Loading...
13-675-010C"IL10 NUMBER NOTES GENERAL rD .- z8y11 -7 A A TO F IJ OV ATE k7 14, w. i 1 T T b g4 T FL.0,0 a, 1.— ALL WORK TO BE PERFORMED SHALL COMPLY WITH THE REQUIREMENTS OF THE FLORIDA BUILDING CODE (F.B.C.) ' 20 } EDITION AND SUPPLEMENT AND ZONING ORDINANCES OF CITY OF D �� %, APPLICABBLE AND ANY AGENCY j "�7T /10,960 �a .C``t 1�. HAVING JURISDICATION ON THIS PROJECT, ® r ���� �� `�� '��aG>t� ���� �� 4- TO M 1T� 0, I-A K1� P a Z— 1 TOTAL: 2,- MATERIALS AND /OR CONSTRUCTION SYSTEM USED AS PART OF OR FOR THE PROTECTION OF THE ENVELOPE OF THE LOT � 64 To (v_% j�IG> �� ��, � m9 square ft STRUCTURE, INCLUDING BUT NOT LIMITED TO WINDOWS, EXTERIOR, GLAZING, WALL CLADDING, ROOFING, EXTERIOR 1 I: a DOORS, SKYLIGHTS, GLASS BLOCK, SIDING AND SHUTTERS MUST HAVE PRODUCT CONTROL ACCEPTANCE NUMBERS IN EXISTING BUILDING �� TYPE I CONSTRUCTION (MADE OF NON COMPLIANCE WITH THE REQUIREMENTS OF CITY OF DORAL BUILDING CODE. COMBUSTIBLE MATERIALS — BUILT IN 1955) THERE ARE FIRE 3,— WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS. IF ANY DISCREPANCIES ARISE THE ARCHITECT L."), I DAT/k SPRINKLERS IN THE BUILDING. % IS TO BE NOTIFIED PRIOR TO THE COMMENCEMENT OF WORK FOR CLARIFICATION. DO NOT SCALE DRAWINGS. 0 *APPLICABLE CODE: FLORIDA BUILDING CODE 2O i O 4.— CONTRACTOR SHALL VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS AND CONDITIONS ON THE JOB. THE OCCUPANCY GROUP' ARCHITECT /ENGINEER SHALL BE NOTIFIED BEFORE PROCEEDING WITH THE WORK OF ANY DISCREPANCIES IN THE ��1'���i�1� `•'; ' k CONTRACT DOCUMENTS AND CONDITIONS ON THESE DRAWINGS AND /OR ALLL OBVIOUS ERRORS AND OMISSIONS. CONSTRUCTION TYPE: CBS °Y .A �� �� o� BUILDING HEIGHT: 1 STORY AND PARTIAL 2 STORY 5.— CONTRACTOR SHALL PROMPTLY NOTIFY THE ARCHITECT /ENGINEER OF THE EXISTENCE OF ANY OBSERVED FIRE PROTECTION VARIATIONS BETWEEN THE CONTRACT DOCUMENTS AND ANY APPLICABLE CODES OR ORDINANCES, ALL OMISSIONS OR CONFLICTS BETWEEN THE VARIOUS ELEMENTS OF THE WORKING DRAWINGS, SHALL BE BROUGHT TO THE INMEDIATE SYSTEM PROVIDED: SPRINKLERS ATTENTION OF THE ARCHITECT .BEFORRE PROCEEDING WITH ANY WORK SO INVOLVED. ANY WORK INSTALLED IN HANDICAPPED PARKING REQUIREMENTS:FOR ENTIRE CONFLICT WITH THE ARCHITECTURAL DRAWINGS SHALL BE CORRECTED BY THE CONTRACTOR AT HIS /HER OWN SITE 1t� j EXPENSE, AND AT NO EXPENSE TO THE OWNER OR ARCHITECT. -1 6.- THE DEMOLITION f�LANS FOR THIS PROJECT ARE GENERAL IN NATURE AND INDICATE APPROXIMATE EXISTING CONDITIONS AT THE PROJECT SITE, THE CONTRACTOR SHALL BE REPONSIBLE FOR VISUAL FIELD VERIFICATION OF 'f CONDITIONS AND QUANTITIES AND NOTIFY THE A/E AND HE OWNER OF DISCREPANCIES VIA ADDENDUM, FAILURE ON THE PART OF THE PROSPECTIVE CONTRACTORS TO COMPLY WITH THE ABOVE MENTIONED MANDATE SHALL NOT ENTITLE I �� � v �T �� 'T m ` ° 8- ����oSC� i C .OL- THE AWARD CONTRACTOR TO ADDITIONAL REMUNERATION AFTER BID AWARD. 63. LA I M0 f 1 5 L tl � AUL, 0 _)P Ff-,F V VAj j— A�t� 7, THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND TOPOGRAPHIC SPOT ELEVATIONS AND NOTIFY THE ,I `� �ti% i� $� "�i n4E_TA� Ft. �� , � I i �, ARCHITECT OF ANY EXISTING DISCREPANCIES PRIOR TO PROCEEDING WITH THE WORK. � B.- THE CONTRACTOR IS TO EXERCISE CARE DURING THE DEMOLITION AND REMOVAL TO ASSURE THAT ITEMS SO AS TO MINIMIZE DAMAGE TO THE SCHEDULED FOR DEMOLITION AND REMOVAL ARE PROPERLY REMOVED a -I SdRROUNDING AREA: ITEMS SCHEDULED TO BE RELOCATED OR TO REMAIN ARE TO BE PROTECTED FROM DAMAGE, ALL M I1� -c �Z_ s �,,� 1 D� �f°# � , t°� j� t d IAA �j � l$f01 SCHEDULED ITEMS THAT ARE CALLED FOR IN THE CONTRACT DOCUMENTS TO BE REMOVED ARE TO BE REMOVED FROM Tut `° �� '' t= At-39 IrA -' L,,, J�-:tcm .ip 6,�,57kALL_ O P AU_ THE SITE BY THE CONTRACTOR AND DISPOSED OF AS REQUIRED BY LOCAL AND STATE CODES AND AS REQUIRED BY r� L r 8 i� yPI�t Cmoi 1° I`aL(rZ�. Y-�` AUTHORITIES HAVING JURISDICTION, ,y w!a a���du591 c Td Lc . 9. THE CONTRACTOR SHALL CAREFULLY EXECUTE ALL WORK TO AVOID UNNECESSARY DAMAGE TO EXISTING ITEMS jt�� T ��- X �Z °'a 4� (� �� - „C's. K k.i6, 4 "�� Y-tt` 1 "fZ, r i`" cj�31. t io d►L SCHEDULED TO REMAIN IN PLACE INCLUDING BUT NOT LIMITED TO EXISTING MECHANICAL, ELECTRICAL &LIGHTING �t I ,�.. 1r� ci ► j,Vtz 5 f- ( L'.av vz, - �� j,,�� �r IA.'5y 6,� 15'E_T , i1J-I` A(,L dJFi ���0� � s 'lid EZi� S � B 4 hIC L rZlIL. tZa 12 EQUIPMENT. 10.E THE CONTRACTOR SHALL NOTIFY THE ARCHIITECT BEFORE CUTTING OF ANY EXISTING PILE /GRADE BEAM SUPPORTED STRUCTURAL FLOOR SLAB, 11.— THE CONTRACTOR IS TO PROVIDE SECURITY BARRIERS AND OTHER APPLICABLE DEVICES AS REQUIRED BY THE CONTRACT DOCUMENTS AND /OR LOCAL AND STATE CODES AND REGULATIONS, THE CONTRACTTORS SCOPE OF WORK OR THIS PROJECT SHALL INCLUDE PATCHING ANY DAMAGE SURFACES TO MATCH EXISTING AND PAINTING ALL SURFACES AFFECTED BY THE NEW CONDTRUCTION, THOSE AFFECTED ITEMS SHALL BE REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER, 12.— THE WORK SHALL INCLUDED THE FURNISHING OF ALL LABORS, MATERIALS, EQUIPMENT, TRANSPORTATION AND SERVICES NECESSARY TO DO A COMPLETE AND THOROUGH, ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS AS PREPARED THEREFORE BY THE OFFICE OF WAYNE DENNIS ARCHITECT.& PLANNER AND ASOCIATED PROJECT ENGINEERS. 13.— WORK NOT INCLUDED IN CONTRACT: WORK NOTED "N,I.C,” OR BY OTHERS ON THE GRAWINGS OR SPECIFICATIONS. IF ANY MATERIALS EQUIPMENT OR BOTH, INDICATED "N.I.C." ARE TO BE INSTALLED BY THE CONTRACTOR, THEY WILL BE SO NOTED ON THE DRAWINGS OR SPECIFIED IN THE SPECIFICATIONS, 14.— CONTRACTOR ACKNOWLEDGES THAT HE HAS INFORMED HIMSELF FULLY REGARDING REO.UIREMENTS OF DRAWINGS, SPECIFICATIONS & REGULATIONS PERTAINIG TO THE PROJECT, SPECIFICATIONS AND DRAWINGS ARE COMMPLEMENTARY AND WHAT IS CALLED FOR BY ONE IS AS BIDING AS IF CALLED FOR BY ALL, VISIT SITE OF WORK, COMPARE REQUIREMENTS OF DRAWINGS AND SPECIFICATIONS AND BECOME FAMILIAR WITH EXISTING CONDITIONS UNDER WHICH WORK OF CONTRACT IS TO BE PERMORMED, INCLUDING TOPOGRAPHY, APPROACHES AND IMPROVEMENTS ON OR ABOUT SITE, 15.- -- PROTECTION OF ADJACENT BUILDINGS AND PROPERTY: EXERCISE ALL REQUIRED PRECAUTIONS NECESSARY TO PROTECT ALL BUILDINGS AND OTHER CONSTRUCTIONS ON PROPERTY ADJACENT TO THAT OF THE WORK OF THIS CONTRACT, CONTRACTOR SHALL BE RESPONSIBLE FOR, AND PAY FOR, ALL DAMAES TO SUCH ADJACENT BUILDINGS AND CONSTRUCTION ON ACCOUNT OF OPERATIONS UNDER THE CONTRACT. 16. —THE ARCHITECT SHALL NOT HAVE CONTROL OR CHARGE OF, AND SHALL NOT BE RESPPONSIBLE FOR, THE MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES OF CONSTRUCTION, FABRICATION, PROCUREMENT SHIPMENT, DELIVERY OR INSTALLATION, OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK, FOR THE ACTS OR OMISSIONS OF THE CONTRACTORS, SUBCONTRACTORS, SUPPLIERS OR ANY ,OTHER PERSONS PERMORMING ANY OF THE WORK, OR FOR THE FAILURE OF ANY OF THEM TO CARRY OUT THE WORK OR TO MEET THEIR SCHEDULES FOR DELIVERY OF COMPLETION IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. 17.— NO TRENCHES DEEPER THAN 5` -0" IN WHICH A PERSON IS TO DESCEND SHALL BE ALLOWED WITHOUT THE CONTRACTOR OBTAINING A PERMIT FROM OSHA. 18.- CONTRACTOR AND ALL SUBCONTRACTORS ARE TO HOLD HARMLESS THE ARCHITECT, ENGINEERS AND OWNER OF ALL LAWSUITS AND CLAIMS WHICH ARISE FROM WORK PERFORMED BY OR MATERIALS SIPPLIED BY THE CONTRACTOR AND THE SUBCONTRACTORS. 19.— PROVIDE A PROJECT SECURITY PROGRAM TO PROTECT WORK, MATERIAL AND EQUIPMENT FROM THEFT AND VANDALISM. CONTRACTOR IS RESPONSIBLE FOR REPLACING ANY STOLEN OR VANDALIZED VIORK, MATERIAL AMD EQUIPMENT. AT NO ADDITIONAL COST TO OWNER, UNTIL COMPLETE PROJECT IS ACCEPTED BY OWNER, 20.— CONTRACTOR SHALL VERIFY TAHT NO CONFLICTS EXIST IN LOCATION OF ANY AND ALL MECHANICAL, TELEPHONE, ELECTRICAL, LIGHTING AND PLUMBING (TO INCLUDE ALL PIPING, DUCTWORK AND CONDUIT) AND THAT REQUIRED CLEARANCES FOR INSTALLATION AND MAINTENANCE OF ABOVE MENTIONED EQUIPMENT ARE PROVIDE, 21.— THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL UNDERGROUND UTILITIES AND /OR STRUCTURES SHOWN AND ANY OTHER UTILITIES OR STRUCTURES NOT OF RECORD OR NOT SHOWNN ON THESE PLANS. 22. —ALL LABOR INSTALLATION SHALL BE PERFORMED IN THE BEST POSSIBLE MANNER BY SKILLED AND EXPERIENCED n/ORKMEN TRAINED IN THEIR RESPECTIVE TRADES. *23.— ALL FINISH MATERIAL SHALL BE PROTECTED AT ALL TIMES AGAINST SUBSEQUENCES DAMAGE, UNTIL FINAL ACCEPTANCE BY THE OWNER. 14,— THE CONTRACTOR SHALL PROVIDE ALL NECESSARY. BLOCKING, BACKING, FRAMING, HANGERS OR OTHER SUPPORT, fOR ALL BUILDING EQUIPMENT AND ACCESORIES SHOWN ON PLANS, REGARDLESS OF WHOM SUPPLIERS SAID E'QUIPMENT OR ACCESSORY UNLESS NOTED OTHERWISE, °Z.5.— ALL TRADES SIAALL AT ALL TIMES, KEEP THE PREMISES FREE FROM ACCUMULATION OF WASTE MATERIAL OR KUBBISH CAUSED BY THEIR WORK, PROVIDE CLEAN UP AND DISPOSE OF ALL DEBRIS, FOR A NEAT AND CLEAN JOB SITE CONDITION THROUGHOUT THE ENTIRE CONSTRUCTION PROCESS, AT THE COMPLETION OF WORK, LEAVE THE PAVEMENT AREA IN A BROOM CLEAN CONDITION WITH NO STAINS, ?-6.— ALL PARTIES AGRE 'rTHAN ANY DISPUTES SHALL BE SETTLED THROUGH. BINDING ARBITRATION f� fi t is L �1 �I MIAMI- ADE Summary Details- Folio No,: 09- 4025 -028 -1170 Property: 5711 S DIXIE HWY Mailing PSYCHO - SOCIAL Address: REHABILITATION Floors: CENTER OF DADE COUNTY Livin2 Units: 5711 S DIXIE HWY MIAMI FL d' S Fovta e: 33143 -3602 Pronerty Infnrrnatinn- Primary Zone: 000 INDUSTRIAL - 3ENERAL LUC: 043 HEALTH CARE Beds /Baths: Wo Floors: Livin2 Units: d' S Fovta e: 10,960 Lot Size: 11,,500 SQ FT ear Built: 1955 5 54 40 TOWNSITE OF Legal ARKINS PB 2 -105 Description: OTS 64 TO 67 INC BLK CF 73R145828 LOT IZE 11500 SQ FT PSYCHO - SOCIAL REHABILITATION CENTER OF nADE COUNTY D. B.A. FELLOWSHIP HOUSE I 5711 SOUTH DIXIE HIGHWAY, SOUTH MIAMI, FLORIDA 33143 � � YYYYYY `Y t { Yn r Yt 5 WAYNEE E. DENNIS ARCHITECT & PLANNER FLORIDA REGISTRATION NO. 5561 P.O. BOX 143551 CORAL GABLES, FLORIDA 33114 TEL: (305) 661 0711