12-742-019t
V)
w
M
J
C
a
a
PLUMBING SYMBOLS NOTE: THIS IS A MASTER LEGEND AND NOT ALL SYMBOLS,
ABBREVIATIONS, ETC. ARE NECESSARILY USED ON THE DRAWINGS.
ANNOTATION PIPING
Q)
PLUMBING PLAN NOTE CALLOUT
-
DOMESTIC COLD
WATER (CW)
ADA ACCESSIBLE DRINKING FOUNTAIN
PLUMBING EQUIPMENT DESIGNATION. (CONTRACTOR FURNISHED
SCW
SOFTENED COLD WATER (SCW)
`! )
AND INSTALLED). REFER TO PLUMBING FIXTURE OR EQUIPMENT
--
DOMESTIC HOT
WATER (HW)
AUXILIARY CONDENSATE DRAIN (ACD)
SCHEDULES
- --
DOMESTIC HOT
WATER RECIRC. (HWR)
�-�
EXTERIOR CLEANOUT (ECO)
EQUIPMENT DESIGNATION (OWNER FURNISHED,
140'
140' DOMESTIC
HOT WATER (140')
I
I
CONTRACTOR INSTALLED)
- — — -G- — — -
NATURAL GAS ON ROOF (G)
CU
MECHANICAL EQUIPMENT DESIGNATION (CONTRACTOR FURNISHED
T
TRAP PRIMER LINE
(T)
AND INSTALLED UNLESS NOTED OTHERWISE)
S
SOIL PIPING -
ABOVE FLOOR (S)
TEE UP WITH SHUT -OFF VALVE (SOV)
CONNECTION POINT OF NEW WORK TO EXISTING
--S--
SOIL PIPING -
BELOW FLOOR (S)
* .A.
DETAIL REFERENCE UPPER NUMBER INDICATES DETAIL NUMBER
W
W--
WASTE PIPING
WASTE PIPING --
- ABOVE FLOOR (W)
BELOW FLOOR (W)
M1
LOWER NUMBER INDICATES SHEET NUMBER
WS
WATER SERVICE (WS)
ADULT STANDARD DRINKING FOUNTAIN
1
SECTION CUT DESIGNATION
GW
— — —GW— — —
GREASE WASTE
GREASE WASTE
-ABOVE FLOOR (GW)
- BELOW FLOOR (GW)
M1
30" FLOOR TO RIM
ST
STORM DRAIN -
ABOVE FLOOR (ST)
STANDARD MOUNTING HEIGHTS
— — — —ST- — — -
STORM DRAIN -
BELOW FLOOR (ST)
(AFF, AFG, UNLESS NOTED OTHERWISE)
OST --
OVERFLOW STORM DRAIN - ABOVE FLOOR (QST)
PLUMBING
4" BLADE HANDLES. PROVIDE WITH 1.5GPM
N
o
EXISTING PIPING TO BE REMOVED
— — —
— — VBG- --
VENT BELOW GRADE (VBG)
REFER TO
THE ARCHITECTURAL DRAWINGS FOR PLUMBING FIXTURE MOUNTING HEIGHTS.
CHILD URINAL
14" FLOOR TO RIM
—VBF— — —
VENT BELOW FLOOR (VBF)
LINO, INSTALL PLUMBING FIXTURES WITH THE MOUNTING HEIGHTS AS LISTED BELOW
30" FLOOR TO RIM
V
VENT PIPING (V)
JANITOR'S SINK FAUCET FITTINGS
ID
INDIRECT DRAIN
(ID)
WITH FINAL APPROVAL BY THE ARCHITECT.
* Nc>r +1M00 �Ik
36" AFF TO CENTERLINE
----AW----
PLUMBING SPECIFICATIONS: SECTION 15200
A. SCOPE OF WORK
1. THIS CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, SERVICES,
TOOLS, TRANSPORTATION AND FACILITIES NECESSARY FOR, REASONABLY IMPLIED AND
INCIDENTAL TO, THE FURNISHING, INSTALLATION, COMPLETION AND TESTING OF ALL THE WORK
FOR THE PLUMBING SYSTEMS AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE
SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS, TO INCLUDE, BUT NOT BE LIMITED
TO THE FOLLOWING: (REFER TO RESPONSIBILITY SCHEDULE FOR EXACT RESPONSIBILITIES)
A. COMPLETE SANITARY PIPING SYSTEMS OF WASTE, DRAINS, AND VENTS.
B. COMPLETE COLD AND HOT WATER PIPING SYSTEMS, APPURTENANCES AND INSULATION.
C. PLUMBING FIXTURES AND EQUIPMENT AS SCHEDULED.
D. TESTS AND ADJUSTMENTS.
2. BEFORE STARTING WORK, THIS CONTRACTOR SHALL EXAMINE THE ARCHITECTURAL,
STRUCTURAL, MECHANICAL AND ELECTRICAL PLANS AND SPECIFICATIONS TO SEQUENCE,
COORDINATE, AND INTEGRATE THE VARIOUS ELEMENTS OF THE PLUMBING SYSTEM, MATERIALS,
AND EQUIPMENT WITH OTHER CONTRACTORS TO AVOID INTERFERENCE'S AND CONFRONTATIONS.
3, RELOCATION OF EXISTING WATER, WASTE, VENT, OR DRAINAGE LINES TO FACILITATE
STORE DESIGN CRITERIA MUST BE INCLUDED IN BID PROPOSAL.
4. ALL WORK SHALL BE DONE IN STRICT ACCORDANCE WITH ALL APPLICABLE GOVERNMENT AND
LOCAL CODES AND THE LANDLORD'S REQUIREMENTS, VERIFY LOCAL ADA AND WATER- SAVING
DEVICE CODE REQUIREMENTS PRIOR TO CONSTRUCTION.
5. CONTRACTOR SHALL SUBMIT A REPRODUCIBLE COPY OF THE "AS- BUILT" DRAWING TO THE
LANDLORD AND TO THE OWNER FOR THEIR RECORDS.
B. PLUMBING EQUIPMENT
1. PROVIDE NEW PLUMBING EQUIPMENT AS SHOWN ON THE DRAWING AND SPECIFIED IN THE
PLUMBING FIXTURE SCHEDULE.
2. WHERE EXISTING PLUMBING FIXTURES ARE TO BE REUSED, REPLACE BALL COCK VALVE
SEALS, LEAVE IN PROPER WORKING ORDER.
C. GENERAL PIPING REQUIREMENTS
1. GENERALLY, SANITARY AND POTABLE WATER CONNECTIONS WILL BE MADE AT TOILET ROOM
AND OTHER PLUMBING FIXTURES SHOWN ON PLANS. FIELD VERIFY EXACT CONNECTION POINTS
PRIOR TO SUBMITTING BID AND NOTIFY THE TENANT'S CONSTRUCTION MANAGER IF CONDITIONS
ARE NOT AS SHOWN ON THE PLANS OR AS STATED IN THE SPECIFICATIONS. CONTRACTOR MUST
VERIFY THE OPERABILITY OF ENTIRE SYSTEM PRIOR TO TIE IN AS FOLLOWS:
A. SNAKE SANITARY FOR A DISTANCE OF 100 FEET AND REPORT ANY BLOCKAGE.
B. TEST WATER PRESSURE TO INSURE MINIMUM OF 50 PSI.
2. INSTALL ALL NECESSARY PIPE HANGERS, SADDLES, AND CARRIERS TO PROPERLY SUPPORT
ALL PIPING AND FIXTURES. HANGERS SHALL SUIT TYPE OF PIPING PROVIDED AND BE SPACED
AT A MAXIMUM SPAN OF 5 FEET.
3. ESCUTCHEONS SHALL BE CHROME PLATED, SIZE AS REQUIRED AND PLACED AT ALL PIPE
PENETRATIONS AT WALLS, FLOORS, AND CEILINGS IN FINISHED AREAS.
4. FLASHING SHALL BE SEALED WATERTIGHT AND PERFORMED IN ACCORDANCE TO THE
LANDLORD'S CRITERIA.
5. THE CONTRACTOR SHALL ENSURE THAT ALL SLAB PENETRATIONS WITHIN THE TENANT'S
DEMISED PREMISES ARE PROPERLY SEALED AND REMAIN WATERTIGHT TO PREVENT ANY POSSIBLE
DAMAGE TO OTHER TENANTS AND /OR TO THE BUILDING. FAILURE TO DO SO SHALL BE AT RISK
AND SOLE EXPENSE OF THE CONTRACTOR.
D. PIPING
1. SANITARY PIPING - NO PVC ALLOWED
A. WASTE AND DRAIN PIPING SHALL BE SERVICE WEIGHT, CAST IRON SOIL PIPE, ALL VENT
PIPING SHALL BE CAST IRON. NO -HUB
JOINTS:
BELOW FLOOR SLAB - COMPRESSION TYPE PLASTIC SEAL (HUB AND SPIGOT).
ABOVE FLOOR SLAB - NEOPRENE SEALING SLEEVE WITH STAINLESS STEEL
SHIELD AND CLAMP WITH APPROVED NEOPRENE - BASED LUBRICANT, (HUBLESS).
B. PITCH WASTE LINES 2" AND SMALLER NOT LESS THAN 1/4" PER FOOT. PITCH LARGER
MAINS NOT LESS THAN 1/8" PER FOOT.
C. INSTALL A CLEANOUT AT BASE OF EACH SOIL STACK, AT EACH CHANGE IN DIRECTION,
AT INTERVALS NOT OVER 50 FEET, AND ELSEWHERE AS SHOWN ON DRAWINGS OR REQUIRED BY
LOCAL CODE. CLEAN OUTS SHALL ONLY BE INSTALLED IN NON- PUBLIC AREAS, UNLESS GIVEN
EXPRESSED WRITTEN PERMISSION BY TENANT'S CONSTRUCTION MANAGER. WHEN GIVEN
PERMISSION TO INSTALL IN PUBLIC AREAS, THE CLEANOUTS SHALL HAVE STAINLESS STEEL
WALL COVERS AND BRASS FLOOR COVERS (FLUSH WITH FINISHED FLOOR) PROVIDED BY THE
CONTRACTOR. PROVIDE COVERS WITH INSET AREA FOR CARPETED FLOOR LOCATIONS. ALL
CLEAN -OUT LOCATIONS SHALL BE APPROVED BY THE TENANT'S CONSTRUCTION MANAGER.
D. INSULATE ALL HORIZONTAL RUNS OF PIPING LOCATED IN CEILING SPACES WHEN
APPLICABLE. INSULATION TO BE AS SPECIFIED FOR WATER PIPING, SEE #5.
E. INSULATE THE TRAP, SANITARY AND SUPPLY PIPES UNDER LAVATORY WITH 1/2"
ARMSTRONG "ARMAFLEX" PIPING INSULATION OR TRUEBRO MODEL 102W "HANDI LAV GUARD"
INSULATION KIT.
2. CONDENSATE PIPING SHALL BE TYPE "L" DRAWN COPPER TUBE WITH 95 -5 TIN - ANTIMONY
SOLDERED JOINTS AND WROUGHT COPPER FITTINGS WITH DIELECTRIC SEPARATION BETWEEN
DISSIMILAR METALS.
3. POTABLE WATER PIPING:
A. BELOW GRADE: TYPE 'K', ANNEALED TEMPERED COPPER TUBE FOR PIPE SIZES 2 INCHES
AND SMALLER. BRAZE ALL JOINTS.
B. ABOVE GRADE: TYPE 'L' DRAWN COPPER TUBE WITH WROUGHT COPPER FITTINGS AND 95 -5
TIN - ANTIMONY SOLDER.
C. INSTALL SHOCK ABSORBERS IN PIPING SYSTEM TO PREVENT NOISE AND
DAMAGE DUE TO WATER HAMMER.
D. ALL BRANCH PIPING SYSTEM SHALL HAVE ACCESSIBLE SERVICE VALVE. PROVIDE SHUT OFF
VALVES IN THE SUPPLY PIPING TO EVERY FIXTURE. PROVIDE ACCESS DOORS WHERE NECESSARY.
E. PROVIDE WATER METER AND REMOTE READER PER LANDLORD'S CRITERIA OR LOCAL
UTILITIES REQUIREMENTS IF APPLICABLE. REFER TO PLANS FOR FOR ADDITIONAL
INFORMATION.
F. SECURE PIPE AT ANGLE STOPS.
G. PROVIDE FLEXIBLE INSERTS AT ALL PIPE PENETRATIONS THROUGH FRAMING TO KEEP
PIPES FROM HITTING FRAME WHEN IN OPERATION.
4. GAS PIPING - NOT APPLICABLE
5. INSULATION
A. INSULATE ALL WATER AND INTERIOR CONDENSATE PIPING WITH 1" THICK K -0.23 @ 75
F) SNAP -ON FIBERGLASS PIPE INSULATION WITH AN ALL SERVICE JACKE TO MEET LOCAL
CODES AND UL FLAME SPREAD RATING OF 25 AND SMOKE DEVELOPED RATINGS OF 50.
APPROVED MANUFACTURER: MANVILLE MICRO -LOK.
6. TEST do STERILIZATION
A. LEAKAGE TESTS SHALL BE PER LOCAL CODES, MINIMUM AS FOLLOWS:
B. TEST POTABLE WATER PIPING AND CONDENSATE PIPING AT 125 PSIG FOR SIX HOURS.
C. TEST DRAIN, WASTE, VENT PIPING BY A 10' WATER COLUMN FOR TWO HOURS. ALL
JOINTS SHALL BE GAS AND WATER TIGHT.
D. STERILIZE POTABLE HOT & COLD WATER LINES UPON COMPLETION OF SYSTEM. STERILIZE
WATER SYSTEM IN ACCORDANCE WITH LOCAL CODES.
HANGERS
INSTALLED
EACH SIDE OF
EXP. TANK
FOR SUPPORT II
3/4
EXISTIN
ET -1
BALL VALVE
BY P. C. (TYP.)
3/4" RUN FULL SIZE
TO FLOOR DRAIN.
DRAIN VALVE BY P.C:
PLATFORM ABOVE MOP SINK —
RE: ARCHITECTURAL DRAWINGS
VACUUM BREAKER
BY P. C.
AMTROL ST -5
THERMAL
EXPANSION
ABSORBER
INSULATE ALL PILING
IN ACCORDANCE "VVIT
SPECIFICATIONS'
••• V U Y�•Wb !+ •
0 1U U r U p Lase:
• • • U Y v e L w
see ••• • • O t!'�'U G Y •
••• W
W:o Leo
r • • • Y Y
•••• • • u •
r • s • u �
• u • Y • u u
Y•O• • 0.000 • ••• • WOO* •
3/4 "T do P RELIEF
VALVE BY P.C.
— WATER HEATER SEE
PLUMBING FIXTURE
SCHEDULE FOR
ADDITIONAL INFO.
2" WIDE, 20 GA. SHEET
METAL BAND, SECURE
TO WALL FOR SEISMIC
BRACING WHERE
REQUIRED BY CODE.
(BY P. C.)
GALV. DRIP PAN
BY P. C.
SEPARATE
3/4" DRAINS..
PLUMBING FIXTURE SCHEDUELE
MANUAL / AUTOMATIC AIR VENT OR VACUUM
CDH
CONDENSATE DRAIN -- HIGH EFFICIENCY RTU (CDH)
ADA ACCESSIBLE DRINKING FOUNTAIN
HW CW V W
17" FLOOR TO RIM
CD
CONDENSATE DRAIN (CD)
ADA ACCESSIBLE LAVATORIES
CAP
34" FLOOR TO RIM
ACD—
AUXILIARY CONDENSATE DRAIN (ACD)
ADA ACCESSIBLE SHOWER VALVES
0
38" MINIMUM TO 48" MAXIMUM
SPD—
SUMP OR SEWAGE PUMP DISCHARGE (SPD)
EXTERIOR CLEANOUT (ECO)
FLOOR TO CENTERLINE
G
NATURAL GAS (G)
ADA ACCESSIBLE TUB VALVES
ELBOW DOWN
CENTER BETWEEN GRAB BAR
- — — -G- — — -
NATURAL GAS ON ROOF (G)
ism
AND TUB RIM
MPG
MEDIUM PRESSURE NATURAL GAS (MPG)
ADA ACCESSIBLE URINALS
17" FLOOR TO RIM
— — —MPG— — —
MEDIUM PRESSURE NATURAL GAS ON ROOF (MPG)
ADA ACCESSIBLE WATER CLOSET
TEE UP WITH SHUT -OFF VALVE (SOV)
17" TO 19" FLOOR TO
NPW
NON POTABLE WATER (NPW)
* .A.
TOP OF SEAT
LPG
LIQUIFIED PETROLEUM GAS (LPG)
ADA ACCESSIBLE WATER COOLER
35" FLOOR TO RIM
WS
WATER SERVICE (WS)
ADULT STANDARD DRINKING FOUNTAIN
P -TRAP
40" FLOOR TO RIM
FP
FIRE PROTECTION (FP)
ADULT STANDARD WATER COOLER
FAUCET
30" FLOOR TO RIM
ELKAY /LKD2432BH
- 60--
TRAP PRIMER WITH DISTRIBUTION UNIT
REMOVABLE CARTRIDGES, 1/2" I.P. CONNECTIONS,
PD
CONDENSATE PUMP DISCHARGE (PD)
CHILD STANDARD DRINKING FOUNTAIN
30" FLOOR TO RIM
4" BLADE HANDLES. PROVIDE WITH 1.5GPM
N
o
EXISTING PIPING TO BE REMOVED
CHILD STANDARD WATER COOLER
14" FLOOR TO RIM
CHILD URINAL
14" FLOOR TO RIM
EXISTING PIPING TO REMAIN
CLINIC SERVICE SINKS
30" FLOOR TO RIM
V
VENT PIPING (V)
JANITOR'S SINK FAUCET FITTINGS
42" FLOOR TO CENTERLINE
AW
ACID WASTE - ABOVE FLOOR (AW)
HOSE BIBBS
* Nc>r +1M00 �Ik
36" AFF TO CENTERLINE
----AW----
ACID WASTE - BELOW FLOOR (AW)
ICE MAKER OUTLET BOXES
BRASS RISER
24" FLOOR TO CENTER OF BOX
AV
ACID VENT (AV)
LAVATORY OR SINK
31" FLOOR TO RIM
CA
COMPRESSED AIR (CA)
NON FREEZE HYDRANT
18" AFG TO CENTERLINE
AI
MEDICAL AIR INTAKE (AI)
SHOWER HEADS
6' -0" MEN k 5' -6" WOMEN
MA
MEDICAL AIR (MA)
Q
C
U
FLOOR TO CENTERLINE
MV
MEDICAL VACUUM (MV)
SHOWER VALVES
48" MEN k 42" WOMEN FLOOR
—VE—
MEDICAL VACUUM EXHAUST (VE)
0
TO CENTERLINE
EV
EVACUATION (EV)
STANDARD URINALS
22" FLOOR TO RIM
CO
CARBON DIOXIDE (CO)
SURGEON'S SCRUB -UP SINKS
P -TRAP WITH CLEANOUT PLUG, 1 1/2" CHROME
35" FLOOR TO FRONT RIM
N
NITROGEN (N)
TUB VALVES
32" FLOOR TO CENTELINE
PLATED BRASS WASTE TO WALL
z
IM
0
OXYGEN (0)
WASHING MACHINE OUTLET BOXES
D
42" FLOOR TO RIM
NO
NITROUS OXIDE (NO)
WATER CLOSET
ISSUE FOR CD -LLD XX -XX -XX
15" FLOOR TO RIM
ISSUE FOR BID XX -XX -XX
Scale:
Drawn MSB
Chocked By: WWR
OXYGEN OUTLET
ABBREVIATIONS
- -=
— o
NITROUS OXIDE OUTLET
MEDICAL AIR OUTLET
AFF ABOVE FINISHED FLOOR
MH MANHOLE
AFG ABOVE FINISHED GRADE
MIN
MINIMUM
AHU AIR HANDLING UNIT
N/C
NORMALLY CLOSED
--��
NITROGEN OUTLET
BFF BELOW FINISHED FLOOR
N/0
NORMALLY OPEN
- -^^-'4
MEDICAL VACUUM INLET
BFG BELOW FINISHED GRADE
ORD
OVERFLOW ROOF DRAIN
®
SQUARE FLOOR DRAIN (FS), SIZE do TYPE
BOP BOTTOM OF PIPE
PDI
PLUMBING DRAINAGE INSTITUTE
®
ROUND FLOOR DRAIN (FD), SIZE do TYPE
BOS BOTTOM OF STRUCTURE
PVC
POLYVINYL CHLORIDE
BTU BRITISH THERMAL UNIT
PRV
PRESSURE REDUCING VALVE
(Q1
ROOF DRAIN (RD), SIZE k TYPE
CPVC CHLORINATED POLYVINYL
RD
ROOF DRAIN
.9i
BALL VALVE
CHLORIDE
RPM
REVOLUTIONS PER MINUTE
^
CONTROL VALVE
DN DOWN
RTU
ROOFTOP UNIT
DFU DRAINAGE FIXTURE UNIT
SF
SQUARE FEET, SUPPLY FAN
SHUTOFF VALVE
DS DOWNSPOUT
SP
SUMP PUMP
_
CHECK VALVE
EfR EXISTING TO REMAIN
SS
STAINLESS STEEL, SANITARY��-
EWC ELECTRIC WATER COOLER
SEWER, SOIL
0%
BALANCING VALVE WITH PRESSURE PORTS
FD FLOOR DRAIN
TDH
TOTAL DYNAMIC HEAD
-�
WATER METER
FFA FROM FLOOR ABOVE
.TEA
TO FLOOR ABOVE
FF6 FROM FLOOR BELOW
TFB
TO FLOOR BELOW
STRAINER
FF FINISHED FLOOR
TYP
TYPICAL
STRAINER WITH BLOWOFF
FL FLOW LINE
UL
UNDERWRITERS LABORATORIES,
RELIEF /SAFETY VALVE
FLA FULL LOAD AMPS
INC.
FLR FLOOR
LINO
UNLESS NOTED OTHERWISE
SOLENOID VALVE
GPM GALLONS PER MINUTE
UPS
UNINTERRUPTIBLE POWER SUPPLY
j
PRESSURE REDUCING VALVE
HD HEAD, HUB DRAIN
V
VOLT(S)
GAS PRESSURE REGULATOR
IE INVERT ELEVATION
VCP
VITRIFIED CLAY PIPE
IN WC INCHES OF WATER COLUMN
VS
VENT STACK
THERMOSTATIC MIXING VALVE
JB JUNCTION BOX
VTR
VENT THROUGH ROOF
PA
PIPE ANCHOR
J - /OX JUNCTION BOX
W/
WITH
EJ
EXPANSION JOINT
kW KILOWATT
W/O
WITHOUT
MAU MAKE -UP AIR UNIT
BACKFLOW PREVENTER
WC
WATER COLUMN
MAX MAXIMUM
WS
WASTE STACK
♦
PRESSURE GAUGE
MBH 1000 BTU PER HOUR
WSFU WATER SUPPLY FIXTURE UNIT
Q
THERMOMETER
—I—
UNION
FLANGE CONNECTION
ALL PLUMBING MATERIALS,
DEVICES, APPLIANCES, AND
.„ _ -^�
HOSE BIBB (HB)
EQUIPMENT SHALL BE
LABEL- LISTED BY A NORTH
CAROLINA APPROVED
THIRD
PARTY TESTING AGENCY.
NONFREEZE WALL HYDRANT (NW)
PLUMBING SPECIFICATIONS: SECTION 15200
A. SCOPE OF WORK
1. THIS CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, SERVICES,
TOOLS, TRANSPORTATION AND FACILITIES NECESSARY FOR, REASONABLY IMPLIED AND
INCIDENTAL TO, THE FURNISHING, INSTALLATION, COMPLETION AND TESTING OF ALL THE WORK
FOR THE PLUMBING SYSTEMS AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE
SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS, TO INCLUDE, BUT NOT BE LIMITED
TO THE FOLLOWING: (REFER TO RESPONSIBILITY SCHEDULE FOR EXACT RESPONSIBILITIES)
A. COMPLETE SANITARY PIPING SYSTEMS OF WASTE, DRAINS, AND VENTS.
B. COMPLETE COLD AND HOT WATER PIPING SYSTEMS, APPURTENANCES AND INSULATION.
C. PLUMBING FIXTURES AND EQUIPMENT AS SCHEDULED.
D. TESTS AND ADJUSTMENTS.
2. BEFORE STARTING WORK, THIS CONTRACTOR SHALL EXAMINE THE ARCHITECTURAL,
STRUCTURAL, MECHANICAL AND ELECTRICAL PLANS AND SPECIFICATIONS TO SEQUENCE,
COORDINATE, AND INTEGRATE THE VARIOUS ELEMENTS OF THE PLUMBING SYSTEM, MATERIALS,
AND EQUIPMENT WITH OTHER CONTRACTORS TO AVOID INTERFERENCE'S AND CONFRONTATIONS.
3, RELOCATION OF EXISTING WATER, WASTE, VENT, OR DRAINAGE LINES TO FACILITATE
STORE DESIGN CRITERIA MUST BE INCLUDED IN BID PROPOSAL.
4. ALL WORK SHALL BE DONE IN STRICT ACCORDANCE WITH ALL APPLICABLE GOVERNMENT AND
LOCAL CODES AND THE LANDLORD'S REQUIREMENTS, VERIFY LOCAL ADA AND WATER- SAVING
DEVICE CODE REQUIREMENTS PRIOR TO CONSTRUCTION.
5. CONTRACTOR SHALL SUBMIT A REPRODUCIBLE COPY OF THE "AS- BUILT" DRAWING TO THE
LANDLORD AND TO THE OWNER FOR THEIR RECORDS.
B. PLUMBING EQUIPMENT
1. PROVIDE NEW PLUMBING EQUIPMENT AS SHOWN ON THE DRAWING AND SPECIFIED IN THE
PLUMBING FIXTURE SCHEDULE.
2. WHERE EXISTING PLUMBING FIXTURES ARE TO BE REUSED, REPLACE BALL COCK VALVE
SEALS, LEAVE IN PROPER WORKING ORDER.
C. GENERAL PIPING REQUIREMENTS
1. GENERALLY, SANITARY AND POTABLE WATER CONNECTIONS WILL BE MADE AT TOILET ROOM
AND OTHER PLUMBING FIXTURES SHOWN ON PLANS. FIELD VERIFY EXACT CONNECTION POINTS
PRIOR TO SUBMITTING BID AND NOTIFY THE TENANT'S CONSTRUCTION MANAGER IF CONDITIONS
ARE NOT AS SHOWN ON THE PLANS OR AS STATED IN THE SPECIFICATIONS. CONTRACTOR MUST
VERIFY THE OPERABILITY OF ENTIRE SYSTEM PRIOR TO TIE IN AS FOLLOWS:
A. SNAKE SANITARY FOR A DISTANCE OF 100 FEET AND REPORT ANY BLOCKAGE.
B. TEST WATER PRESSURE TO INSURE MINIMUM OF 50 PSI.
2. INSTALL ALL NECESSARY PIPE HANGERS, SADDLES, AND CARRIERS TO PROPERLY SUPPORT
ALL PIPING AND FIXTURES. HANGERS SHALL SUIT TYPE OF PIPING PROVIDED AND BE SPACED
AT A MAXIMUM SPAN OF 5 FEET.
3. ESCUTCHEONS SHALL BE CHROME PLATED, SIZE AS REQUIRED AND PLACED AT ALL PIPE
PENETRATIONS AT WALLS, FLOORS, AND CEILINGS IN FINISHED AREAS.
4. FLASHING SHALL BE SEALED WATERTIGHT AND PERFORMED IN ACCORDANCE TO THE
LANDLORD'S CRITERIA.
5. THE CONTRACTOR SHALL ENSURE THAT ALL SLAB PENETRATIONS WITHIN THE TENANT'S
DEMISED PREMISES ARE PROPERLY SEALED AND REMAIN WATERTIGHT TO PREVENT ANY POSSIBLE
DAMAGE TO OTHER TENANTS AND /OR TO THE BUILDING. FAILURE TO DO SO SHALL BE AT RISK
AND SOLE EXPENSE OF THE CONTRACTOR.
D. PIPING
1. SANITARY PIPING - NO PVC ALLOWED
A. WASTE AND DRAIN PIPING SHALL BE SERVICE WEIGHT, CAST IRON SOIL PIPE, ALL VENT
PIPING SHALL BE CAST IRON. NO -HUB
JOINTS:
BELOW FLOOR SLAB - COMPRESSION TYPE PLASTIC SEAL (HUB AND SPIGOT).
ABOVE FLOOR SLAB - NEOPRENE SEALING SLEEVE WITH STAINLESS STEEL
SHIELD AND CLAMP WITH APPROVED NEOPRENE - BASED LUBRICANT, (HUBLESS).
B. PITCH WASTE LINES 2" AND SMALLER NOT LESS THAN 1/4" PER FOOT. PITCH LARGER
MAINS NOT LESS THAN 1/8" PER FOOT.
C. INSTALL A CLEANOUT AT BASE OF EACH SOIL STACK, AT EACH CHANGE IN DIRECTION,
AT INTERVALS NOT OVER 50 FEET, AND ELSEWHERE AS SHOWN ON DRAWINGS OR REQUIRED BY
LOCAL CODE. CLEAN OUTS SHALL ONLY BE INSTALLED IN NON- PUBLIC AREAS, UNLESS GIVEN
EXPRESSED WRITTEN PERMISSION BY TENANT'S CONSTRUCTION MANAGER. WHEN GIVEN
PERMISSION TO INSTALL IN PUBLIC AREAS, THE CLEANOUTS SHALL HAVE STAINLESS STEEL
WALL COVERS AND BRASS FLOOR COVERS (FLUSH WITH FINISHED FLOOR) PROVIDED BY THE
CONTRACTOR. PROVIDE COVERS WITH INSET AREA FOR CARPETED FLOOR LOCATIONS. ALL
CLEAN -OUT LOCATIONS SHALL BE APPROVED BY THE TENANT'S CONSTRUCTION MANAGER.
D. INSULATE ALL HORIZONTAL RUNS OF PIPING LOCATED IN CEILING SPACES WHEN
APPLICABLE. INSULATION TO BE AS SPECIFIED FOR WATER PIPING, SEE #5.
E. INSULATE THE TRAP, SANITARY AND SUPPLY PIPES UNDER LAVATORY WITH 1/2"
ARMSTRONG "ARMAFLEX" PIPING INSULATION OR TRUEBRO MODEL 102W "HANDI LAV GUARD"
INSULATION KIT.
2. CONDENSATE PIPING SHALL BE TYPE "L" DRAWN COPPER TUBE WITH 95 -5 TIN - ANTIMONY
SOLDERED JOINTS AND WROUGHT COPPER FITTINGS WITH DIELECTRIC SEPARATION BETWEEN
DISSIMILAR METALS.
3. POTABLE WATER PIPING:
A. BELOW GRADE: TYPE 'K', ANNEALED TEMPERED COPPER TUBE FOR PIPE SIZES 2 INCHES
AND SMALLER. BRAZE ALL JOINTS.
B. ABOVE GRADE: TYPE 'L' DRAWN COPPER TUBE WITH WROUGHT COPPER FITTINGS AND 95 -5
TIN - ANTIMONY SOLDER.
C. INSTALL SHOCK ABSORBERS IN PIPING SYSTEM TO PREVENT NOISE AND
DAMAGE DUE TO WATER HAMMER.
D. ALL BRANCH PIPING SYSTEM SHALL HAVE ACCESSIBLE SERVICE VALVE. PROVIDE SHUT OFF
VALVES IN THE SUPPLY PIPING TO EVERY FIXTURE. PROVIDE ACCESS DOORS WHERE NECESSARY.
E. PROVIDE WATER METER AND REMOTE READER PER LANDLORD'S CRITERIA OR LOCAL
UTILITIES REQUIREMENTS IF APPLICABLE. REFER TO PLANS FOR FOR ADDITIONAL
INFORMATION.
F. SECURE PIPE AT ANGLE STOPS.
G. PROVIDE FLEXIBLE INSERTS AT ALL PIPE PENETRATIONS THROUGH FRAMING TO KEEP
PIPES FROM HITTING FRAME WHEN IN OPERATION.
4. GAS PIPING - NOT APPLICABLE
5. INSULATION
A. INSULATE ALL WATER AND INTERIOR CONDENSATE PIPING WITH 1" THICK K -0.23 @ 75
F) SNAP -ON FIBERGLASS PIPE INSULATION WITH AN ALL SERVICE JACKE TO MEET LOCAL
CODES AND UL FLAME SPREAD RATING OF 25 AND SMOKE DEVELOPED RATINGS OF 50.
APPROVED MANUFACTURER: MANVILLE MICRO -LOK.
6. TEST do STERILIZATION
A. LEAKAGE TESTS SHALL BE PER LOCAL CODES, MINIMUM AS FOLLOWS:
B. TEST POTABLE WATER PIPING AND CONDENSATE PIPING AT 125 PSIG FOR SIX HOURS.
C. TEST DRAIN, WASTE, VENT PIPING BY A 10' WATER COLUMN FOR TWO HOURS. ALL
JOINTS SHALL BE GAS AND WATER TIGHT.
D. STERILIZE POTABLE HOT & COLD WATER LINES UPON COMPLETION OF SYSTEM. STERILIZE
WATER SYSTEM IN ACCORDANCE WITH LOCAL CODES.
HANGERS
INSTALLED
EACH SIDE OF
EXP. TANK
FOR SUPPORT II
3/4
EXISTIN
ET -1
BALL VALVE
BY P. C. (TYP.)
3/4" RUN FULL SIZE
TO FLOOR DRAIN.
DRAIN VALVE BY P.C:
PLATFORM ABOVE MOP SINK —
RE: ARCHITECTURAL DRAWINGS
VACUUM BREAKER
BY P. C.
AMTROL ST -5
THERMAL
EXPANSION
ABSORBER
INSULATE ALL PILING
IN ACCORDANCE "VVIT
SPECIFICATIONS'
••• V U Y�•Wb !+ •
0 1U U r U p Lase:
• • • U Y v e L w
see ••• • • O t!'�'U G Y •
••• W
W:o Leo
r • • • Y Y
•••• • • u •
r • s • u �
• u • Y • u u
Y•O• • 0.000 • ••• • WOO* •
3/4 "T do P RELIEF
VALVE BY P.C.
— WATER HEATER SEE
PLUMBING FIXTURE
SCHEDULE FOR
ADDITIONAL INFO.
2" WIDE, 20 GA. SHEET
METAL BAND, SECURE
TO WALL FOR SEISMIC
BRACING WHERE
REQUIRED BY CODE.
(BY P. C.)
GALV. DRIP PAN
BY P. C.
SEPARATE
3/4" DRAINS..
PLUMBING FIXTURE SCHEDUELE
MANUAL / AUTOMATIC AIR VENT OR VACUUM
MANUFACTURER
MARK
RELIEF VALVE
HW CW V W
M DEL NUMBER
CLEANOUT
SINK
"LUSTERTONE" SINGLE BOWL, SEAMLESSLY FORMED
CAP
1/2"
--IDA
WALL CLEANOUT (WCO)
ELKAY /LRAD1716
0
FLOOR CLEANOUT (FCO)
OF x`18 GAUGE, TYPE 304 (18 -8) NICKEL BEARING
o�
EXTERIOR CLEANOUT (ECO)
— 10
ELBOW UP
+0
ELBOW DOWN
a
TEE UP
ism
TEE DOWN
.9
ELBOW UP WITH SHUT -OFF VALVE (SOV)
ELBOW DOWN WITH SHUT -OFF VALVE (SOV)
TEE UP WITH SHUT -OFF VALVE (SOV)
PREVENT CONDENSATION, 6" BOWL DEPTH, 17 "X16"
TEE DOWN WITH SHUT -OFF VALVE (SOV)
* .A.
WATER HAMMER ARRESTER (WHA)
0
WITH PDI SIZES, (A, B, C, D, do E)
RECIRCULATION PUMP
P -TRAP
GAS COCK
FAUCET
TRAP PRIMER
ELKAY /LKD2432BH
- 60--
TRAP PRIMER WITH DISTRIBUTION UNIT
PLUMBING SPECIFICATIONS: SECTION 15200
A. SCOPE OF WORK
1. THIS CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, SERVICES,
TOOLS, TRANSPORTATION AND FACILITIES NECESSARY FOR, REASONABLY IMPLIED AND
INCIDENTAL TO, THE FURNISHING, INSTALLATION, COMPLETION AND TESTING OF ALL THE WORK
FOR THE PLUMBING SYSTEMS AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE
SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS, TO INCLUDE, BUT NOT BE LIMITED
TO THE FOLLOWING: (REFER TO RESPONSIBILITY SCHEDULE FOR EXACT RESPONSIBILITIES)
A. COMPLETE SANITARY PIPING SYSTEMS OF WASTE, DRAINS, AND VENTS.
B. COMPLETE COLD AND HOT WATER PIPING SYSTEMS, APPURTENANCES AND INSULATION.
C. PLUMBING FIXTURES AND EQUIPMENT AS SCHEDULED.
D. TESTS AND ADJUSTMENTS.
2. BEFORE STARTING WORK, THIS CONTRACTOR SHALL EXAMINE THE ARCHITECTURAL,
STRUCTURAL, MECHANICAL AND ELECTRICAL PLANS AND SPECIFICATIONS TO SEQUENCE,
COORDINATE, AND INTEGRATE THE VARIOUS ELEMENTS OF THE PLUMBING SYSTEM, MATERIALS,
AND EQUIPMENT WITH OTHER CONTRACTORS TO AVOID INTERFERENCE'S AND CONFRONTATIONS.
3, RELOCATION OF EXISTING WATER, WASTE, VENT, OR DRAINAGE LINES TO FACILITATE
STORE DESIGN CRITERIA MUST BE INCLUDED IN BID PROPOSAL.
4. ALL WORK SHALL BE DONE IN STRICT ACCORDANCE WITH ALL APPLICABLE GOVERNMENT AND
LOCAL CODES AND THE LANDLORD'S REQUIREMENTS, VERIFY LOCAL ADA AND WATER- SAVING
DEVICE CODE REQUIREMENTS PRIOR TO CONSTRUCTION.
5. CONTRACTOR SHALL SUBMIT A REPRODUCIBLE COPY OF THE "AS- BUILT" DRAWING TO THE
LANDLORD AND TO THE OWNER FOR THEIR RECORDS.
B. PLUMBING EQUIPMENT
1. PROVIDE NEW PLUMBING EQUIPMENT AS SHOWN ON THE DRAWING AND SPECIFIED IN THE
PLUMBING FIXTURE SCHEDULE.
2. WHERE EXISTING PLUMBING FIXTURES ARE TO BE REUSED, REPLACE BALL COCK VALVE
SEALS, LEAVE IN PROPER WORKING ORDER.
C. GENERAL PIPING REQUIREMENTS
1. GENERALLY, SANITARY AND POTABLE WATER CONNECTIONS WILL BE MADE AT TOILET ROOM
AND OTHER PLUMBING FIXTURES SHOWN ON PLANS. FIELD VERIFY EXACT CONNECTION POINTS
PRIOR TO SUBMITTING BID AND NOTIFY THE TENANT'S CONSTRUCTION MANAGER IF CONDITIONS
ARE NOT AS SHOWN ON THE PLANS OR AS STATED IN THE SPECIFICATIONS. CONTRACTOR MUST
VERIFY THE OPERABILITY OF ENTIRE SYSTEM PRIOR TO TIE IN AS FOLLOWS:
A. SNAKE SANITARY FOR A DISTANCE OF 100 FEET AND REPORT ANY BLOCKAGE.
B. TEST WATER PRESSURE TO INSURE MINIMUM OF 50 PSI.
2. INSTALL ALL NECESSARY PIPE HANGERS, SADDLES, AND CARRIERS TO PROPERLY SUPPORT
ALL PIPING AND FIXTURES. HANGERS SHALL SUIT TYPE OF PIPING PROVIDED AND BE SPACED
AT A MAXIMUM SPAN OF 5 FEET.
3. ESCUTCHEONS SHALL BE CHROME PLATED, SIZE AS REQUIRED AND PLACED AT ALL PIPE
PENETRATIONS AT WALLS, FLOORS, AND CEILINGS IN FINISHED AREAS.
4. FLASHING SHALL BE SEALED WATERTIGHT AND PERFORMED IN ACCORDANCE TO THE
LANDLORD'S CRITERIA.
5. THE CONTRACTOR SHALL ENSURE THAT ALL SLAB PENETRATIONS WITHIN THE TENANT'S
DEMISED PREMISES ARE PROPERLY SEALED AND REMAIN WATERTIGHT TO PREVENT ANY POSSIBLE
DAMAGE TO OTHER TENANTS AND /OR TO THE BUILDING. FAILURE TO DO SO SHALL BE AT RISK
AND SOLE EXPENSE OF THE CONTRACTOR.
D. PIPING
1. SANITARY PIPING - NO PVC ALLOWED
A. WASTE AND DRAIN PIPING SHALL BE SERVICE WEIGHT, CAST IRON SOIL PIPE, ALL VENT
PIPING SHALL BE CAST IRON. NO -HUB
JOINTS:
BELOW FLOOR SLAB - COMPRESSION TYPE PLASTIC SEAL (HUB AND SPIGOT).
ABOVE FLOOR SLAB - NEOPRENE SEALING SLEEVE WITH STAINLESS STEEL
SHIELD AND CLAMP WITH APPROVED NEOPRENE - BASED LUBRICANT, (HUBLESS).
B. PITCH WASTE LINES 2" AND SMALLER NOT LESS THAN 1/4" PER FOOT. PITCH LARGER
MAINS NOT LESS THAN 1/8" PER FOOT.
C. INSTALL A CLEANOUT AT BASE OF EACH SOIL STACK, AT EACH CHANGE IN DIRECTION,
AT INTERVALS NOT OVER 50 FEET, AND ELSEWHERE AS SHOWN ON DRAWINGS OR REQUIRED BY
LOCAL CODE. CLEAN OUTS SHALL ONLY BE INSTALLED IN NON- PUBLIC AREAS, UNLESS GIVEN
EXPRESSED WRITTEN PERMISSION BY TENANT'S CONSTRUCTION MANAGER. WHEN GIVEN
PERMISSION TO INSTALL IN PUBLIC AREAS, THE CLEANOUTS SHALL HAVE STAINLESS STEEL
WALL COVERS AND BRASS FLOOR COVERS (FLUSH WITH FINISHED FLOOR) PROVIDED BY THE
CONTRACTOR. PROVIDE COVERS WITH INSET AREA FOR CARPETED FLOOR LOCATIONS. ALL
CLEAN -OUT LOCATIONS SHALL BE APPROVED BY THE TENANT'S CONSTRUCTION MANAGER.
D. INSULATE ALL HORIZONTAL RUNS OF PIPING LOCATED IN CEILING SPACES WHEN
APPLICABLE. INSULATION TO BE AS SPECIFIED FOR WATER PIPING, SEE #5.
E. INSULATE THE TRAP, SANITARY AND SUPPLY PIPES UNDER LAVATORY WITH 1/2"
ARMSTRONG "ARMAFLEX" PIPING INSULATION OR TRUEBRO MODEL 102W "HANDI LAV GUARD"
INSULATION KIT.
2. CONDENSATE PIPING SHALL BE TYPE "L" DRAWN COPPER TUBE WITH 95 -5 TIN - ANTIMONY
SOLDERED JOINTS AND WROUGHT COPPER FITTINGS WITH DIELECTRIC SEPARATION BETWEEN
DISSIMILAR METALS.
3. POTABLE WATER PIPING:
A. BELOW GRADE: TYPE 'K', ANNEALED TEMPERED COPPER TUBE FOR PIPE SIZES 2 INCHES
AND SMALLER. BRAZE ALL JOINTS.
B. ABOVE GRADE: TYPE 'L' DRAWN COPPER TUBE WITH WROUGHT COPPER FITTINGS AND 95 -5
TIN - ANTIMONY SOLDER.
C. INSTALL SHOCK ABSORBERS IN PIPING SYSTEM TO PREVENT NOISE AND
DAMAGE DUE TO WATER HAMMER.
D. ALL BRANCH PIPING SYSTEM SHALL HAVE ACCESSIBLE SERVICE VALVE. PROVIDE SHUT OFF
VALVES IN THE SUPPLY PIPING TO EVERY FIXTURE. PROVIDE ACCESS DOORS WHERE NECESSARY.
E. PROVIDE WATER METER AND REMOTE READER PER LANDLORD'S CRITERIA OR LOCAL
UTILITIES REQUIREMENTS IF APPLICABLE. REFER TO PLANS FOR FOR ADDITIONAL
INFORMATION.
F. SECURE PIPE AT ANGLE STOPS.
G. PROVIDE FLEXIBLE INSERTS AT ALL PIPE PENETRATIONS THROUGH FRAMING TO KEEP
PIPES FROM HITTING FRAME WHEN IN OPERATION.
4. GAS PIPING - NOT APPLICABLE
5. INSULATION
A. INSULATE ALL WATER AND INTERIOR CONDENSATE PIPING WITH 1" THICK K -0.23 @ 75
F) SNAP -ON FIBERGLASS PIPE INSULATION WITH AN ALL SERVICE JACKE TO MEET LOCAL
CODES AND UL FLAME SPREAD RATING OF 25 AND SMOKE DEVELOPED RATINGS OF 50.
APPROVED MANUFACTURER: MANVILLE MICRO -LOK.
6. TEST do STERILIZATION
A. LEAKAGE TESTS SHALL BE PER LOCAL CODES, MINIMUM AS FOLLOWS:
B. TEST POTABLE WATER PIPING AND CONDENSATE PIPING AT 125 PSIG FOR SIX HOURS.
C. TEST DRAIN, WASTE, VENT PIPING BY A 10' WATER COLUMN FOR TWO HOURS. ALL
JOINTS SHALL BE GAS AND WATER TIGHT.
D. STERILIZE POTABLE HOT & COLD WATER LINES UPON COMPLETION OF SYSTEM. STERILIZE
WATER SYSTEM IN ACCORDANCE WITH LOCAL CODES.
HANGERS
INSTALLED
EACH SIDE OF
EXP. TANK
FOR SUPPORT II
3/4
EXISTIN
ET -1
BALL VALVE
BY P. C. (TYP.)
3/4" RUN FULL SIZE
TO FLOOR DRAIN.
DRAIN VALVE BY P.C:
PLATFORM ABOVE MOP SINK —
RE: ARCHITECTURAL DRAWINGS
VACUUM BREAKER
BY P. C.
AMTROL ST -5
THERMAL
EXPANSION
ABSORBER
INSULATE ALL PILING
IN ACCORDANCE "VVIT
SPECIFICATIONS'
••• V U Y�•Wb !+ •
0 1U U r U p Lase:
• • • U Y v e L w
see ••• • • O t!'�'U G Y •
••• W
W:o Leo
r • • • Y Y
•••• • • u •
r • s • u �
• u • Y • u u
Y•O• • 0.000 • ••• • WOO* •
3/4 "T do P RELIEF
VALVE BY P.C.
— WATER HEATER SEE
PLUMBING FIXTURE
SCHEDULE FOR
ADDITIONAL INFO.
2" WIDE, 20 GA. SHEET
METAL BAND, SECURE
TO WALL FOR SEISMIC
BRACING WHERE
REQUIRED BY CODE.
(BY P. C.)
GALV. DRIP PAN
BY P. C.
SEPARATE
3/4" DRAINS..
PLUMBING FIXTURE SCHEDUELE
CONNECTIONS
MANUFACTURER
MARK
w
HW CW V W
M DEL NUMBER
S -1
SINK
"LUSTERTONE" SINGLE BOWL, SEAMLESSLY FORMED
1/2"
1/2"
1 1/2"
1 1/2"
ELKAY /LRAD1716
OF x`18 GAUGE, TYPE 304 (18 -8) NICKEL BEARING
STAINLESS STEEL, SELF - RIMMING, FULLY
a
UNDERCOATED UNDERSIDE TO DAMPEN SOUND AND
Of
U
w
PREVENT CONDENSATION, 6" BOWL DEPTH, 17 "X16"
0
OVERALL DIMENSIONS, 3 HOLES ON 4" CENTERS
FAUCET
DUAL HANDLE TOP MOUNT MIXING FAUCET,
GOOSENECK SWING SPOUT, HEAVY CHROME PLATE,
ELKAY /LKD2432BH
REMOVABLE CARTRIDGES, 1/2" I.P. CONNECTIONS,
4" BLADE HANDLES. PROVIDE WITH 1.5GPM
N
o
AERATOR.
SUPPLIES
1/2" CHROME PLATED ANGLE STOPS WITH LOOSE
0
z
KEY HANDLE, 1/2" CHROME PLATED FLEXIBLE
* Nc>r +1M00 �Ik
STM OF
BRASS RISER
LICENSE 689
WASTE
STANDARD DUO STRAINER, FITS 3 1/2 11 OPENING
(4 1/2" TOP DIAMETER), ONE PIECE STAINLESS
ELKAY /LK -35
i
CONICAL STRAINER BASKET WITH NEOPRENE
Q
C
U
STOPPER, CHROME PLATED BRASS TAILPIECE, 1
W
<z
0
1/2" 17 GAUGE CHROME PLATED ADJUSTABLE
C/)
W L7j
p�
P -TRAP WITH CLEANOUT PLUG, 1 1/2" CHROME
W
_j
z
�D
J
�0I�
PLATED BRASS WASTE TO WALL
z
IM
FIELD VERIFY ALL CONDITIONS
DESIGN DRAWINGS ARE SCHEMATIC. THIS CONTRACTOR SHALL VISIT THE SITE
PRIOR TO BIDDING OR AWARD OF CONTRACT TO INSPECT EXISTING FIELD
CONDITIONS. THIS CONTRACT SHALL INCLUDE ALL LABOR AND MATERIALS
NECESSARY FOR FIELD MODIFICATIONS . DUE TO ' EXISTING CONDITIONS.
THE CONTRACTOR SHALL CONTACT THE ARCHITECT, ENGINEER OR OWNER PRIOR
TO BIDDING FOR INTERPRETATIONS AND CLARIFICATIONS OF THE DESIGN AND
INCLUDE IN HIS BID ALL COSTS TO MEET THE DESIGN INTENT.
CLARIFICATIONS MADE BY THE ARCHITECT, ENGINEER OR OWNER AFTER
BIDDING WILL BE FINAL AND SHALL BE IMPLEMENTED AT CONTRACTORS COST.
BIDDING CONTRACTORS SHALL HAVE A WORKING KNOWLEDGE OF LOCAL CODES
AND ORDINANCES AND SHALL INCLUDE IN THEIR BIDS THE COSTS FOR ALL
WORK INSTALLED IN STRICT ACCORDANCE WITH GOVERNING CODES, THE
PLANS AND SPECIFICATIONS NOT WITHSTANDING. THE CONTRACTOR SHALL
ALERT ARCHITECT, ENGINEER OR OWNER OF ANY APPARENT DISCREPANCIES
BETWEEN GOVERNING CODES AND DESIGN INTENT.
x
,w
HENDERSON
ENGINEERS=_
8325 LENEXA DRIVE
LENEXA, KS 66214
im 913142 5000 FAx 913142 5001
www hell- eny .osem
1250000991
EL. CEFffWIl[011IXRUglfl WI(376H 1606
fiIRinq/11I�/ 3
-,
7
I'*
w
01
4,
z
0
a
Of
U
w
0
N
o
0
z
* Nc>r +1M00 �Ik
STM OF
KEN L. B
LICENSE 689
i
Q
C
U
W f-
W
<z
0
z
C/)
W L7j
p�
In
W
_j
z
�D
J
�0I�
C
z
IM
D
ISSUE FOR DD -LLL XX -XX -XX
ISSUE FOR DD -LLD XX -XX -XX
ISSUE FOR CD -LLL XX -XX -XX
ISSUE FOR CD -LLD XX -XX -XX
ISSUE FOR PERMIT 06 -12 -12
ISSUE FOR BID XX -XX -XX
Scale:
Drawn MSB
Chocked By: WWR
Job Number. 17 k1
Drawing:
W..
P5.`
-,
7
I'*