PLUMBING GENERAL NOTES:
1.
THE ABBREVIATION 'P.C." USED HENCEFORTH IN THIS GENERAL PLUMBING SPECIFICATION SHALL
(D
BE CONSTRUED TO MEAN PLUMBING CWRACTDR ON THE MECHANICAL, ELECTRICAL AND ARE
<
PROTECTION DRAWNGS.
2-
ALL WORK AND MATERIALS SHALL BE IN FULL ACCORDMCE WITH THE NATIONAL RINBING CODIE,
CISH& AND ALL STATE AND LOCAL CODE THAT APPLY
3.
THE P.C. SHALL PAY PARTICULAR ATTENTION TO THE STATE OF FLORIDA IENERGY EFFICIENCY
CODE FOR BUILDING CONSTRUCTIOW. ALL WOW SHALL BE IN ACCORDANCE WITH THIS CODF,
CHAPTER 5, SEC71ONS 504.1. 504.2, 504.3, 5K4 AND 504.5.
4.
THE P.C. SHALL TAKE OUT ALL PERMITS, PROCURE CERTIFICATES, AND PAY ALL FEES ASSOCIATED
WITH HIS WOW
5.
THE DRAWINGS ARE DIAGRAMMATIC AND IN 1) TO SHOW APPROAMATE LOCATIONS. THE P.C.
c)
SHALL NOT SCALE TIE DRAWNGS.
6.
THE BIDDERS SI-IALL VISIT RE SITE AND FAMILIARrZE THEMSEUVES WITH ALL CONDITIONS
ASSOCIATED WITH THE WORK
7.
ff SHALL BE THE RESPONSIBILITY OF THE P.C. FOR THE ADVANCE ORDERING OF LONG LEAD
ITEMS SO AS NOT TO DRAY OTHER TRADES RESLLTING IN MY DOWN OR LAG TIME
8.
THE P.C. SliALL FURNISH ALL EQUIPMENT, LAMIR, MATERIALS, AND SUPERIASION TO INSTALL A
COMPLETE AND PROPERLY OPERATING PLLASNG SYSTEM AS DE3CRIBED HEREIN AND AS SHOWN
AND/OR NOTIM ON THE DRAWNGS.
9.
THE P.C. SHALL FURNISH AND INSTALL ALL MINOR ITEMS WHCH ARE OBVIOUSLY AND
REASONAW NECESSARY TO COMPLETE THE INSTALLA— TION WHETHER OR NOT SPECIFIED OR
SHOW ON THE RA&
10.
THE P.C. SHALL BE A LICENSED MASTER PLUMBER.
11.
WORKMANSHIP SIW_L BE FIRST CLASS AS NORMALLY PERFORMED BY JOURNEYMAN PLUMBERS.
12.
THE P.C. IS REFERRED TO THE ARCHITECTURAL, ELECTRICAI, AND MECHANICAL PLANS AND
SPECIFICATIONS. SUCH PLANS AND SPECIR— CATIONS ARE CONTRACT' DOCUMENTS. VERIFY ALL
REQUIRDAENTS PRIOR TO INSTALLATION. ANY DISCREPANCIES IN THE DRAWNGS OR FIELD
COORDINATION PROBLEMS SHU BE BRO#{I" TO THE ATTEN TION OF THE ENGINEER PRIOR TO
COMMENCEMENT OF WOW,
13.
THE P.C. SHAIL D(AMINE TIE SPECIFICATIONS AND THE WHOLE CONTRACT BY SECURING A
COMPLETE SET OF DRAWINGS AND SPECIFI—cknONS OF THE WHOLE CONTRACT
14.
THE P.C. SHALL BE RESPONSIBLE- FOR THE FULL COORDINATION OF HIS WORK WITH THAT OF
THE G E N E R A L C O N T R A C T O R AND OTHER SUBCONTRACTORS T O M UTUALLY AVOID CONFUCT.
15.
ALL PLUMBING WORK SHALL NOT INTERFERE WITH CLEAR4M RE— QUIRED FOR GENERAL AND
MECHANICAL CONSTRUCTION. SHOULD PLUMBING WORK BE INSTALLED WHICH INTERFERES WITH
THE VIOW OF THE OTHER CONTRACTORS, SUCH WORK SHALL BE CHANGED AT NO ADDITIONAL
COST TO THE OWNER.
16.
THE P.C. SHALL VERIFY ALL NOTES AND DIMENSIONS PRIOR TO PROCEEDING WITH BID. ANY
DISCIREPANUES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEIR
17.
TIE P.C. SHALL PROVIDE SHOP DRAW AL PRIOR TO PURCHASE OR INSTALLATION
OF ALL EQUIPMENT CALLED FOR IN THE RAW OR SPECIFICATIONS.
18.,,
THE P.C. SHAII SUBMIT' REQUESTS FOR SUBSTITUTIONS IN WRMNG.
19.
THE P.C. SHALL PROVIDE AS LT DRAWNGS.
20.
THE PLUMBING INSTALLATION SHALL MEET TIE APPROVAL OF THE ARCFMCT BEFORE ACCEPTANCE
BY THE OWNER
21.
ALL WOW SHAILL BE GUAR I7 FREE FROM DEFECTS FOR A PERIOD OF ONE (1) YEAR FROM
DATE OF CERTIFICATE OF OCCUPANCY.
22
22 THE P.C. SHALL TOUCH UP OR REFINISH THE FAMW FINISH TO ORIGINAL CONDITION OF
EQUIPMENT MARRED DURING SHIPMENT' OR INSTALLATION. HE IS RESPONSIBLE TO REPAIR TO
ORIGINAL CONDITION FURNISHINGS CAUSED DURING PERFORMANCE OF WOW
23.
THE P.C. SHAIL KEEP ALL AREAS IN WHICH WOW IS BEING PER— FORMED FREE FROM DEBRIS
AT ALL II SAID AREA SHALL BE LEFT BROOM CLEAN AT RE END OF EACH NG
DAY.
24.
AT THE COMPLETION OF THE WOK TIE P.C. SHALL REMOVE ALL RUBBISH CAUSED BY HIS
WOFK AND SHALL THOROUGHLY CLEAN ALL PLUMBING EQUIPMENT
25,
THE P.C. SHALL VERIFY ALL E)GsnNG CONDITIONS ASSOCIATED WITH WOW AND REPORT' ANY
DISCREPANCIES TO ARCHI— TECT/ENGINEER PRIOR TO BID.
26.
CONTRACTOR SHAIL VERIFY ALL DIMENSIONS, SPACES AND CONDI Ti ONS PRIOR TO FABRICATION
AND INSTALIAMON OF EQUIPMENT AM MATERIAL
27.
A MINIMUM OF 20' IS REQUIRED BETWEEN ANY TWO TTEMS PENE TRATING THE ROOF DECK
28.
DIELIECTTZIC UNIONS SHALL BE PROVIDED MiEREVER DISSIMILAR METALS ARE JOINED.
29.
AT ALL INSPECTIONS MADE OTHER BY A REPRESENTATIVE OF THE BUILDING DEPARTMENT OR BY
THE ARCHITECT OR PC. SKU PROMDE A LADDER OF SUFFICIENT SIZE IN
ORDER THAT THE INSPECTOR CAN PROPERLY LOOK AT ALL MM TO BE INSPECTED THE LADDER
SHALL BE IN GOOD REPAIR AND BE POSI TIONED IN RACE BY THE P.C. TO MEET ALL OSHA
REQUIREMENT& THE P.C. SHALL ALSO PROVIDE A COMPLETE SET OF CONTRACT DOCUMIDUS,
AVALABLE AT THE JOB SITF, AT THE TIME OF INSPEC— TION. THE CONTRACT DOCUM94M SHALL
INCLUDE.
A WORI(ING DRAWNGS
B. SPECIFICATIONS
C ALL APPROVED SHOP DRAWINGS
D. ALL ADDENDA, CHANGE ORDERS AND CORRESPONDENCE. IF A LADDER AND CONTRACT
DOCUMENTS ARE NOT AVAILABLE AT THE TIME OF INSPECTION, THE P.C. SHALL PAY THE
ARCHITECT OR ENGINEER FOR THE VISIT TO THE SITE AND A NEW INSPECT10N TIME SHALL
BE AGREED UPON.
r TA; III ej;
,3 skjL
M
ILI '11A 94:A:1 4:A ol J-A
TYPE 5 UNPRO. CONSTRUCTION
GROUP: B
OCCUPANT LOAD
23 -1-1iiPLE
9-8--3
1111F RQD = 1 (KITCHEN)
EGRESS RQD
:V6190 124 Its] i
im
E X I ST I N G C 0 N STR UUM 0 N
1,777777,77,777,771 Existil-icy interoir AV-all
-iterior all
New 1i W
rA
DATE�
5 Mag 12010
7
•
r T-M
�q •
(D
<
Lo
to
0
on
z
c)
N
<
0
cr
0
LL
rA
DATE�
5 Mag 12010
7
•