10-920-0190
Lo GENERAL NOTES,
Z) 1 ALL WORK SHALL BE INSTALLED, it'l ACCORDANCE WITH APPLICABLE BUILDING
AND MECHANICAL CODES. ALL PLUMBING WORK SHALL BE INSTALLED IN
ACCORDANCE WITH THE STATE PLUMBING CODE AND LOCAL BOARD OF
V) HEALTH. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST
z LANDLORD'S TENANT CRITERIA AND GUIDELINES.
2. LOCATIONS OF EXISTING PIPING;' DUCTWORK, AND MECHANICAL EQUIPMENT
CL ARE BASED ON BEST AVAILABLE; INFORMATION, CONTRACTOR SHALL FIELD
ui VERIFY EXACT LOCATIONS PRIOR TO COMMENCING WORK.
cl- 3. REMOVE EXISTING MECHANICAL �ITEMS (EQUIPMENT, PIPING, DUCTWORK, ETC..)
NOT REQUIRED IN REMODELED. A, RRANGEMENT. .REMOVE OR RELOCATE
0 PLUMBING ITEMS IN WALLS TO BE REMOVED AND AS NECESSARY TO
8
W- COORDINATE WITH REMODELED SPACES. EXISTING LOCATIONS OF ALL EXISTING
0- SANITARY, VENT AND WATER LINES MUST BE FIELD VERIFIED. MODIFY NEW
LAYOUT AS REQUIRED TO COORDINATE WITH EXISTING CONDITIONS. PROVIDE
OWNER WITH AS-BUILT PLANS OF ACTUAL INSTALLED SYSTEM.
4. ALL EXISTING PIPING NOT REUSED IN REMODELED SPACE SHALL BE CUT AND
CAPPED IN CONCEALED LOCATIONS, FLUSH WITH FLOOR OR WALL. ALL
UNUSED PIPING THAT IS NOT COMPLETELY CONCEALED SHALL BE REMOVED.
DISCONNECTED PIPING TO REMAIN IN USE SHALL BE RECONNECTED TO BEST
SUIT JOB CONDITIONS.
5. WHERE EXISTING WALLS ARE REMOVED, EXPOSED PIPING THAT WILL REMAIN
IN USE SHALL BE OFFSET TO THE NEAREST AVAILABLE WALL AND
RECONNECTED USING ALL NEW MATERIAL. THIS SHALL APPLY TO ALL
PLUMBING PIPING OF BOTH KNOWN AND UNKNOWN LOCATIONS.
6. PROVIDE DIRT LEGS IN GAS PIPING AT EACH CHANGE IN ELEVATION AND AT
CONNECTIONS TO APPLIANCES. PROVIDE ACCESSIBLE SHUTOFF VALVE AT EACH
CONNECTION TO APPLIANCES OR EQUIPMENT WHERE APPLICABLE.
7. NOT USED
8. NOT USED
9. ALL ROOFING WORK SHALL BE PERFORMED BY LANDLORD DESIGNATED
I ROOFING CONTRACTOR AT TENANT CONTRACTOR'S EXPENSE.
10. FIELD VERIFY (IF EXISTING) SMOKE EXHAUST/CONTROL SYSTEMS IN TENANT
SPACE INCLUDING FANS, GRILLES, CONTROLS, ETC.. COORDINATE
REQUIREMENTS WITH LANDLORD .1 PROVIDE WIRING TO LANDLORD'S FIRE ALARM
SYSTEM AS DIRECTED BY LANDLORD, PROVIDE NEW EQUIPMENT, ACCESSORIES,
WIRING, ETC.. AS REQUIRED FOR LANDLORD APPROVAL AND CODE
COMPLIANCE. WIRE ROOF TOP FANS THRU RELAY TO STOP AIR CIRCULATION
WHEN BUILDING FIRE ALARM SYSTEM IS ACTIVATED.
11. REFER I TO ARCHITECTURAL PLANS FOR LOCATIONS OF FIRE RATED WALLS,
CEILINGS OR ROOF. FIRE DAMPERS AND ACCESS DOORS SHALL BE INSTALLED
IN DUCTWORK WHEREVER DUCTWORK PENETRATES RATED CONSTRUCTION. SEAL
AROUND ALL DUCT AND PIPE PENETRATIONS OF RATED CONSTRUCTION WITH
FIRE RESISTANT SEALANT.
12. COORDINATE LOCATION, INSTALLATION, AND WIRING OF SENSORS AND
THERMOSTAT(S) WITH BUILDING OWNER.
13. FIRE SPRINKLERS: ADDITIONS &,: MODIFICATIONS AS REQUIRED BY CODE AND
NFPA PAMPHLET #13. SPRINKLER HEADS CENTERED WITHIN CEILING BOARD.
ANY MODIFICATION TO BE DONE BY TENANT'S SPRINKLER CONTRACTOR.
14, MECHANICAL CONTRACTOR SHALL INSPECT EXISTING UNIT AND REPORT TO
OWNER ANY SERVICE OR REPAIRS THAT ARE REQUIRED IN REGARD TO
BELTS, REFRIGERANT CHARGE, COOLING COIL, FILTERS, ETC.
15. MECHANICAL COMPONENTS EXCEEDING 20 POUNDS IN WEIGHT SHALL HAVE
THEIR CONNECTIONS TO THE BUILDING DESIGNED PER SECTION ASCE 7-05,
CH. 13
�
O NEW 5 TON RTU. GC TO OBTAIN MANUFACTURER SPECS DURING BID
PROCESS. - GC TO CONSULT LANDLORD & STRUCTURAL ENGINEER FOR
PLACEMENT.
OEXHAUST FAN IN RESTROOM
O NOT USED
O NOT USED
NOT USED
O NOT USED
07 NEW WATER HEATER. SEE PLUMBING DRAWINGS
08 NEW THERMOSTAT ATTACHED TO EXISTING ROOF TOP UNIT. VERIFY
OPERATION AND MOUNT AS SHOWN AT A HEIGHT OF 48-54" A.F.F.
MECHANICAL EQUIPMENT SCHEDULE 1�
A AIR 6E&Q COOLING TOTAL
NOMINAL IT ES ELECTRI 29�& - MIN. ARI HEATIN2 — 0PE`,RA`nNG HEIGHT
SYMBOL MANUFACTURER MODEL # TONS ItirAL. O'S'A' IES.P. MAX FAN HP UNIT MCA VOLT / # EFFICIENCY ENT. AIR AMB' CA PA ITY H ELECTRI�__ HEAT .., WEIGHT W1 CURB
MB
P =
EL CFM, DB I WB RDIBEN–T , TOM SM KW USOTAGLS
i
CARRIER (5 TON) 5 2000 400 0.8 1.0 1 kBH 600 45'
RTU-1 NEW 40 208 / 1 10.0 SEER 80-0 1651 0 110 51j.743.5 an
NM CARRIER OR EQUAL - GC TO VERIFY ELECTRICAL SPECS
F!JRNISH- WITH THE FOLLOWING:
1. PROGRAMMABLE THERMOSTAT, ECONOMIZER 2. PROGRAMMABLE THERMOSTAT,
W/GRAVITY EXHAUST & DUAL ENTHAPY W/GRAVITY EXHAUST & DW
CONTROL, OUTDOOR AIR DAMPER SECTION, CONTROL, OUTDOOR AIR DAN
ROOF CURB POWER ENTRY KIT, ROOF BAROMETRIC RELIEF DAMPER
MOUNTING FRAME, PREFAB ROOF CURB. PRE-FAB ROOF CURB, DUAL
SMOKE DETECTORS ASSOCIATED WITH SMOKE DAMPERS
AND HVAC SHUTOFFS SHALL BE TESTED BY AN APPROVED
TESTING AGENCY OR A QUALIFIED THIRD PARTY SPECIAL
INSPECTOR. THE SPECIAL INSPECTOR/TESTING AGENCY
SHALL BE AN INDEPENDENT THIRD PARTY INDIVIDUAL OR
FIRM AND SHALL NOT BE THE INSTALLING CONTRACTOR. A
PROFESSIONAL ENGINEER SHALL SUBMIT A FINAL SIGNED
AND SEALED REPORT TO THE MECHANICAL INSPECTOR
PRIOR TO CITY ISSUANCE OF FINAL INSPECTION APPROVAL
OR OCCUPANCY APPROVAL, INCLUDING CONDITIONAL
OCCUPANCY APPROVAL."
I I
MATERIALS SPECS:
1 ALL MAINLINE DUCTWORK SHALL BE NO. 1 GRADE
GALVANIZED STEEL, ASTM A-120, IN ACCORDANCE WITH
SMACNA STANDARDS LATEST EDITION, CURRENT
UNIFORM MECHANICAL CODE, AND WITH ASHRAE GUIDE
RECOMMENDATIONS.
2. FLEXIBLE DUCTS TO DIFFUSERS SHALL BE THERMAFLEX
TYPE M—KE OR EQUIVALENT GLENFLEX, CLASS 0
OR CLASS 1 WITH FLAME SPREAD RATING OF 25
AND A SMOKE DEVELOPED RATING OF 50.
3. ALL AIR CONDITIONING SUPPLY AIR DUCTS SHALL BE
WRAPPED WITH A MINIMUM OF 1-1/2" DUCT
INSULATION MEETING NFPA —90A. INSULATION SHALL BE
3/4 PCF DENSITY WITH FOIL SCRIM KRAFT FACING. ALL
AIR CONDITIONING RECTANGULAR RETURN AIR DUCTS &
PLENUMS SHALL BE LINED WITH 1" THICK, 1-1/2 PCIF
JOHNS—MANVILLE "LINACOUSTIC R" OR EQUAL.
4. COIL CONDENSATE DRAINS SHALL BE TYPE "M" HARD
DRAWN COPPER TUBING. INSULATE CONDENSATE
DRAINS INSIDE BUILDING WITH 1/2" FLEXIBLE CLOSED
CELL FOAMED PLASTIC PIPE INSULATION, ARMSTRONG
ARMAFLEX AP, OR EQUAL, SECURED WITH ADHESIVE.
FLAME SPREAD RATING NO GREATER THAN 25 AND
SMOKE DEVELOPED RATING OF 50.
MECHANICAL CONTRACTOR NOTE:
GENERAL C&ITRACTOR IS REQUIRED TO PERFORM A TEST AND
BALANCE AND DUCT DETECTOR TEST AND PROVIDE A CONFIRMATION
REPORT PRIOR TO A FINAL INSPECTION.
FYI'.c;TlNr, MFCHANICAI WAIT
Wr UAWSWAN_bl
DIFFUSER, GRILLE & A
NOT USED
CC TO LOCATE GLYCOL MACHINE
IN A STRUCTURALLY SOUND
APPROVED AREA - COORDINATE
WITH LANDLORD
SMOKE DUCT DETECTOR MOUNTED
ON
SUPPLY DUCT. INSTALL AND CONTROL
KRUEGER
1400
WIRING (FROM DETECTOR TO UNIT)
BY
MECHANICAL CONTRACTOR.
WHITE
FURNISHED, POWER WIRING, AND FIRE
ALARM INTERFACE WIRING (FROM
RETURN
DETECTOR TO FIRE ALARM PANEL)
BY
ELECTRICAL CONTRACTOR, AIR
HANDLING UNIT SHALL SHUT DOWN
UPON
SENSING SMOKE.
MECHANICAL EQUIPMENT SCHEDULE 1�
A AIR 6E&Q COOLING TOTAL
NOMINAL IT ES ELECTRI 29�& - MIN. ARI HEATIN2 — 0PE`,RA`nNG HEIGHT
SYMBOL MANUFACTURER MODEL # TONS ItirAL. O'S'A' IES.P. MAX FAN HP UNIT MCA VOLT / # EFFICIENCY ENT. AIR AMB' CA PA ITY H ELECTRI�__ HEAT .., WEIGHT W1 CURB
MB
P =
EL CFM, DB I WB RDIBEN–T , TOM SM KW USOTAGLS
i
CARRIER (5 TON) 5 2000 400 0.8 1.0 1 kBH 600 45'
RTU-1 NEW 40 208 / 1 10.0 SEER 80-0 1651 0 110 51j.743.5 an
NM CARRIER OR EQUAL - GC TO VERIFY ELECTRICAL SPECS
F!JRNISH- WITH THE FOLLOWING:
1. PROGRAMMABLE THERMOSTAT, ECONOMIZER 2. PROGRAMMABLE THERMOSTAT,
W/GRAVITY EXHAUST & DUAL ENTHAPY W/GRAVITY EXHAUST & DW
CONTROL, OUTDOOR AIR DAMPER SECTION, CONTROL, OUTDOOR AIR DAN
ROOF CURB POWER ENTRY KIT, ROOF BAROMETRIC RELIEF DAMPER
MOUNTING FRAME, PREFAB ROOF CURB. PRE-FAB ROOF CURB, DUAL
SMOKE DETECTORS ASSOCIATED WITH SMOKE DAMPERS
AND HVAC SHUTOFFS SHALL BE TESTED BY AN APPROVED
TESTING AGENCY OR A QUALIFIED THIRD PARTY SPECIAL
INSPECTOR. THE SPECIAL INSPECTOR/TESTING AGENCY
SHALL BE AN INDEPENDENT THIRD PARTY INDIVIDUAL OR
FIRM AND SHALL NOT BE THE INSTALLING CONTRACTOR. A
PROFESSIONAL ENGINEER SHALL SUBMIT A FINAL SIGNED
AND SEALED REPORT TO THE MECHANICAL INSPECTOR
PRIOR TO CITY ISSUANCE OF FINAL INSPECTION APPROVAL
OR OCCUPANCY APPROVAL, INCLUDING CONDITIONAL
OCCUPANCY APPROVAL."
I I
MATERIALS SPECS:
1 ALL MAINLINE DUCTWORK SHALL BE NO. 1 GRADE
GALVANIZED STEEL, ASTM A-120, IN ACCORDANCE WITH
SMACNA STANDARDS LATEST EDITION, CURRENT
UNIFORM MECHANICAL CODE, AND WITH ASHRAE GUIDE
RECOMMENDATIONS.
2. FLEXIBLE DUCTS TO DIFFUSERS SHALL BE THERMAFLEX
TYPE M—KE OR EQUIVALENT GLENFLEX, CLASS 0
OR CLASS 1 WITH FLAME SPREAD RATING OF 25
AND A SMOKE DEVELOPED RATING OF 50.
3. ALL AIR CONDITIONING SUPPLY AIR DUCTS SHALL BE
WRAPPED WITH A MINIMUM OF 1-1/2" DUCT
INSULATION MEETING NFPA —90A. INSULATION SHALL BE
3/4 PCF DENSITY WITH FOIL SCRIM KRAFT FACING. ALL
AIR CONDITIONING RECTANGULAR RETURN AIR DUCTS &
PLENUMS SHALL BE LINED WITH 1" THICK, 1-1/2 PCIF
JOHNS—MANVILLE "LINACOUSTIC R" OR EQUAL.
4. COIL CONDENSATE DRAINS SHALL BE TYPE "M" HARD
DRAWN COPPER TUBING. INSULATE CONDENSATE
DRAINS INSIDE BUILDING WITH 1/2" FLEXIBLE CLOSED
CELL FOAMED PLASTIC PIPE INSULATION, ARMSTRONG
ARMAFLEX AP, OR EQUAL, SECURED WITH ADHESIVE.
FLAME SPREAD RATING NO GREATER THAN 25 AND
SMOKE DEVELOPED RATING OF 50.
MECHANICAL CONTRACTOR NOTE:
GENERAL C&ITRACTOR IS REQUIRED TO PERFORM A TEST AND
BALANCE AND DUCT DETECTOR TEST AND PROVIDE A CONFIRMATION
REPORT PRIOR TO A FINAL INSPECTION.
FYI'.c;TlNr, MFCHANICAI WAIT
Wr UAWSWAN_bl
DIFFUSER, GRILLE & A
CC TO LOCATE GLYCOL MACHINE
IN A STRUCTURALLY SOUND
APPROVED AREA - COORDINATE
WITH LANDLORD
FRAME
A
TE
KRUEGER
1400
GNOC TO VERIFY ALL MFG SPECS
FOR ROOFTOP UNIT DURING
BID PROCESS
WHITE
No
NOTE
RETURN
GC TO CONSULT TENANT'S
LEASE IN REGARDS TO RTUS
SUPPLIED & INSTALLED
MECHANICAL EQUIPMENT SCHEDULE 1�
A AIR 6E&Q COOLING TOTAL
NOMINAL IT ES ELECTRI 29�& - MIN. ARI HEATIN2 — 0PE`,RA`nNG HEIGHT
SYMBOL MANUFACTURER MODEL # TONS ItirAL. O'S'A' IES.P. MAX FAN HP UNIT MCA VOLT / # EFFICIENCY ENT. AIR AMB' CA PA ITY H ELECTRI�__ HEAT .., WEIGHT W1 CURB
MB
P =
EL CFM, DB I WB RDIBEN–T , TOM SM KW USOTAGLS
i
CARRIER (5 TON) 5 2000 400 0.8 1.0 1 kBH 600 45'
RTU-1 NEW 40 208 / 1 10.0 SEER 80-0 1651 0 110 51j.743.5 an
NM CARRIER OR EQUAL - GC TO VERIFY ELECTRICAL SPECS
F!JRNISH- WITH THE FOLLOWING:
1. PROGRAMMABLE THERMOSTAT, ECONOMIZER 2. PROGRAMMABLE THERMOSTAT,
W/GRAVITY EXHAUST & DUAL ENTHAPY W/GRAVITY EXHAUST & DW
CONTROL, OUTDOOR AIR DAMPER SECTION, CONTROL, OUTDOOR AIR DAN
ROOF CURB POWER ENTRY KIT, ROOF BAROMETRIC RELIEF DAMPER
MOUNTING FRAME, PREFAB ROOF CURB. PRE-FAB ROOF CURB, DUAL
SMOKE DETECTORS ASSOCIATED WITH SMOKE DAMPERS
AND HVAC SHUTOFFS SHALL BE TESTED BY AN APPROVED
TESTING AGENCY OR A QUALIFIED THIRD PARTY SPECIAL
INSPECTOR. THE SPECIAL INSPECTOR/TESTING AGENCY
SHALL BE AN INDEPENDENT THIRD PARTY INDIVIDUAL OR
FIRM AND SHALL NOT BE THE INSTALLING CONTRACTOR. A
PROFESSIONAL ENGINEER SHALL SUBMIT A FINAL SIGNED
AND SEALED REPORT TO THE MECHANICAL INSPECTOR
PRIOR TO CITY ISSUANCE OF FINAL INSPECTION APPROVAL
OR OCCUPANCY APPROVAL, INCLUDING CONDITIONAL
OCCUPANCY APPROVAL."
I I
MATERIALS SPECS:
1 ALL MAINLINE DUCTWORK SHALL BE NO. 1 GRADE
GALVANIZED STEEL, ASTM A-120, IN ACCORDANCE WITH
SMACNA STANDARDS LATEST EDITION, CURRENT
UNIFORM MECHANICAL CODE, AND WITH ASHRAE GUIDE
RECOMMENDATIONS.
2. FLEXIBLE DUCTS TO DIFFUSERS SHALL BE THERMAFLEX
TYPE M—KE OR EQUIVALENT GLENFLEX, CLASS 0
OR CLASS 1 WITH FLAME SPREAD RATING OF 25
AND A SMOKE DEVELOPED RATING OF 50.
3. ALL AIR CONDITIONING SUPPLY AIR DUCTS SHALL BE
WRAPPED WITH A MINIMUM OF 1-1/2" DUCT
INSULATION MEETING NFPA —90A. INSULATION SHALL BE
3/4 PCF DENSITY WITH FOIL SCRIM KRAFT FACING. ALL
AIR CONDITIONING RECTANGULAR RETURN AIR DUCTS &
PLENUMS SHALL BE LINED WITH 1" THICK, 1-1/2 PCIF
JOHNS—MANVILLE "LINACOUSTIC R" OR EQUAL.
4. COIL CONDENSATE DRAINS SHALL BE TYPE "M" HARD
DRAWN COPPER TUBING. INSULATE CONDENSATE
DRAINS INSIDE BUILDING WITH 1/2" FLEXIBLE CLOSED
CELL FOAMED PLASTIC PIPE INSULATION, ARMSTRONG
ARMAFLEX AP, OR EQUAL, SECURED WITH ADHESIVE.
FLAME SPREAD RATING NO GREATER THAN 25 AND
SMOKE DEVELOPED RATING OF 50.
MECHANICAL CONTRACTOR NOTE:
GENERAL C&ITRACTOR IS REQUIRED TO PERFORM A TEST AND
BALANCE AND DUCT DETECTOR TEST AND PROVIDE A CONFIRMATION
REPORT PRIOR TO A FINAL INSPECTION.
FYI'.c;TlNr, MFCHANICAI WAIT
Wr UAWSWAN_bl
DIFFUSER, GRILLE & A
SOU ALL SHOP DRAWINGS AND SUBMITTALS FOR APPROVAL
EXPOSED OPEN DUCTWORK NECKS SHALL BE COVERED DURING
CONSTRUCTION.
XQIE.
TEST AND BALANCE OF SYSTEMS, AND SUBMITTAL OF AIR BALANCE
REPORT TO CONTRACTOR
,UOTE:
STRUCTURAL ENGINEER SHALL BE CONTRACTED BY TENANT TO
FURNISH LOAD CALCULATIONS AND DRAWINGS FOR GLYCOL SUPPORT
AND LANDLORD APPROVAL.
MECHANICAL PLAN
"W WATER HEATER
SEE P SHEET
0)
(00
tw w z
LLI o 0 < x
-J 0
n
n
0 w z
o < (o L0 z
z co r4,) V) <
uj < QD 0) >
ELI � — L-0 0)
< J_ (r,) V_ <
L/) Lb Lo Lo -r
CD
< zo) -4- V)
z Q eC 0 <
< V) 00
C) (/�w
O cy) < m: < I
Lt --,nion i, iji
C/)
REVISION
FIRE COMMENTS
10-22-10
AFIRE COMMENTS
2 11-10-10
CITY COMMENTS
4-1-11
MENCHIE'S
MENB549
Ij Kilt
No
46-942
o S TA, T
of? 11
NA L
m
ikki%v I
m 1.1
STYLE MATERIAL FINISH O.B.D. REMARKS
SYMBOL
DESCRIPTION
MANUF. do
MODEL
FRAME
A
SUPPLY
KRUEGER
1400
LAY–IN
CEILING
DS�WEPN
STEEL
WHITE
No
B
L
RETURN
KRUEGER I
S80
LAY–IN
CEILING
FIXED
BAR,
WHITE
NO
SOU ALL SHOP DRAWINGS AND SUBMITTALS FOR APPROVAL
EXPOSED OPEN DUCTWORK NECKS SHALL BE COVERED DURING
CONSTRUCTION.
XQIE.
TEST AND BALANCE OF SYSTEMS, AND SUBMITTAL OF AIR BALANCE
REPORT TO CONTRACTOR
,UOTE:
STRUCTURAL ENGINEER SHALL BE CONTRACTED BY TENANT TO
FURNISH LOAD CALCULATIONS AND DRAWINGS FOR GLYCOL SUPPORT
AND LANDLORD APPROVAL.
MECHANICAL PLAN
"W WATER HEATER
SEE P SHEET
0)
(00
tw w z
LLI o 0 < x
-J 0
n
n
0 w z
o < (o L0 z
z co r4,) V) <
uj < QD 0) >
ELI � — L-0 0)
< J_ (r,) V_ <
L/) Lb Lo Lo -r
CD
< zo) -4- V)
z Q eC 0 <
< V) 00
C) (/�w
O cy) < m: < I
Lt --,nion i, iji
C/)
REVISION
FIRE COMMENTS
10-22-10
AFIRE COMMENTS
2 11-10-10
CITY COMMENTS
4-1-11
MENCHIE'S
MENB549
Ij Kilt
No
46-942
o S TA, T
of? 11
NA L
m
ikki%v I
m 1.1