Loading...
14-645-0151 31 t YORE: u a 4 Tag: � F Z- DC6 �40I300 d v 1 RC0437 *WHEN USING MODEL VS ZF /iJ 180/210/240/300, IF THIS AREA IS USED AS A PLENUM A NON INSULATED COVER MUST BE ADDED TO PROTECT THE INSULATION ON THE BASE OF THE RTU. * Verify existing Curb OD * Verify supply and return openings * Note any changes * Call with any questions 06 ADDED COVER NOTE 4/11/12 MWG c M�a �}E} * Fax back if drawing is OK as IS 05 UPDATE BRACES 10/5/1) MWG APPROVA S I DATE mu: 4/11/20IZ UNITARY PRODUCTS ROOF CURB as MGURATQN 7/17ro8 MWG m reenwooa 03 UPDATED ADDRESS 7/5/06 AL MUD 02 CHANGED DIMENSION STYLE TO INSIDE OF R & S OPENINGS 12J8/04 MWG %IE7LSMK6RO YLER ST KW CD 1WMN553X P50720 �15020L06 17851 wawraro 01 INMALDESIGN 11/8/01 MWG REV. DESCRIPTION DATE APPROVED SUMS:: OF