10-920-0251. CONTRACTOR SHALL FIELD VERIFY .EXISTING SEWER UTILITY CONNECTION SIZE,
LOCATION, SLOPE, DIRECTION � OF FLOW, AND INVERT PRIOR TO BEGINNING
CONSTRUCTION. CONTRACTOR SHALL IMMEDIATELY NOTIFY ENGINEER OF ANY
DISCREPANCIES BETWEEN THEM PLANS AND ACTUAL FIELD CONDITIONS.
2. CONTRACTORS SHALL FIELD VERIFY EXISTING WATER UTILITY CONNECTION
SIZE, AND LOCATION PRIOR TO BEGINNING CONSTRUCTION. CONTRACTOR
SHALL IMMEDIATELY NOTIFY ENGINEER OF ANY DISCREPANCIES BETWEEN THE
PLANS AND ACTUAL FIELD CONDITIONS.
3> PLUMBING CONTRACTOR TO COORDINATE EXACT STREET WATER PRESSURE
AND NOTIFY ENGINEER OF ANY DISCREPANCIES. CONTRACTOR SHALL
PROVIDE A PRESSURE REDUCING VALVE (PRV) IF STREET WATER PRESSURE
EXCEEDS 80 PSI. PRV SHALL BE INSTALLED ON BUILDING SIDE OF WATER
METER AND SET TO 80 PSI.
4. CONTRACTOR TO FIELD VERIFY EXISTING DOMESTIC WATER SYSTEM IS
PROVIDED WITH A REDUCED PRESSURE BACKFLOW PREVENTER (RPBP). IF
NOT EXISTING, PROVIDE AN APPROVED RPBP ASSEMBLY SIZED TO MATCH
BUILDING WATER METER. INSTALL NEW RPBP BETWEEN THE WATER METER
AND THE BUILDING PER LOCAL JURISDICT'ION'S REQUIREMENTS.
5. CONTRACTOR SHALL MAINTAIN ALL WARRANTIES ASSOCIATED WITH ROOF FOR
ALL ROOF PENETRATIONS.
KITCHEN GENERAL NOTES
1. REFER TO K.E.C. DRAWINGS FOR ADDITIONAL WORK REQUIRED (INDIRECT
WASTE PIPING, ETC.) AND FOR ALL EQUIPMENT SCHEDULES, AND
SPECIFICATIONS.
2. REFER TO K.E.C. ROUGH --IN DRAWINGS AND COORDINATE WITH CONTRACTOR
EXACT LOCATIONS OF EQUIPMENT AND FLOOR SINK LOCATIONS, PLUMBING
ROUGH --IN HEIGHTS, ETC.
3. ALL FLOOR SINKS HAVE HALF GRATE UNLESS NOTED OTHERWISE. FLOOR
SINKS LOCATED BELOW EQUIPMENT SHALL BE RAISED 1/4" MIN. A.F.F. OR
AS DIRECTED BY LOCAL JURISDICTION.
4. PROVIDE CHROME PLATED STOP VALVES AT EACH REQUIRED EQUIPMENT
WATER CONNECTION, PROVIDED BUTTERFLY VALVE AT EACH REQUIRED
EQUIPMENT GAS CONNECTION. PROVIDE CHROME PLATED P- -TRAP, TAILPIECE
AND ESCUTCHEON AT EACH REQUIRED EQUIPMENT DIRECT WASTE
CONNECTION. FOR EACH REQUIRED EQUIPMENT INDIRECT WASTE PIPING
CONNECTION. ROUTE INDIRECT WASTE PIPING FROM EQUIPMENT TO NEAREST
FLOOR SINK PER K.E.C. DWGS. INDIRECT WASTE PIPING: COPPER TYPE "DWV"
WITH SOLDERED END DRAINAGE FITTINGS.
5. ALL DIRECT CONNECT EQUIPMENT SHALL BE PROVIDED WITH BACKFLOW
PREVENTION "CARBONATOR" TYPE SODA DISPENSERS ARE CONSIDERED TO BE
"HIGH HAZARD" APPLIANCES AND SHALL BE PROTECTED BY A STAINLESS
STEEL REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER. (WATTS SS009
OR EQUAL). ALL OTHER APPLIANCES SUCH AS ICE MACHINES,
COFFEE – MAKERS, YOGURT DISPENSERS, AND SIMILAR EQUIPMENT WITH
DIRECT CONNECTIONS TO POTABLE WATER SHALL BE PROTECTED BY A
DOUBLE CHECK VALVE TYPEi BACKFLOW PREVENTER (WATTS 007 OR EQUAL).
6. ALL INDIRECT WASTE PIPING INSTALLED WITH A LENGTH GREATER THAN 5'--0"
SHALL HAVE A CLEANOUT PROVIDED. MAXIMUM LENGTH OF INDIRECT WASTE
LINE SHALL BE 1!5'-0".
7. ALL HAND SINKS /LAVATORIES SHALL BE PROVIDED WITH A THERMO —STATIC
MIXING VALVE TO SUPPLY TEMPERED HW, MAX. 110 DEG. HW.
III mo
EXAMINE THE CONTRACT DRAWINGS AND ALL AVAILABLE INFORMATION CONCERNING
EXISTING INSTALLATION, STRUCTURE, AND LOCAL CONDITIONS. VISIT THE SITE TO
UNDERSTAND THE NATURE AND SCOPE OF ALL WORK TO BE PERFORMED AND
VERIFY EXISTING CONDITIONS. THE SUBMISSION OF A BID WILL BE TAKEN AS
EVIDENCE THAT SUCH AN EXAMINATION HAS BEEN MADE AND THAT ALL EXISTING
CONDITIONS HAVE BEEN CONSIDERED. NO ALLOWANCES WILL BE MADE AFTER
THE PROJECT HAS BEEN AWARDED FOR FAILURE TO VERIFY EXISTING CONDITIONS.
CONTRACTOR SHALL NOTIFY ENGINEER OF ANY DISCREPANCIES BETWEEN ACTUAL
FIELD CONDITIONS AND THAT OF THESE DRAWINGS PRIOR TO BEGINING
CONSTRUCTION.
NOTE:
GENERAL CONTRACTOR'S RESPONSIBILITY TO VERIFY EXACT
LOCATION & DEPTH OF EXISTING WASTE LINE DURING
FIELD VISIT /BID PROCESS
NOTE:
ALL WALL PENETRATIONS INTO A FIRE RATED ASSEMBLY
SHALL NOT BE LARGER THAN 4" NOMINAL PIPE OR 16
SQUARE INCHES IN OVERALL CROSS — SECTIONAL AREA
WITH AN AGGREGATE AREA NOT MORE THAN 100 SQUARE
INCHES FOR ANY 100 SQUARE FEET,
NOTE: .
PLUMBING CONTRACTOR MUST PROVIDE CAMERA
VERIFICATION OF EXACT LOCATION OF WASTE LINE TO GC
DURING BID. VERIFICATION MUST BE MADE PRIOR TO
ISSUANCE OF PERMIT AND AFTER ACCEPTANCE OF
CONTRACT TO PROCEED.
NOTE:
PLUMBING CONTRACTOR IS RESPONSIBLE FOR THE
INSTALLATION OF THE' GLYCOL SYSTEM. MATERIALS FOR
GLYCOL SYSTEM WILLI BE PURCHASED BY KES IN KITCHEN
PACKAGE.
B 1
NOTE: —�
GLYCOL UNIT ON
ROOF. CLOSED
LOOP COOLING
SYSTEM PROVIDED I
TO COOL YOGURT
MACHINES
DOMESTIC WATER PIPING PLAN
;AL TANK STATE
sTRIES WATER HEATER
VE)
SINK
SHEET P2.1 FOR
IRT /GLYCOL CONNECTION
GC TO VERIFY IN FIELD 4" WASTE
AND VENT– LOCATION OF POINT
OF CONNECTION DURING DEMO
PROCESS (DEPTH & DIRECTION)
P.O.C. GC TO PROVIDE CAMERA
P.Oe VERIFICATION WITH SCOPE IN BID
"W
2"V—,,, 4
2 3
- - x- J
FCO
2"W
2"W____
�—+
7
L__- _- -____J
[u'
4 c \\
\
-t \
\
\
-V
\
=I \
i
i
r
PROVIDE ISLAND
f' VENTING AT SINK
SEE 1 /P1.2
y
\
\
\
cU d
\
I �\
'J
\
t
4 2 _ ,, 2"V —
i 4' �•_
3
FCO
11
NEW SELF
CONTAINED WALK ---IN
COOLERS, NO FLOOR
SINK REQUIRED
DRAIN PREP SINK AND
3 COMP SINK INDIRECT
TO FLOOR SINKS BELOW
2"V
SINK
3"V
3 "W DRAIN W/H TO MOP
MOP SINK BELOW
SINK, 3"V
.�lv SINK, = ,iI
2"V—�
3 "FS�`�, I
y
A
ii �7r_ 4
-V,
I '
I `l
It r
/r
y -
SANITARY/WASTE PIPING' PLAN
SCALE: 1/4" = V -0"
2"V
DRAIN INDIRECT
FROM COLD STATION
CONDENSATE TO
FLOOR SINK
w.
r
�k
i
T
COMBS
MENCHIE'S
MENB549
No
46942
STATE-OF
SEP m NAIL
ol 00 SHEET NAME
Building � � -�r;f 31 ' I Ic y DUMBER
' 0
L�.... I
i I i