11-50-016PART GENERAL 1.1 GENERAL: THE GENERAL AND SPECIAL CONDITIONS AND REQUIREMENTS OF THE CONTRACT AND SPECIFICATIONS AS WELL AS PLANS AND SPECIFICATIONS OF OTHER DISCIPLINES AND TRADES SHALL APPLY AND BE PART OF THE WORK HEREBY SPECIFIED. THESE SPECIFICATIONS AND THE ACCOMPANYING PLANS ARE INTENDED TO PROVIDE FOR THE COMPLETE FURNISHING AND INSTALLATION OF THE MECHANICAL SYSTEMS. "PROVIDE" MEANS "FURNISH AND INSTALL". 1.2 COMPLIANCE: WORKMANSHIP, MATERIALS AND INSTALLATION SHALL BE IN STRICT ACCORDANCE WITH THE LATEST EDiTION OF NFPA, ASHRAE, ASME, ASPS, ASTM, NEC, IEEE, OSHA, HRS, HEALTH AGENCIES, AND OTHER APPLICABLE NATIONAL, STATE, AND LOCAL CODES AND PERTAINING REGULATIONS ESTABLISHED BY RULING AUTHORITIES HAVING JURISDICTION. CONTRACTOR SHALL ALSO MEET REQUIREMENTS OF OTHER RECOGNIZED STANDARDS, WHERE SUCH REQUIREMENTS ARE MORE STRINGENT THAN THOSE CITED ABOVE. 1.3 WORKMANSHIP: ALL WORK SHALL BE PERFORMED BY CONTRACTORS LICENSED IN THEIR RESPECTIVE DISCIPLINES. WORK SHALL BE DONE IN A FIRST CLASS MANNER, FULLY OPERATIVE, AND TO THE ACCEPTANCE OF THE ARCHiTECT/ENGINEER. CONTRACTOR SHALL PROVIDE FOR ALL NECESSARY LABOR AND MATERIALS REQUIRED FOR COMPLETION OF THE WORK INCLUDING BUT NOT LIMITED TO CONNECTIONS TO RELATED WORK SUCH AS CONNECTION TO EXISTING SYSTEMS. 1.4 MATERIALS: CONTRACTOR SHALL PROVIDE ALL NEW MATERIALS OF AMERICAN MANUFACTURE, BEARING THE UNDERWRITER'S LABORATORY (UL) LABEL AS APPLICABLE MATERIALS SHALL BE ACCEPTABLE AND ABOVE STANDARD QUALITY NORMALLY USED FOR THE PURPOSE AS CALLED FOR ON PLANS. SUPPLEMENTAL MATERIALS, PRODUCTS AND COMPONENTS NECESSARY TO COMPLY WITH THE INTENT OF THE CONTRACT DRAWINGS AND /OR SPECIFICATIONS, BUT NOT NOTED OR SPECIFIED ON THESE SECTIONS, SHALL BE PROVIDED BY CONTRACTOR AS REQUIRED FOR COMPLETION OF THE WORK AT NO ADDITIONAL COST TO THE OWNER. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVISIONS AND COORDINATION OF DELIVERY OF MATERIALS. EQUIPMENT MARRED DURING SHIPMENT OR INSTALLATION SHALL BE TOUCHED UP AND REFINISHED TO FACTORY FINISH, REPLACED WHERE NOT ACCEPTABLE. 1.5 PERMITS & INSURANCE: CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS, FEES, TAXES, INSPECTIONS. TESTS, FINES AND OTHER ITEMS AS REQUIRED FOR THE INSTALLATION OF COMPLETE MECHANICAL SYSTEMS AS OUTLINED HEREIN AND SHOWN ON PLANS. PROVIDE ALL REQUIRED INSURANCE FOR PROTECTION AGAINST PUBLIC LIABILITY AND PROPERTY DAMAGE FOR THE DURATION OF THE WORK. 1.6 EXISTING CONDITIONS: BEFORE BIDDING CONTRACTOR SHALL VISIT THE JOB SITE AND ASCERTAIN ALL EXISTING CONDITIONS WHICH WILL AFFECT HiS WORK. FAILURE TO DO SO WILL NOT BE ACCEPTED AS A REASON FOR REQUESTING EXTRA PAY WHERE THE EXISTING CONDITIONS RESULT IN EXTRA MATERIAL OR LABOR. ANY EXISTING CONDITION FOUND BY THE CONTRACTOR WHICH WILL ADVERSELY AFFECT THE WORK SHALL IMMEDIATELY BE BROUGHT TO THE ATTENTION OF THE ARCHITECT /ENGINEER. CORRECTION OF ANY DEFECTS SHALL BE COMPLETED WITHOUT ADDITIONAL CHARGE AND SHALL INCLUDE REPLACEMENTS OR REPAIR OF ANY OTHER PHASE OF THE INSTALLATION WHICH MAY HAVE BEEN DAMAGED THEREBY. 1.7 UTILITY COMPANIES. BEFORE SUBMITTING BID CONTRACTOR SHALL CHECK WITH WATER, SEWER, GAS, ELECTRICAL. TELEPHONE. CABLE TV AND OTHER UTILITY COMPANIES SUPPLYING SERVICE TO THiS INSTALLATION TO DETERMINE INSTALLATION STANDARDS AND EQUIPMENT REQUIREMENTS AND COSTS TO BE INCLUDED IN THE BID. EXCEPT WHERE U11UTY REQUIREMENTS CHANGE AFTER SUBMITTAL. NO EXTRA PAYMENT WILL BE MADE TO THE CONTRACTOR FOR SUCH ITEMS. PROVIDE TEMPORARY SERVICES FOR ALL TRADES AS REQUIRED. 1.8 PLANS: DRAWINGS ARE GENERALLY DIAGRAMMATIC, INTENDED TO SHOW APPROXIMATE EQUIPMENT LOCATIONS AND ARRANGEMENTS, NOT TO SHOW EVERY MINOR DETAIL PLANS SHALL NOT BE SCALED TO DETERMINE EXACT LOCATION AND DIMENSIONS. 1.9 INTERFERENCE: CONTRACTOR SHALL COORDINATE HIS WORK WITH THE WORK OF OTHER TRADES SO THAT INTERFERENCES WITH EXISTING CONDITIONS, CONDUITS, PIPING. EQUIPMENT. ARCHITECTURAL, STRUCTURAL MEMBERS WILL BE AVOIDED. 1.10 SHOP DRAWINGS: PRIOR TO PLACING AN ORDER AND BEFORE INSTALLATION. SUBMIT FOR REVIEW PROPERLY IDENTIFIED AND BOUND SHOP DRAWINGS AND MANUFACTURER'S LITERATURE GIVING SPECIFICATIONS, DETAILS, COMPLIANCE, UL APPROVAL, MATERIALS, FINISHES, ACCESSORIES AND INSTALLATION DIRECTIONS WHERE REQUIRED OF THE EQUIPMENT SPECIFIED. FACTORY CERTIFIED PRINTS SHALL BE FURNISHED FOR ALL MAJOR ITEMS OF EQUIPMENT AND SPECIFIED. SUBMISSION OF EQUIPMENT FOR APPROVAL SHALL BE MADE COMPLETE AND ALL AT THE SAME TiME. 1.11 SUBSTITUTIONS: PRODUCTS AND MATERIALS CALLED OUT BY TRADE NAME AND /OR CATALOG NUMBERS ESTABLISH A STANDARD OF QUALITY, APPEARANCE. PERFORMANCE AND DIMENSION. CONTRACTOR SHALL BASE HiS PROPOSAL ON THOSE ITEMS AS THEY SHALL BE CONSIDERED AS A STANDARD BASIS OF BIDDING. REQUESTS FOR SUBSTITUTIONS SHALL BE SUBMITTED IN WRITING TO THE ARCHITECT/ENGINEER, DEMONSTRATING THAT PRODUCT IS OF COMPARABLE AND BASIC DESIGN, CONSTRUCTION STANDARDS AND WARRANTIES, DIMENSIONS TO FIT WITHOUT CHANGE. AND DOES NOT CAUSE EXTRA WORK FOR OTHER TRADES. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVING EQUALITY OF SUBSTITUTIONS; ARCHiTECT/ENGINEER WILL, UNDER NO CIRCUMSTANCES. BE REQUIRED TO PROVE SUCH ITEM IS OR IS NOT OF EQUAL QUALITY TO THE SPECIFIED ITEM. ARCHITECT/ENGINEER EXPENSES INCURRED DUE TO CONTRACTOR'S REQUESTED REVISIONS OR SUBSTITUTIONS SHALL BE PAID BY CONTRACTOR. 1.12 GUARANTEES: AFTER THE SYSTEM IS INSTALLED, THE CONTRACTOR SHALL CONDUCT AN OPERATIVE TEST FOR APPROVAL AND ACCEPTANCE BY THE ARCHITECT /OWNER. ENTIRE MECHANICAL WORK, INCLUDING PARTS AND LABOR, SHALL BE GUARANTEED FOR A PERIOD OF ONE (1) YEAR FROM DATE OF FINAL WRITTEN ACCEPTANCE THEREOF AGAINST DEFECTIVE MATERIALS, CONSTRUCTION AND WORKMANSHIP. WHERE APPLICABLE, LONGER GUARANTEES FOR CERTAIN COMPONENTS SHALL APPLY AS REQUIRED AND NOT BE REDUCED IN ANY WAY. CORRECTION OF ANY DEFECTS SHALL BE COMPLETED WITHOUT ADDITIONAL CHARGE TO THE OWNER AND SHALL INCLUDE REPLACEMENTS AND /OR REPAIR OF ANY OTHER PHASE OF THE INSTALLATION WHICH MAY HAVE BEEN DAMAGED THEREBY. 1.13 RECORD DRAWINGS: MAINTAIN A COMPLETE SET OF PRINTS FOR INDICATING ALL CHANGES. USE COLORED PENS TO MARK CHANGES AT THE TiME OF EXECUTION AND DELIVER THE SET TO ARCHITECT/ENGINEER UPON COMPLETION. CONTRACTOR SHALL STAMP "AS BUILT- ON PRINTS AND PLANS. DATE AND SIGN IN INK. WORK SHALL NOT BE CONSIDERED COMPLETED UNTIL SUCH PLANS ARE REVIEWED AND APPROVED BY ARCHITECT/ENGINEER. r ! � 2.1 PIPE MATERIALS AND SERVICE SCHEDULE: A. CAST IRON SOIL PiPE. STANDARD WEIGHT. BELL. & SPIGOT OR NO- HUB; PVC SCHEDULE 40 NSF PW/DWV. SERVICE: ALL SOIL, WASTE, GREASY WASTE AND VENT LINES INSIDE BUILDING; ALL RAINWATER, SOiL WASTE AND GREASY WASTE TO UTILITY PIPES OUTSIDE OF BUILDING SUCH AS MANHOLE, PUBLIC SEWER, INTERCEPTOR OR SOAKAGE PiT AS REQUIRED. WHERE APPROVED BY OWNER/ENGINEER AND RULING AUTHORITIES, PVC MAY BE USED EXCEPT IN RETURN AiR PLENUMS WITH FIRE WRAP. B. COPPED DRAINAGE TUBE (DWV) ASTM B306. SERVICE: SANITARY WASTE ARMS AND CLEAR WATER WASTES ABOVE THE SLAB. C. SEAMLESS COPPER WATER TUBE. ASTM B88 HARD DRAWN TEMPER; TYPE L ABOVE GRADE. TYPE K BELOW GRADE SERVICE. HOT AND COLD WATER SYSTEMS. D. PVC HIGH IMPACT SCHEDULE 40 NSF PW/DWV. SERVICE: RAIN WATER LEADERS SYSTEM AND DRAINAGE SYSTEMS. E BRASS PIPE OR TUBE, CHROME PLATE. SERVICE: EXPOSED BRANCHES AT FIXTURES AND EQUIPMENT. 2.2 FITTINGS SHALL PROVIDE FOR PERMANENT WATERTIGHT JOINTS AND CONNECTIONS. A. PRESSURE TYPE: 1. THREADED STEEL PIPE, WATER SERVICE PIPING: MALLEABLE IRON, 150 LB BANDED, GALVANIZED. 2. COPPER PIPE, WATER PIPING: WROUGHT COPPER, SOLDER - JOINT TYPE, NO LEAD. 3. UNIONS. GALVANIZED MALLEABLE IRON OR BRASS GROUND JOINT UNIONS FOR PIPING TWO (2) INCHES iN DIAMETER OR SMALLER. 4. PVC SCHEDULE 80 ASTM D2467 B. NON- PRESSURE TYPE: 1. CAST -IRON SOIL PIPE: FITTING OF SAME WEIGHT AND MANUFACTURE AS PiPE. CAULK SOLID OR A POSITIVE -SEAL ONE PIECE ELASTOMERIC COMPRESSION TYPE GASKET MAY BE USED FOR BELL AND SPIGOT JOINTS. JOINTS FOR HUBLESS PIPE SHALL BE MADE WITH APPROVED NEOPRENE GASKETS AND STAINLESS STEEL RETAINING SLEEVES. 2. THREADED DRAINAGE PIPE SHALL BE A MAXIMUM OF (2) TWO INCHES iN SiZE. 3. COPPER TUBE, DRAINAGE TYPE: WROUGHT COPPER SOLDER - JOINT 95/5. 2.3 PIPING PROTECTION: A. PAINT ALL UNINSULATED COPPER AND STEEL PIPING RUN UNDERGROUND WITH TWO COATS OF ASPHALTIC PAINT OR WRAP WITH TWO LAYERS OF 6 MIL POLYETHYLENE. B. SPIRALLY WRAP ALL PIPE LINES EMBEDDED IN CONCRETE WITH ONE LAYER OF 30 LB FELT. C. COAT ALL EXPOSED THREADS ON GALVANIZED STEEL PIPE WITH TWO COATS OF ZINC CHROMATE AFTER ASSEMBLY. D. CLOSE ALL PIPE OPENINGS WITH CAPS OR PLUGS DURING INSTALLATION. E. PROVIDE PACKING AND FIRE RATED RETARDANT SEALER IN JOINTS AROUND PIPING PENETRATING FIRE RATED FLOORS AND WALLS. 2.4 CIEANOUT COVER IN FINISHED AREAS OR AT STACKS: A. WALLS: JOSAM 58750, J.R. SMITH 4710, ZURN 1460 -9. B. TiLE FLOORS: JOSAM 58480 FERRULE WITH 58640 -2 PLATE, J.R. SMITH 4283 WITH 4930 ALL BRONZE, ZURN 1450 -8 WITH 1460 -10 POLISHED BRONZE TOP. C. CONCRETE FLOORS OR BLACK TOP: JOSAM 58360 -2. 2.5 PROVIDE DIELECTRIC FITTINGS FOR JOINING DISSIMILAR METALS AS MANUFACTURED BY EPCO OR APPROVED EQUAL- 2.6 VALVES SHALL BE FULL PORT. SCREWED AND /OR SOLDERED VALVE BODIES FOR PIPING SYSTEMS 2" DIAMETER AND SMALLER; MATERIAL SHALL BE ALL BRONZE. SCREWED ENDS, SWEAT TYPE ENDS FOR COPPER. MANUFACTURER'S NAME AND VALVE RATING SHALL BE CAST IN VALVE BODY. MANUFACTURER SHALL BE CRANE, NIBCO AND STOCKHAM. MINIMUM WORKING PRESSURE SHALL BE 125 PSIG STEAM. GAS VALVES SHALL BE CRANE 254. PLUG TYPE 2.7 VALVE BOXES SHALL BE PRECAST, BROOKS CO. ONE FOR EACH VALVE. SIZE SHALL PROVIDE A MINIMUM OF 2" ANNULAR CLEARANCE AROUND THE HANDLE AND INCLUDE THE VALVE BOX EXTENSIONS REQUIRED FOR WORKING ACCESS FROM FINISH GRADE TO VALVE BODY. 2.8 EXTERIOR HOSE BIBBS SHALL BE 3/4" WALL HYDRANT, THREADED HOSE END AND KEY HANDLE, WITH INTEGRAL VACUUM BREAKER AND NICKALOY FINISH JOSAM 71050 HYDRANSAN L, J.R. SMITH 5610 OR ZURN 1310. 2.9 WATER HEATER: PROVIDE WATER HEATERS AS SPECIFIED ON PLANS. UNLESS OTHERWISE NOTED ON PLANS. TERMINATE PRESSURE AND TEMPERATURE RELIEF VALVE LINE OUTSIDE OF BUILDING, POINTING DOWN 6 INCHES ABOVE GRADE. CONNECTIONS TO WATER HEATER SHALL BE PROVIDED WITH UNIONS AT EACH LINE. PROVIDE VALVE AT COLD WATER LINE AND HEAT EXPANSION LOOP AT HOT WATER LINE. 2.10 FLOOR DRAINS: A. TOILETS: JOSAM 30003 -5A WITH NICKALOY TOP. J.R. SMITH 2O10A. OR ZURN 2415. B. OTHER AREAS: JOSAM 32123 -40-2 WITH SATIN BRONZE GRATING. J.R. SMiTH 2110B WiTH BRONZE TOP, ZURN Z550Y WITH POLISHED BRONZE 2.11 FLOOR CLEANOUTS SHALL BE JOSAM 56020, J.R. SMITH 4045, ZURN 1405 -3. 2.12 PROVIDE REDUCED PRESSURE BACKFLOW PREVENTER OR TYPE AS REQUIRED BY UTILITY COMPANY AT POINT OF SERVICE IN MAIN WATER LINE. 2.13 PLUMBING FIXTURES SHALL BE PROVIDED COMPLETE WITH ALL CHROME PLATED TRIM AND FITTINGS UNLESS OTHERWISE NOTED. ALL EXPOSED TRIM TO BE CHROME PLATED. FIXTURES SHALL BE AS MANUFACTURED BY AMERICAN STANDARDS, KHOLER OR ELJER. FLUSH VALVES SHALL BE SLOAN, ROYAL OR DELANY. FAUCETS AND HOSE BIBBS SHALL BE CHICAGO, AMERICAN STANDARD OR KHOLER. FIXTURES SHALL BE 'WHITE" UNLESS OTHERWISE NOTED; SELECTED BY ARCHITECT /OWNER. PROVIDED BY CONTRACTOR. PART 3 - EXECUTiON 3.1 CONTRACTOR SHALL VERIFY AT SITE LOCATION, ELEVATION AND SIZE OF ALL EXISTING MAINS, WATER. SEWER. VENT, AND GREASY WASTE FOR CONNECTION OF NEW SERVICES, PRIOR TO INSTALLATION OF PIPING. 3.2 ALL SANITARY DRAIN LINES SHALL SLOPE AT A MINIMUM OF 1/8- PER FOOT. FIELD COORDINATE INVERT ELEVATION MATH EXISTING SANITARY AND GREASE WASTE STUB -OUT. 3.3 PROVIDE CONTROL VALVES TO ALL BRANCHES, GROUP OF FIXTURES, AND TO EACH PIECE OF EQUIPMENT. PROVIDE INDIVIDUAL STOPS TO EACH PLUMBING FIXTURE SUPPLY. 3.4 PROVIDE CLEANOUTS AT FOOT OF EACH SANITARY. GREASY WASTE. STORM DRAINAGE AND SOIL STACKS. AS WELL AS CHANGE OF DIRECTION OF HORIZONTAL LINES GREATER THAN 45- DEGREES. IN HORIZONTAL RUNS AT MINIMUM 75 -FOOT INTERVALS, AND AS NOTED ON DRAWINGS. 3.5 FLOOR DRAINS SHALL BE PROVIDED WITH AUTOMATIC TRAP SEALS. HOSE BIBBS SHALL BE PROVIDED WITH VACUUM BREAKERS. MAIN WATER LINES SHALL BE PROVIDED WITH BACKFLOW PREVENTERS IN ACCORDANCE WITH RULING AUTHORITIES. 3.6 HANGERS SHALL BE MALLEABLE OR WROUGHT IRON SPLIT RiNG WiTH ADJUSTERS. SUPPORT SERVICE PIPE LARGER THAN 1 -1/2" AT 10 FEET, 1- 1 /2" AND SMALLER AT 8 FEET; HORIZONTAL SOIL PIPE AT 5 FEET AND COPPER TUBE AT 6 FEET. 3.7 PROVIDE ACCESS PANELS FOR VALVES AND OTHER REQUIRED COMPONENTS. 3.8 ALL SYSTEMS AND EQUIPMENT SHALL BE DEMONSTRATED TO BE FUNCTIONING SATISFACTORILY AND SHALL MEET THE APPROVAL OF THE GOVERNING AUTHORITIES AND OWNER BEFORE ACCEPTANCE. 3.9 PROVIDE OWNER WITH A BOUND COPY OF ALL APPLICABLE OPERATION OR MAINTENANCE INSTRUCTIONS, LITERATURE AND INFORMATION PERTAINING TO OTHER EQUIPMENT. 3.10 CONTRACTOR SHALL GUARANTEE THAT ALL PIPE WORK SHALL OPERATE WITHOUT VIBRATION. PULSATION OR OBJECTIONABLE NOISES. 3.11 PLUMBING WORK SHALL NOT INTERFERE WITH CLEARANCES REQUIRED FOR GENERAL CONSTRUCTION AND OTHER CONTRACTOR'S INSTALLATION. PLUMBING WORK THAT INTERFERES WITH THE WORK OF OTHER CONTRACTORS SHALL BE CHANGED AT PLUMBING CONTRACTOR'S EXPENSE. 3.12 AT THE COMPLETION OF THE WORK, THIS CONTRACTOR SHALL REMOVE ALL RUBBISH CAUSED BY HIS WORK, AND THOROUGHLY CLEAN ALL RELATED EQUIPMENT. EXISTING EQUIPMENT NOT IN USE AFTER COMPLETION OF THE WORK SHALL BE REMOVED FROM THE JOB SITE. 3.13 TEST ALL SANITARY, GREASY WASTE. STORM WATER AND OTHER SOIL PIPING WITH WATER AT 10 FOOT HEAD ABOVE THE HIGHEST OUTLET IN THE SYSTEM DURING A 4-HOUR PERIOD. 3.14 MATERIALS AND EQUIPMENT SHALL BE NEW AND PROVIDED BY THIS CONTRACTOR UNLESS OTHERWISE NOTED AS TO BE RELOCATED. 3.15 HOT WATER INSTALLED IN CONDITIONED SPACES SHALL BE INSULATED. HORIZONTAL RAIN WATER LEADER AND CONDENSATE DRAIN PIPING SHALL BE INSULATED WITH 2" FIBERGLASS LOW PRESSURE INSULATION WITH ALL SERVICE JACKET INSTALLED PER MANUFACTURER'S RECOMMENDATIONS. EXTEND INSULATION THROUGH WALLS TO OUTLETS. COVER ALL FITTINGS NTH PLASTIC INSULATION CEMENT TO FULL THICKNESS OF ADJACENT PIPE COVERINGS AND FINISH WITH STANDARD VAPOR BARRIER WHITE RETARDANT JACKET. INSTALL THREE (3) METAL BANDS PER SECTION. 3.16 NO INSULATION SHALL BE INSTALLED UNTIL SYSTEM HAS BEEN CHECKED AND FOUND FREE FROM LEAKS. 3.17 TRAPS SHALL BE SELF CLEANING; EACH FIXTURE SHALL BE INDIVIDUALLY TRAPPED UNLESS OTHERWISE NOTED. 3.18 HORIZONTAL AND VERTICAL RUNS OF WATER AND SOIL PIPE SHALL BE PROVIDED WITH ONE LAYER OF 30 LB. FELT AT ALL HANGERS AT CONTACT SURFACE TO PIPE TO REDUCE VIBRATION. 3.19 AIR CHAMBERS SHALL BE PROVIDED AT EACH FIXTURE ON RISERS AND ENDS OF SUPPLY LINES FOR PROTECTION AGAINST WATER HAMMER. SIZE SHALL BE SAME AS SUPPLY LINE, 3/4" MINIMUM. RISER SHALL BE 20 PIPE DIAMETERS LONG BUT IN NO CASE LESS THAN 18" LONG. 3.20 EQUIPMENT CONNECTIONS SHALL BE MADE WITH UNIONS, FLANGE JOINTS OR OTHER FITTINGS WHICH WILL ALLOW DISCONNECTION AND REMOVAL OF EQUIPMENT. PROVIDE VALVES IN SUPPLY LINES TO EACH PIECE OF EQUIPMENT ON SUPPLY SIDE OF UNION CONNECTION. TESTS SHALL BE IN COMPLIANCE WITH APPROVED GOVERNING BUILDING CODE BUT IN NO CASE SHALL HYDROSTATIC PRESSURE APPLIED BE LESS THAN 100 PSIG FOR FOUR (4) HOURS WITHOUT ANY LEAKS DURING THESE CONDITIONS. 3.21 WATER, SANITARY AND OTHER PLUMBING LINES SHALL BE CONCEALED IN WALLS, CEILINGS, SLABS AND PARTITIONS; NO PIPING SHALL BE EXPOSED WITHIN INTERIOR SPACES UNLESS OTHERWISE NOTED ON DRAWINGS. NO PIPING SHALL BE RUN ABOVE ELECTRICAL AND TELECOM EQUIPMENT, SUCH AS PANELS, TRANSFORMERS, COORDINATE WITH ELECTRICAL PLANS. 3.22 PLUMBING COMPONENTS AND EQUIPMENT SHALL BE CLEARLY AND PERMANENTLY IDENTIFIED. 3.23 BEFORE COMMENCING WORK CONTRACTOR SHALL COORDINATE WITH ARCHITECT /OWNER EXTENT OF WORK WITHIN AND OUTSIDE SPACE TO DETERMINE PROVISIONS REQUIRED. 3.24 CONTRACTOR SHALL MAKE ALL NECESSARY EXCAVATIONS, CUTTING AND REPATCHiNG AS NECESSARY FOR THE PROPER EXECUTION OF THIS WORK. 3.25 ANY EXISTING EQUIPMENT OR DEVICES INADVERTENTLY DISCONNECTED SHALL BE RECONNECTED AND MADE OPERABLE AT NO ADDITIONAL COST. 3.26 WHERE WORK ON EXISTING PIPING IS REQUIRED, SPECIAL ATTENTION SHALL BE GIVEN TO CONDITIONS OF EXISTING STORM DRAIN, SANITARY, GREASY WASTE, CONDENSATE LINES AND OTHER PIPING. REROUTE EXISTING PIPING TO SUIT NEW WALL AND PARTITION LAYOUT. 3.27 A MINIMUM SEPARATION OF 10 FEET SHALL BE MAINTAINED BETWEEN SANITARY DRAIN LINES AND DOMESTIC WATER SERVICE LINES BELOW GRADE UNLESS PERMITTED OTHERWISE BY LOCAL AUTHORITIES. 3.28 VENT TERMINALS SHALL BE LOCATED A MINIMUM OF 10 FEET AWAY FROM ANY BUILDING OPENINGS FOR OUTSIDE AIR SUCH AS DOORS, WINDOWS, FRESH AND OUTSIDE AIR DUCT INTAKES. 3.29 ABOVE GRADE HOT AND COLD WATER PIPING INSTALLED BELOW BLANKET AND /OR ROOF INSULATION SHALL BE INSULATED WITH 3/4" FIBERGLASS LOW PRESSURE INSULATION WITH ALL SERVICE JACKET INSTALLED PER MANUFACTURER'S RECOMMENDATIONS. EXTEND INSULATION THROUGH WALLS TO OUTLETS. COVER ALL FITTINGS WITH PLASTIC INSULATION CEMENT TO FULL THICKNESS OF ADJACENT PIPE COVERINGS AND FINISH WITH STANDARD VAPOR BARRIER WHITE RETARDANT JACKET. INSTALL THREE (3) METAL BANDS PER SECTION. 3.30 ABOVE GRADE HOT AND COLD WATER PIPING LOCATED OUTSIDE OF BUILDING INSULATION ENVELOP SHALL BE INSULATED IN ACCORDANCE WITH LOCAL STANDARDS. HORIZONTAL RAiN WATER LEADER RUNS SHALL. BE INSULATED WiTH 2" FIBERGLASS BLANKET WiTH UL APPROVED FOIL VAPOR SEAL FACING. 3.31 STERIUZA11ON: IMMEDIATELY AFTER WATER PIPING SYSTEM HAS BEEN THOROUGHLY FLUSHED OUT, STERILIZE THE LINES, OPEN AND CLOSE ALL VALVES WHILE SYSTEM IS BEING CHLORINATED. AFTER STERILIZING AGENT HAS BEEN APPLIED FOR 24 HOURS. TEST FOR RESIDUAL CHLORIDE AT ENDS OF THE LINES; REPEAT THE PROCESS UNTIL TEST SHOWS RESIDUAL CHLORINE CONTENT ESTABLISHED BY RULING AUTHORITIES. FLUSH OUT THE SYSTEM UNTIL ALL TRACES OF THE CHEMICAL USED ARE REMOVED. MAKE NECESSARY CONNECTIONS TO STERILIZED PIPING. 3.32 A FINAL BACTERIOLOGICAL TEST OF THE POTABLE WATER SYSTEM SHALL BE MADE BY A LABORATORY APPROVED BY THE STATE OF FLORIDA HEALTH DEPARTMENT AND DELIVERED TO THE ARCHITECT /OWNER AT THE TiME OF FINAL INSPECTION. PART 1 - GENERAL 1.1 ALL WORK AND MATERIALS SHALL BE NEW AND PROVIDED BY THIS CONTRACTOR UNLESS OTHERWISE NOTED AS EXISTING TO REMAIN OR BE RELOCATED. WORK SHALL ALSO INCLUDE THE REMOVAL AND DISPOSAL OF MATERIALS FROM THE SITE AND THOROUGH CLEANING OF THE PREMISES UPON COMPLETION OF THE WORK AS DIRECTED BY ARCHITECT /OWNER. 1.2 WORK SHALL INCLUDE PROVISIONS OF ALL MATERIALS, CUTTING, EXTENSIONS, CONNECTIONS, PATCHING, PAINTING, REPAIRING. ADAPTING AND OTHER WORK INCIDENTAL THERETO, TOGETHER WITH SUCH TEMPORARY CONNECTIONS AS MAY BE REQUIRED. 1.3 ANY WORK NOT SHOWN OR SPECIFICALLY MENTIONED ON PLANS AND /OR SPECIFICATIONS BUT CONSIDERED NECESSARY FOR COMPLETION OF THE WORK IN THE PROPER MANNER SHALL BE PROVIDED BY THiS CONTRACTOR WITHOUT ADDITIONAL CHARGE. 1.4 WHERE PRESENT WORK IS DAMAGED IN THE EXECUTION OF THIS CONTRACT, OR WHERE OPENINGS ARE LEFT DUE TO THE REMOVAL OF PIPES, EQUIPMENT OR APPARATUS, THE SAME SHALL BE REPAIRED OR CLOSED UP TO CORRESPOND IN MATERIAL, QUALITY, SHAPE AND FINISH WITH THAT OF SIMILAR AND ADJOINING WORK. UNLESS OTHERWISE CALLED FOR. WHERE DAMAGE IS UNREPAIRABLE. NEW ITEMS OR EQUIPMENT SHALL BE PROVIDED. PROVIDE ALL NECESSARY WATERPROOFING, FIRE STOPPING AND SEALING OF PENETRATIONS LEFT FROM REMOVED EQUIPMENT OR PRODUCED BY THIS WORK. 1.5 INTERRUPTION OF EXISTING SERVICES AND /OR OPERATION OF FACILITIES SHALL BE KEPT TO A MINIMUM. CONTRACTOR SHALL FURNISH ALL MATERIALS REQUIRED WHENEVER TEMPORARY CONNECTIONS ARE NECESSARY TO MAINTAIN CONTINUITY OF SERVICE. INTERRUPTION OF EXISTING SERVICES, THE INSTALLATION OF TEMPORARY FACILITIES, AND THE WORK OF MAKING FINAL CONNECTIONS TO THE NEW WORK SHALL BE DONE ONLY AT SUCH TIMES PERMITTED AND SCHEDULED IN ADVANCE BY THE ARCHITECT /OWNER WITHOUT ADDITIONAL COST. CARE MUST BE USED IN REMOVING SERVICES TO AREAS BEING DEMOLISHED SO THAT SERVICES TO OTHER AREAS WHICH MIGHT BE SERVED THROUGH THESE AREAS WILL NOT BE INTERRUPTED. PART 2 - MECHANICAL 2.1 REMOVE ALL DOMESTIC WATER, GAS, SANITARY, GREASY WASTE, DRAINAGE, VENT AND OTHER PIPING NOT REQUIRED, OR ABANDON PIPING NOT IN USED NOT IN CONFLICT WITH EXISTING BUILDING AND /OR WORK UNDER THIS CONTRACT. CAP EXISTING LINES TO REMAIN AND IDENTIFY ACCORDINGLY. SATISFY CODE REQUIREMENTS FOR PROHIBITED DEAD ENDS. 2.2 PROVIDE FOR RECONNECTION OF FIXTURES TO PREVIOUSLY CONNECTED SERVICES AS SHOWN ON PLANS. FIELD COORDINATE EXACT LOCA11ON OF WATER, SANITARY, VENTS AND GAS LINES AS APPLICABLE PROVIDE FIXTURES WHERE EXISTING FIXTURES HAVE BEEN DAMAGED DURING REMODELING. 2.3 SEAL EXISTING FLOOR DRAINS IN GENERAL AREAS AS SHOWN ON PLANS. ALL HOSE BIBBS SHALL BE PROVIDED WITH VACUUM BREAKERS. AIR CONDITIONING EQUIPMENT CONDENSATE LINES AND DRYVWELLS SHALL BE FLUSHED CLEANED OF ALL ALGAE, RUST, AND SEDIMENTS THAT MAY AFFECT EQUIPMENT OPERATION. 2.4 RELOCATE PLUMBING PIPING ABOVE ANY ELECTRICAL AND TELECOM EQUIPMENT, SUCH AS PANELS, TRANSFORMERS. COORDINATE WITH ELECTRICAL (TEE C.O. W BRONZE COUNTER SUNK PLUGI TEE # O' DETAIL_ a a a so FINISHED WALL OR COLUMN WATER HAMMER ARRESTER SPECS. 4 0 MANUFACTURER .�� J. R. SMITH �►. cnkpl0t: 01/17/2011 �=2 _ _ A rpl (10)1125 Biwa-w-wo "o x. `x -� J) } SEAT F�# �9�5� If e` f q \8 tP ae e w • s • • s • ss • • e w a r °. . f f,'<.... 4 0 N T sTI^^ W U ^` c') •� Zcm .S J oc) _ c w u_ co .-. Cn o c°r) Z ® X C� i W w t W o Z T W --� Juj o L9 ® 00 00 to d a0 cp z Q 04 w o ai I� U Biwa-w-wo "o x. `x -� J) } SEAT F�# �9�5� If e` f q \8 tP ae e w • s • • s • ss • • e w a r °. . f f,'<....