Loading...
10-920-0251. CONTRACTOR SHALL FIELD VERIFY .EXISTING SEWER UTILITY CONNECTION SIZE, LOCATION, SLOPE, DIRECTION � OF FLOW, AND INVERT PRIOR TO BEGINNING CONSTRUCTION. CONTRACTOR SHALL IMMEDIATELY NOTIFY ENGINEER OF ANY DISCREPANCIES BETWEEN THEM PLANS AND ACTUAL FIELD CONDITIONS. 2. CONTRACTORS SHALL FIELD VERIFY EXISTING WATER UTILITY CONNECTION SIZE, AND LOCATION PRIOR TO BEGINNING CONSTRUCTION. CONTRACTOR SHALL IMMEDIATELY NOTIFY ENGINEER OF ANY DISCREPANCIES BETWEEN THE PLANS AND ACTUAL FIELD CONDITIONS. 3> PLUMBING CONTRACTOR TO COORDINATE EXACT STREET WATER PRESSURE AND NOTIFY ENGINEER OF ANY DISCREPANCIES. CONTRACTOR SHALL PROVIDE A PRESSURE REDUCING VALVE (PRV) IF STREET WATER PRESSURE EXCEEDS 80 PSI. PRV SHALL BE INSTALLED ON BUILDING SIDE OF WATER METER AND SET TO 80 PSI. 4. CONTRACTOR TO FIELD VERIFY EXISTING DOMESTIC WATER SYSTEM IS PROVIDED WITH A REDUCED PRESSURE BACKFLOW PREVENTER (RPBP). IF NOT EXISTING, PROVIDE AN APPROVED RPBP ASSEMBLY SIZED TO MATCH BUILDING WATER METER. INSTALL NEW RPBP BETWEEN THE WATER METER AND THE BUILDING PER LOCAL JURISDICT'ION'S REQUIREMENTS. 5. CONTRACTOR SHALL MAINTAIN ALL WARRANTIES ASSOCIATED WITH ROOF FOR ALL ROOF PENETRATIONS. KITCHEN GENERAL NOTES 1. REFER TO K.E.C. DRAWINGS FOR ADDITIONAL WORK REQUIRED (INDIRECT WASTE PIPING, ETC.) AND FOR ALL EQUIPMENT SCHEDULES, AND SPECIFICATIONS. 2. REFER TO K.E.C. ROUGH --IN DRAWINGS AND COORDINATE WITH CONTRACTOR EXACT LOCATIONS OF EQUIPMENT AND FLOOR SINK LOCATIONS, PLUMBING ROUGH --IN HEIGHTS, ETC. 3. ALL FLOOR SINKS HAVE HALF GRATE UNLESS NOTED OTHERWISE. FLOOR SINKS LOCATED BELOW EQUIPMENT SHALL BE RAISED 1/4" MIN. A.F.F. OR AS DIRECTED BY LOCAL JURISDICTION. 4. PROVIDE CHROME PLATED STOP VALVES AT EACH REQUIRED EQUIPMENT WATER CONNECTION, PROVIDED BUTTERFLY VALVE AT EACH REQUIRED EQUIPMENT GAS CONNECTION. PROVIDE CHROME PLATED P- -TRAP, TAILPIECE AND ESCUTCHEON AT EACH REQUIRED EQUIPMENT DIRECT WASTE CONNECTION. FOR EACH REQUIRED EQUIPMENT INDIRECT WASTE PIPING CONNECTION. ROUTE INDIRECT WASTE PIPING FROM EQUIPMENT TO NEAREST FLOOR SINK PER K.E.C. DWGS. INDIRECT WASTE PIPING: COPPER TYPE "DWV" WITH SOLDERED END DRAINAGE FITTINGS. 5. ALL DIRECT CONNECT EQUIPMENT SHALL BE PROVIDED WITH BACKFLOW PREVENTION "CARBONATOR" TYPE SODA DISPENSERS ARE CONSIDERED TO BE "HIGH HAZARD" APPLIANCES AND SHALL BE PROTECTED BY A STAINLESS STEEL REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER. (WATTS SS009 OR EQUAL). ALL OTHER APPLIANCES SUCH AS ICE MACHINES, COFFEE – MAKERS, YOGURT DISPENSERS, AND SIMILAR EQUIPMENT WITH DIRECT CONNECTIONS TO POTABLE WATER SHALL BE PROTECTED BY A DOUBLE CHECK VALVE TYPEi BACKFLOW PREVENTER (WATTS 007 OR EQUAL). 6. ALL INDIRECT WASTE PIPING INSTALLED WITH A LENGTH GREATER THAN 5'--0" SHALL HAVE A CLEANOUT PROVIDED. MAXIMUM LENGTH OF INDIRECT WASTE LINE SHALL BE 1!5'-0". 7. ALL HAND SINKS /LAVATORIES SHALL BE PROVIDED WITH A THERMO —STATIC MIXING VALVE TO SUPPLY TEMPERED HW, MAX. 110 DEG. HW. III mo EXAMINE THE CONTRACT DRAWINGS AND ALL AVAILABLE INFORMATION CONCERNING EXISTING INSTALLATION, STRUCTURE, AND LOCAL CONDITIONS. VISIT THE SITE TO UNDERSTAND THE NATURE AND SCOPE OF ALL WORK TO BE PERFORMED AND VERIFY EXISTING CONDITIONS. THE SUBMISSION OF A BID WILL BE TAKEN AS EVIDENCE THAT SUCH AN EXAMINATION HAS BEEN MADE AND THAT ALL EXISTING CONDITIONS HAVE BEEN CONSIDERED. NO ALLOWANCES WILL BE MADE AFTER THE PROJECT HAS BEEN AWARDED FOR FAILURE TO VERIFY EXISTING CONDITIONS. CONTRACTOR SHALL NOTIFY ENGINEER OF ANY DISCREPANCIES BETWEEN ACTUAL FIELD CONDITIONS AND THAT OF THESE DRAWINGS PRIOR TO BEGINING CONSTRUCTION. NOTE: GENERAL CONTRACTOR'S RESPONSIBILITY TO VERIFY EXACT LOCATION & DEPTH OF EXISTING WASTE LINE DURING FIELD VISIT /BID PROCESS NOTE: ALL WALL PENETRATIONS INTO A FIRE RATED ASSEMBLY SHALL NOT BE LARGER THAN 4" NOMINAL PIPE OR 16 SQUARE INCHES IN OVERALL CROSS — SECTIONAL AREA WITH AN AGGREGATE AREA NOT MORE THAN 100 SQUARE INCHES FOR ANY 100 SQUARE FEET, NOTE: . PLUMBING CONTRACTOR MUST PROVIDE CAMERA VERIFICATION OF EXACT LOCATION OF WASTE LINE TO GC DURING BID. VERIFICATION MUST BE MADE PRIOR TO ISSUANCE OF PERMIT AND AFTER ACCEPTANCE OF CONTRACT TO PROCEED. NOTE: PLUMBING CONTRACTOR IS RESPONSIBLE FOR THE INSTALLATION OF THE' GLYCOL SYSTEM. MATERIALS FOR GLYCOL SYSTEM WILLI BE PURCHASED BY KES IN KITCHEN PACKAGE. B 1 NOTE: —� GLYCOL UNIT ON ROOF. CLOSED LOOP COOLING SYSTEM PROVIDED I TO COOL YOGURT MACHINES DOMESTIC WATER PIPING PLAN ;AL TANK STATE sTRIES WATER HEATER VE) SINK SHEET P2.1 FOR IRT /GLYCOL CONNECTION GC TO VERIFY IN FIELD 4" WASTE AND VENT– LOCATION OF POINT OF CONNECTION DURING DEMO PROCESS (DEPTH & DIRECTION) P.O.C. GC TO PROVIDE CAMERA P.Oe VERIFICATION WITH SCOPE IN BID "W 2"V—,,, 4 2 3 - - x- J FCO 2"W 2"W____ �—+ 7 L__- _- -____J [u' 4 c \\ \ -t \ \ \ -V \ =I \ i i r PROVIDE ISLAND f' VENTING AT SINK SEE 1 /P1.2 y \ \ \ cU d \ I �\ 'J \ t 4 2 _ ,, 2"V — i 4' �•_ 3 FCO 11 NEW SELF CONTAINED WALK ---IN COOLERS, NO FLOOR SINK REQUIRED DRAIN PREP SINK AND 3 COMP SINK INDIRECT TO FLOOR SINKS BELOW 2"V SINK 3"V 3 "W DRAIN W/H TO MOP MOP SINK BELOW SINK, 3"V .�lv SINK, = ,iI 2"V—� 3 "FS�`�, I y A ii �7r_ 4 -V, I ' I `l It r /r y - SANITARY/WASTE PIPING' PLAN SCALE: 1/4" = V -0" 2"V DRAIN INDIRECT FROM COLD STATION CONDENSATE TO FLOOR SINK w. r �k i T COMBS MENCHIE'S MENB549 No 46942 STATE-OF SEP m NAIL ol 00 SHEET NAME Building � � -�r;f 31 ' I Ic y DUMBER ' 0 L�.... I i I i