09-1072-032A/C EQUIPMENT
Flowelml
@
ROOF MTD. EXH. FAN
-
DUCT TURN DOWN
s
TOTA L SENS.
i#
••4
s
TURNING VANE
FLEXIBLE DUCT
UNIT MANUFACTURER
NEW SUPPLY
HORIZONTAL FIRE DAMPER
DnRN& STATIC PRESS.
• ,
,
•
V_
FIRE DAMPER
"+`
REMARKS: REF. PIPING RS/RL
__D 4-
CU -3
410
17.9/112
NW..fa l
LTl�iilii
DISTRIBUTION AIR
MODEL NUMBER _7111111111:44,TWIN.5-M
r •
NOTES:
1. REFER TO PLAN FOR QUANTITY, LOCATION AIR THROW
PATTERN AND
14:11 vi
M11101.011
101011MY11110•.. . . ii
(�
Flowelml
@
ROOF MTD. EXH. FAN
-
DUCT TURN DOWN
s
TOTA L SENS.
i#
••4
s
TURNING VANE
FLEXIBLE DUCT
UNIT MANUFACTURER
NEW SUPPLY
HORIZONTAL FIRE DAMPER
ME
M.V.D.
MANUAL VOLUME DAMPER
V_
FIRE DAMPER
"+`
REMARKS: REF. PIPING RS/RL
__D 4-
VALVE
ER
SUPPLY DIFFUSER
`_CWS ---
CONDENSING WATER SUPPLY
�-Ei9
RETURN AIR GRILLE
�--- CWR- --�
CONDENSING WATER RETURN
--- 0
AIR FLOW DIRECTION
- }
POINT OF CONNECTION BETWEEN NEW
& EXISTING WORK
COMP./COND.
larm-FIF
, %mi
1 MODEL NUMBER
M
REMARKS SEER/NOTES
STEPS OF ELEC. HEAT NO.
MODEL : R-
NOTES:
1. PROVIDE `•
MOUNTED
HORIZONTALLY MOUNTED
CU -3
410
17.9/112
NW..fa l
LTl�iilii
DISTRIBUTION AIR
MODEL NUMBER _7111111111:44,TWIN.5-M
r •
NOTES:
1. REFER TO PLAN FOR QUANTITY, LOCATION AIR THROW
PATTERN AND
14:11 vi
M11101.011
101011MY11110•.. . . ii
(�
THERMOSTAT
@
ROOF MTD. EXH. FAN
DUCT SMOKE DETECTOR
DUCT TURN DOWN
TRANSITION
DUCT TURN UP
TURNING VANE
FLEXIBLE DUCT
45' BRANCH DUCT TAKE -OFF
NEW SUPPLY
HORIZONTAL FIRE DAMPER
NEW RETURN
M.V.D.
MANUAL VOLUME DAMPER
V_
FIRE DAMPER
"+`
RETURN REGISTER
__D 4-
VALVE
ER
SUPPLY DIFFUSER
`_CWS ---
CONDENSING WATER SUPPLY
�-Ei9
RETURN AIR GRILLE
�--- CWR- --�
CONDENSING WATER RETURN
--- 0
AIR FLOW DIRECTION
- }
POINT OF CONNECTION BETWEEN NEW
& EXISTING WORK
HVAC DESIGN REQUIRES:
DUCT r DETECTOR
FIRE DAMPER(S)
AHU -2 (B AY-B)
O/A CFM REQUIRED: 15 CFM 415 SQFT (CLASS ROOM) � 1000ESQFf) ` PERSON ) - 315 CFM
0/A CFM PROVIDED: 315 CFM
AHU -3 BAY -B)
0/A CFM REQUIRED:
1190 SQFT (OFFICE) ( PERSONS 20 CFM
\PERSON/
- 180 CFM
0/A CFM PROVIDED: 180 CFM
AHU -4 (BAY -C)
0/A CFM REQUIRED:
1600 SQFT (OFFICE) ( 1 PERSONS 20 CFIVI
` PERSON 240 CFM
0/A CFM PROVIDED: 240 CFM
AHU -5 (BAY -D)
O/A CFM REQUIRED:
640 SQFT (MULTI - PURPOSE) (1000 E SQFT� `PERSON - 285 CFM
0/A CFM PROVIDED: 285 CFM
AHU -6 (BAY -D)
O/A CFM REQUIRED:
640 SQFT (MULTI - PURPOSE) (1000 ESQFf� ( PERSON ) - 285 CFM
0/A CFM PROVIDED: 285 CFM
FAN SCHEDULE
UNIT NUMBER I EF--1 EF-2
•
r rev,
DUTY SUPPLY/EXH
DRIVE r
FAN SPEED .• •� �r
AIR QUAN11TY
TOTAL STATIC PRESS.- •Ifiii�
OPENING REQUIRED
FAN MOTOR
ELECTRICAL CHAR. V/0/60
r ar r .r
MANUFACTURER .
MODEL • •: :r I aq TIN rr
WEIGHT LBS.�
V, on
1. FANS EF-1 SHALL BE CONNECTED TO ROOM FIXTURE
2. FANS EF-2 SHALL BE r r TO ROOM LIGHT FIXTURE
INTAKE /RELIEF VENT SCHEDULE
MARK MANUFACTURER MODEL # THROAT AREA
IV -1 GREENHECK GRSI -10 10 *0
RV -1 GREENHECK GRSR -8 8.0
1. PROVIDE PREMANUFACTURED ROOF CURBS TO EACH AIR INTAKE /REIJEF VENT
2. PROVIDE AIR INTAKE /RELIEF VENT WITH ALUMINUM HOUSING do GALVANIZED BIRDSCREEN
1111 _ A y
1.0 QENE
• r AND INSTALL NECESSARY
IERLAI AND LABOR FOR A COM4&Y OPERATIONAL
AIR CONDITIONING, AND VENTILATING
SHOWN ON DRAWINGS a- a ar
ACCORDANCE 1.2 INSTALL IN •- r
BUILDING •i AND LOCAL
ORDINANCES.
SCOPE OF •.
PROVIDE r ! WING COMPLETE SYSTEMS
A. SUPPLY AND RETURN DUCT SYSTEM.
B. EXHAUST SYSTEM FOR TOILET ROOMS.
C. AIR CONDITIONING UNITS WITH REFRIGERANT
AND CONTROLS FOR OFFICES.
D. INDEPENDENT TEST AND
1,4 CONTRACTOR MUST BE FAMILIAR WITH THIS TYPE OF INSTALLATION
AND THOROUGHLY UNDERSTAND ALL THE REQUIREMENTS FOR
THE INSTALLATION OF EACH PIECE OF EQUIPMENT HEREIN SHOWN.
ITS PROPER OPERATION REQUIREMENTS AND TESTING
PROCEDURES FOR CITY APPROVALS.
1.5 PAY FOR ALL FEES, INSPECTIONS AND CONNECTION
CHARGES REQUIRED
1.6 VERIFY AT JOB SITE ALL SPACE CONDITIONS, DIMENSIONS
AND EQUIPMENT SIZES PRIOR TO DUCT FABRICATION OR
INSTALLATION, COORDINATE REQUIREMENTS TO AVOID
INTERFERENCE WITH OTHER TRADES.
1.7 NATURE OF DESIGN DRAWINGS:
DESIGN DRAWINGS ARE DIAGRAMMATIC AND DO NOT INTEND
TO SHOW EVERY FITTING, ELBOW. TRANSITION, ETC. THAT
WILL BE NECESSARY FOR A COMPLETE OPERATIONAL SYSTEM
AS REQUIRED BY THESE SPECIFICATIONS.
1,8 COORDINATION DRAWINGS:
PREPARE 1/4 , SCALE COORDINATION DRAWINGS SHOWING
MAJOR SYSTEM COMPONENTS FOR A/E APPROVAL.
1.9 SUBMIT SHOP DRAWINGS FOR ARCHITECT1 ENGINEER
APPROVAL BEFORE PROCEEDING WITH THE PPURCHASE OR
INSTALLATION OF EQUIPMENT AND MATERIALS.
SUBMIT AL AT ONCE IN A BINDER WITH AN INDEX AND DIVIDERS AS
REQUIRED TO SEPARATE ALL DIFFERENT MATERIALS AND EQUIPMENT.
1.10 GUARANTEE ALL WORK FREE OF DEFECTS IN MATERIALS
AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM
DATE OF ACCEPTANCE.
2.0 MA1:E131A1a
2.1 DUCTWORK: ALL JOINTS SEALED WITH HIGH PRESSURE MASTIC.
2.1.1 GENERAL. ALL DUCT SIZES SHOWN ARE CLEAR INSIDE
DIMENSIONS.
2.1.2 DUCTWORK MATERIALS:
A: TOILETS ROOM EXHAUST AND FRESH AIR INTAKES:
GALVANIZED SHEET METAL. CONSTRUCTED, AND INSTALLED
ACCORDING TO LATEST EDITION OF SMACNA'S. LOW
PRESSURE CONSTRUCTION STD. 0.5" W.G.
SEAL ALL JOINTS WITH APPROVED FIRE RATED MASTIC.
B: SUPPLY AND RETURN AIR
GALVANIZED SHEET METAL. CONSTRUCTED, AND INSTALLED
ACCORDING TO LATEST EDITION OF SMACNA'S. LOW
VELOCITY CONSTRUCTION STD. FOR 2" STATIC PRESSURE.
INSULATE WITH 1 -1/2" THICK FIBERGLASS BLANKET INSULATION
WITH APPROVED FIRE & SMOKE REINFORCED ALUMINUM JACKET.
C: ROUND INSULATED FLEXIBLE DUCT
PROVIDE AS SHOWN ON PLANS, WIREMOL.D WCK
W 1-1/2* INSULATION do REINFORCED ALUM. VAPOR
(Y9 APPROVED EQUAL
MAXIMUM LENGTH PERMITTED PER RUNOUT = 5' -0"
2.1.3 DUCT INSULATION: A LL A/C SUPPLY d RETURN)
/LB D LDVPR ER
BLANKET
WITH REINFORCED ALUMINUM DENSITY GLASS ER,
SEAL ALL JOINTS WITH APPROVED FIRE RATED MASTIC.
2.1.4 ACOUSTICAL LINING: (ALL A/C SUPPLY do RETURN)
LINE FIRST 10 FT FROM UNIT WITH 1" THICK GLASS FIBER
MATT FACED. PAINT WITH ANTIBACTERIAL COATING.
ATTACH TO DUCT WITH APPROVED SMACNA PROCEDURE.
2.1.5 DUCTWORK ACCESSORIES:
A. PROVIDE DOUBLE THICKNESS TURNING VANES AT ALL
SQUARE ELBOWS. WHERE THE ELBOWS ARE RECTANGULAR
INSTALL SINGLE THICKNESS INSTEAD.
.1 ALTERNATE A. PROVIDE 3 -PIECE ELBOWS IN LIEU
OF TURNING VANES FOR GLASS FIBER DUCTS ONLY.
.2 ALTERNATE A: PROVIDE FULL RADIUS ELBOWS IN LIEU
OF TURNING VANES.
B. PROVIDE VOLUME EXTRACTORS BEHIND EACH SUPPLY
OUTLET AND AT EACH DUCT BRANCH.
2.2 AIR DISTRIBUTION PRODUCTS :
2.2.1 PROVIDE SUPPLY AND RETURN GRILLES AND DIFFUSERS
AS INDICATED ON THE DRAWINGS.
2.2.2 PROVIDE EXTRUDED ALL ALUMINUM AIR DISTRIBUTION
PRODUCTS.
2,2.3 PROVIDE FINISHES AND TYPES OF MOUNT IN COORDINATION
WITH THE CEILING TYPES AS SHOWN ON ARCHITECTURAL
DRAWINGS.
2.2.4 PROVIDE OPPOSED BLADE, KEY OPERATED DAMPERS
BEHIND ALL AIR SUPPLY OUTLETS.
2.3 PIPING:
REFRIGERANT l..a. mij r
WROUGHT HARD OR SOFr DRAWN ON ACR COPPER TUBING WITH
• . a- BRAZED JOINT a-
CONTAINING BRAZING ! LESS THAN 49X SILVER.
NOT USED
2.5 INSULATION:
2.5.1 INSULATE ALL REFRIGERANT !
• Ei CELL POLYETHYLENE PRE MOLDED
INSULATION, APPROVED , SMOKE
JACKET. PAINT ALL EXPOSED INSULATION WITH TWO
COATS OF E►
NOT ar
NOT Ei
2.6 ALL AIR CONDITIONING COMPRESSORS
WARRANTED FOR A MINIMUM OF a
OF OF PROJECT.
CONTROLS:
2.7.1 GENERAL PROVIDE THE NECESSARY AUTOMATIC CON OLS
•-r•a• OPERATION OF ALL EQUIPMENT SPECIFIED HEREIN.
FURNISH MAGNETIC a AND INTERLOCK
INDICATED FOR EACH « OF • a
2.7.2 PUBLIC AREA DX •
PROVIDE AIR CONDITIONING PROGRAMMABLE
LOW VOLTAGE #• • ON-O ON-OFF AUTO
SUB-BASE SWITCH, FURNISHED 13Y THE EQUIPMENT
MANUFACTURER WITH HEAT-COOL STEPS AS REQUIRED.
CONTROL
PROVIDE (FURNISH & INSTALL) POWER SUPPLY WRING SOURCE
TO POWER O t INCLUDE DISCONNECTS
i REQUIRED ELECTRICAL DEVICES, INTERLOCK
RACEWAY. CONDUITS, PULL WIRES AND EXPOSED CONDUITS
FOR 'TEMPERATURE • -• SYSTEM.
IN CONDUITS, NO EXCEPTION
•
CONTROL
PROVIDE (FURNM & INSTALL) POWER SUPPLY WRING SOURCE
TO POWER CONNECTION, INCLUDE STARTERS, DISCONNECTS
D REQUIRED ELECTRICAL DEVICES,
• • r EXPOSED CONDUITS
FOR TEMPERATURE CONTROL
IN CONDUITS, NO EXCEPTION
- STARTERS.
PROVIDE r a• FOR ALL MECHANICAL EQUIPMENT
IN THIS SECTION, OF DESCRIBED • SCHEDULES
WITH HAND-OFF-AUTO BUTTON POSITIONS ON THE COVER
AND RED-GREEN PILOT LIGHTS.
PROVIDE • -a r CLOSED CONTACTS
INTENDED FOR THE #•- .«
IDENTIFICATION:
LABEL • • a ENGRAVED BLACK PLASTIC
PLAQUES r LETTERS.
3.0 EXECUTION
3.1 INSTALL ALL EQUIPMENT AND MATERIALS IN STRICT ACCORDANCE
WITH THE MANUFACTURER'S MANUALS AND RECOMMENDATIONS.
a • •D.
PAYING
•- INSTALLATION. OPERATION AND SERVICE.
S
THERMOSTAT s • •
THERMOSTAT ! TO PROPER EQUIPMENT OPERATION.
INSTALL THERMOSTAT AT LOCATIONS • ON
RELOCATE ONLY •• • BY THE A/E IN WRITING.
3.4 WHERE R/A IS PROPOSED BY WAY OF DOOR UNDS?CUTS, PROVIDE A MINIMUM
CLEAR SPACE BETWEEN BOTTOM OF #••• AND THE FLOOR
•. TILE.
3.5 EQUIPMENT MUST OPERATE FREE OF OBJECTIONABLE NOISE AND VIBRATION
REPAIR AND/OR REPLACE ALL SOURCES OF NOISE AND VIBRATION FOUND
TO BE OBJECTIONABLE, TO THE SATISFACTION OF THE A /E.
3.6 BALANCE ALL SYSTEMS 1 PROVIDE AIR QUANTITIES AND CAPACITIES
TO MATCH SPECIFIED FLOWS
NOTIFY OF DEFICIENCIES • ai DURING TESTING
FLOWS CALIBRATE • NEW EQUIPMENT PER MANUFACTURER'S . a a
ALLOW BEFORE COMPLETING TEST & BALANCE PROCEDURES.
aSSA FOR IMPLEMENTING PROPOSED SOLUTIONS
BEFORE •
AT END OF TEST AND BALANCE ISSUE A COMPLETE REPORT FOR A/E
APPROVAL AND ALLOW TIME AND PROVIDE S INSTRUMENTS
FOR SPOT
SUBMIT FINAL TEST AND BALANCE REPORT TO FOR a-
AIR QUANTITIES SHOWN ARE TO BE ADJUSTED AS REQUIRED
TO MEET SPECIFIC JOB CONDITIONS.
3.9 STRICTLY FOLLOW ALL MANUFACTURERS • •
INSTRUCTIONS l OF •
OBTAIN. -! M EACH MANUFACTURER, PROPER CERTIFICATION FOR
THE ADEQUACY OF • OF OF +
BEFORE OPERATION.
3.10 PROVIDE MAINTENANCE AND OPERA11ON MANUAL
PROVIDE AS-BUILT REPRODUCIBLE DRAWINGS. PROVIDE INSTRUC7• TO OWNER'S DESIGNATED PERSONNEL
_ A
w " m tQMIN
0
RAW
W ON =_�
N
�<- ti
a wz
� <Q
Tb
V cn � NyW
V'-! V . A PN =Z
v
•�•,+ O Nvw�W °g.p�
a =a
s ,
,
i
rt
tn
.. •
0 C4
Le •
•
•
' '
0 r
In
., to
i
.a
r
.- .
9
lit
�� � • t
CONTRACTOR SHALL VERFY ALL
PROCEEDING VATH ANY WOWL
. .�, , ..
UNLESS
APPROVED BY ARCHITECT.
CLIENT APPROVAL DATE
PREPARED
APPROVED BY: DAIE
ISSUED DATE
...,
NUMBER TRP PROJECT
FILE NAME
FAN SCHEDULE
UNIT NUMBER I EF--1 EF-2
•
r rev,
DUTY SUPPLY/EXH
DRIVE r
FAN SPEED .• •� �r
AIR QUAN11TY
TOTAL STATIC PRESS.- •Ifiii�
OPENING REQUIRED
FAN MOTOR
ELECTRICAL CHAR. V/0/60
r ar r .r
MANUFACTURER .
MODEL • •: :r I aq TIN rr
WEIGHT LBS.�
V, on
1. FANS EF-1 SHALL BE CONNECTED TO ROOM FIXTURE
2. FANS EF-2 SHALL BE r r TO ROOM LIGHT FIXTURE
INTAKE /RELIEF VENT SCHEDULE
MARK MANUFACTURER MODEL # THROAT AREA
IV -1 GREENHECK GRSI -10 10 *0
RV -1 GREENHECK GRSR -8 8.0
1. PROVIDE PREMANUFACTURED ROOF CURBS TO EACH AIR INTAKE /REIJEF VENT
2. PROVIDE AIR INTAKE /RELIEF VENT WITH ALUMINUM HOUSING do GALVANIZED BIRDSCREEN
1111 _ A y
1.0 QENE
• r AND INSTALL NECESSARY
IERLAI AND LABOR FOR A COM4&Y OPERATIONAL
AIR CONDITIONING, AND VENTILATING
SHOWN ON DRAWINGS a- a ar
ACCORDANCE 1.2 INSTALL IN •- r
BUILDING •i AND LOCAL
ORDINANCES.
SCOPE OF •.
PROVIDE r ! WING COMPLETE SYSTEMS
A. SUPPLY AND RETURN DUCT SYSTEM.
B. EXHAUST SYSTEM FOR TOILET ROOMS.
C. AIR CONDITIONING UNITS WITH REFRIGERANT
AND CONTROLS FOR OFFICES.
D. INDEPENDENT TEST AND
1,4 CONTRACTOR MUST BE FAMILIAR WITH THIS TYPE OF INSTALLATION
AND THOROUGHLY UNDERSTAND ALL THE REQUIREMENTS FOR
THE INSTALLATION OF EACH PIECE OF EQUIPMENT HEREIN SHOWN.
ITS PROPER OPERATION REQUIREMENTS AND TESTING
PROCEDURES FOR CITY APPROVALS.
1.5 PAY FOR ALL FEES, INSPECTIONS AND CONNECTION
CHARGES REQUIRED
1.6 VERIFY AT JOB SITE ALL SPACE CONDITIONS, DIMENSIONS
AND EQUIPMENT SIZES PRIOR TO DUCT FABRICATION OR
INSTALLATION, COORDINATE REQUIREMENTS TO AVOID
INTERFERENCE WITH OTHER TRADES.
1.7 NATURE OF DESIGN DRAWINGS:
DESIGN DRAWINGS ARE DIAGRAMMATIC AND DO NOT INTEND
TO SHOW EVERY FITTING, ELBOW. TRANSITION, ETC. THAT
WILL BE NECESSARY FOR A COMPLETE OPERATIONAL SYSTEM
AS REQUIRED BY THESE SPECIFICATIONS.
1,8 COORDINATION DRAWINGS:
PREPARE 1/4 , SCALE COORDINATION DRAWINGS SHOWING
MAJOR SYSTEM COMPONENTS FOR A/E APPROVAL.
1.9 SUBMIT SHOP DRAWINGS FOR ARCHITECT1 ENGINEER
APPROVAL BEFORE PROCEEDING WITH THE PPURCHASE OR
INSTALLATION OF EQUIPMENT AND MATERIALS.
SUBMIT AL AT ONCE IN A BINDER WITH AN INDEX AND DIVIDERS AS
REQUIRED TO SEPARATE ALL DIFFERENT MATERIALS AND EQUIPMENT.
1.10 GUARANTEE ALL WORK FREE OF DEFECTS IN MATERIALS
AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM
DATE OF ACCEPTANCE.
2.0 MA1:E131A1a
2.1 DUCTWORK: ALL JOINTS SEALED WITH HIGH PRESSURE MASTIC.
2.1.1 GENERAL. ALL DUCT SIZES SHOWN ARE CLEAR INSIDE
DIMENSIONS.
2.1.2 DUCTWORK MATERIALS:
A: TOILETS ROOM EXHAUST AND FRESH AIR INTAKES:
GALVANIZED SHEET METAL. CONSTRUCTED, AND INSTALLED
ACCORDING TO LATEST EDITION OF SMACNA'S. LOW
PRESSURE CONSTRUCTION STD. 0.5" W.G.
SEAL ALL JOINTS WITH APPROVED FIRE RATED MASTIC.
B: SUPPLY AND RETURN AIR
GALVANIZED SHEET METAL. CONSTRUCTED, AND INSTALLED
ACCORDING TO LATEST EDITION OF SMACNA'S. LOW
VELOCITY CONSTRUCTION STD. FOR 2" STATIC PRESSURE.
INSULATE WITH 1 -1/2" THICK FIBERGLASS BLANKET INSULATION
WITH APPROVED FIRE & SMOKE REINFORCED ALUMINUM JACKET.
C: ROUND INSULATED FLEXIBLE DUCT
PROVIDE AS SHOWN ON PLANS, WIREMOL.D WCK
W 1-1/2* INSULATION do REINFORCED ALUM. VAPOR
(Y9 APPROVED EQUAL
MAXIMUM LENGTH PERMITTED PER RUNOUT = 5' -0"
2.1.3 DUCT INSULATION: A LL A/C SUPPLY d RETURN)
/LB D LDVPR ER
BLANKET
WITH REINFORCED ALUMINUM DENSITY GLASS ER,
SEAL ALL JOINTS WITH APPROVED FIRE RATED MASTIC.
2.1.4 ACOUSTICAL LINING: (ALL A/C SUPPLY do RETURN)
LINE FIRST 10 FT FROM UNIT WITH 1" THICK GLASS FIBER
MATT FACED. PAINT WITH ANTIBACTERIAL COATING.
ATTACH TO DUCT WITH APPROVED SMACNA PROCEDURE.
2.1.5 DUCTWORK ACCESSORIES:
A. PROVIDE DOUBLE THICKNESS TURNING VANES AT ALL
SQUARE ELBOWS. WHERE THE ELBOWS ARE RECTANGULAR
INSTALL SINGLE THICKNESS INSTEAD.
.1 ALTERNATE A. PROVIDE 3 -PIECE ELBOWS IN LIEU
OF TURNING VANES FOR GLASS FIBER DUCTS ONLY.
.2 ALTERNATE A: PROVIDE FULL RADIUS ELBOWS IN LIEU
OF TURNING VANES.
B. PROVIDE VOLUME EXTRACTORS BEHIND EACH SUPPLY
OUTLET AND AT EACH DUCT BRANCH.
2.2 AIR DISTRIBUTION PRODUCTS :
2.2.1 PROVIDE SUPPLY AND RETURN GRILLES AND DIFFUSERS
AS INDICATED ON THE DRAWINGS.
2.2.2 PROVIDE EXTRUDED ALL ALUMINUM AIR DISTRIBUTION
PRODUCTS.
2,2.3 PROVIDE FINISHES AND TYPES OF MOUNT IN COORDINATION
WITH THE CEILING TYPES AS SHOWN ON ARCHITECTURAL
DRAWINGS.
2.2.4 PROVIDE OPPOSED BLADE, KEY OPERATED DAMPERS
BEHIND ALL AIR SUPPLY OUTLETS.
2.3 PIPING:
REFRIGERANT l..a. mij r
WROUGHT HARD OR SOFr DRAWN ON ACR COPPER TUBING WITH
• . a- BRAZED JOINT a-
CONTAINING BRAZING ! LESS THAN 49X SILVER.
NOT USED
2.5 INSULATION:
2.5.1 INSULATE ALL REFRIGERANT !
• Ei CELL POLYETHYLENE PRE MOLDED
INSULATION, APPROVED , SMOKE
JACKET. PAINT ALL EXPOSED INSULATION WITH TWO
COATS OF E►
NOT ar
NOT Ei
2.6 ALL AIR CONDITIONING COMPRESSORS
WARRANTED FOR A MINIMUM OF a
OF OF PROJECT.
CONTROLS:
2.7.1 GENERAL PROVIDE THE NECESSARY AUTOMATIC CON OLS
•-r•a• OPERATION OF ALL EQUIPMENT SPECIFIED HEREIN.
FURNISH MAGNETIC a AND INTERLOCK
INDICATED FOR EACH « OF • a
2.7.2 PUBLIC AREA DX •
PROVIDE AIR CONDITIONING PROGRAMMABLE
LOW VOLTAGE #• • ON-O ON-OFF AUTO
SUB-BASE SWITCH, FURNISHED 13Y THE EQUIPMENT
MANUFACTURER WITH HEAT-COOL STEPS AS REQUIRED.
CONTROL
PROVIDE (FURNISH & INSTALL) POWER SUPPLY WRING SOURCE
TO POWER O t INCLUDE DISCONNECTS
i REQUIRED ELECTRICAL DEVICES, INTERLOCK
RACEWAY. CONDUITS, PULL WIRES AND EXPOSED CONDUITS
FOR 'TEMPERATURE • -• SYSTEM.
IN CONDUITS, NO EXCEPTION
•
CONTROL
PROVIDE (FURNM & INSTALL) POWER SUPPLY WRING SOURCE
TO POWER CONNECTION, INCLUDE STARTERS, DISCONNECTS
D REQUIRED ELECTRICAL DEVICES,
• • r EXPOSED CONDUITS
FOR TEMPERATURE CONTROL
IN CONDUITS, NO EXCEPTION
- STARTERS.
PROVIDE r a• FOR ALL MECHANICAL EQUIPMENT
IN THIS SECTION, OF DESCRIBED • SCHEDULES
WITH HAND-OFF-AUTO BUTTON POSITIONS ON THE COVER
AND RED-GREEN PILOT LIGHTS.
PROVIDE • -a r CLOSED CONTACTS
INTENDED FOR THE #•- .«
IDENTIFICATION:
LABEL • • a ENGRAVED BLACK PLASTIC
PLAQUES r LETTERS.
3.0 EXECUTION
3.1 INSTALL ALL EQUIPMENT AND MATERIALS IN STRICT ACCORDANCE
WITH THE MANUFACTURER'S MANUALS AND RECOMMENDATIONS.
a • •D.
PAYING
•- INSTALLATION. OPERATION AND SERVICE.
S
THERMOSTAT s • •
THERMOSTAT ! TO PROPER EQUIPMENT OPERATION.
INSTALL THERMOSTAT AT LOCATIONS • ON
RELOCATE ONLY •• • BY THE A/E IN WRITING.
3.4 WHERE R/A IS PROPOSED BY WAY OF DOOR UNDS?CUTS, PROVIDE A MINIMUM
CLEAR SPACE BETWEEN BOTTOM OF #••• AND THE FLOOR
•. TILE.
3.5 EQUIPMENT MUST OPERATE FREE OF OBJECTIONABLE NOISE AND VIBRATION
REPAIR AND/OR REPLACE ALL SOURCES OF NOISE AND VIBRATION FOUND
TO BE OBJECTIONABLE, TO THE SATISFACTION OF THE A /E.
3.6 BALANCE ALL SYSTEMS 1 PROVIDE AIR QUANTITIES AND CAPACITIES
TO MATCH SPECIFIED FLOWS
NOTIFY OF DEFICIENCIES • ai DURING TESTING
FLOWS CALIBRATE • NEW EQUIPMENT PER MANUFACTURER'S . a a
ALLOW BEFORE COMPLETING TEST & BALANCE PROCEDURES.
aSSA FOR IMPLEMENTING PROPOSED SOLUTIONS
BEFORE •
AT END OF TEST AND BALANCE ISSUE A COMPLETE REPORT FOR A/E
APPROVAL AND ALLOW TIME AND PROVIDE S INSTRUMENTS
FOR SPOT
SUBMIT FINAL TEST AND BALANCE REPORT TO FOR a-
AIR QUANTITIES SHOWN ARE TO BE ADJUSTED AS REQUIRED
TO MEET SPECIFIC JOB CONDITIONS.
3.9 STRICTLY FOLLOW ALL MANUFACTURERS • •
INSTRUCTIONS l OF •
OBTAIN. -! M EACH MANUFACTURER, PROPER CERTIFICATION FOR
THE ADEQUACY OF • OF OF +
BEFORE OPERATION.
3.10 PROVIDE MAINTENANCE AND OPERA11ON MANUAL
PROVIDE AS-BUILT REPRODUCIBLE DRAWINGS. PROVIDE INSTRUC7• TO OWNER'S DESIGNATED PERSONNEL
_ A
w " m tQMIN
0
RAW
W ON =_�
N
�<- ti
a wz
� <Q
Tb
V cn � NyW
V'-! V . A PN =Z
v
•�•,+ O Nvw�W °g.p�
a =a
s ,
,
i
rt
tn
.. •
0 C4
Le •
•
•
' '
0 r
In
., to
i
.a
r
.- .
9
lit
�� � • t
CONTRACTOR SHALL VERFY ALL
PROCEEDING VATH ANY WOWL
. .�, , ..
UNLESS
APPROVED BY ARCHITECT.
CLIENT APPROVAL DATE
PREPARED
APPROVED BY: DAIE
ISSUED DATE
...,
NUMBER TRP PROJECT
FILE NAME
V, on
1. FANS EF-1 SHALL BE CONNECTED TO ROOM FIXTURE
2. FANS EF-2 SHALL BE r r TO ROOM LIGHT FIXTURE
INTAKE /RELIEF VENT SCHEDULE
MARK MANUFACTURER MODEL # THROAT AREA
IV -1 GREENHECK GRSI -10 10 *0
RV -1 GREENHECK GRSR -8 8.0
1. PROVIDE PREMANUFACTURED ROOF CURBS TO EACH AIR INTAKE /REIJEF VENT
2. PROVIDE AIR INTAKE /RELIEF VENT WITH ALUMINUM HOUSING do GALVANIZED BIRDSCREEN
1111 _ A y
1.0 QENE
• r AND INSTALL NECESSARY
IERLAI AND LABOR FOR A COM4&Y OPERATIONAL
AIR CONDITIONING, AND VENTILATING
SHOWN ON DRAWINGS a- a ar
ACCORDANCE 1.2 INSTALL IN •- r
BUILDING •i AND LOCAL
ORDINANCES.
SCOPE OF •.
PROVIDE r ! WING COMPLETE SYSTEMS
A. SUPPLY AND RETURN DUCT SYSTEM.
B. EXHAUST SYSTEM FOR TOILET ROOMS.
C. AIR CONDITIONING UNITS WITH REFRIGERANT
AND CONTROLS FOR OFFICES.
D. INDEPENDENT TEST AND
1,4 CONTRACTOR MUST BE FAMILIAR WITH THIS TYPE OF INSTALLATION
AND THOROUGHLY UNDERSTAND ALL THE REQUIREMENTS FOR
THE INSTALLATION OF EACH PIECE OF EQUIPMENT HEREIN SHOWN.
ITS PROPER OPERATION REQUIREMENTS AND TESTING
PROCEDURES FOR CITY APPROVALS.
1.5 PAY FOR ALL FEES, INSPECTIONS AND CONNECTION
CHARGES REQUIRED
1.6 VERIFY AT JOB SITE ALL SPACE CONDITIONS, DIMENSIONS
AND EQUIPMENT SIZES PRIOR TO DUCT FABRICATION OR
INSTALLATION, COORDINATE REQUIREMENTS TO AVOID
INTERFERENCE WITH OTHER TRADES.
1.7 NATURE OF DESIGN DRAWINGS:
DESIGN DRAWINGS ARE DIAGRAMMATIC AND DO NOT INTEND
TO SHOW EVERY FITTING, ELBOW. TRANSITION, ETC. THAT
WILL BE NECESSARY FOR A COMPLETE OPERATIONAL SYSTEM
AS REQUIRED BY THESE SPECIFICATIONS.
1,8 COORDINATION DRAWINGS:
PREPARE 1/4 , SCALE COORDINATION DRAWINGS SHOWING
MAJOR SYSTEM COMPONENTS FOR A/E APPROVAL.
1.9 SUBMIT SHOP DRAWINGS FOR ARCHITECT1 ENGINEER
APPROVAL BEFORE PROCEEDING WITH THE PPURCHASE OR
INSTALLATION OF EQUIPMENT AND MATERIALS.
SUBMIT AL AT ONCE IN A BINDER WITH AN INDEX AND DIVIDERS AS
REQUIRED TO SEPARATE ALL DIFFERENT MATERIALS AND EQUIPMENT.
1.10 GUARANTEE ALL WORK FREE OF DEFECTS IN MATERIALS
AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM
DATE OF ACCEPTANCE.
2.0 MA1:E131A1a
2.1 DUCTWORK: ALL JOINTS SEALED WITH HIGH PRESSURE MASTIC.
2.1.1 GENERAL. ALL DUCT SIZES SHOWN ARE CLEAR INSIDE
DIMENSIONS.
2.1.2 DUCTWORK MATERIALS:
A: TOILETS ROOM EXHAUST AND FRESH AIR INTAKES:
GALVANIZED SHEET METAL. CONSTRUCTED, AND INSTALLED
ACCORDING TO LATEST EDITION OF SMACNA'S. LOW
PRESSURE CONSTRUCTION STD. 0.5" W.G.
SEAL ALL JOINTS WITH APPROVED FIRE RATED MASTIC.
B: SUPPLY AND RETURN AIR
GALVANIZED SHEET METAL. CONSTRUCTED, AND INSTALLED
ACCORDING TO LATEST EDITION OF SMACNA'S. LOW
VELOCITY CONSTRUCTION STD. FOR 2" STATIC PRESSURE.
INSULATE WITH 1 -1/2" THICK FIBERGLASS BLANKET INSULATION
WITH APPROVED FIRE & SMOKE REINFORCED ALUMINUM JACKET.
C: ROUND INSULATED FLEXIBLE DUCT
PROVIDE AS SHOWN ON PLANS, WIREMOL.D WCK
W 1-1/2* INSULATION do REINFORCED ALUM. VAPOR
(Y9 APPROVED EQUAL
MAXIMUM LENGTH PERMITTED PER RUNOUT = 5' -0"
2.1.3 DUCT INSULATION: A LL A/C SUPPLY d RETURN)
/LB D LDVPR ER
BLANKET
WITH REINFORCED ALUMINUM DENSITY GLASS ER,
SEAL ALL JOINTS WITH APPROVED FIRE RATED MASTIC.
2.1.4 ACOUSTICAL LINING: (ALL A/C SUPPLY do RETURN)
LINE FIRST 10 FT FROM UNIT WITH 1" THICK GLASS FIBER
MATT FACED. PAINT WITH ANTIBACTERIAL COATING.
ATTACH TO DUCT WITH APPROVED SMACNA PROCEDURE.
2.1.5 DUCTWORK ACCESSORIES:
A. PROVIDE DOUBLE THICKNESS TURNING VANES AT ALL
SQUARE ELBOWS. WHERE THE ELBOWS ARE RECTANGULAR
INSTALL SINGLE THICKNESS INSTEAD.
.1 ALTERNATE A. PROVIDE 3 -PIECE ELBOWS IN LIEU
OF TURNING VANES FOR GLASS FIBER DUCTS ONLY.
.2 ALTERNATE A: PROVIDE FULL RADIUS ELBOWS IN LIEU
OF TURNING VANES.
B. PROVIDE VOLUME EXTRACTORS BEHIND EACH SUPPLY
OUTLET AND AT EACH DUCT BRANCH.
2.2 AIR DISTRIBUTION PRODUCTS :
2.2.1 PROVIDE SUPPLY AND RETURN GRILLES AND DIFFUSERS
AS INDICATED ON THE DRAWINGS.
2.2.2 PROVIDE EXTRUDED ALL ALUMINUM AIR DISTRIBUTION
PRODUCTS.
2,2.3 PROVIDE FINISHES AND TYPES OF MOUNT IN COORDINATION
WITH THE CEILING TYPES AS SHOWN ON ARCHITECTURAL
DRAWINGS.
2.2.4 PROVIDE OPPOSED BLADE, KEY OPERATED DAMPERS
BEHIND ALL AIR SUPPLY OUTLETS.
2.3 PIPING:
REFRIGERANT l..a. mij r
WROUGHT HARD OR SOFr DRAWN ON ACR COPPER TUBING WITH
• . a- BRAZED JOINT a-
CONTAINING BRAZING ! LESS THAN 49X SILVER.
NOT USED
2.5 INSULATION:
2.5.1 INSULATE ALL REFRIGERANT !
• Ei CELL POLYETHYLENE PRE MOLDED
INSULATION, APPROVED , SMOKE
JACKET. PAINT ALL EXPOSED INSULATION WITH TWO
COATS OF E►
NOT ar
NOT Ei
2.6 ALL AIR CONDITIONING COMPRESSORS
WARRANTED FOR A MINIMUM OF a
OF OF PROJECT.
CONTROLS:
2.7.1 GENERAL PROVIDE THE NECESSARY AUTOMATIC CON OLS
•-r•a• OPERATION OF ALL EQUIPMENT SPECIFIED HEREIN.
FURNISH MAGNETIC a AND INTERLOCK
INDICATED FOR EACH « OF • a
2.7.2 PUBLIC AREA DX •
PROVIDE AIR CONDITIONING PROGRAMMABLE
LOW VOLTAGE #• • ON-O ON-OFF AUTO
SUB-BASE SWITCH, FURNISHED 13Y THE EQUIPMENT
MANUFACTURER WITH HEAT-COOL STEPS AS REQUIRED.
CONTROL
PROVIDE (FURNISH & INSTALL) POWER SUPPLY WRING SOURCE
TO POWER O t INCLUDE DISCONNECTS
i REQUIRED ELECTRICAL DEVICES, INTERLOCK
RACEWAY. CONDUITS, PULL WIRES AND EXPOSED CONDUITS
FOR 'TEMPERATURE • -• SYSTEM.
IN CONDUITS, NO EXCEPTION
•
CONTROL
PROVIDE (FURNM & INSTALL) POWER SUPPLY WRING SOURCE
TO POWER CONNECTION, INCLUDE STARTERS, DISCONNECTS
D REQUIRED ELECTRICAL DEVICES,
• • r EXPOSED CONDUITS
FOR TEMPERATURE CONTROL
IN CONDUITS, NO EXCEPTION
- STARTERS.
PROVIDE r a• FOR ALL MECHANICAL EQUIPMENT
IN THIS SECTION, OF DESCRIBED • SCHEDULES
WITH HAND-OFF-AUTO BUTTON POSITIONS ON THE COVER
AND RED-GREEN PILOT LIGHTS.
PROVIDE • -a r CLOSED CONTACTS
INTENDED FOR THE #•- .«
IDENTIFICATION:
LABEL • • a ENGRAVED BLACK PLASTIC
PLAQUES r LETTERS.
3.0 EXECUTION
3.1 INSTALL ALL EQUIPMENT AND MATERIALS IN STRICT ACCORDANCE
WITH THE MANUFACTURER'S MANUALS AND RECOMMENDATIONS.
a • •D.
PAYING
•- INSTALLATION. OPERATION AND SERVICE.
S
THERMOSTAT s • •
THERMOSTAT ! TO PROPER EQUIPMENT OPERATION.
INSTALL THERMOSTAT AT LOCATIONS • ON
RELOCATE ONLY •• • BY THE A/E IN WRITING.
3.4 WHERE R/A IS PROPOSED BY WAY OF DOOR UNDS?CUTS, PROVIDE A MINIMUM
CLEAR SPACE BETWEEN BOTTOM OF #••• AND THE FLOOR
•. TILE.
3.5 EQUIPMENT MUST OPERATE FREE OF OBJECTIONABLE NOISE AND VIBRATION
REPAIR AND/OR REPLACE ALL SOURCES OF NOISE AND VIBRATION FOUND
TO BE OBJECTIONABLE, TO THE SATISFACTION OF THE A /E.
3.6 BALANCE ALL SYSTEMS 1 PROVIDE AIR QUANTITIES AND CAPACITIES
TO MATCH SPECIFIED FLOWS
NOTIFY OF DEFICIENCIES • ai DURING TESTING
FLOWS CALIBRATE • NEW EQUIPMENT PER MANUFACTURER'S . a a
ALLOW BEFORE COMPLETING TEST & BALANCE PROCEDURES.
aSSA FOR IMPLEMENTING PROPOSED SOLUTIONS
BEFORE •
AT END OF TEST AND BALANCE ISSUE A COMPLETE REPORT FOR A/E
APPROVAL AND ALLOW TIME AND PROVIDE S INSTRUMENTS
FOR SPOT
SUBMIT FINAL TEST AND BALANCE REPORT TO FOR a-
AIR QUANTITIES SHOWN ARE TO BE ADJUSTED AS REQUIRED
TO MEET SPECIFIC JOB CONDITIONS.
3.9 STRICTLY FOLLOW ALL MANUFACTURERS • •
INSTRUCTIONS l OF •
OBTAIN. -! M EACH MANUFACTURER, PROPER CERTIFICATION FOR
THE ADEQUACY OF • OF OF +
BEFORE OPERATION.
3.10 PROVIDE MAINTENANCE AND OPERA11ON MANUAL
PROVIDE AS-BUILT REPRODUCIBLE DRAWINGS. PROVIDE INSTRUC7• TO OWNER'S DESIGNATED PERSONNEL
_ A
w " m tQMIN
0
RAW
W ON =_�
N
�<- ti
a wz
� <Q
Tb
V cn � NyW
V'-! V . A PN =Z
v
•�•,+ O Nvw�W °g.p�
a =a
s ,
,
i
rt
tn
.. •
0 C4
Le •
•
•
' '
0 r
In
., to
i
.a
r
.- .
9
lit
�� � • t
CONTRACTOR SHALL VERFY ALL
PROCEEDING VATH ANY WOWL
. .�, , ..
UNLESS
APPROVED BY ARCHITECT.
CLIENT APPROVAL DATE
PREPARED
APPROVED BY: DAIE
ISSUED DATE
...,
NUMBER TRP PROJECT
FILE NAME
s ,
,
i
rt
tn
.. •
0 C4
Le •
•
•
' '
0 r
In
., to
i
.a
r
.- .
9
lit
�� � • t
CONTRACTOR SHALL VERFY ALL
PROCEEDING VATH ANY WOWL
. .�, , ..
UNLESS
APPROVED BY ARCHITECT.
CLIENT APPROVAL DATE
PREPARED
APPROVED BY: DAIE
ISSUED DATE
...,
NUMBER TRP PROJECT
FILE NAME
tn
.. •
0 C4
Le •
•
•
' '
0 r
In
., to
i
.a
r
.- .
9
lit
�� � • t
CONTRACTOR SHALL VERFY ALL
PROCEEDING VATH ANY WOWL
. .�, , ..
UNLESS
APPROVED BY ARCHITECT.
CLIENT APPROVAL DATE
PREPARED
APPROVED BY: DAIE
ISSUED DATE
...,
NUMBER TRP PROJECT
FILE NAME
.- .
9
lit
�� � • t
CONTRACTOR SHALL VERFY ALL
PROCEEDING VATH ANY WOWL
. .�, , ..
UNLESS
APPROVED BY ARCHITECT.
CLIENT APPROVAL DATE
PREPARED
APPROVED BY: DAIE
ISSUED DATE
...,
NUMBER TRP PROJECT
FILE NAME