WITH • . a- BRAZED JOINT a- CONTAINING BRAZING ! LESS THAN 49X SILVER. NOT USED 2.5 INSULATION: 2.5.1 INSULATE ALL REFRIGERANT ! • Ei CELL POLYETHYLENE PRE MOLDED INSULATION, APPROVED , SMOKE JACKET. PAINT ALL EXPOSED INSULATION WITH TWO COATS OF E► NOT ar NOT Ei 2.6 ALL AIR CONDITIONING COMPRESSORS WARRANTED FOR A MINIMUM OF a OF OF PROJECT. CONTROLS: 2.7.1 GENERAL PROVIDE THE NECESSARY AUTOMATIC CON OLS •-r•a• OPERATION OF ALL EQUIPMENT SPECIFIED HEREIN. FURNISH MAGNETIC a AND INTERLOCK INDICATED FOR EACH « OF • a 2.7.2 PUBLIC AREA DX • PROVIDE AIR CONDITIONING PROGRAMMABLE LOW VOLTAGE #• • ON-O ON-OFF AUTO SUB-BASE SWITCH, FURNISHED 13Y THE EQUIPMENT MANUFACTURER WITH HEAT-COOL STEPS AS REQUIRED. CONTROL PROVIDE (FURNISH & INSTALL) POWER SUPPLY WRING SOURCE TO POWER O t INCLUDE DISCONNECTS i REQUIRED ELECTRICAL DEVICES, INTERLOCK RACEWAY. CONDUITS, PULL WIRES AND EXPOSED CONDUITS FOR 'TEMPERATURE • -• SYSTEM. IN CONDUITS, NO EXCEPTION • CONTROL PROVIDE (FURNM & INSTALL) POWER SUPPLY WRING SOURCE TO POWER CONNECTION, INCLUDE STARTERS, DISCONNECTS D REQUIRED ELECTRICAL DEVICES, • • r EXPOSED CONDUITS FOR TEMPERATURE CONTROL IN CONDUITS, NO EXCEPTION - STARTERS. PROVIDE r a• FOR ALL MECHANICAL EQUIPMENT IN THIS SECTION, OF DESCRIBED • SCHEDULES WITH HAND-OFF-AUTO BUTTON POSITIONS ON THE COVER AND RED-GREEN PILOT LIGHTS. PROVIDE • -a r CLOSED CONTACTS INTENDED FOR THE #•- .« IDENTIFICATION: LABEL • • a ENGRAVED BLACK PLASTIC PLAQUES r LETTERS. 3.0 EXECUTION 3.1 INSTALL ALL EQUIPMENT AND MATERIALS IN STRICT ACCORDANCE WITH THE MANUFACTURER'S MANUALS AND RECOMMENDATIONS. a • •D. PAYING •- INSTALLATION. OPERATION AND SERVICE. S THERMOSTAT s • • THERMOSTAT ! TO PROPER EQUIPMENT OPERATION. INSTALL THERMOSTAT AT LOCATIONS • ON RELOCATE ONLY •• • BY THE A/E IN WRITING. 3.4 WHERE R/A IS PROPOSED BY WAY OF DOOR UNDS?CUTS, PROVIDE A MINIMUM CLEAR SPACE BETWEEN BOTTOM OF #••• AND THE FLOOR •. TILE. 3.5 EQUIPMENT MUST OPERATE FREE OF OBJECTIONABLE NOISE AND VIBRATION REPAIR AND/OR REPLACE ALL SOURCES OF NOISE AND VIBRATION FOUND TO BE OBJECTIONABLE, TO THE SATISFACTION OF THE A /E. 3.6 BALANCE ALL SYSTEMS 1 PROVIDE AIR QUANTITIES AND CAPACITIES TO MATCH SPECIFIED FLOWS NOTIFY OF DEFICIENCIES • ai DURING TESTING FLOWS CALIBRATE • NEW EQUIPMENT PER MANUFACTURER'S . a a ALLOW BEFORE COMPLETING TEST & BALANCE PROCEDURES. aSSA FOR IMPLEMENTING PROPOSED SOLUTIONS BEFORE • AT END OF TEST AND BALANCE ISSUE A COMPLETE REPORT FOR A/E APPROVAL AND ALLOW TIME AND PROVIDE S INSTRUMENTS FOR SPOT SUBMIT FINAL TEST AND BALANCE REPORT TO FOR a- AIR QUANTITIES SHOWN ARE TO BE ADJUSTED AS REQUIRED TO MEET SPECIFIC JOB CONDITIONS. 3.9 STRICTLY FOLLOW ALL MANUFACTURERS • • INSTRUCTIONS l OF • OBTAIN. -! M EACH MANUFACTURER, PROPER CERTIFICATION FOR THE ADEQUACY OF • OF OF + BEFORE OPERATION. 3.10 PROVIDE MAINTENANCE AND OPERA11ON MANUAL PROVIDE AS-BUILT REPRODUCIBLE DRAWINGS. PROVIDE INSTRUC7• TO OWNER'S DESIGNATED PERSONNEL _ A w " m tQMIN 0 RAW W ON =_� N �<- ti a wz � <Q Tb V cn � NyW V'-! V . A PN =Z v •�•,+ O Nvw�W °g.p� a =a s , , i rt tn .. • 0 C4 Le • • • ' ' 0 r In ., to i .a r .- . 9 lit �� � • t CONTRACTOR SHALL VERFY ALL PROCEEDING VATH ANY WOWL . .�, , .. UNLESS APPROVED BY ARCHITECT. CLIENT APPROVAL DATE PREPARED APPROVED BY: DAIE ISSUED DATE ..., NUMBER TRP PROJECT FILE NAME s , , i rt tn .. • 0 C4 Le • • • ' ' 0 r In ., to i .a r .- . 9 lit �� � • t CONTRACTOR SHALL VERFY ALL PROCEEDING VATH ANY WOWL . .�, , .. UNLESS APPROVED BY ARCHITECT. CLIENT APPROVAL DATE PREPARED APPROVED BY: DAIE ISSUED DATE ..., NUMBER TRP PROJECT FILE NAME tn .. • 0 C4 Le • • • ' ' 0 r In ., to i .a r .- . 9 lit �� � • t CONTRACTOR SHALL VERFY ALL PROCEEDING VATH ANY WOWL . .�, , .. UNLESS APPROVED BY ARCHITECT. CLIENT APPROVAL DATE PREPARED APPROVED BY: DAIE ISSUED DATE ..., NUMBER TRP PROJECT FILE NAME .- . 9 lit �� � • t CONTRACTOR SHALL VERFY ALL PROCEEDING VATH ANY WOWL . .�, , .. UNLESS APPROVED BY ARCHITECT. CLIENT APPROVAL DATE PREPARED APPROVED BY: DAIE ISSUED DATE ..., NUMBER TRP PROJECT FILE NAME