Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
14-1433-002
w c� E-0 w a V.� !n NOTES: I. VIINDOW FRAMER / MULLION ANCHORAGE TO MAIN STRUCTURE SHALL BE IN ACCORDANCE WITH THE UNIT'S NOTICE OF ACCEPTANCE (REFER TO PRODUCT5 CONTROLS). 2, ONLY THE OPENINGS THAT ARE IDENTIFIED WITH THEIR 51ZES AND DE51GN PRESSURES ARE PART OF THIS PERMIT. ALL OTHER OPENINGS ARE NOT PART OF THIS PERMIT. 3, THE MAIN WIND FORCE RE51STING SYSTEM OF THE STRUCTURE (I.E.: BEAMS, COLUMNS, FRAMING, ETC.) SHALL BE DESIGNED TO I^IITHSTAND THE LOADS POSED BY THE GLAZING. NO CALCULATIONS HAVE BEEN PERFORMED TO VERIFY THEIR ADEQUACY, 4, EGRESS WINDOWS TO HAVE A MINIMUM OPENING AREA OF 5.7 50. FT. (5.0 50. FOR GROUND FLOOR) (FBC 1029.2), AND 24" HEIGHT MINIMUM, 20" WIDTH MINIMUM (FBC 1029,2.1) 5. EGRE55 WINDOWS TO BE NOT MORE THAN 44" ABOVE THE FLOOR (FBC 1029.3) 11V I I !"11\ I VI i- KUI `I I tL tVA I I UI �. TH15 PERMIT SCALE: 114`4_0II -------------------- - - - - -- ------------------------------------------ NOT PART OF —j TH15 PERMIT FIGHT ELEVATION SCALE: 114'1- I' --0'1 --------------------------- ----- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - -- - - - --- - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - X 0 PW3 X PW2 5D1 S�1 X x L NOT PART OF —j TH15 PERMIT FIGHT ELEVATION SCALE: 114'1- I' --0'1 --------------------------- ----- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - -- - - - --- - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - w u- 8 Cz z i-n DEAR ELEVATION SCALE: 11411 =1' -011 - - - - - -- - x o R2 X D X 0 EGRE55 EGRESS X PW2 5D1 S�1 X x L FD2 x o t W ` CA3 w u- 8 Cz z i-n DEAR ELEVATION SCALE: 11411 =1' -011 - - - - - -- - LEFT ELEVATION SCALE: 1141111_011 V V U V V UUJ V�V J V � V �D,�TE: 10/10/2014 5( --AI _F: A i sI!•-InWN V v'J J U J J V U J u v uUU 'J V u iJUJ �+ � V V VVJ V V 01- 210 - 100614 CONTEN -r: dS INSTALLATION SHEET 2 I � DRAWN BY: a.aArafting services, inc. aaMbellsouth,net X D X 0 EGRE55 EGRESS LEFT ELEVATION SCALE: 1141111_011 V V U V V UUJ V�V J V � V �D,�TE: 10/10/2014 5( --AI _F: A i sI!•-InWN V v'J J U J J V U J u v uUU 'J V u iJUJ �+ � V V VVJ V V 01- 210 - 100614 CONTEN -r: dS INSTALLATION SHEET 2 I � DRAWN BY: a.aArafting services, inc. aaMbellsouth,net = % m 10/m. iim� • J> 5. ° „� C rb' 1 G�ia }'yy y�y� L 0 T1 C? C 6 r� UJ F- Chi a 0 Cu a a� = % m 10/m. iim� • J> 5. ° „� C rb' 1 G�ia }'yy y�y� L 0 T1