Loading...
12-419-013f- :2 IL I U u U ELEXTRICAL PLAN EXISTING EXISTING PANEL "N' SCAM. 1/r V-V MAIN BUS: 125 AMP SERVICE- IPH,3W,6OHz IPK3W,6OHz TO FPL POLE TO FPL POLE NEUTRAL 125 AMP VOLTAGE- 121240V 120/240V 10,000 AMPS SYM1MS. @ 240 V. (U.L LISTED) (U.L LISTED) EXISTING MAIN: IVLO —EXISTING NO DEMI CONDUIT WIRE. TRIP EXISTING LOAD DESCRIPTION CKT PHASE GKIF EXISTING EXISTING POLES TRIP WIRE CONDUIT NO DEM DEMAND LOAD VA LOAD VA INCHES SIZE ELf CTRICAL ROOM AND REMARKS NO. A—C NO. AND REMARKS AND REMARKS AMP SIZE INCHES LOAD VA LOAD VA 0 MAIN 1 3 1 6 60 2 A/C UNIT MAIN 2/$ �Jwwp 1 2 EMSTING OFFICE LIGHT A/C UNIT 1 20 12 10 840 IRAMP 5,200 1/2" 93L 20 1 3 3 4 EASTING CIRCUIT 1 2D 12 1/2, 1. General: The General and Special Conditiorm trod Requirentents of i _00 600 I/Z' 100 20 1 2001 NEW ji NEW EASTING CIRCUIT EASTING CIRCUIT 1 20 12 (R) 120/240V tiJ 540 10 0 20 1 HOSTING RECEPTACLES PANEL 'A' 7 PANEL OB, EXISTING CIRCUIT 1 2U 12, ICY- 10,3w 7ti- 500 390- 112" 12 120/240v 1 NEW WINDOW LIGHTING M 125—AMP Inters ®r Design 125—AMP FRONT SIGN M cited above. 1 20 700 1 DWDKW too manner, fully operative, and to the acceptance of the Architect and C5 C: 1,128 1/2" 1*119V 20 MLG NEWT IGHTTNG MLO EMAR33dallWaffi0beftsouthmt 12 NEWUGHTING nufacture, bearing the Underwrfter`s Laboratory (UL) label as appli- 1 20 12 117 z Supplemental materials, products and components necessary to comply M TOOKW 1/2" 120/240V 20 120/240V FRONTWINDOW REG 13 13 14 11-00 and coordination of delivery of moterial& 1 20 Ln (n 1/2" as 540 360 10,3W 1/2- 10 20 1 CASH REGISTREIR 15 15, 16 1-00 1150NW72rAAVE_&4151 WAUL FLORIDA, 3312fi 100 20 _-V ­ tX5) 513-SM 1/2" outrined herein and shown on plans. 1,260 12,518 = SUB - TOTALS 1,086 D.F. = 0.50 12 public liability and property damage for the duration of the work- 1 6.— Existing conditions: Before bidding. the contractor shall visit the job 1-7 SUB'- TOTALS = TENANT 5822 TENANT 5824 VA DEMAND LOAD I NOTES: -1CWP Any existing conditions found by the Contractor which will adversely t"Olt affect the work shall be immediately be brought to the attention of 15,026 VA - NO DEMAND LOAD 19 without additional charge. and shall include replacements or repair of 1. PROVIDE GROUNDING BAR KIT any oftw phase of the vistallatim which -may have been damaged -thereby. 7— Plans: Drawmp are basically diograrrs intended to depict approximately FTING 1s7, GROUND FLOOR Plans shall not be scaled to determine exact location and dimerKmns. 18,266 VA- CONNECTED PANEL LOAD trades so that interference with existing conditions, conduits, piping, 6' 2. NCL= NOT CONCURRENT LOAD I ,PARTIAL Fl --=GTRCAL REM N.T. TYPE: EXISTING EXISTING PANEL "N' MAIN BUS: 125 AMP SERVICE- IPH,3W,6OHz IPK3W,6OHz PART 1— GENERAL NEUTRAL 125 AMP VOLTAGE- 121240V 120/240V 10,000 AMPS SYM1MS. @ 240 V. (U.L LISTED) (U.L LISTED) MAIN: IVLO DEMAND NO DEMI CONDUIT WIRE. TRIP NUMBER LOAD DESCRIPTION CKT PHASE GKIF LOAD DESCRIPTION POLES TRIP WIRE CONDUIT NO DEM DEMAND LOAD VA LOAD VA INCHES SIZE AMP POLES AND REMARKS NO. A—C NO. AND REMARKS AND REMARKS AMP SIZE INCHES LOAD VA LOAD VA LOAD VA LOAD VA 5,200 1 6 60 2 A/C UNIT 1 1 2 EMSTING OFFICE LIGHT A/C UNIT 1 20 12 10 840 5,200 5,200 1/2" 12 20 1 3 3 4 EASTING CIRCUIT 1 2D 12 1/2, 1. General: The General and Special Conditiorm trod Requirentents of 400 600 I/Z' 12 20 1 EXISTING LIGHTS 5 BLITSTEIN 6 EASTING CIRCUIT EASTING CIRCUIT 1 20 12 1/7 specified. These specifications and accompanying plans are intended 500 540 10 12 20 1 HOSTING RECEPTACLES 7 7 8 E)OSTING OFFICE REG EXISTING CIRCUIT 1 2U 12, 1/20 1/2- 1 •40 500 390- 112" 12 20 1 NEW WINDOW LIGHTING M 9 Inters ®r Design 10 FRONT SIGN M cited above. 1 20 12 10 1;200 manner, fully operative, and to the acceptance of the Architect and (305) 444 4433 1,128 1/2" 12 20 1 NEWT IGHTTNG 11 EMAR33dallWaffi0beftsouthmt 12 NEWUGHTING nufacture, bearing the Underwrfter`s Laboratory (UL) label as appli- 1 20 12 117 10 Supplemental materials, products and components necessary to comply 360 with the intent of the Contract drawings and/or specifications but 1/2" 12 20 1 FRONTWINDOW REG 13 13 14 NEW GEN REG and coordination of delivery of moterial& 1 20 12 1/2" 10 540 360 and refinished to factory finish. replaced where not acceptable. 1/2- 12 20 1 CASH REGISTREIR 15 15, 16 SPACE 1150NW72rAAVE_&4151 WAUL FLORIDA, 3312fi required for the installation of the complete electrical systems as 20 _-V ­ tX5) 513-SM 1/2" outrined herein and shown on plans. 1,260 12,518 = SUB - TOTALS 1,086 D.F. = 0.50 12 public liability and property damage for the duration of the work- 1 6.— Existing conditions: Before bidding. the contractor shall visit the job 1-7 SUB'- TOTALS = 27508 1,980 3,240 VA DEMAND LOAD I NOTES: Any existing conditions found by the Contractor which will adversely t"Olt affect the work shall be immediately be brought to the attention of 15,026 VA - NO DEMAND LOAD 19 without additional charge. and shall include replacements or repair of 1. PROVIDE GROUNDING BAR KIT any oftw phase of the vistallatim which -may have been damaged -thereby. 7— Plans: Drawmp are basically diograrrs intended to depict approximately equipment locations and arrangements. not to show every minor detail. Plans shall not be scaled to determine exact location and dimerKmns. 18,266 VA- CONNECTED PANEL LOAD trades so that interference with existing conditions, conduits, piping, 2. NCL= NOT CONCURRENT LOAD I 9.— Substitutions. Products and materials called out by trade name and/or 21 catalog numbers estabrish a standard of quality, appearunces perfor- 22 mance and - dimension. Contractors shall base his proposal on those items.- as they. shall be considered as a standard basis of bidding. Requests for substitution shall be submitted in writings{ to the Archs- 797 VA- 25% OF TOTAL LIGHTING design. construction, standards and warranties. dimensions to fit wi- 3. CK=LTS CONTACTOR; T=TIMER thout change, and does not cause extra work to other trades. Contractor project name shall be responsible for providing equality of substitution: Architect/Engineer will, under no -circumstances, be required to prove I such item is or is not of equal quarity to the specified item. Archi— New Store for: 500 VA- 25%OF LARGEST MOTOR sions or substitutions shall be paid by the Contractor. 4. MULTWIRE CIRCUITS SHALL BE 900 4,374 SUB ® TOTALS 19,563 \Lk- TOTAL DEMAND LOAD PROTECTED WITH MULTI-POLE BREAKERS. SUB -TOTALS 11,013 2,220 3,120 VA: DEMAND LOAD 82 AIVIP__- TOTAL DEIVANDLOAD CURRENT 15,387 VA: NO DEMAND LOAD El IMAL SPE04CATM L L r NEW PANEL "B" V BUS: 125 AMP M SERVICE: IPK3W,6OHz PART 1— GENERAL NEUTRAL• 125 AMP VOLTAGE- 120/240V 10,000 AMPS SYMMS. @ 244 V. (U.L LISTED) MW. MLO DEMAND A-- Overall Installation:, The installation shall comply with the Latest TRIP NUMBER LOAD DESCRIPTION CKT PHASE CKT LOAD DESCRIPTION POLES TRIP WIRE CONDUIT edition of Electrical Code (NEC), the Florida Building Code (FBC), and LOAD VA LOAD VA INCHES SIZE AMP POLES AND REMARKS NO. A_C NO. AND REMARKS AMP SIZE INCHES LOAD VA LOAD VA 500 1/2" 12 20 1 EXISTING CIRCUIT 1 any other applicable Federal, State and Local codes. 2 A/C UNIT 2 60 6 1" 5,200 400 1/2" 12 20 1 EXISTING CIRCUIT 3 4 B.— Conductor Calculations: Conductor -cakmilations are based an 75 'C. 1. General: The General and Special Conditiorm trod Requirentents of 5,200 500 10 12 20 the Contract and Specifications as well as plans and specifications EASTING CIRCUIT BLITSTEIN 6 EASTING CIRCUIT 1 of other %:fiscoines, and tudes shall be a- part. of the work. hereby 12 specified. These specifications and accompanying plans are intended 400 400 10 12 to provide for the complete furnishing and installation of the elec— 1 DESIGN 7 8 EXISTING CIRCUIT trical systems. To provide means to furnish and install. 1 20 12 1/2- 1 500 2- Compliance: Workmanship, materials and 'installation shall be in strict MSOJAaccordance FES with the applicable edition of the NEC,NFPA.NEWAASTM, 12 OSHA, HRS health agencies,, and other applicable national, state, and local codes and pertaining regulations established- by the ruling Architecture authority having jurisdiction. Contractors shall also meet the requirements of other standards Inters ®r Design where such requirements are more strict than those standards 10 cited above. 285 Sevilla Avenue J. Workmanship: All work shaft be performed by contractors ricensed CoW Cuabless, f1 33-134 in their respective discipline. Work shall be done in a first class 1/27 manner, fully operative, and to the acceptance of the Architect and (305) 444 4433 the Engineers. Contractor shall provide for all necessary labor and 1,128 material required for the completion of the work including but not FaX (305) 444 rimlied to related work such as connection of existing systems, exca- 1 vations and back filling. EMAR33dallWaffi0beftsouthmt 4. Materials: Contractor shall provide all new materials of American ma— P= BLITSTEIN nufacture, bearing the Underwrfter`s Laboratory (UL) label as appli- LIG. No. AR00075M cable. Materials shall be new, suitable for the application and above - standard qualdy normally used for the purpose as called for an plans. 10 Supplemental materials, products and components necessary to comply 600 with the intent of the Contract drawings and/or specifications but 460 .not noted or specified on these sections. shall be provided by the 12 GUIROLA & ASSOCIATES PA 1 Contractor as required for the completion of the work at no aMtio— nal cost to the Owner. Contractor shall be. responsible for provisions 13 CO?,MMTM EMPNEERS 14 and coordination of delivery of moterial& P.E. Na 57468 20 Equipment marred during shipment or installation shall be touched up 10 David Guirola 360 and refinished to factory finish. replaced where not acceptable. 400 Electrical Engineer 12 &— Permits and Insurance: Contractor shaft secure and pay for all 1 NEWLIGHTINGM 15, permits, fees, taxes, inspections, tests, fines and other items as 16 1150NW72rAAVE_&4151 WAUL FLORIDA, 3312fi required for the installation of the complete electrical systems as 20 _-V ­ tX5) 513-SM 1/2" outrined herein and shown on plans. CA OW09112 EMAJL C�! 5@AOL COM 1,086 Contractor shall provide, all required insurance for protection against 12 public liability and property damage for the duration of the work- 1 6.— Existing conditions: Before bidding. the contractor shall visit the job 1-7 site and ascertain all existing conditions which will affect his work. 18 SPACE, Failure to do so will not be accepted as a reason for requesting I extra pay where the existing conditions result in extra materials or Any existing conditions found by the Contractor which will adversely t"Olt affect the work shall be immediately be brought to the attention of the Architect/Erigineeir Correct= of any defects sholl be completely SPACE 19 without additional charge. and shall include replacements or repair of 20 any oftw phase of the vistallatim which -may have been damaged -thereby. 7— Plans: Drawmp are basically diograrrs intended to depict approximately equipment locations and arrangements. not to show every minor detail. Plans shall not be scaled to determine exact location and dimerKmns. B.— Interference: The Contractor shall coordinate his work with other trades so that interference with existing conditions, conduits, piping, equipment, architectural and structural members be avoided. I 9.— Substitutions. Products and materials called out by trade name and/or 21 catalog numbers estabrish a standard of quality, appearunces perfor- 22 mance and - dimension. Contractors shall base his proposal on those items.- as they. shall be considered as a standard basis of bidding. Requests for substitution shall be submitted in writings{ to the Archs- tecVEngineer. demonstratiN that product is of comparle and basic design. construction, standards and warranties. dimensions to fit wi- thout change, and does not cause extra work to other trades. Contractor project name shall be responsible for providing equality of substitution: Architect/Engineer will, under no -circumstances, be required to prove I such item is or is not of equal quarity to the specified item. Archi— New Store for: tect/Ergineer-agienses incurred due to ControclaWs requested revi- 24 sions or substitutions shall be paid by the Contractor. 10.—Record Drawings: Maintain a complete set of prints for indicating all changes. Use colored pens to mark -changes at the time of exe- cution and deriver the set to the Architect /Engineer upon -completion. Corttractor shall stamp 'As Buit- on peoft and plans, dute,,and, sign in ink. 11 The Contractor shall, and hereby does, warrant all labor and material free from defects for a period of one (1) year from the date of acceptance or beneficial use by the owner., whichever is earlier and sholi, upon notification during this period promptly repair or replace any defective items or material, or equipment at no cost to the owner. TYPE: SIEMENS. NEW PANEL "B" V BUS: 125 AMP M SERVICE: IPK3W,6OHz NEUTRAL• 125 AMP VOLTAGE- 120/240V 10,000 AMPS SYMMS. @ 244 V. (U.L LISTED) MW. MLO DEMAND NO DENL CONDUIT WIRE TRIP NUMBER LOAD DESCRIPTION CKT PHASE CKT LOAD DESCRIPTION POLES TRIP WIRE CONDUIT NO DEW DEMAND LOAD VA LOAD VA INCHES SIZE AMP POLES AND REMARKS NO. A_C NO. AND REMARKS AMP SIZE INCHES LOAD VA LOAD VA 500 1/2" 12 20 1 EXISTING CIRCUIT 1 2 A/C UNIT 2 60 6 1" 5,200 400 1/2" 12 20 1 EXISTING CIRCUIT 3 4 5,200 500 10 12 20 1 EASTING CIRCUIT 5 6 EASTING CIRCUIT 1 20 12 1!2" 400 400 10 12 20 1 EXISTING CIRCUrr 7 8 EXISTING CIRCUIT 1 20 12 1/2- 1 500 400 1/2" 12 20 1 EXISTING CIRCUIT 9 10 SHOW WINDOW REC. 1 20 12 1/27 360 1,128 VT 12 20 1 -NEWLIGHT'ING 11 12 CHAS REGISTER 1 20 12 10 600 460 112" 12 20 1 NEWLIGI-ITING 13 14 GEN- RIE-C 1 20 12 10 360 400 112" 12 20 1 NEWLIGHTINGM 15, 16 NEWLIGHTING 1 20 12 1/2" 613 1,086 1/2" 12 20 1 NEWLIGHTING 1-7 18 SPACE, I I SPACE 19 20 SPACE I I SPACE 21 22 SPACE I I SPACE 23 24 [::SP:Ar-E 900 4,374 SUB ® TOTALS D.F. 0.50 SUB -TOTALS 11,013 2,220 3,120 VA: DEMAND LOAD NOTES: 15,387 VA: NO DEMAND LOAD 1. PROVIDE GROUNDING BAR KIT 969 VA 25% OF TOTAL LIGHTING 2 NCL= NOT CONCURRENT LOAD 500 VA- 25%OF LARGEST MOTOR 3. CK=LTS CONTACTOR; T=TIMER 19,976, VA TOTAL DEMAND LOAD 4. MULTIWIRE CIRCUITS SHALL BE 83 AMP.- TOTAL DEMAND LOAD CURRENT PROTECTED WITH MULTI-POLE BREAKERS. date 03-23-12 revision draw by A.F. 411i"14M, , SCALE- AS SHOWN sheet number oytwv 4 IV 4