Loading...
13-406-002C7ENERAL NOTE5 1•,• The Contractor sholl not be relieved of obligations to perform the, Nork- in acr-ordance vilth the Contract 1;)ocurnents either ]��y or-tivitics or duties of the Architect in the Architect's administration of the Contract, or by tests, inspections or approvals rectuired or performod by persons other than the Contractor. ILC The Contractor sholl be responsible for inspection of portions of Nork already performed under this Contract to determine that surh portions are in proper condition to rer-cive subsecLuent Nork. 54.0 The Contractor shall provide the Owner and Architect or-r-ess to the Work in preparation and progress wherever located. RC'rALTIE5 AND FATENT5 I tj�r.Frrwry-ARcm-rECYGRE —19-ER164-DESIGN --- • :LESCO ASSOCIATES TEL 305 8661014 FAX 305 866 3317 I # . k ; I PROJECT No. i PPLAMN B*Y'tC..R. &P. J.C. DATE: 04/1*1/2013 FIT-A-19PI no I z r-I LI my Ul ' "I YA ............ AR c12751 i I IWI GN -1 I I