Loading...
11-257-003U U V V VU u ® U U U V V O V V V V UUUVV V UU V UU U U U UU•) U V J V Ul V U U V VU UU V U U V U U U V V V U U V V VV VVU 11 Uu 3 -3 -2011 vJV U JU J " t'U W VU U U U V U L V V UV V v u U U U GENERAL_ NOTES U V C14 1. ALL WORK AND MATERIALS DESCRIBED HEREIN ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE TERMS "GENERAL CONTRACTOR," 257HE GENERAL CONTRACTOR SHALL FURNISH AND PAY FOR ALL TEMPORARY UTILITY SERVICES DURING THE COURSE OF CONSTRUCTION. 44, THE GENERAL CONTRACTOR WILL FURNISH AND INSTALL A COMPLETE MECHANICAL SYSTEM TO INCLUDE BUT NOT BE LIMITED TO MECHANICAL LL "CONTRACTOR," OR "SUBCONTRACTOR" REFER TO THOSE ENGAGED BY THE OWNER TO PERFORM THE WORK FOR THE OWNER. EQUIPMENT, INSTALLED AND MOUNTED WITH DISCONNECT AND WIRING, HANGERS AND DUNNAGE FOR SAME (INCLUDING THE HIRING OF A LOCAL i� Qi .-Z E cz STRUCTURAL ENGINEER TO DESIGN SUCH DUNNAGE HANGERS), DUCTWORK, COLLARS, DIFFUSERS, REGISTERS, CONTROLS, TIME CLOCKS, ETC. a J 26. EACH CONTRACTOR AND SUBCONTRACTOR PARTICIPATING IN THE PERFORMANCE OF OWNER'S WORK SHALL (A) MAKE APPROPRIATE WHETHER OR NOT SUCH WORK IS OR IS NOT SHOWN OR DELINEATED IN THE CONTRACT DOCUMENTS. GENERAL CONTRACTOR'S MECHANICAL I Q ca 2. ALL RULES AND REGULATIONS, SCOPE OF WORK AND PROCEDURES INDICATED WILL BE PERFORMED BY THE GENERAL CONTRACTOR, THEIR ARRANGEMENTS WITH OWNER FOR TEMPORARY UTILITY CONNECTIONS INCLUDING WATER AND ELECTRICITY, AS AVAILABLE, (B) PAY THE COST OF THE CONTRACTOR(S) ARE REQUIRED TO COORDINATE WITH ALL OTHER CONTRACTORS ON JOB TO MAINTAIN CEILING HEIGHT, LIGHT FIXTURE LOCATION, a C%) 0 AGENTS, AND SUPPLIERS TO PROVIDE A TOTAL AND COMPLETE PROJECT FOR THE OWNER, WORK SHOWN IN THESE NOTES IS TO BE PERFORMED BY CONNECTIONS AND OF PROPER MAINTENANCE AND REMOVAL OF SAME, AND (C) PAY ALL UTILITY CHARGES INCURRED AT THE PREVAILING RATES OF SPRINKLER BRANCH LINES, ETC, O i-+ THE GENERAL CONTRACTOR OR SUBCONTRACTORS, AGENTS AND / OR SUPPLIERS ONLY, WHETHER OR NOT THE WORK IS DELINEATED PROPERLY. THE UTILITY COMPANY PROVIDING SUCH SERVICE TO THE BUILDING, DURING THE COURSE OF CONSTRUCTION UP TO AND INCLUDING THE DATE OF N i x C'11 "TURN OVER" TO THE OWNER. C 45. THE GENERAL CONTRACTOR SHALL COORDINATE WITH THE MECHANICAL SUBCONTRACTOR TO ENGINEER AND INSTALL ALL NECESSARY MISC. 0 3. THE WORK CONTAINED IN THESE CONTRACT DOCUMENTS AND/ OR SPECIFICATIONS IS TO BE PERFORMED BY GENERAL CONTRACTOR AND/ OR ITS STRUCTURAL STEEL SHAPES. SHAPES TO BE INSTALLED WHERE DIRECTED BY THE LANDLORD'S REPRESENTATIVE FOR ADDITIONAL MECHANICAL '', r,7 SUBCONTRACTORS WHETHER OR NOT SPECIFICALLY NOTED OTHERWISE, 27. IT IS THE GENERAL CONTRACTOR'S REQUIREMENT THROUGH ITS SUBCONTRACTORS TO RECONFIGURE AND BRING IN NEW UTILITY SERVICES AS UNIT ROOFTOP SUPPORT AND THE SUPPORT OF INTERIOR MECHANICAL EQUIPMENT, DUCTWORK, COLLARS, DIFFUSERS, REGISTERS, EXHAUSTS, FANS, REQUIRED, TO MEET THE NEEDS OF THESE CONTRACT DOCUMENTS. ETC. 4. THE GENERAL CONTRACTOR IS REQUIRED TO HAVE ALL SUBCONTRACTORS REVIEW THESE NOTES PRIOR TO BIDDING AND TO FAMILIARIZE ALL J PERSONS AND SUBCONTRACTORS WORKING ON THIS PROJECT WITH THESE GENERAL NOTES AS WELL AS THE CONTRACT DOCUMENTS. ANY 28. THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS WORKING ON THIS PROJECT ARE RESPONSIBLE FOR CONTACTING THE PUBLIC UTILITY 46. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR FURNISHING AND INSTALLING ALL TOILET ACCESSORIES, AS WELL AS THE NEW TOILET ROOM(S), DISCREPANCY BETWEEN THESE CONTRACT DOCUMENTS OR DESIGN CRITERIA INFORMATION IS TO BE REPORTED TO THE ARCHITECT PRIOR TO THE COMPANIES SUPPLYING UTILITIES TO THE AREA WHERE THE PROJECT IS LOCATED IN ORDER TO VERIFY LOCATIONS OF UTILITIES, UNDERGROUND OR DRINKING FOUNTAIN AND SERVICE SINK IF APPLICABLE, IN THESE PREMISES UNLESS NOTED OTHERWISE OR EXISTING. TOILET ACCESSORY AND START OF ANY WORK ON THE PROJECT. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR FULLY ACQUAINTING THEMSELVES WITH THE OVERHEAD, AND SECURE THE PROBLEMS WITH EXPLOSIONS, DISCONNECTION, REMOVALS, ETC, FIXTURE MOUNTING HEIGHTS TO BE THE HEIGHT NOTED ON THE LATEST A.D.A./CABO /ANSI REGULATIONS AS REQUIRED BY LOCAL BUILDING AGENCIES CONTENT AND SCOPE OF THE WORK INDICATED IN THE CONSTRUCTION DOCUMENTS AND SPECIFICATIONS. ALL WORK IS BY GENERAL CONTRACTOR AND PLUMBING CODES. THE GENERAL CONTRACTOR TO FURNISH AND INSTALL NEW TOILET EXHAUST WITH ASSOCIATED DUCTWORK, ROOF UNLESS OTHERWISE NOTED, WORK DECLARED UNACCEPTABLE BY THE ONWER SHALL BE CORRECTED IN A MANNER AND TO DEGREE OF QUALITY PENETRATIONS, OR HOOK UP TO COMMON EXHAUST DUCT WITH BACKDRAFT DAMPER ETC., INCLUDING ASSOCIATED ELECTRICAL HOOKUP AND PANEL ACCEPTABLE TO THE OWNER. 29, THE GENERAL CONTRACTOR SHALL APPLY FOR ALL UTILITY METERS AND NOTIFY THE UTILITY COMPANY OF THE NAME, ADDRESS AND PHONE CONNECTIONS, OR REFURBISH EXISTING LIGHT /FAN UNIT(S) TO LIKE NEW CONDITION, (WHERE NOTED ON THE PLANS), WHETHER SUCH WORK IS SHOWN NUMBERS OF THE OWNER FOR PERMANENT SERVICES. GENERAL CONTRACTOR SHALL BRING IN ALL ADDITIONAL SERVICES, ADEQUATE FOR TENANTS OR NOT SHOWN IN THE CONSTRUCTION DOCUMENTS, THE TOILET ROOM IS OF THE A.D.A. AND /OR CABO /ANSI TYPE AND ALL PLUMBING FIXTURES AND NEEDS AS REQUIRED, INCLUDING, BUT NOT LIMITED TO ELECTRIC, SPRINKLER, SOIL (WASTE), AND DOMESTIC WATER LINES (WHEN APPLICABLE). TOILET ACCESSORIES ARE TO BE FURNISHED AND INSTALLED BY THE GENERAL CONTRACTOR, BUT WITH SPECIFICATIONS AND MOUNTING HEIGHTS 5. THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS ARE REQUIRED TO CHECK AND VERIFY ALL DEMENSIONS AND FIELD CONDITIONS AT THE HANDICAPPED ACCESSIBLE, UTILIZING ABOVE SPECIFICATIONS ONLY AS A GUIDELINE. BUILDING SITE AND PREMISES AND NOTIFY THE OWNER AND ARCHITECT OF ANY AND ALL DISCREPANCIES. ALL CONTRACTORS SHALL CHECK AND VERIFY ALL FIELD CONDITIONS AND SHALL HAVE SOLE RESPONSIBILITY FOR VERIFICATION OF CLEAR HEIGHTS WITHIN THE PREMISES. ANY 30. THE GENERAL CONTRACTOR AND /OR HIS ELECTRICAL SUBCONTRACTOR SHALL VERIFY ALL EQUIPMENT SPECIFICATIONS AND REQUIREMENTS DISCREPANCIES SHALL BE REPORTED TO THE ARCHITECT IMMEDIATELY. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL CODE REQUIRED WITH THE OWNER OR THE OWNER'S CONSTRUCTION REPRESENTATIVE PRIOR TO START OF CONSTRUCTION. THIS CONTRACTOR TO VERIFY 47, ALL GYPSUM BOARD TO BE 5/8" THICK, FIRE CODE "X" BOTH SIDES (WATER RESISTANT IN TOILET ROOMS) AND ALL METAL STUDS TO BE AS NOTED IN A IS TO CO TACT THE ARCHITECT OF ANY DISCREPANCIES VERBALLY AND ALSO IN WRITING. AMPERAGE /VOLTAGE SPECIFICATIONS WIRING SIZES AND REQUIREMENTS SERVICE AND PANEL SPECIFICATION WITH THE EQUIPMENT SUPPLIERS, THE PARTITION SCHEDULE - MINIMUM GAUGE AS PER CODE AT 16 "0, C. TO UNDERSIDE OF DECK ABOVE, UNLESS OTHERWISE NOTED. DEMISING WALL DIMENSIONS AND N ( ) AND CHECK THE CONTRACT DOCUMENTS FOR MISCALCULATIONS, IN COORDINATION WITH EQUIPMENT SPECIFICATIONS FOR EQUIPMENT SUPPLIED BY FIRE RATING TO BE CONFIRMED BY GENERAL CONTRACTOR RESPONDING TO LANDLORD AND CODE REQUIREMENTS, SEE CONTRACT DOCUMENTS FOR THE OWNER, THE CONTRACTORS OR OTHER SOURCES (AS SPECIFIED BY THE ARCHITECT) AS A DOUBLE CHECK TO ASCERTAIN PROPER INSTALLATION WALL INDICATIONS. ALL PENETRATIONS FOR SUPPLY OR RETURN AIR, ETC„ TO HAVE PROPERLY INSTALLED FIRE DAMPERS MEETING THE LATEST FIRE E S A O . IN THE EVENT THAT PROBLEMS OF EQUIPMENT AT THE CORRECT AMPERAGE/VOLTAGE AND IRI IZE. NO I • HT FIXTURES ARE TO BE ORDERED UNTIL THIS "DOUBLE CHECK" HAS DEPARTMENT REQUIREMENTS. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR OBTAINING APPROVAL FROM THE BUILDING AND ELECTRICAL 6. THE CONSTRUCTION DOCUMENTS HAVE BEEN PREPARED BASED ON THE BEST INFORMATION AVAILABLE T OWNER E E R_ W NG S L O FIXT E ARISE DURING THE COURSE OF THE PROJECT, DUE TO UNKNOWN SITE CONDITION OR CODE REQUIREMENTS (IF ANY) THAT CONFLICT WITH THE TAKEN PLACE. INSPECTORS FOR ALL CONCEALED WORK PRIOR TO CLOSING UP WALLS, FLOORS, CEILINGS. CONTRACT DOCUMENTS, THE GENERAL CONTRACTOR SHALL INFORM THE ARCHITECT IMMEDIATLY OF ANY CHANGES THAT WILL BE REQUIRED. 31. THE GENERAL CONTRACTOR AND /OR ELECTRICAL SUBCONTRACTOR IS TO FURNISH AND INSTALL EMERGENCY AND EXIT LIGHTING, AS REQUIRED 48. ALL GYPSUM BOARD TO BE APPLIED VERTICALLY ON WALLS UNLESS OTHERWISE NOTED. ALL GYPSUM WALL BOARD TO BE FIRE RESISTANT AND 7. WHEN BIDDING THIS PROJECT, THE GENERAL CONTRACTOR AND EACH SUBCONTRACTOR SHALL BE RESPONSIBLE FOR VISITING THE SITE PRIOR TO BY LOCAL CODE OR AGENCIES HAVING JURISDICTION OVER THE PROJECT UNLESS NOTED OTHERWISE. THE EXIT /EMERGENCY LIGHTING SHOULD BE NONCOMBUSTIBLE AS SPECIFIED BY LOCAL CODES. BIDDING AND VERIFYING EXISTING CONDITIONS AS REFLECTED IN THESE CONTRACT DOCUMENTS. ANY EXTRA WORK REQUIRED BUT NOT INCLUDED IN PROPERLY LABELED AND APPROVED TYPE LOCKOUTS INSTALLED, NOTWITHSTANDING LOCATIONS IDENTIFIED BY THRE ARCHITECT OR ENGINEER, THE DOCUMENTS SHALL BE REPORTED TO THE OWNER AND ARCHITECT IMMEDIATELY. AFTER CONTRACT AWARD, THE GENERAL CONTRACTOR IS CONTRACTOR IS RESPONSIBLE FOR ASSURING FIRE DEPARTMENT APPROVAL OF THE FINAL LAYOUT, AND MAKING ADJUSTMENTS REQUIRED TO OBTIAN RESPONSIBLE FOR THE COST OF ANY CONDITIONS THAT COULD REASONABLY HAVE BEEN PREDICTED OR UNDERSTOOD BASED ON THE THAT APPROVAL. 49, ALL GYPSUM BOARD TO BE FIRE TAPED AND SPACKLED THREE (3) COATS, SANDED AND READY TO RECEIVE PAINT OR WALL COVERING. ALL CONTRACTOR'S VIST TO AND VERIFICATION OF EXISTING CONDITIONS. EXISTING GYPSUM BOARD TO BE REPAIRED TO "LIKE NEW" CONDITION. 32, SPRINKLER SYSTEM DESIGN AND /OR LAYOUT MODIFICATION, (IF APPLICABLE) TO BE PROVIDED BY THE DESIGNATED SPRINKLER SUBCONTRACTOR 8. ALL WORK ON THIS PROJECT SHALL BE IN ACCORDANCE WITH ALL CODES, SUB - CODES, AND BUILDING DEPARTMENTS AND HEALTH DEPARTMENTS AND ALL SUBMISSIONS TO THE FIRE MARSHALL AND BUILDING INSPECTOR FOR THE NECESSARY APPROVAL ARE THE RESPONSIBILITY OF THE 50. ALL DOORS, METAL BUCKS, TRIMMED OPENINGS AND HARDWARE, INCLUDING LOCKS, TO BE PROVIDED BY THE GENERAL CONTRACTOR UNLESS REGULATIONS HAVING JURISDICTION. GENERAL CONTRACTOR TO CONTACT LOCAL BUILDING OFFICIALS FOR SPECIFIC REQUIREMENTS FOR THIS USE. SPRINKLER SUBCONTRACTOR. GENERAL CONTRACTOR TO VERIFY WITH THE OWNER'S CRITERIA IF SPRINKLER CONTRACTOR IS TO BE OWWER'S OTHERWISE NOTED, APPROVED OR DESIGNATED CONTRACTOR. SPRINKLER HEAD SPACING TO CONFORM WITH THE LATEST N.F.P,A. STANDARDS (PAMPHLET 13) AND ALL CODES HAVING JURISDICTION, SPRINKLER HEAD BRANCH LINES, DROPS AND HEADS ARE THE RESPONSIBILITY OF THE SPRINKLER SUBCONTRACTOR OD TECHNIQUES, SEQUENCES, AND THE DESIGN MUST BE BASED ON FLOOR LAYOUT AND REFLECTED CEILING PLANS, APPROVALS BY THE BUILDING INSPECTOR AND FIRE MARSHALL 51. ALL SWITCH /OUTLET PLATES /COVERS TO BE FINISHED IN SAME COLOR/WALL COVERING AS ADJACENT WALL FINISHES, UNLESS NOTED 9. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR, AND HAVE CONTROL OVER CONSTRUCTION MEANS, METHODS, TE NIQ U E E AND PROCEDURES AND FOR COORDINATING ALL PORTIONS OF THE WORK UNDER THE CONTRACT, INCLUDING ANY AND ALL OSHA REQUIREMENTS. THE WILL BE REQUIRED. OTHERWISE. FACTORY PAINTED GRILLES, DIFFUSERS, METAL TRIM (BUCKS, ETC.), ACCESSORIES, SWITCH AND OUTLET PLATES, ETC., ARE TO BE ARCHITECT SHALL NOT HAVE CONTROL OVER OR CHANGE, AND SHALL NOT BE RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, PAINTED TO MATCH ADJACENT SURFACE IN AN ENAMEL, CLEANABLE FINISH, OR AS SPECIFIED ON THE CONTRACT DOCUMENTS, SEQUENCES, OR PROCEDURES, OR FOR SAFETY PRECAUTIONS AND PROGRAMS, INCLUDING ANY AND ALL OSHA REQUIREMENTS, IN CONECTION WITH THE WORK, 33. ALL PLUMBING AND ELECTRICAL ROUGH -IN TO BE NEW AND ELECTRICAL SERVICE CONDUIT AND WIRE TO THE PREMISES TO BE EXTENDED TO THE POINT OF NEW PANELS BY THE CONTRACTOR AS NECESSARY AS SHOWN ON CONTRACT DOCUMENTS. GENERAL CONTRACTOR TO FIELD VERIFY THAT 52, THE GENERAL CONTRACTOR IS RESPONSIBLE TO CUT AND FRAME ALL OPENINGS FOR OTHER TRADES, SUCH AS MECHANICAL, SPRINKLER, THESE UTILITY LINES ARE AS NOTED AND AT THE SIZE SPECIFIED, BASED ON GENERAL CONTRACTOR'S OR SUBCONTRACTOR'S PRE -BID REVIEW OF PLUMBING, ELECTRICAL, FIXTURE CONTRACTOR, THROUGH PARTITIONS AND STRUCTURAL WALLS. ALL PENETRATIONS THROUGH RATED WALLS, WITH " I T G" MATERIALS MAINTAIN THE INTEGRITY OF THE SPECIFIED RATING OF THE WALL. 10, THE GENERAL CONTRACTOR AND SUBCONTRACTORS FOR THE GENERAL CONTRACTORS SHALL PAY FOR AND OBTAIN ALL PERMITS REQUIRED FOR PREMISES. IF THE UTILITIES ARE NOT IN LOCATIONS AS NOTED ON THE CONTRACT DOCUMENTS OR OF A SIZE LARGER OR SMALLER THAN NOTED, THIS DUCTS OR PIPING, TO BE FILLED AT OPENING WITH F RES OPPIN MA RIAL TO THE WORK NOTED ON THESE PLANS AND SPECIFICATIONS. THIS INCLUDES COSTS FOR ALL INSPECTIONS BY AUTHORITIES HAVING JURISDICTION, CONTRACTOR IS TO MODIFY THE SERVICE ACCORDINGLY WITH EITHER NEW CONDUIT AND /OR NEW COPPER SERVICE WIRE EXTENDING BACK TO BUILDING DEPARTMENT AND HEALTH DEPARTMENT PERMIT COSTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY REQUIRED ENGINEERING OF OWNER'S ELECTRICAL /METER ROOM SERVICE POINT, AND INCLUDE SUCH COSTS IN THE BID TO THE TENANT. SPECIAL INSPECTOR INSPECTIONS, WHICH ARE NOT A PART OF THE ARCHITECT'S SCOPE OF WORK. 53, THE GENERAL CONTRACTOR IS REQUIRED TO ADHERE TO ALL NEW REQUIREMENTS, WHETHER STATED OR NOT ON THESE CONTRACT DOCUMENTS, FOR THE LATEST A.DA. LAW EFFECTIVE JANUARY 26, 1992 OR LOCAL BARRIER FREE DESIGN. THIS LAW IS A CIVIL RIGHTS LAW AND THE EXCLUSION OF 34. THE ELECTRICAL SUBCONTRACTOR IS TO PROVIDE A CIRCUIT DIRECTORY WITH PROPER PHASING AND BALANCING, WHICH IS TO CONFORM TO THE REQUIREMENTS BY THE LOCAL CODE OFFICIALS DOES NOT RELIEVE THE TENANT OR THE GENERAL CONTRACTOR OF ADHERING TO THE NECESSARY 11, ALL CLEARANCES OF PIPES AND DUCT WORK INSTALLED BY THE GENRAL CONTRACTOR OR SUBCONTRACTORS MUST BE CONFIGURED TO LATEST EDITION OF THE NATIONAL ELECTRICAL CODE AND UNDERWRITER'S CODE, WORK, EITHER DURING CONSTRUCTION OR AFTER OCCUPANCY. MAINTAIN THE CEILING HEIGHTS INDICATED ON THE DRAWINGS, AND THE HEIGHTS REQUIRED FOR CEILING SYSTEM AND LIGHT FIXTURES. CONTRACTOR MUST REVIEW ENTIRE SET OF CONTRACT DOCUMENTS FOR CEILING HEIGHTS. 35. THE PROPER RECEIPT OF ALL NEW MATERIALS AND EQUIPMENT AT THE JOB SITE IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR, AND /OR 54. QUALITY STANDARDS: ALL SUCH WORK SHALL BE PERFORMED IN A FIRST -CLASS WORKMANLIKE MANNER AND SHALL BE IN GOOD AND USABLE ITS SUBCONTRACTORS (IF ANY.) SECURE AND SAFE STORAGE OF ALL NEW AND EXISTING MATERIALS AND EQUIPMENT TO REMAIN (IF ANY) WILL BE CONDITION AT THE DATE OF COMPLETION THEREOF. GENERAL CONTRACTOR SHALL REQUIRE ANY PERSON PERFORMING ANY SUCH WORK TO 12. ALL CONTRACTORES SHALL BE BONDED LICENSED CONTRACTORS POSSESING GOOD LABOR RELATIONS AND MUST BE CAPABLE OF QUALITY PROVIDED BY THE GENERAL CONTRACTOR. GENERAL CONTRACTOR TO IMMEDIATELY ADVISE OWNER OF ALL DAMAGED OR DEFICIENT SHIPMENTS OF GUARANTEE THE SAME TO BE FREE FROM ANY AND ALL DEFECTS IN WORKMANSHIP AND MATERIALS FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE WORKMANSHIP, IN HARMONY WITH OTHER CONTRACTORS WORKING ON THE PROJECT. THE TENANT SHALL BE NOTIFIED IN WRITING OF THE NAMES, MATERIALS AND EQUIPMENT, WHETHER SUPPLIED BY TENANT OR DIRECTLY BY CONTRACTOR OR ITS SUPPLIERS. GENERAL CONTRACTOR TO OF THE CERTIFICATE OF OCCUPANCY. OWNER SHALL ALSO REQUIRE ANY TYPE SUCH PERSON TO BE RESPONSIBLE FOR THE REPLACEMENT OR ADRESSES DAYTIME PHONE FAX AND EMERGENCY PHONE NUMBERS OF ALL SUBCONTRACTORS AND SUPPLIERS WORKING ON THIS PROJECT. COMPLETE AND SUBMIT ALL NECESSARY PAPERWORK AND ARRANGE INSPECTIONS OF DAMAGED GOODS AS PER OWNER'S REQUIREMENTS. NOTIFY REPAIR WITHOUT ADDITIONAL CHARGE, OF ANY AND ALL WORK DONE OR FURNISHED BY OR THROUGH SUCH PERSON, WHICH SHALL BECOME GENERAL CONTRACTOR MUST ATTEST THAT NO PRODUCTS CONTAINING ASBESTOS MATERIAL WERE KNOWINGLY USED ON THIS PROJECT, ARCHITECT AND OWNER OF ANY POSSIBLE DELAYS, INCOMPLETE ORDERS AND DELAYS ARE TO BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE DEFECTIVE WITHIN ONE (1) YEAR AFTER SUBSTANTIAL COMPLETION OF THE WORK. THE CORRECTION OF SUCH WORK SHALL INCLUDE, WITHOUT SUPPLIER AND THE ARCHITECT. SUBMIT CONFIRMATION OF ALL ORDERS, DELIVERY DATES, AND A FULL WRITTEN SCHEDULE TO TENANT'S ARCHITECT. ADDITIONAL CHARGE, ALL EXPENSES AND DAMAGES IN CONNECTION WITH SUCH REMOVAL, REPLACEMENT OR REPAIR OF ANY PART OF THE WORK WHICH MAY BE DAMAGED OR DISTURBED THEREBY. ALL WARRANTIES OR GUARANTEES AS TO MATERIALS OR WORKMANSHIP ON OR WITH RESPECT TO 13, THE GENERAL CONTRACTOR AGREES THAT IN THE IN THE PERFORMANCE OF THE WORK CALLED FOR BY THIS CONTRACT, THEY WILL EMPLOY ONLY TENANT'S WORK SHALL BE CONTAINED IN THE CONTRACT OR SUBCONTRACT WHICH SHALL INURE TO THE BENEFIT OF THE OWNER, AS THEIR SUCH LABOR AS WILL NOT DELAY OR INTERFERE WITH THE PROGRESS OF THE PROJECT AND AS WILL BE ACCEPTABLE TO AND WORK IN HARMONY 36, THE GENERAL CONTRACTOR SHALL UNLOAD, PROTECT AND INSTALL OWNER'S SPECIFIED EQUIPMENT, FIXTURES AND FURNISHINGS. RESPECTIVE INTERESTS APPEAR AND CAN BE DIRECTLY ENFORCED BY EITHER. GENERAL CONTRACTOR TO HAVE THIS CLAUSE IN EVERY WITH ALL OTHER CONTRACTORS EMPLOYED ON THE CONSTRUCTION SITE OR ON ANY OTHER BUILDING, STRUCTURE, OR OTHER IMPROVEMENTS SUBCONTRACTOR AGREEMENT FOR THE PROJECT AND IF SUCH CLAUSE IS NOT INCLUDED, IT WILL NOT RELIEVE THE GENERAL CONTRACTOR OF THE WHETHER PUBLIC OR PRIVATE WHICH THE GENERAL CONTRACTOR MAY THERN BE ERECTING OR ALTERING IN OTHER LOCATIONS, REQUIREMENTS OR WORK STATED HEREIN. 37. ANY SUBSTITUTIONS OF FINISH MATERIALS MUST BE APPROVED BY THE OWNER'S ARCHITECT IN WRITING, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR SUBMITTING TWO (2) SAMPLES OF EACH SUBSTITUTION. 14, PRIOR TO COMMENCEMENT OF ANY WORK, THE GENERAL CONTRACTOR SHALL CONTACT AND MEET WITH OWNER AND ARCHITECT FORA 55. CONTRACTOR IS TO VERIFY THAT THIS SPACE IS ASBESTOS FREE, NO ASBESTOS WORK IS TO BE COMPLETED BY THIS CONTRACTOR UNLESS PRECONSTRUCTION MEETING. AT WHICH TIME, HE / SHE WILL PRESENT TO ALL PARTIES A LIST OF NAMES, ADRESSES, BUSINESS PHONE, FAX AND SPECIFICALLY NOTED IN THESE CONTRACT DOCUMENTS. IF ASBESTOS IS UNCOVERED, NOTIFY THE OWNER IMMEDIATELY AND STOP ALL WORK, EMERGENCY TELEPHONE NUMBERS OF THE SUBCONSTRACTORS FOR THIS PROJECT. 38. ALL CONCRETE FLOOR SLABS AND /OR FILLING IN OF DEPRESEED FLOOR AREAS LEVEL WITH CONCRETE OR OTHER APPROVED FINISHES WILL BE OWNER IS RESPONSIBLE FOR ALL ASBESTOS TESTING, FILING AND REMOVAL. COMPLETED BY THE GENERAL CONTRACTOR AS PART OF THE WORK OF THIS PROJECT IN ORDER TO ACHIEVE THE DESIGN INTENT INDICATED ON THE B CONCRETE INSTALLATION. PLANS. THE GENERAL CONTRACTOR TO INCLUDE MISCELLANEOUS STEEL FRAMING AND METAL DECK (IF APPLICABLE) AND CON R 15, THE GENERAL CONTRACTOR AGREES THAT TIME IS OF THE ESSENCE IN EXECUTING THE WORK OF THIS PROJECT. ALL FLOOR SLAB PENETRATIONS SHALL HAVE WATERTIGHT SLEEVES EXTENDING A MINIMUM 4" A.F.F. CONCRETE SLABS ARE NOT BE CORE 56. THE GENERAL CONTRACTOR, AT THE POINT OF "SUBSTANTIAL COMPLETION" AND "TURNOVER" OF PREMISES TO TENANT, MUST COMPLETE, AT DRILLED /SAW CUT UNLESS ABSOLUTELY NECESARY, IF THIS IS A STRUCTURAL SLAB THEN ANY AND ALL PENETRATIONS THROUGH SLAB MAY NEED TO GENERAL CONTRACTOR'S COST AND EXPENSE (FINAL PAYMENT CANNOT BE REQUESTED TO TENANT BY THIS GENERAL CONTRACTOR UNLESS ALL OF BE X -RAYED AND MUST BE COORDINATED WITH THE OWNER PRIOR TO STARTING WORK, GENERAL CONTRACTOR AND /OR ITS PLUMBING /ELECTRICAL THIS WORK NOTED IS COMPLETED), 16. IF THE OWNER, OWNER'S REPRESENTATIVE OR OWNER'S ARCHITECT DO NOT MAKE REPEATED SITE VISITS CONTINUALLY OR AT ALL, THE GENERAL SUBCONTRACTOR, WITH LANDLORD'S PRIOR WRITTEN APPROVAL, TO CORE DRILL/SAW CUT, (WHICHEVER IS APPLICABLE) CONCRETE SLAB. IF SAW CERTIFICATE OF OCCUPANCY OR CONTRACTOR IS NOT RELIEVED OF ANY RESPONSIBILITY OR DUTIES INVOLVED IN THIS CONSTRUCTION WORK. CUTTING OCCURS, INSTALL UNDER SLAB PLUMBING WASTE PIPING /ELECTRICAL CONDUIT. FURNISH AND INSTALL NEW CONCRETE SLAB IN EXCAVATED A) FINAL INSPECTIONS BY ALL BODIES HAVING JURISDICTION NECESSARY FOR FINAL COMPLETION, RT O AREA TO MATCH EXISTING ADJACENT SLAB IN THICKNESS, STRESS, AND STRENGTH. COMPLETION, WHICHEVER IS APPLICABLE, 17. THE ARCHITECT, WITHOUT INVALIDATING THE CONTRACT, MAY ORDER EXTRA WORK, ALTER, ADD TO, OR DEDUCT FROM THE CONTRACT WORK, IF B) THE GENERAL CONTRACTOR TO FINALIZE ALL APPLICABLE ONWER AND ARCHITECT PUNCH LISTS AND /OR REQUIREMENTS, MO THE INTENT IS TO ADHERE TO A PREVIOUSLY AGREED UPON DESIGN WITHOUT ANY COST TO ONWER AND ARCHITECT. 39, ALL THE FLOOR FINISHES, WITHIN THE PREMISES, AND AT THE TRANSITION BETWEEN LANDLORD FLOOR FINISHES ARE TO BE _ SMOOTH AND LEVEL MARSHALL AN ON A TO AVOID TRIPPING HAZARDS AND BE WITHIN THE REQUIREMENTS OF BARRIER -FREE DESIGN. IF AN EXPANSION JOINT COVER IS REQUIRED, SUCH C) FINALIZE CHANGES ON PLANS AND SPECIFICATIONS AND MARKS ALL APPROVED OWNER, BUILDING DEPARTMENT FIRE D COVER IS TO BE LEVEL AND SMOOTH WITH FLOOR FINISH ELEVATION AND WILL NOT PROJECT ABOVE SUCH FLOOR FINISH ELEVATION. IF THE EXISTING SET OF PRINTS FOR BOTH TENANT AND TENANT'S ARCHITECT AND FORWARD SUCH INFORMATION TO BOTH PARTIES VIA OVER NIGHT DELIVERY. 18. NO CHANGE ORDER EXTRAS FOR COSTS CAN BE AUTHORIZED UNLESS APPROVED IN WRITING BY THE ARCHITECT OR OWNER. ANY ISSUANCE OF SLABS ARE NOT LEVEL, THE GENERAL CONTRACTOR IS REQUIRED TO COMPLETE EXTENSIVE FLASH PATCHING THROGHOUT TO OBTAIN A SMOOTH AND MARK SHALL BE COMPLETED USING A CLOUD PROCEDURE WITH A REIFELT TIP PEN TO EASILY DISTINGUISH CHANGES FROM ORIGINAL CREDITS TO BE CALCULATED BASED ON COMPETITIVE RATES AND EQUIPMENT COSTS APPROVED BY THE ARCHITECT OR OWNER. LEVEL CONCRETE SLAB. WORK, D) PREPARE AN OPERATING PROCEDURE MANUAL FOR OWNER FOR MECHANICAL EQUIPMENT AND CHANGE FILTERS FOR EQUIPMENT, ON DAY OF TURNOVER, IF APPLICABLE. 19, THE GENERAL CONTRACTOR SHALL HAVE AT ALL TIMES, AT THE PREMISES, OWNER APPROVED CONTRACT DOCUMENTS, BUILDING DEPARTMENT 40, SHOULD AN EXPANSION JOINT OCCUR, GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL CONSTRUCTION AFFECTED BY SUCH JOINT, INCLUDING AND HEALTH DEPARTMENT (IF APPLICABLE) APPROVED PERMIT DRAWINGS. FURNISHING AND INSTALLING A LEVEL SLAB HEIGHT EXPANSION JOINT COVER, INCLUDING FLOOR, WALLS, AND CEILING, GENERAL CONTRACTORS E) TURN OVER ALL KEYS TO OWNER. SHALL MAINTAIN INTEGRITY OF ALL SUCH EXPANSION JOINTS IN A MANNER CONSISTENT WITH ACCEPTABLE CONSTRUCTION DESIGN PRACTICES. 20. IF THE OWNER REQUESTS, THE GENERAL CONTRACTOR IS TO ARRANGE WITH THE OWNER, WHERE BUILDING EQUIPMENT AND MATERIALS ARE TO 57. GUARANTEES FOR ALL WORK BY SUBCONTRACTORS SHALL BE FOR A PERIOD OF ONE YEAR, FROM THE DATE OF THE CERTIFICATE OF OCCUPANCY BE L OCATED AND HOW TRUCK TRAFFIC IS TO BE ROUTED TO AND FROM THE BUILDING. 41. ANY SCAFFOLDING, SAFETY RAILINGS, BARRICADES AND /OR PROTECTION DEVICES REQUIRED FOR THE PROJECT ARE THE RESPONSIBILITY OF THE UNLESS OTHERWISE NOTED. AT THE TIME OF FINAL SUBMITTAL FOR ALL COSTS BY THE GENERAL CONTRACTOR TO THE OWNER, INCLUDING BASE BID, GENERAL CONTRACTOR. WORK IN PLACE THAT IS SUBJECT TO INJURY BECAUSE OF OPERATIONS BEING CARRIED ON ADJACENT THERETO SHALL BE EXTRAS AND CREDITS, THE GENERAL CONTRACTOR'S SUBCONTRACTORS SHALL FURNISH TO THE OWNER A WRITTEN GUARANTEE STIPULATING THAT, COVERED, BOARDED UP, OR SUBSTANTIALLY ENCLOSED WITH ADEQUATE PROTECTION. ALL FORMS OF PROTECTION SHALL BE CONSTRUCTED IN A AT NO ADDITIONAL COST TO THE OWNER, ANY DEFECTIVE WORK OR MATERIALS SHALL BE REPAIRED OR REPLACED FOR A PERIOD OF ONE YEAR 21, AN APPROVAL BY THE OWNER WILL ONLY BE VALID IF IN WRITING AND SIGNED BY THE OWNER OR BY THE OWNER'S DESIGNATED REPRESENTIVE MANNER SUCH THAT, UPON COMPLETION, THE ENTIRE WORK WILL BE DELIVERED TO THE OWNER IN PROPER, WHOLE, AND UNBLEMISHED CONDITION. AFTER ACCEPTANCE OF WORK, UNLESS OTHERWISE NOTED, IF SUCH WORK AFFECTS OWNER'S OTHER WORK, OWNER'S OTHER WORK IS TO BE FOR SUCH PURPOSE, THE GENERAL CONTRACTOR WILL BE RESPONSIBLE FOR OBTAINING APPROVAL FROM OWNWER'S ARCHITECT ON ALL ALL SUCH WORK SHALL BE COORDINATED WITH THE OWNER, THE ARCHITECT IS NOT RESPONSIBLE FOR JOB SITE SAFETY OR EXISTING CONDITIONS COMPLETED BY THE SUBCONTRACTOR AT NO COST TO THE OWNER, STRUCTURAL CHANGES DURING THE COURSE OF THE CONSTUCTION PHASE OF THE PROJECT. AT THE JOB SITE AND SINCE ALL WORK IS BY GENERAL CONTRACTOR FOR THE OWNER, THEIR REPRESENTATIVES WILL BE REQUIRED TO DO ALL SUPERVISION, OBSERVATIONS, AND JOB SITE SAFETY. 58, UPON A COMPLETION OF WORK, THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS ARE TO OBTAIN A CERTIFICATE OF COMPLETION AND 22, ALL FINISH AND EXPOSED WOOD SHALL BE KILN DRIED, MILL QUALITY FINISH AND SHALL RECEIVE A FIRE RETARDANT COATING OR TREATMENT IF APPROVAL FROM THE BUILDING DEPARTMENT, OR OTHER AUTHORITIES HAVING JURISDICTION, AND SUBMIT SAME TO THE OWNER'S ARCHITECT. FINAL REQUIRED BY CODE OR THE LOCAL FIRE MARSHAL. NO WOOD OR COMBUSTIBLE MATERIAL SHALL BE USED ABOVE THE SUSPENDED CEILING UNLESS 42. THE STRUCTURAL SYSTEM OF THE BUILDING HAS BEEN DESIGNED TO CARRY A MAXIMUM LIVE LOAD FOR THE USES INTENDED, THE GENERAL PAYMENT WILL NOT BE ISSUED BY THE OWNNR PRIOR TO RECEIPT OF SUCH CERTIFICATES. POSE ANY LOADING FOR ANY OF THE D/ SUBCONTRACTOR ER U HANDLERS RE NOT TO IM A OA G NONCOMBUSTIBLE LUMBER IS USED AND IS SPECIFICALLY ALLOWED BY APPLICABLE BUILDING CODES, THE FIRE MARSHALL AND ALL AGENCIES CONTRACTOR AND/OR THEIR SUBC N RACTOR AND /OR ANY AND ALL MAT. IAL SUPPLY A HAVING JURISDICTION, IF FIRE TREATED WOOD IS REQUIRED FOR FIXTURING ITEMS, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR EXECUTING THIS TENANT'S WORK ON A TEMPORARY OR PERMANENT BASIS WHICH CAN EXCEED SUCH SPECIFIED LOAD. WORK AS PER BUILDING OFFICIALS' REQUIREMENTS, ALL WOOD IN CONTACT WITH MASONRY OR CONCRETE TO BE PRESSURE TREATED. 59. UPON COMPLETION OF ALL CONSTRUCTION AND PRIOR TO TURNOVER OF THE SPACE, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR HAVING THE SPACE CLEANED. ANY CLEANING WHICH IS NOT DONE AT THE TIME OF TURNOVER AND NEEDS TO BE DONE BY THE OWNER, WILL BE BACK 43, IF A RENOVATION PROJECT, THE MECHANICAL SUBCONTRACTOR IS RESPONSIBLE FOR VISITING THE SITE PRIOR TO SUBMITTING A BID FOR THE CHARGED TO THE GENERAL CONTRACTOR, 23, WHERE REQUIRED BY BUILDING CODE, THE GENERAL CONTRACTOR SHALL FURNISH AND INSTALL HAND OPERATED FIRE EXTINGUISHERS, U.L, WORK ON THIS PROJECT. THE CONTRACTOR MUST BECOME FAMILIARIZED WITH THE FIELD CONDITIONS, AND THE SCOPE OF WORK. CONTRACTOR TO RATED, PLACEMENT AS APPROVED BY OWNER AND LOCAL BUILDING OFFICIAL. ENGINEER, (UNLESS A FIRE ALARM DRAWING IS SUBMITTED AS PART OF THESE CONTRACT DOCUMENTS), FURNISH AND INSTALL ANY /ALL REQUIRED FIRE ALARM, SMOKE EVACUATION, SMOKE DETECTION SYSTEMS, INCLUDING ANY /ALL PARTS AND LABOR (OR MODIFY EXISTING AS REQUIRED), TO MEET 60, SUBMIT SHOP DRAWINGS FOR ALL FABRICATED ITEMS. LOCAL CODES, OWNER REQUIREMENTS AND FIRE MARSHALL SPECIFICATION, WHETHER SUCH WORK IS OR IS NOT SHOWN IN THE CONSTRUCTION 24. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR DAILY REMOVAL, OF TRASH, RUBBISH AND SURPLUS MATERIALS RESULTING FROM DOCUMENTS. IF A SMOKE EVACUATION AND /OR DETECTION SYSTEM OCCURS FOR THIS SPACE, IT SHALL BE LEFT INTACT DURING CONSTRUCTION AND CONSTRUCTION. THE CONTRACTORS AND SUBCONTRACTORS PARTICIPATING IN THE PERFORMANCE OF OWNER'S WORK SHALL REMOVE AND ANY NEW WORK, MODIFICATION AND REWIRING TO BE COMPLETED DURING CONSTRUCTION PHASE TO POINT OF NEW PANELS. IF SMOKE DETECTORS 61, SUBMIT SAMPLES FOR ALL FINISHES. DISPOSE OF, AT LEAST ONCE A WEEK, AND MORE FREQUENTLY AS OWNER MAY DIRECT, ALL DEBRIS AND RUBBISH CAUSED BY OR RESULTING FROM ARE REQUIRED TO BE HARD WIRED TO OWNER FIRE ALARM SYSTEM, THEY ARE TO BE PER OWNER'S SYSTEM. CONTRACTOR TO CONTACT OWNER OR THE PERFORMANCE OF WORK AND, UPON COMPLETION THEREOF, REMOVE ALL TEMPORARY STRUCTURES, SURPLUS MATERIALS, DEBRIS AND APPROVED AGENTS FOR PURCHASE AND INSTALLATION OF DETECTORS AT G.C. EXPENSE. G.C, AND /OR ITS FIRE ALARM SUBCONTRACTOR TO CONTACT IN THE BUILDING WHIG AD BEEN BROUGHT I OR CREATED BY THE CONTRACTOR AND SUBCONTRACTORS IN OWNER FOR FINAL POINT OF CONNECTION TO LANDLORD'S FIRE ALARM JUNCTION BOX AND PERFORM WORK AT CONTRACTOR'S EXPENSE. 62, CONTRACTOR MUST PROVIDE A CERTIFICATE OF COMPLIANCE FOR PRE - CONSTRUCTION SOIL TREATMENT FOR SUBTERRANEAN TERMITE WITH RUBBISH OF WHATEVER KIND REMAINING H _ H H B N E O THE PERFORMANCE OF OWNER'S WORK, THIS CONTRACTOR MUST MAINTAIN A CLEAR PATH OF EGRESS FROM THE PREMISES FREE FROM TRASH AND ACCORDENCE TO THE RULES AND LAWS AS ESTABLISHED BY THE FLORIDA BUILDING DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES AND RUBBISH AT ALL TIMES. ALL REMOVAL OF CONSTRUCTION DEBRIS TO AN APPROVED DUMPING SITE TO BE INCLUDED IN THE GENERAL CONTRACTOR'S WITH THE FLORIDA BUILDING CODE 2001 SECTION 1616 TERMITE PROTECTION, WORK, 63, CONTRACTOR MUST SUPPLY PRODUCTS, BUILDING MATERIALS AND/ OR BUILDING SYSTEMS WHICH COMPLY TO THE MIAMI -DADE PRODUCT CONTROL APPROVAL PROCESS AND HAVE A NOTICE OF ACCEPTANCE NUMBER. I .s Revisions No. 11 Date 11 Description O 3 -3 -2011 CL P.O. W co C7 11 H_ C14 LL Ln i� Qi .-Z E cz =w ®U a J I Q ca a C%) 0 O i-+ < - N i x C'11 C Ln 0 '', r,7 C7 J W cn ALL DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN CONS71TUTE THE ORIGINAL AND UNPUBLISHED WORK OF Tamp Design Group, AND MAY NOT BE DUPLICATED, USED, OR DISCLOSED WITHOUT THE EXPRESS WRITTEN CONSENT OF Tomc Design Group Inc. TO THE BEST OF MY KNOWLEDGE THE PLANS AND APPLICABLE SPECIFICATIONS COMPLY WITH THE MINIMUM BUILDING CODES AND THE APPLICABLE FIRE - SAFETY STANDARDS AS DETERMINED BY THE LOCAL AUTHORITY IN ACCORDANCE WITH THIS SECTION AND 633 FLORIDA STATUTES, CHAPTER 1 105.114,4 OF (FLORIDA BUILDING CODE 2001) It LL", TOMA DESIGN GROUP INC. Tel: (305)401.2223 Fax: (305) 466-4077 80900 NE 30th Ave, #1010 Aventurn, FL, 33180 Date 3 -3 -2011 Drawn by P.O. Checked By co C7 Scale N.T.S. LL 0 RS i� Qi .-Z E cz C7 ccs N r 0 a C%) t� E i-+ < - N i x L C L U C7 (�_ LO It LL", TOMA DESIGN GROUP INC. Tel: (305)401.2223 Fax: (305) 466-4077 80900 NE 30th Ave, #1010 Aventurn, FL, 33180 Date 3 -3 -2011 Drawn by P.O. Checked By M.L. Scale N.T.S. Sheet NO CAD ID: , G-1 .