10-920-003GENERAL NOTES GENERAL REQUIREMENTS A. DRAWINGS. THE DRAWINGS ARE INTENDED TO DESCRIBE THE OVERALL SCOPE OF WORK. CONTRACTORS SHALL FIELD VERIFY EXISTING CONDITIONS AND ALERT ARCHITECT TO ANY UNFORESEEN CONSTRUCTION DIFFICULTIES BEFORE BEGINNING WORK. B. PRE — CONSTRUCTION MEETING. PRIOR TO ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY, THE CONTRACTOR SHALL SCHEDULE, WITH OWNERS APPROVAL, A PRE — CONSTRUCTION MEETING WITH THE LOCAL BUILDING DEPT. OR LOCAL PUBLIC WORKS DEPT. VERIFY WHICH AGENCY WOULD BE INVOLVED. THE CONTRACTOR SHALL PROVIDE LOCAL INSPECTOR WITH 24 HOURS NOTICE PRIOR TO INSPECTION. C. REPETITIVE. TYPICAL WALL SECTIONS, FINISHES, AND DETAILS ARE NOT INDICATED EVERYWHERE THEY OCCUR ON PLANS, ELEVATIONS AND SECTIONS. REFER TO DETAILED DRAWINGS. CONTRACTOR TO PROVIDE AS IF DRAWN IN FULL. D. CODES / PERMITS / REGULATIONS. ALL EXTERIOR SIGNAGE MUST BE SUBMITTED AND REVIEWED UNDER SEPARATE PERMIT APPLICATION. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS NECESSARY OTHER THAN THE BUILDING PERMIT. CONTRACTOR SHALL ALSO PAY FOR ALL OTHER I CHARGES, FEES OR COSTS CHARGED BY THE BUILDING AND CONSTRUCTION DEPARTMENTS, UTILITY AGENCIES OR PRIVATE COMPANIES WHICH REQUIRE SUCH COSTS FOR OR PRIOR TO INSTALLATIONS. NOTHING IN THE, DRAWINGS SHALL BE CONSTRUCTED TO PERMIT AN INSTALLATION IN VIOLATION OF APPLICABLE CODES AND /OR RESTRICTIONS. !SHOULD ANY CHANGE IN THE DRAWINGS BE NECESSARY IN ORDER TO COMPLY WITH APPLICABLE CODES AND /OR REQUIREMENTS, THE CONTRACTOR SHALL NOTIFY THE ARCHITECT AT ONCE AND CEASE WORK. ALL PARTS PERFORMED UNDER THIS CONTRACT SHALL BE IN FULL ACCORDANCE WITH THE LATEST RULES, REGULATIONS, RESTRICTIONS, REQUIREMENTS AND CODES: AMENDED BY GOVERNING CITY & ALL JURISDICTION RULES AND REGULATIONS. E. DIMENSIONS ARE SHOWN TO FACE OF MASONRY OR CENTERLINE OF OPENING, UNLESS DETAILED OTHERWISE ON DRAWINGS. DO NOT SCALE DRAWINGS. THE CONTRACTOR SHALL USE DIMENSIONS SHOWN ON THE DRAWINGS AND ACTUAL FIELD MEASUREMENTS. NOTIFY THE ARCHITECT IF ANY DISCREPANCIES ARE FOUND. THE CONTRACTOR SHALL VERIFY ALL ROUGH —IN DIMENSIONS FOR THE EQUIPMENT FURNISHED AND INSTALLED BY HIMSELF /HERSELF OR OTHERS. THE CONTRACTOR SHALL CONSULT THE PLANS OF ALL TRADES FOR OPENINGS THROUGH SLABS, WALLS, CEILINGS AND ROOFS. F. SHOP DRAWINGS REVIEW. PROVIDE SHOP DRAWINGS FOR THE ARCHITECTS / OWNERS AND AS REQUIRED BY THE CITY PRIOR TO CONSTRUCTION. G. CONTRACTOR TO FRAME OPENINGS IN WALLS, CEILINGS AND FLOORS FOR H.V.A.C. AND OTHER MECHANICAL OR ELECTRICAL WORK WHERE REQUIRED AND NOT OTHERWISE SHOWN ON THE PLANS. H. COMPLY WITH APPLICABLE REGULATIONS FOR BARRIER —FREE FACILITIES INCLUDING: 1) MAXIMUM THRESHOLD HEIGHT TO BE ONE HALF INCH (1/2 ") ALONG ACCESSIBLE ROUTE OF TRAVEL. 2) STAIR NOSINGS TO BE FLUSH, SLIP — RESISTANT AND ROUNDED TO RADIUS, OF ONE HALF INCH (1/2 ") MAXIMUM. DOORS / WINDOWS A. GLAZING. PROVIDE GLAZING PER CITY CODES: INSULATED UNITS SHALL BE CLASS 40 GLAZING WITH LOW ARGON GAS. GLAZING IN LOCATIONS SUBJECT TO HUMAN IMPACT SUCH AS PANES IN DOORS, GLAZING WITHIN A 24" ARC OF A DOOR OPENING, GLAZING WITHIN 118" OF THE FLOOR (AND IS OVER 9 SQ. FT. PER PANEL) SHALL BE TEMPERED GLASS OR LAMINATED SAFETY GLASS PER CODE. GLAZING U —VAL UI E (AMMA TESTED) U -40 MAXIMUM. FIRE PROTECTION A. EXTEND THE EXISTING AUTOMATIC FIRE SPRINKLER SYSTEM AS REQUIRED. GET SYSTEM DESIGN APPROVED BY GOVERNING CITY'S BUILDING 'DEPT. AND FIRE DEPT. PRIOR TO INSTALLATION. (IF APPLICABLE) B. PROVIDE FIRE EXTINGUISHERS AS REQUIRED BY INTERNATIONAL BUILDING CODE AND LOCATE PER FIRE MARSHALL'S DIRECTION. 1 FIRE EXTINGUISHER PER 3,000 S.F. OF BLDG. AREA WITH 75' -0" TRAVEL DISTANCE BETWEEN EXTINGUISHERS. C. MAINTAIN STRUCTURAL AND FIRE RESISTIVE INTEGRITY AT EXTERIOR AND RATED INTERIOR WALL PENETRATIONS FOR ELECTRICAL, MECHANICAL, PLUMBING AND COMMUNICATIONS CONDUITS, PIPED AND SIMILAR SYSTEMS PER CITY'S CODE. THERMAL /MOISTURE PROTECTION A. OPENINGS. ALL OPENING TO BE CAULKED, SEALED OR WEATHER — STRIPPED. ALL FLASHING AND ARCHITECTURAL SHEET METAL TO BE 24 GAUGE GALVANIZED STEEL, FACTORY PRIMED AND FIELD PAINTED. 10' -0" LENGTHS, PER SMACNA MANUAL UNLESS OTHERWISE NOTED. B. CAULKING AND SEALANTS. USE PRIMERS AS REQUIRED BY MANUFACTURER. BACKING RODS OR TAPE AS RECOMMENDED BY MANUFACTURER. USE POLYURETHANE SEALANTS AT CONCRETE FLOOR AND SIDEWALK JOINTS. ALL OTHER LOCATIONS USE POLYSULFIDE OR SILICONE. C. VAPOR BARRIERS'. CONTINUOUS APPROVED VAPOR BARRIERS SHALL BE INSTALLED ON THE HEATED SIDE OF ALL THERMAL INSULATION INSTALLED. D. INSULATION. PROVIDE INSULATION PER LOCAL CODE, COMPONENT PERFORMANCE APPROACH. 1. VERIFY IN FIELD PRIOR DEMOLITION OF EXISTING WALLS IF ANY STRUCTURAL COLUMNS EXIST. IF SO CONTACT ARCHITECT IMMEDIATELY. 2. CONTRACTOR TO MAINTAIN PROPER LIGHTING, SANITATION AND VENTILATION AT ALL TIMES. 3. ALL WORK MUST BE APPROVED BY BUILDING INSPECTOR PRIOR TO COVERING WORK. 4. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN A WATER AND WEATHER TIGHT BUILDING. 5. ALL WORK TO BE PERFORMED TO CODE BY LICENSED CONTRACTORS PERFORMING WORK IN THEIR SPECIFIC TRADE ONLY. 6. ALL DESIGN, DRAWINGS AND DETAILS REPRESENT COMPLETE WORK IN PLACE. ARCHITECT SHALL HAVE NO CONTROL OR CHANGE OF AND SHALL NOT BE RESPONSIBLE FOR CONSTRUCTION. 7. INTERIOR PARTITION DIMENSIONS NOTED ON PLANS MAY BE SHOWN A NOMINAL DIMENSION, SUCH AS 5" INTERIOR WALL REFERS TO GYPSUM BOARD EACH OVER 3 5/8" STUDS. STUD SPACING IS 24" O.C. 8. ALL DEBRIS GENERATED FROM CONSTRUCTION MUST BE KEPT ON THE SITE IN EITHER AN ENCLOSED AREA OR HAULED AWAY DAILY, AND DISPOSED OF LEGALLY OFF SITE. 9. EXTERIOR SIGNAGE IS NOT PART OF THIS CONTRACT OR PERMIT EXCEPT ELECTRICAL ROUGH —IN AND BLOCKING. SIGN CONTRACT SHALL MAKE SEPARATE SUBMITTAL TO THE CITY FOR REVIEW AND PERMIT. 10. KEEP ALL PIPING AND CONDUIT AS CLOSE TO WALLS AND ROOF DECK AS POSSIBLE AND ALL DUCTWORKS AS CLOSE TO ROOF AS POSSIBLE. WHERE EXPOSED ALL PIPING CONDUIT AND DUCTWORK SHALL BE PAINTED UNLESS NOTED. ALL PIPING AND CONDUIT SHALL BE ORGANIZED IN A NEAT MANNER RUNNING PARALLEL OR PERPENDICULAR TO ROOF FRAMING MEMBERS. 11. MAXIMUM FLAME SPREAD CLASSIFICATION OF FINISH MATERIALS USED ON INTERIOR WALLS AND CEILINGS SHALL NOT EXCEED THAT SET FORTH IN FLAME SPREAD TABLE OF THE BUILDING CODE. 12. VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO CONSTRUCTION AND COORDINATE WITH ARCHITECT ANY CONFLICTS WITH THE PLANS. 13. PERFORM THE REMOVAL, CUTTING AND DRILLING WITH THE CARE USE OF THE SMALLEST TOOLS SO AS TO NOT DAMAGE THE STRUCTURAL INTEGRITY OF THE BUILDING. 14. TO SAW CUT AT EXISTING RESTROOM LOCATION USE SAWS AND COREDRILLS DO NOT USE JACKHAMMER UNDER ANY CIRCUMSTANCES. GENERAL CONTRACTOR NOTE: THE GC MUST SUBMIT SEPARATE DRAWINGS FOR SPRINKLER AND FIRE ALARM WORK AND SHALL BE UNDER SEPARATE PERMIT. PROJECT MAP PROJECT A TENANT IMPROVEMENT FOR 5744 SUNSET DR SOUTH MIAMI, FLORIDA 33143 REFERENCE SYMBOLS I PROJECT DATA ABBREVIATIONS ACP ACOUSTICAL CL.G. PANEL ACT ACOUSTICAL CLG. TILE AL ALUMINUM ALUM ALUMINUM ARCH DOOR TAG 1� BUILDING ELEVATION X PROJECT NAME: BLKG BLOCKING REFERENCE A4 PROJECT ADDRESS: ROOM TAG 100 CERAMIC TILE CFM CUBIC FEET PER MINUTE CL CENTER LINE WALL SECTION X CONC CONCRETE 1 REFERENCE A4 LOCAL JURISDICTION: DETAIL REFERENCE A4 DF DRINKING FOUNTAIN DIA DIAMETER DIM EQUIPMENT REFERENCE 0 CODES UTILIZED: REVISION — DS DOWNSPOUT DWG ABBREVIATIONS ACP ACOUSTICAL CL.G. PANEL ACT ACOUSTICAL CLG. TILE AL ALUMINUM ALUM ALUMINUM ARCH ARCHITECTURAL, AVG. AVERAGE BLDG BUILDING BLKG BLOCKING BR BRICK CMU CONCRETE BLOCK CT CERAMIC TILE CFM CUBIC FEET PER MINUTE CL CENTER LINE CLG CEILING CONC CONCRETE CONT CONTINUOUS CW COLD WATER DTL DETAIL DF DRINKING FOUNTAIN DIA DIAMETER DIM DIMENSION DN DOWN DR DOOR DS DOWNSPOUT DWG DRAWING EA EACH ELEV ELEVATION EXIST EXISTING or E. HORIZONTAL EXT. EXTERIOR FDN FOUNDATION FIN FINISH FD FLOOR DRAIN FL FLOOR FLASH. FLASHING P.LAM PLASTIC LAMINATE FOIC FURNISHED BY OWNER PLYWD PLYWOOD INSTALLED BY CONTRACTOR R RISER, RADIUS FO FINISH OPENING REBAR REINFORCING BAR FRP FIBERGLASS REF REFERENCE SEATS REINFORCED PANELS REV REVISION FRT FIRE RETARDANT TREATED RM. RMS ROOM, ROOMS GA GAUGE RO ROUGH OPENING GALV GALVANIZED S & V STAIN AND VARNISH GL GLASS SC SOLID CORE GWB GYPSUM WALLBOARD SCHED SCHEDULE HDWE HARDWARE SEC SECTION HM HOLLOW METAL SHT SHEET HOR HORIZONTAL SPECS SPECIFICATIONS HT HEIGHT SF SQUARE FEET HW HOT WATER ST STEEL HWT HOT WATER TANK STOR STORAGE LAV LAVATORY STRUCT STRUCTURAL LT LIGHT SUSP SUSPENDED MAT'L MATERIAL SV SHEET VINYL MAX MAXIMUM SS STAINLESS STEEL MTL METAL TB TELEPHONE MOUNTING BOARD MIN MINIMUM TD TRENCH DRAIN M.O. MASONRY OPENING THRESH THRESHOLD MUL MULLION TYP TYPICAL N/A NOT APPLICABLE UNFIN UNFINISHED UR URINAL NIC NOT IN THIS CONTRACT VCT VINYL COMPOSITION TILE NO. NUMBER VERT VERTICAL NOM NOMINAL VST VINYL SAFETY TILE NTS NOT TO SCALE W WIDTH O.C. ON CENTER WC WATER CLOSET OD OUTSIDE DIMENSION WD WOOD PT PAINT WDW WINDOW WP . WATERPROOF CONTACT INFORMATION TENANT 'II4,G RMAT-1ON: ATTN:, F ► B BO SA 305 -2 STEFA GMAIL.COM CORPORATE INFORMATION: MENCHIE'S YOGURT ATTN: TOM REGEV 6345 BALBOA BOULEVARD SUITE 170 ENCINO, CA 91316 P: (818).708.0316 F: (818).708.0117 tom.regev®menchiesyogurt.com LANDLORD: AMAL QAHHAT 305.796.0481 AMALQAH HAT®YAH OO. CO M HEALTH DEPARTMENT: DIVISION OF HOTELS & RESTAURANTS 1940 N. MONROE STREET TALLAHASSEE, FL 32399 P: 850.487.1395 NEPTUNE PROJECT MANAGER: ATTN: ELISA BAYHA 9311 E. VIA DE VENTURA SCOTTSDALE, AZ 85258 P: (480).362.4764 F: (480).452.0122 elisa ®neptunedg.com BUILDING DEPARTMENT: CITY HALL, 2ND FLOOR 6130 SUNSET DRIVE SOUTH MIAMI, FL 33143 TEL: (305) 663 -6358 FAX: (305) 666 -4591 MENCHIE'S FROZEN YOGURT 5744 SUNSET DR SOUTH MIAMI, FL 33143 BUILDING & SAFETY — CITY OF SOUTH MIAMI HEALTH — DIVISION OF HOTELS & RESTAURANTS 2007 FLORIDA BUILDING CODE 2007 FLORIDA PLUMBING CODE 2007 FLORIDA MECHANICAL CODE 2005 NATIONAL ELECTRICAL CODE 2007 FLORIDA STATE ACCESSIBILITY CODE PROPOSED USE: SELF SERVED YOGURT CONSTRUCTION TYPE: V —N OCCUPANCY GROUP: A2 TOTAL S.F.: 2,076 S.F. DINING AREA 540 S.F. / 15 = 36 KITCHEN /SERVICE AREA 1140 S.F. / 200 = 5.7 HALLWAY /RESTROOM 180 S.F. / 100 = 1.8 ACTUAL INTERIOR SEATING: 33 SEATS TOTAL OCCUPANT LOAD: 43.5 1 EXIT(S) REQUIRED, 2 EXITS) PROVIDED (OCCUPANT >50) 2 RESTROOM REQUIRED, 2 RESTROOM(S) PROVIDED NO STRUCTURAL WORK IS TO BE PERFORMED UNDER THIS PERMIT. NO SITE WORK IS TO BE PERFORMED UNDER THIS PERMIT. (3) EMPLOYEES MAXIMUM I EXTERIOR SIGN UNDER SEPARATE PERMIT BY SIGN COMPANY — INSTALLED BY GC NDEX OF SHEETS Al TITLE SHEET Al.1 EXISTING AND PROPOSED A1.2 RESPONSIBILITY SCHEDULES A2 FLOOR PLAN A3 REFLECTED CEILING PLAN A4 ELEVATIONS V I D A4.1 ELEVATIONS A5 EQUIPMENT PLAN A6 DETAILS A7 MILLWORK /SOFFIT DETAILS M1.1 MECHANICAL PLAN AND SYMBOLS M2.1 MECHANICAL DETAILS, SCHEDULES R -1 GLYCOL SPECIFICATION SHEET P1.1 PLUMBING PLAN & SYMBOLS P2.1 PLUMBING DETAILS, SCHEDULES E1.1 ELECTRICAL LIGHTING PLAN & POWER PLAN E2.1 SINGLE —LINE DIAGRAM & PANEL SCHEDULES A M � M w � V1 d' 1J REVISION A- A2 — MENCHIE'S MEN6549 0, o f D ... r City Of`olit') M ! <i tt l �?� %�;�a� "7lr emt SHEET NAME_ Vol, "',! I AffPt :�e,{ , NUMBcR a. kj ,,raava� �� -.� G��axi DATED: 9.17.10 l c CT O � O O 0�0 00 0.0 M .. M Q; coo 00 8 o 00 Ar__1 4 En zS1 EXTERIOR SIGN UNDER SEPARATE PERMIT BY SIGN COMPANY — INSTALLED BY GC NDEX OF SHEETS Al TITLE SHEET Al.1 EXISTING AND PROPOSED A1.2 RESPONSIBILITY SCHEDULES A2 FLOOR PLAN A3 REFLECTED CEILING PLAN A4 ELEVATIONS V I D A4.1 ELEVATIONS A5 EQUIPMENT PLAN A6 DETAILS A7 MILLWORK /SOFFIT DETAILS M1.1 MECHANICAL PLAN AND SYMBOLS M2.1 MECHANICAL DETAILS, SCHEDULES R -1 GLYCOL SPECIFICATION SHEET P1.1 PLUMBING PLAN & SYMBOLS P2.1 PLUMBING DETAILS, SCHEDULES E1.1 ELECTRICAL LIGHTING PLAN & POWER PLAN E2.1 SINGLE —LINE DIAGRAM & PANEL SCHEDULES A M � M w � V1 d' 1J REVISION A- A2 — MENCHIE'S MEN6549 0, o f D ... r City Of`olit') M ! <i tt l �?� %�;�a� "7lr emt SHEET NAME_ Vol, "',! I AffPt :�e,{ , NUMBcR a. kj ,,raava� �� -.� G��axi DATED: 9.17.10 l