Loading...
10-920-008POS SPECIFICATIONS (MICROS- FIDELIO) CUSTOMER RESPONSIBILITIES To ensure the success of your Installation, the following Items need to be implemented. Electrical 1. Hire a licensed wiring contractor (with network certlflc ation If necessary). Wiring and electrical speclficaations are listed below and should be completed a minimum of 1 week prior to Installation. 2. All electrical or data hardware must be provided by the contractor. (Junction bo), conduit, Patch Panel, etc.) 3. Please note: Micros connecting cables are 9 feet In length and a workstation power cord is 4 feet in length. This must be considered when pla ing power outlets and data connections. 4. The UPS (uninterrupted power supply) for the PC must be within 3 feet of the PC. The power cord for the UPS Is 3 feet in length. Please en sure a power outlet in an appropriate location. Power for the UPS, modems, and printer, as well as the phone jacks, should be located near the patch panel for the workstations. Phone 5. Two dedicated phone lines are required for the MICROS PC. One is used for dial up support and one for credit cards. Dial up support is critical. This enables us to provide you with a more effklent level of support, i.e. we can dial up and make adjustments to your system verses driving to the side. A single modem limits our dial up capabilities. If you have credit cards and you need support, you will not be able to process ANY credit cards while we are dialed up. This could seriously Impact your operation. The same applies to sharing a phone line with a fax machine. Phone lines should be completed a minimum of 1 week prior to Iristaliation. Operational 6. You need to provide MICROS, with your credit card bank name, contact name, and phone number in order to ensure that credit cards will be available when you go live. Credit card set-up takes a MINIMUM of 2 to 3 weeks to process. 7. Property expert training is one of the most important aspects of your Installation. It Is Imperative that the appointed person ( people) attend the scheduled training. 8. Managers need to attend the employee training classes so that they will be able to assist the employees with operational issues. 9. MICROS recommends that all, training be done in our office to avoid operational disturbances and ensure a quality training atTrroephers. Information 10. All non- MICROS operational questions will be referred to the manager on duty. MICROS personnel will not act as managers during live coverage. 11. One day of PDT Is 8 hours. PDT includes database development (programming), all training, and live coverage. CREDIT CARDS 12. 3 to 4 days after your site goes live you MUST verify with your bank that the credit cards are being deposited to your account. You should always check the batch transfer status report that prints dally to verify j that your credit card batches have been succesafuily transferred. A.C. POWER REQUIREMENTS All A. C. power for the MICROS equipment ( Computer, POS terminals and Remote printers ) Is to be provided from a dedicated circuit containing separate NEUTRAL and ISOLATED GROUND conductors. The isolated ground conductor shall not be bonded to conduit and shall be terminated at the buildings main ground buss. This dedicated circuit should not be used to supply any other electrical loads In the building. All A.C. power receptacles shall be of the isolating ground (usually Identified by an orange face). DATA CABLE SPECIFICATIONS FOR ETHRANET CONNECTIONS 1. MICROS "does not" pull cables. 2. It Is recommended that all MICROS data cable be installed In metallic condult. If conduit Is not available, shielded cable should be used! 3. Two cables should be run from each workstation to a central patch panel for remote printing. 4. If remote printers are to be daisy-chained from a PC Workstation, the single connections at the ends of the chain can be terminated by the contracted network cabling vendor but It Is recommended that MICROS make all the connections in the center of the chain ( 2 cable ends Into 1 Jade ). Each remote printerloe'artion should have a 2 x 4 or 4 x 4 junction box installed with approximately 18 Inches of cable left out for termination. 5. PC Workstations connect via an Ethranet hub. All cable nine must be point to point and should be at least 3 meters In leneih but no longer than 100 nwisrs. MICROS doss recd mmaW lust you limit these runs to an actual 90 metiers or less. MICROS will not terminate dwse oonnecd►o W All LAN ©onnecdons must be 6. Cable runs should be at least 6 feet from any sources of electromagnetic interference 19--fluorescent lighting ballasts, refrigeration equipment, modors...etc. 7. All data cable runs must be free of splices. 8. All data cable should be Category 5, flour twisted pair, 2 AWO solid cone. 9. Patch panels are recommended for use in wiring closets and In the computer room. The panels should have a 110 style block to RJR configuration. The wiring pattem should folkyw ATT368B standards. GLYCOL SPECIF SEE SHEET P2.1 GEC MUST CONTACT MANUFACTURER AND CONSULT TENANT AND SUPPLIER OF UNIT TO CONFIRM RESPONSIBILITY OF ALL COMPONENTS LANDLORD MUST CONFIRM PLACEMENT OF UNIT WITH STRUCTURAL ENGINEER. WALK -IN UNIT WALLS, CEILINGS, AND FLOOR/ WALL JUNCTURES SHALL BE METAL OR EQUAL AND PROPERLY COVED. FLASH, TRIM, OR CAULK SPACES BETWEEN WALK -IN UNITS AND ADJACENT WALLS. WALK -IN UNITS OR OTHER LARGE EQUIPMENT /SURFACES WITH SPACES 30 INCHES OR LESS IN HEIGHT BETWEEN THE TOP SURFACES AND THE CEILING REQUIRE FLASHING OR CLOSING OFF IN A CLEAN, TIGHT VERMIN PROOF MANNER. - A WATER HEATER OF ADEQUATE CAPACITY AND RECOVERY IS REQUIRED TO FURNISH A CONTINUOUS SUPPLY OF HOT WATER FOR ' iHAND SINKS, RINSE SINKS, DISH /UTENSIL SINKS, MOP/ SERVICE SINKS AND OTHER FIXTURES, A MINIMUM 30- GALLON CAPACITY WATER HEATER IS REQUIRED FOR RETAIL ESTABLISHMENTS. A MINIMUM '50- GALLON CAPACITY WATER HEATER IS REQUIRED FOR FOOD SERVICE ESTABLISHMENTS. A MINIMUM ''75- GALLON CAPACITY WATER HEATER IS REQUIRED FOR ESTABLISHMENTS WITH A MECHANICAL DISHWASHER. WATER HEATERS INCLUDING APPROVED TANK -LESS WATER HEATERS SHALL BE CAPABLE OF SUPPLYING TEMPERED WATER (85' TO 105-F) TO HAND WASH SINKS AND HOT WATER (1207 MINIMUM) TO ALL OTHER SINKS. PROVIDE A 50 - GALLON CAPACITY WATER HEATER TO MEET THE MINIMUM HOT WATER DEMANDS OF THE FACILITIES' FIXTURES. WINDOWS OR VENTS THAT OPEN TO THE OUTSIDE MUST BE PROPERLY PROTECTED WITH #16 MESH SCREEN. PROVIDE AN APPROVED SNEEZE GUARD WITH SIDE PANELS FOR PROTECTION OF ALL EXPOSED FOOD ALONG THE CUSTOMER SERVING COUNTER, BUFFET LINES, ETC. ALL SNEEZE GUARDS ARE APPROVED ON A CASE -BY -CASE BASIS AND, REQUIRE FINAL ON -SITE APPROVAL. - PROVIDE ADEQUATE MECHANICAL VENTILATION OR PROPERLY SCREENED WINDOWS TO THE OUTSIDE AIR FOR TOILET ROOMS. ALL CONSTRUCTION SHALL MEET CURRENT MARICOPA COUNTY HEALTH CODE REQUIREMENTS. EACH PIECE OF FOOD SERVICE EQUIPMENT WITH A WATER INLET LINE INCLUDING, BUT NOT LIMITED TO, COFFEE AND TEA BREWERS, JUICE MACHINES, AND ICED DRINK MACHINES SHALL HAVE INDIVIDUAL APPROVED ASSE 1022 DUAL CHECK BACKFLOW PREVENTERS INSTALLED, IF AN AIR GAP IS NOT PROVIDED. GENERAL NOTES: 1. INSTALLATION PER MENCHIE'S SPECIFICATIONS, UNLESS NOTED OTHERWISE. 2. MATERIALS AND INSTALLATION PER MENCHIE'S SPECIFICATIONS, UNLESS NOTED OTHERWISE. SEE PLANS 3. REFER TO PLAN SPECIFICATIONS FOR DOOR INFORMATION. UNLESS NOTED OTHERWISE. 4. SHOP DRAWINGS ARE REQUIRED AND MUST BE SUBMITTED TO NEPTUNE FOR APPROVAL 5. ALL DRILLED HOLES IN COUNTER TOP BY TGC, COORDINATE LOCATIONS WITH M/F. 6. TGC TO COORDINATE EQUIPMENT DELIVERY. 7. TO BE ORDERED THROUGH FOOD SERVICE TENANT ACCOUNTS. REFER TO FOOD SERVICE TENANT DRAWINGS. GC BID TO EXCLUDE SIGN ITSELF. 8. NOT USED. 9. TGC SHALL TIE -IN TO LANDLORDS' ALARM SYSTEM. TGC SHALL PROVIDE REQUIRED RELAYS - FIELD VERIFY ALL CONDITIONS DURING BID 10. ALL INSTALLER DEBRIS SHALL BE REMOVED BY INSTALLER AND DISPOSED INTO GC PROVIDED DUMPSTER. 11. SEE SPECIFICATIONS ON FOOD SERVICE TENANT DRAWINGS. 12. ALL REQUIRED ROUGH -INS ARE SHOWN ON DRAWINGS AND ARE TO BE PROVIDED AND INSTALLED BY TGC. 13. REFER TO DOOR SCHEDULE ON FOOD SERVICE TENANT DRAWINGS. 14. FIELD VERIFY ACTUAL CONDITIONS DURING BID PROCESS. 15. PERMITTING OF SIGNAGE BY SC. VERIFY COORDINATION AND CONTACTS OF SIGNAGE ON EXTERIOR OF BUILDING - GC TO INSTALL & FINAL CONNECTION r. 17. GC TO CONSULT TENANT 18. FINAL CONNECTION INVOLVES POWER SUPPLY HOOK UP ONLY. 19. ALL PLANS SUBMITTALS FOR CITY/STATEMEALTH SHALL BE DONE BY FRANCHISEE. 20. GC TO SUBMIT PLANS PROVIDED BY GC CONSULTANT UNDER SEPARATE PERMIT. 21. SEE MFG SPECIFICATIONS OF ACTUAL MODEL ORDERED. 22. HOSES FROM GLYCOL MANIFOLD TO TAYLOR MACHINES SUPPLIED BY TGC. 5W, 350LBS PSI, CHEM. LINED RADIATOR HOSE. hl MENCHIE'S RESPONSIBILITY SCHEDULE MARCH 2010 GENERAL REQUIREMENTS PVISION 1) GC TO SIGN AND FAX TO NEPTUNE DESIGN GROUP @ 480 -452 -0122 SUPPLIED BY CONTRACTOR GENERAL RESPONSIBILITY AND NOTES: FINAL CONNECT NOTES 1. GENERAL CONTRACTOR TO OBTAIN FROM EQUIPMENT SUPPLIER ALL SPECIFICATIONS OF EQUIPMENT FOOD SERVICE BUILDING PERMIT N DURING BID PROCESS - CONTACT BRIAN LEWIS, STAR EQUIPMENT FOR BIDS (818) 782 -4460 EX. 311 19 INITIAL SC TGC 2. GENERAL CONTRACTOR AND SUBS ARE REQUIRED TO FIELD VISIT SITE DURING BID PROCESS (NO 15 PERMIT FEES- CITY, STATE, HEALTH EXCEPTIONS) INITIAL 0 3. GENERAL CONTRACTOR AND ELECTRICAL CONTRACTOR MUST FIELD VERIFY EXISTING ELECTRICAL GC TO FIELD VERIFY ALL EXISTING CONDITIONS DURING BID PROCESS TGC CONDITIONS IN FIELD AND COMPARE WITH CONSTRUCTION DOCUMENTS AND LEASE DURING BID PHASE. ANY AND ALL DISCREPANCIES MUST BE SENT TO NEPTUNE DESIGN GROUP FOR REVIEW VIA EMAIL. TGC INITIAL CONCRETE (DMSION 3) 4, GENERAL CONTRACTOR AND PLUMBING CONTRACTOR MUST FIELD VERIFY EXISTING WATER LINE SIZE CONCRETE SLAB- NEW POUR OR PREPARE EXISTING- SEE PLANS- FIELD VERIFY TGC AND APPROXIMATE LOCATION OF WASTE LINES IN FIELD AND COMPARE WITH CONSTRUCTION DOCUMENTS 14 AND LEASE DURING BID PHASE. ANY AND ALL DISCREPANCIES MUST BE SENT TO NEPTUNE DESIGN GROUP WALLS, KNEEWALLS AND BULKHEADS (FRAMING, FURRING, AND PLYWOOD) FOR REVIEW VIA EMAIL, INITIAL TGC h 5. GENERAL CONTRACTOR AND MECHANICAL CONTRACTOR MUST FIELD VERIFY EXISTING MECHANICAL BLOCKING SUPPORT FOR CHAIR RAIL, CROWN MOLD, EQUIPMNT / INTERIOR SIGNS TGC UNITS AND APPROXIMATE LOCATION OF GAS LINES IF APPLICABLE IN FIELD AND COMPARE WITH 00 CONSTRUCTION DOCUMENTS AND LEASE DURING BID PHASE. ANY AND ALL DISCREPANCIES MUST BE SENT TGC TGC TO NEPTUNE DESIGN GROUP FOR REVIEW VIA EMAIL. INITIAL 5,10, 4 FINISH CARPENTRY /ARCHITECTURAL WOODWORK (CABINETS, ETC.) 6. NOT USED. TGC TGC 2 THERMAL AND MOISTURE PROTECTION (DMSWN 7) 7. GENERAL CONTRACTOR TO OBTAIN DESIGN GUIDE BOOK FROM MENCHIE'S CORPORATE, INITIAL TGC TGC^ 8. GENERAL CONTRACTOR TO USE MENCHIE'S CORPORATE BID FORMS. INITIAL 7,11,16 EXHAUST FAN CURB ON ROOF 9. GLYCOL HOSES SHALL BE SUPPLIED BY GC - GC TO CONTACT GLYCOL SUPPLIER TO VERIFY ALL PARTS TGC TGC NEEDED, INITIAL DOORS AND WINDOWS (DIVISION 8) 10. GC SHALL INSTALL EXTERIOR SIGNS AND COMPLETE FINAL WIRING - SIGN COMPANY TO FURNISH SIGN TGC TGC AND APPLY FOR ALL PERMITS. INITIAL 1.3 SPECIALTY DOORS, DOOR FRAMES AND HARDWARE (WOOD. PLASTIC. ETC) 11, GC TO COORDINATE WITH TENANT ALL LOW VOLTAGE SPEAKERS, OS AND ALARM WITH VENDERS AND TGC IS NOT PART OF THIS CONSTRUCTION DOCUMENTS, INITIAL FRAMELESS GLASS STOREFRONT OF APPLICABLE) TGC 12. GC MUST DESTROY BID SETS AT TIME OF PERMIT, INITIAL -� 16 13. GC MUST SUBMIT FORMAL SHOP DRAWINGS OF NEW GLASS STOREFRONT TO LANDLORD FOR APPROVAL TGC TGC GC SHALL USE THESE PLANS AS A REFERENCE AND CONTACT NEPTUNE TO OBTAIN ANY ADDITIONAL 2 FINISHES (DIVISION 9) INFORMATION OR ASSIST WITH COORDINATION. INITIAL WALL FINISHES (GYPSUM BOARD. PRIMER COAT AND FRP PER MENCHIE'S SPECS) TGC 14. GC MUST LOCATE AND BUILD APPROVED PAD FOR GLYCOL UNIT ON ROOF- LANDLORD TO APPROVE 2 LOCATION PRIOR TO ORDERING EQUIPMENT. GC TO COORDINATE WITH LANDLORD LOCATION OF SHAFT THRU TGC TGC SECOND FLOOR AND DESIGN OF GLYCOL LINES WITH ON -SITE LANDLORD REPRESENTATIVE. INITIAL CEILING AND SUSPENSION GRID (GYP BD AND ACOUSTICAL TILE PER SPECS) TGC TGC GENERAL NOTES: 1. INSTALLATION PER MENCHIE'S SPECIFICATIONS, UNLESS NOTED OTHERWISE. 2. MATERIALS AND INSTALLATION PER MENCHIE'S SPECIFICATIONS, UNLESS NOTED OTHERWISE. SEE PLANS 3. REFER TO PLAN SPECIFICATIONS FOR DOOR INFORMATION. UNLESS NOTED OTHERWISE. 4. SHOP DRAWINGS ARE REQUIRED AND MUST BE SUBMITTED TO NEPTUNE FOR APPROVAL 5. ALL DRILLED HOLES IN COUNTER TOP BY TGC, COORDINATE LOCATIONS WITH M/F. 6. TGC TO COORDINATE EQUIPMENT DELIVERY. 7. TO BE ORDERED THROUGH FOOD SERVICE TENANT ACCOUNTS. REFER TO FOOD SERVICE TENANT DRAWINGS. GC BID TO EXCLUDE SIGN ITSELF. 8. NOT USED. 9. TGC SHALL TIE -IN TO LANDLORDS' ALARM SYSTEM. TGC SHALL PROVIDE REQUIRED RELAYS - FIELD VERIFY ALL CONDITIONS DURING BID 10. ALL INSTALLER DEBRIS SHALL BE REMOVED BY INSTALLER AND DISPOSED INTO GC PROVIDED DUMPSTER. 11. SEE SPECIFICATIONS ON FOOD SERVICE TENANT DRAWINGS. 12. ALL REQUIRED ROUGH -INS ARE SHOWN ON DRAWINGS AND ARE TO BE PROVIDED AND INSTALLED BY TGC. 13. REFER TO DOOR SCHEDULE ON FOOD SERVICE TENANT DRAWINGS. 14. FIELD VERIFY ACTUAL CONDITIONS DURING BID PROCESS. 15. PERMITTING OF SIGNAGE BY SC. VERIFY COORDINATION AND CONTACTS OF SIGNAGE ON EXTERIOR OF BUILDING - GC TO INSTALL & FINAL CONNECTION r. 17. GC TO CONSULT TENANT 18. FINAL CONNECTION INVOLVES POWER SUPPLY HOOK UP ONLY. 19. ALL PLANS SUBMITTALS FOR CITY/STATEMEALTH SHALL BE DONE BY FRANCHISEE. 20. GC TO SUBMIT PLANS PROVIDED BY GC CONSULTANT UNDER SEPARATE PERMIT. 21. SEE MFG SPECIFICATIONS OF ACTUAL MODEL ORDERED. 22. HOSES FROM GLYCOL MANIFOLD TO TAYLOR MACHINES SUPPLIED BY TGC. 5W, 350LBS PSI, CHEM. LINED RADIATOR HOSE. hl MENCHIE'S RESPONSIBILITY SCHEDULE MARCH 2010 GENERAL REQUIREMENTS PVISION 1) NEW STORE, EXPANSION, TAKE -OVER SUPPLIED BY INSTALLED BY FINAL CONNECT NOTES FOOD SERVICE BUILDING PERMIT N 19 FOOD SERVICE SIGNAGE PERMIT (EXTERIOR) & SIGN INSTALL SC TGC TGC 15 PERMIT FEES- CITY, STATE, HEALTH F 0 GC TO FIELD VERIFY ALL EXISTING CONDITIONS DURING BID PROCESS TGC DEMOLITION OF EXISTING WALLS (IF APPLICABLE) TGC CONCRETE (DMSION 3) CONCRETE SLAB- NEW POUR OR PREPARE EXISTING- SEE PLANS- FIELD VERIFY TGC TGC 14 METALS, WOODS AND PLASTICS (DIVISION 5U) WALLS, KNEEWALLS AND BULKHEADS (FRAMING, FURRING, AND PLYWOOD) TGC TGC h 2 BLOCKING SUPPORT FOR CHAIR RAIL, CROWN MOLD, EQUIPMNT / INTERIOR SIGNS TGC TGC 00 COUNTERS AND COUNTER TOPS TGC TGC TGC 5,10, 4 FINISH CARPENTRY /ARCHITECTURAL WOODWORK (CABINETS, ETC.) TGC TGC TGC 10.4 THERMAL AND MOISTURE PROTECTION (DMSWN 7) ROOF PENETRATIONS ON ROOF- GC TO CONSULT TENANTS LEASE TGC TGC^ TGC 7,11,16 EXHAUST FAN CURB ON ROOF TGC TGC TGC 1 DOORS AND WINDOWS (DIVISION 8) METAL DOORS, DOOR FRAMES AND HARDWARE TGC TGC 1.3 SPECIALTY DOORS, DOOR FRAMES AND HARDWARE (WOOD. PLASTIC. ETC) TGC TGC 13 FRAMELESS GLASS STOREFRONT OF APPLICABLE) TGC TGC -� 16 STOREFRONT DOORS AND HARDWARE (IF REQUIRED BY AUTHORITY HAVING JURISDICTION) (IF APPLICABLE) TGC TGC r­4 2 FINISHES (DIVISION 9) WALL FINISHES (GYPSUM BOARD. PRIMER COAT AND FRP PER MENCHIE'S SPECS) TGC TGC 2 WALL FINISHES (FINAL PAINT. TILE AND OTHER SPECIALTY WALL FINISHES) TGC TGC CEILING AND SUSPENSION GRID (GYP BD AND ACOUSTICAL TILE PER SPECS) TGC TGC 2 FLOORING FINISHES IN STORES (QUARRY TILE IN KITCHEN AND UTILITY AREAS ONLY) TGC TGC 2.14 FLOORING FINISHES IN STORES (TILE IN ENTIRE DINING/ PARTY ROOM SPACE) TGC TGC 2 WALL BASE TGC TGC 2 WALL BASE (SANITARY COVE BABE) TGC TGC 2 QUARRY TILE BASE TGC TGC 11 SPECIALTIES (DIVISION 10) ORNAMENTAL STEEL RAILING (IF APPLICABLE) verify verily 16 AWNING (!F APPLICABLE) verify verify 16 SIGNAGE (INTERIOR AND EXTERIOR) PERMITTING BY SIGN COMPANY SC SC TGC 7,11 INTERIOR SIGNS, MENU BOARD, GRAPHICS M TGC j TGC j 10 EQUIPMENT (DMSION 11) ALL KITCHEN EQUIPMENT (UNLESS NOTED OTHERWISE) KES TGC TGC 6110 CEILING DISK LOCATED ABOVE CASHWRAP TGC TGC TGC MILLWORK AT CABINET DISPLAYS (RETAIL / REFRIG) TGC TGC TGC FURNISHINGS (DMSION 12) FURNISHINGS (DINING TABLES. SEATING, PLANTERS, ETC) KES TGC 7,10 SPECIAL CONSTRUCTION (DMSION 13) NOT USED L O TA E / SPEAKERS / SECURITY SYSTEM OF APPLICABLE) TGC TGC TGC 9.20 MECHANICAL (DMSION 15) PLUMBING (ROUGH INS) TOC TGC TGC WALL MOUNTED HAND SINK, MOP SINK. FAUCETS AND ACCESSORIES TGC TGC TGC 2 3 COMPART SINKS, PREP SINK. COUNTER HAND SINK, FAUCETS / ACCESSORIES. KES TGC TGC 21 WATER HEATER AND COLD WATER SUPPLY TGC TGC TGC 1111 HOT AND COLD WATER SUPPLY TGC TGC TGC 1 WALK-IN COOLER BOX KES KES TGC 11,18.21 GLYCOL ROOFTOP UNIT KES TGC TGC 21 GLYCOL RADIATOR HOSES AND CONNECT TGC TGC TGC 21.22 ROOFTOP UNITS (SUPPLIED BY - SEE PLANS) TGC TGC 16 MECHANICAL EQUIPMENT AND CONNECTIONS (HVAC DUCTWORK AND DIFFUSERS) TGC TGC TGC 16 ELECTRICAL (DMSION 16) ELECTRICAL ROUGH -IN WIRING TGC TGC TGC 16 ELECTRICAL PANELS (FIELD VERIFY SEE PLANS) TGC -FIELD YERIFY TGC TGC 16 'C ' OF' SOo r w ELECTRICAL RECEPTACLES TGC TGC TGC rILL)I NG rjEP7,. 1 FLUORESCENT LIGHTING FIXTURES (2X4 PERM SPECS) TGC TGC TGC 2 " w " SPECIALTY LIGHTING FIXTURES TGC TGC TGC INSECT CONTROL LIGHTING FIXTURES TGC TGC TGC 2 TELECOMMUNICATIONS (WIRING, RECEPTACLES AND COVER PLATES) TGC TGC TGC 17.11 LEGEND: TGC = TENANTS GENERAL CONTRACTOR F =FRANCHISEE OWNER/ OPERATOR KES = KITCHEN EQUIPMENT SUPPLIER (CONTRACTED BY OWNER OPERATOR) N = NEPTUNE DESIGN GROUP M= MENCHIE'S CORPORATE SC= SIGN COMPANY REVISION ,� FIRE COMMENTS 10 -22 -10 2 FIRE COMMENTS 11 -10 -10 7ME CHI E'S B549 U w v� 0 0 N � h tn 00 O O M 00 M .. M .-� -� 00 0000 r­4 v COO REVISION ,� FIRE COMMENTS 10 -22 -10 2 FIRE COMMENTS 11 -10 -10 7ME CHI E'S B549 SHEET NAME NUMBER A 1 .2 v� SHEET NAME NUMBER A 1 .2