10-920-031ELECTRICAL NOTES.
1. ALL WORK TO BE IN ACCORDANCE WITH THE N.E.C. AND ALL APPLICABLE
RULES, REGULATIONS AND ORDINANCES.
2. ALL WIRE TO BE', COPPER THW, THWN, THHN OR XHHW, #12 MIN. ALL
CONDUITS TO BE EITHER RIGID OR EMT AS ALLOWED BY THE CODES. ALL
EMTS, FLEX CONDUITS, MC CABLES AND NON — METALLIC CONDUITS MUST
HAVE GROUND WIRE AS PER N. E. C.. THIS IS A NON — RESIDENTIAL JOB
AND HENCE RQMEX OR SIMILAR WIRING METHODS SHALL NOT BE USED FOR
THIS PROJECT.
3. ALUMINUM CONDUCTORS ARE NOT ALLOWED.
4. VERIFY THE STRUCTURAL, CEILING AND OTHER DETAILS THAT MAY AFFECT
THE MOUNTING AND PLACEMENT OF LIGHTING FIXTURES. VERIFY THE
RECESSED FIXTURES TO ASCERTAIN THAT THEY WILL GO WITH THE CEILING
OR WALL DETAILS ALL FIXTURES TO BE MOUNTED IN A NEAT,
EYE — PLEASING MANNER AT HEIGHTS AND LOCATIONS THAT ARE SUBJECT
TO THE FINAL CONFIRMATION BY THE OWNER OR ARCHITECT IN THE FIELD.
5. PROVIDE DISCONNECTS, FUSES, OVERLOAD PROTECTION AND PROPER
CONTROL & POWER WIRING FOR OTHER EQUIPMENT SUCH AS' HVAC,
MECHANICAL AND ANY OTHER SPECIAL EQUIPMENT THAT MAY BE USED FOR
THIS PROJECT. VERIFY THE ROUGH --IN DETAILS, ACTUAL LOCATIONS, WIRE
SIZES AND ANY OTHER DETAILS WITH THE RESPONSIBLE TRADES AND
FOLLOW THE ACTUAL INSTALLATION INSTRUCTIONS FOR THE EQUIPMENT
BEING INSTALLED. COORDINATE WITH THE OTHER TRADES.
6. ALL DISCONNECTS, FIXTURES, AND OTHER ELECTRICAL COMPONENTS THAT
ARE SUBJECT T0, THE OUT SIDE WEATHER ELEMENTS MUST HAVE THE
WEATHERPROOF ENCLOSURES.
7. FOR HOMERUNS MOVER 80 FEET, USE ONE SIZE LARGER WIRE. FOR
HOMERUNS OVER 135 FEET, USE TWO SIZE LARGER WIRE.
8. PROVIDE PROPER GROUNDING FOR ALL EQUIPMENT, RACEWAYS ETC. AS
PER NEC.
9. ALL BREAKERS THAT ARE TO BE USED TO SUPPLY LIGHTING LOADS MUST
BE RATED FOR SWITCHING DUTY. PROVIDE LOCK —ON DEVICES FOR THE
NIGHT LIGHT CIRCUIT AND OTHER CIRCUITS THAT MAY BE SO DIRECTED BY
THE ARCHITECT.
NOTE:
ELECTRICAL CONTRACTOR TO CONTACT
EQUIPMENT MANUFACTURER FOR
SPECIFICATION SHEETS FOR PROPER
INSTALLATION/ WIRE SIZE AND AMPS.
CONTACT ENGINEER IMMEDIATELY IF
DIFFERENT THAN SHOWN" ON PLANS.
PROVIDE NEW SERVICE
WEATHERHEAD FOR
OVERHEAD SERVICE
GC TO REVIEW AT BID
NEW 4 "RGSC
1
4 , . NIR , �• • myffiol 1
EXISTING OVERHEAD
SERVICE ENTRANCE
LATERAL
PROVIDE NEW 600A CT CABINET
IN ACCORDANCE WITH LADWP
REQUIREMENTS
120 /240V /1 /3W /NEMA 3R
PROVIDE NEW METER S ��
CAN AND SOCKET
TO COMPLY WITH 1" C.
LADWP REQUIREMENT
NEW 3" RGS CONDUIT
WITH 3#500KCMIL CU
X1/0 CU—
GROUND
PER NEC
600A/2P
DISC, N3R
600AF
K
K
■:i
K
K
K
#
#
NEW (BY GC) PANEL — PANEL "A" NEW SUB PANEL ° PANEL "B"
PANEL A FLUSH MOUNTED
USE / AREA C/B o
j 600 AMP 120/240V,
A B
1 PH, 3W 600
NIo a/B USE / AREA QmRimm
2 35 YOGURT #2_ RIGHT
4 z 240/60/1 PH
YOGURT #1— RIGHT
35
z
1
1950
35
2
240/60/1 PH
3
1724
2
240/60/1 PH
1950
YOGURT #1— LEFT
35
z
5
1794
4
72,
YOGURT #2 — LEFT
1794
s
240/60/1 PH
7
YOGURT #6— LEFT,,,
240/60/1 PH
240/60/1 PH
��
$
YOGURT #3— RIGHT
35
2
240/60/ 1 y PH '
1794
35
2
YOGURT #3— LEFT
9
1794
10
240/60/1 PH
11
�r,l ,9 ,.w
YOGURT #7— LEFT
1794
240/60/1 PH
240/60/1 PH
1994
12
YOGURT #4-- RIGHT
35
2
13
1950
12
35
2
YOGURT 4— LEFT
13
1794
14
240/60/1 PH
15
SPARE
240/60/1 PH
EXTERIOR SIGNAGE
17x4
1s
SERVICE LIGHTING #1
201
1�
4200
WALK —IN 'LIGHTING(F)
40
z
RTU-r1 NEW
SPARE
2Q1
1s
WATER HEATER
�°
z
19
2°
2
3120
SEE MFG SPECS
1$
4200
20
2
SEE MFG
21
312o
'
Zo1
SYRUP
—
z2
WAFFLE MACHINE
2g/ 1
23
201
WALK —IN REFRIG.
2q1
WALK —IN LIGHTING(R)
WALK --IN FREEZER
60o
z4
SCALES
20
1
25
195
KITCHEN LIGHTING
yj
REF. DISPLAY #1
SPARE
1217
2s
POS MACHINES
201
27
29
1
COUNTER COOLER
z 1
COLD PAN
SPARE
302
z8
DINING LIGHTING #1
29/ 1
29
550
SPARE'
zo1
SPARE
PARTY ROOM RECPT
201
3o
DINING LIGHTING 2
Ni
1
35
2
4B0
2° 1
FLYTRAPS
SPARE
200
32
TIME CLOCK
20
1
33
200
z5o®
z0
1
GENERAL RECEPT.
35
2
600
34
TMB
201
35
YOGURT #8— LEFT
1794
29/ 1
UPLIGHT @ SOFFIT
3s
1200
3s
KITCHEN RECEPT.
z 1'
12050
3s
SPARE
201
SERVICE LIGHTING #2
`�
38
RESTROOM LIGHTING
2 °1
39
SPACE
30
z
SUB PANEL B
25646
40
PARTY RM LIGHTING
2 1
41
300
40
SPACE
300 AMP
41
42
TOTAL LOAD PER PHASE
52908
1 53484
153484 VA /120V — 445.7A
42
# -- LIGHTING FACTORED AT 125%
* -- HIGHEST MOTOR LOAD FACTORED AT 125%
K -- KITCHEN EQUIPMENT FACTORED AT 65% OF -LOAD
NOTE:
ELECTRICAL CONTRACTOR TO
CONTACT EQUIPMENT
MANUFACTURER FOR SPECIFICATION
SHEETS FOR PROPER
INSTALLATION/ WIRE SIZE AND
AMPS. CONTACT ENGINEER
IMMEDIATELY IF DIFFERENT THAN
SHOWN ON PLANS.
EXISTING 600A,
120/240V, 1—PH, 3W
DISCONNECT SWITCH
FOR SERVICE ENTRANCE
REMOVE EXISTING TENANT --_
SPACE PANEL
FIELD VERIFY EXACT
____ __________ __ _.. -- EXISTING W I R EWAY � - -- --- - -___,
- - -T EXISTING
r---------
TENANT
I
PANEL
I
I � M M Il l 11 M I1 M 1 1 M 1 1 1
I I I I 1 1
If If I I I I I
I I i I I i i
it 11 1 1 I I
I
- -- )�� )�� ) )�� )� MCB
T I i I T I I 4 I I t L_..,.. —_- - __ __ J
L ------- J I 11 I I. I I{ l I I
I 1 i L ------ J
I
- - - -- L ------------- -----------------------------
--
EXISTING METERS ---- ---� � -- _----_____ ___________________�
I
I
I
FOR TENANT SPACES REMOVE EXISTING CONDUCTORS
c ----- EXISTING GROUND AND ABANDON CONDUIT IN PLACE
I PER NEC REQUEST FOR UTILITY TO
ABANDON METER SOCKET
NEW 4 C. WITH
PROPOSED ROUTING AT BLDG
COORDINATE WITH BUILDING
OWNER
PATCH ASPHALT AND RESTORE
TO ITS ORIGINAL CONDITION
M
m
K
K
#
#
NOTE:
GC MUST OBTAIN CUT
SHEETS OF YOGURT
MACHINES PRIOR TO
START OF WORK
NOTE:
GC TO OBTAIN SHOP
DRAWINGS OF WALK —IN
AND CONFIRM
ELECTRICAL
REQUIREMENTS
NOTE:
GC SHALL OBTAIN AND
VERIFY ELEC LOADS OF
WATER HEATER AND
RTU DURING BID
PROCESS
NOTE: ALL NEW
ELECTRICAL WORK TO
BE PERFORMED AFTER
CITY AND UTI LITY
COMPANY REVIEW AND
WRITTEN APPROVAL IS
COMPLETE
PROVIDE NEW 120/240V
PANELS TO BE
LOCATED IN REMODELED
TENANT SPACE UNDER
THIS CONTRACT
NEW NEW
TENANT TENANT
PANEL A PANEL B
MLO
3 #21 1#8G)
1 -1/4' C.
K
K
K
11 j
,
W .,
K
U
K
,..
> ?
� F.4 '�
'r
9
CD
f Fy�9
n al
a
PANEL A FLUSH MOUNTED
USE /AREA c/B No
1300 AMP 120/24OV, 1 PH, 3W 300 �!
A B �o c/B USE j AREA
YOGURT #5— RIGHT
35
2
1
1950
35
2
YOGURT #5 --' LEFT
240/60/1 PH
1724
2
240/60/1 PH
3
1794
4
YOGURT #6— RIGHT
35
1994
2;.
YOGURT #6— LEFT,,,
6
240/60/1 PH
7
1950
240/60/ 1 y PH '
1794
YOGURT #7— RIGHT
35
2
9
1950
!''
35 „
2
�r,l ,9 ,.w
YOGURT #7— LEFT
1794
10
240/60/1 PH
11
240/60/1 PH
1950
12
SPARE
X01
13
20
1
SPARE
14
EXTERIOR SIGNAGE
201
1s
201
WALK —IN 'LIGHTING(F)
soo°
1s
SPARE
2Q1
17
2°
2
WALK —IN REFRIG.
920
1$
WALKIN FREEZER
20
2
19
600
'
920
—
21
900
201
WALK —IN REFRIG.
22
WALK --IN FREEZER
2 °1
23
201
KITCHEN LIGHTING
300
24
SPARE
20
1
25
-
29
1
COUNTER COOLER
900
26
SPARE
zo1
27
201
SPARE'
_
2s
PARTY ROOM RECPT
201
a9
35
2
GLYCOL MACHINE
z5o0
30
SPARE
zo
1
31
-
SEE MFG. SPECS
z5o®
32
YOGURT #8— RIGHT
35
2
33
35
YOGURT #8— LEFT
1794
34
240/60/1 PH
3s
240/60/1 PH
1950
3s
SPARE
20
1
37
`�
2°
SPARE
SPACE
2°
1
39
—
40
2
RTU — 2
4200
40
SPACE
2 °1
41
SEE MFG SPECS
4200
42
TOTAL LOAD PER PHASE
25316
25646
25646
,
W .,
K
U
K
,..
> ?
� F.4 '�
'r
9
CD
f Fy�9
n al
a
# — LIGHTING FACTORED AT 125%
* — HIGHEST MOTOR LOAD FACTORED AT 125%
K — KITCHEN EQUIPMENT FACTORED AT 65% OF LOAD
NOTE: IT IS THE GENERAL CONTRACTOR'S
RESPONSIBILITY TO VERIFY ALL EQUIPMENTIi
SPECIFICATIONS AND COMPARE WITH
ELECTRICAL DRAWINGS. CONTACT PROJECT
MANAGER AND ENGINEER IMMEDIATELY 'IF
DISCREPANCIES OCCUR.
RK-1 Fuses specify "Bussman LPN -rk -1
NOTED
#= MECHANICAL EQUIPMENT AT 125
GC TO REVIEW ALL ELECTRICAL SPECIFICATIONS AND EQUIPMENT SHEETS FO'R
REQUIRED ELECTRICAL NEEDS. PRIOR TO CONSTRUCTION, CONSULT DESIGNER AND
TENANT FOR POSSIBLE SUB PANEL MAY BE NEEDED.
NOTES: 1. GROUND PER NEC AND LOCAL
CODES.
2. DEBATE CONDUCTOR AS REQUIRED
ONE -SINE DIAGRAM (1 -PHASE SERVICE) FOR AMBIENT TEMPERATURE
TYPE SHALL COMPLY
3. CONDUIT
NO SCALE WITH CODE AND SUITABLE FOR
ENVIRONMENT.
NOTE:
SUBCONTRACTOR TO PROVIDE LOCK OUT AND TAG OUT SYSTEM ONCE
BUILDING BECOMES ENERGIZED AND SHALL BE RESPONSIBLE FOR
MAINTAINING "SAFE WORK" ENVIRONMENT.
NOTE:
GENERAL CONTRACTOR IS
RESPONSIBLE TO FIELD VERIFY
EXISTING CONDITIONS DURING
BID PROCESS — COORDINATE
WITH LANDLORD SCOPE OF
WORK
NOTE:
GENERAL CONTRACTOR SHALL
VERIFY EXISTING ELECTRICALS +������
CONDITIONS DURING BID PROCENta.
MENCHIE'S
S`v v NAME
tq BE'R ,
�.> :.
a � �m
VA/
12 0V --
214A .
# — LIGHTING FACTORED AT 125%
* — HIGHEST MOTOR LOAD FACTORED AT 125%
K — KITCHEN EQUIPMENT FACTORED AT 65% OF LOAD
NOTE: IT IS THE GENERAL CONTRACTOR'S
RESPONSIBILITY TO VERIFY ALL EQUIPMENTIi
SPECIFICATIONS AND COMPARE WITH
ELECTRICAL DRAWINGS. CONTACT PROJECT
MANAGER AND ENGINEER IMMEDIATELY 'IF
DISCREPANCIES OCCUR.
RK-1 Fuses specify "Bussman LPN -rk -1
NOTED
#= MECHANICAL EQUIPMENT AT 125
GC TO REVIEW ALL ELECTRICAL SPECIFICATIONS AND EQUIPMENT SHEETS FO'R
REQUIRED ELECTRICAL NEEDS. PRIOR TO CONSTRUCTION, CONSULT DESIGNER AND
TENANT FOR POSSIBLE SUB PANEL MAY BE NEEDED.
NOTES: 1. GROUND PER NEC AND LOCAL
CODES.
2. DEBATE CONDUCTOR AS REQUIRED
ONE -SINE DIAGRAM (1 -PHASE SERVICE) FOR AMBIENT TEMPERATURE
TYPE SHALL COMPLY
3. CONDUIT
NO SCALE WITH CODE AND SUITABLE FOR
ENVIRONMENT.
NOTE:
SUBCONTRACTOR TO PROVIDE LOCK OUT AND TAG OUT SYSTEM ONCE
BUILDING BECOMES ENERGIZED AND SHALL BE RESPONSIBLE FOR
MAINTAINING "SAFE WORK" ENVIRONMENT.
NOTE:
GENERAL CONTRACTOR IS
RESPONSIBLE TO FIELD VERIFY
EXISTING CONDITIONS DURING
BID PROCESS — COORDINATE
WITH LANDLORD SCOPE OF
WORK
NOTE:
GENERAL CONTRACTOR SHALL
VERIFY EXISTING ELECTRICALS +������
CONDITIONS DURING BID PROCENta.
MENCHIE'S
S`v v NAME
tq BE'R ,
�.> :.
a � �m