Loading...
13-12-011XISTING IC TANK SITE PLAN LOCATION FIXTURE CONNECTION SCHEDULE ITEM WASTE UNITS WATER COLD HOT WC 3" 3 1/2 )p to LAVATORY 1-1/4 1 1/2" 1/2 HOSE BIBB 0 1/2 if co SHOWER 2„ 2 1/2)) 1 /2" KITCHEN SINK 1-1/2" 2 1/2" 1/22$ WASHER 2„ 2 1 /2" 1/2" DISWASHER 1 -1 /2" 2 1/2$1 1/2"_ COLD WATER HOT WATER SANITARY 01.- WATER CLOSE (WC) 1.5 GLS. PER FLUSH. 02. ALL SANITARY LINES SHALL BE SLOPED AS FOLLOW: 2,, OR LESS AT 1/4 )) PER FT. 3" OR LONGER AT 1/8' PER FT. 03.- PROVIDE ANTI SCALD VALVES AT SHOWERS AND TUB PLUMBING NOTES FOR CPVC WATER SERVICE PIPE: AS PER TABLE 605.3 OF 2007 FLORIDA BUILDING CODE: PLUMBING WATER DISTRIBUTION PIPE: AS PER TABLE 605.4 2007 FLORIDA BUILDING CODE: PLUMBING STANDARD ASTMD 2846, ASTMF 441, ASTMF 442, CSA 13137.6 PIPE FITTING: 605.5 (CPVC) ASTMF 437, ASTMF 438, ASTMF 439, CSAB ""137.6 JOINTS AND CONNECTIONS. - JOINT SURFACES SHALL BE CLEAN & FREE FROM MOISTURE AND APPROVED PRIMER SHALL BE APPLIED. JOINTS BETWEEN CPVC PLASTIC PIPES OR FITTINGS SHALL COMPLY WITH SECTION 605.16.1 TROUGH 605.16.3 - THE SOLVENT CEMENT IS USED ONLY FOR JOINING 1/2" THROUG 2" DIAMETER CPVC PIPE AND FITTINGS. - THE CPVC AND FITTINGS ARE MANUFACTURED IN ACCORDANCE WITH ASTM D 2846 5. HANGER SPACING: CPVC PIPE OR TUBING 1" AND SMOLER (3' -0 ") CPVC PIPE OR TUBING 1 1/4" AND LARGER (4' -0 ") 6. PLASTIC PIPE, FITTINGS AND COMPONENTS SHALL BE THIRD -PARTY CERTIFIED AS CONFORMING TO NSF 14 TALL PLUMBING PRODUCTS AND MATERIALS SHALL COMPLY WITH REFERENCES STANDARDS SPECIFICATIONS AND PERFORMANCE CRITERIA OF FBC 2007 EDITION: PLUMBING AND IDENTIFIED IN ACCORDANCE WITH SECTION 303.1 PLUMBING SPECIFICATIONS 1 THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS AND EQUIPMENT SHOWN OR INDICATED FOR A COMPLETE PLUMBING SYSTEM IN ACCORDANCE WITH THESE DRAWINGS AND WITH THE LOCAL PLUMBING CODES AND FLORIDA BUILDING CODE 2007 EDITION: PLUMBING 2 CONTRACTOR SHALL COORDINATE HIS WORK WITH ALL TRADES IN ORDER TO AVOID CONFLICTS.. NO CHANGES WILL BE ACCEPTED UNLESS A PRIOR WRITTEN APPROVAL HAS BEEN ISSUED FROM THE ARCHITECT /ENGINEER. 3 CONTRACTOR SHALL COORDINATE HIS WORK WITH CORRESPONDING UTILITY COMPANIES IPA ORDER TO VERIFY THE POINTS OF CONNECTION. 4 CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF ALL EQUIPMENT AND THEIR CORRESPONDING SHOP DRAWINGS BEFORE ROUGH -IN. 5 PROVIDE ALL EXCAVATION, BACKFILL AND COMPACTION REQUIRED BY ALL PLUMNING WORK. 6 PROVIDE COMPLETE ACCESS TO ALL SYSTEM. LOCATE CLEAN -OUTS ON WALLS AND OR FLOORS AS NECESSARY, FOR ACCES.AND OF USE PROVIDE PANELS, WHERE NECESSARY FOR THE WATER DISTRIBUTION SYSTEM. 7 PLUMBING CONTRACTOR TO PROVIDE ALL FLASHING AND PITCH PANS AS REQUIRED AT ALL ROOF PENETRATIONS TO ROOFING CONTRACTOR. 8 BUILDING DRAINAGE SYSTEM DISIGN BASE ON 1/8 FT. MINIMUM FALL, ANY DEVIATIONS SHALL BE APPROVED BY THE ARCHITECT AND ENGINEER. 9 CONTRACTOR TO PROVIDE 1" MINIMUM WATER PIPE CAPPED AT EVERY ELECTRICAL SAITCHGRAR ROOM OR METER ROOM TO BE USED AS GROUND (IF APPLICABLE). 10 ALL VALVES UNDERGROUND TO BE INSTALLED IN PROCAST CONCRETE BOXES, BROOKS OR EQUAL. 11 ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND AS FOLLOWS: A SANITARY WASTE AND VENT PIPES AND FITTINGS SHALL BE PVC OR DWV (ASTM -D- 2662) B AC CONDENSATE DRAIN SHALL BE SCHEDULE 40 P.V.C. C HOT AND COOLD WATER LINES SHALL BE CHORINATED POLYVINYL CHORIDE (CPVC) PLASTIC PIPES. D PROVIDE DI ELECTRIC COUPLINGS AS REQUIRED FOR CONNECTION TO DIFFERENT MATERIALS SHUT -OFF VALVES AT FIXTURES AND EQUIPMENT REQUIRING WATER SOPPY. E INSULATE ALL HOT WATER LINES WITH 1/2" FIBERGLASS WITH SELF SEALING UNIVERSAL JACKET. F PLUMBING FIXTURES- AMERICAN STANDARD, KO G FLOOR AND ROOF DRAINS, IF USED, JOSAN OR a L l O :"�A 2Pk'V SHALL BE RESEALED. H ELECTRICAL WATER HEATERS- GLASSLINED, 5 Y A . SMITH OR EQUAL. I VALVES - 125 PSI NIBCO SCOTT OR EQUAL. K HOSE BIBBS CHICAGO 952, OR EQUAL, L ALL EXPOSED PIPENG AT FIXTURES AND EQUIPM NAT SH LL BB CHR e PLATE ESCUTCHEONS AS REQUIRED. -128 %3MIA.Gran 12 PERFORM THE FOLLOWING TESTS: gg , d h esi A WATER PIPING SHALL BE SUBJECTED TO HIDROS'TATIC PRESSURE TEST 0 100 PSG. FOR A PERIOD OF TIME SUFFICIENT T4 EXAMINE ENTIRE SYSTEM BUT NOT LESS THAN ONE HOUR, B DRAINAGE PIPING- BEFORE INSTALLATION OF ANY DRAIN , "' f '"`lCR SYSTEM SHALL BE CAPPED AND ALL LINES FILLED WITH WATER TO HIGHEST POINT AND ALLOWED TO STAND UNTIL INSPECTION IS MADE AND WATER LEVEL REMAINS CONSTANT. C CORRECT ALL DEFECTS DISCLOSED BY ABOVE TEST, 13 STERILIZE ALL WATER LINES WITH MIXTURE OF (2) TWO POUNDS OF CHLORINATED LIME TO EACH 1000 GALLONS OF WATER (50 PPM OF AVAILABLE CHLORINE). RETAIN MIXTURE IN PIPES 24 HOURS AND FLUSH THOROUGHLY WITH POTABLE WATER BEFORE PLACING IN SERVICE. 14 COMPLETE SYSTEM, FIXTURES AND EQUIPMENT SHALL BE GIVEN AN IN- SERVICE TEST AFTER COMPLETION OF THE INSTALLATION. 15 PLUMBING CONTRACTOR SHALL FURNISH A WRITTEN GUARANTEE THAT ALL PLUMBING WORK SHALL BE FREE FROM DEFECTS OF MATERIALS & WORKMANSHIP FOR A PERIOD OF ONE YEAR, FROM DATE OF FINAL ACCEPTANCE, AND THAT HE WILL, AT THIS EXPENSE REPAIR AND REPLACE ALL WORK WICH BECOMES DEFECTIVES DURING GUARANTEE PERIOD. uj ¢ to M N M 0 co U- 1 i M z u_ Dui R JU < 00 o W ry w .0 0 ® o : , W U 10L 0't w o` a n mm �A t? PLUMBING NOTES FOR CPVC WATER SERVICE PIPE: AS PER TABLE 605.3 OF 2007 FLORIDA BUILDING CODE: PLUMBING WATER DISTRIBUTION PIPE: AS PER TABLE 605.4 2007 FLORIDA BUILDING CODE: PLUMBING STANDARD ASTMD 2846, ASTMF 441, ASTMF 442, CSA 13137.6 PIPE FITTING: 605.5 (CPVC) ASTMF 437, ASTMF 438, ASTMF 439, CSAB ""137.6 JOINTS AND CONNECTIONS. - JOINT SURFACES SHALL BE CLEAN & FREE FROM MOISTURE AND APPROVED PRIMER SHALL BE APPLIED. JOINTS BETWEEN CPVC PLASTIC PIPES OR FITTINGS SHALL COMPLY WITH SECTION 605.16.1 TROUGH 605.16.3 - THE SOLVENT CEMENT IS USED ONLY FOR JOINING 1/2" THROUG 2" DIAMETER CPVC PIPE AND FITTINGS. - THE CPVC AND FITTINGS ARE MANUFACTURED IN ACCORDANCE WITH ASTM D 2846 5. HANGER SPACING: CPVC PIPE OR TUBING 1" AND SMOLER (3' -0 ") CPVC PIPE OR TUBING 1 1/4" AND LARGER (4' -0 ") 6. PLASTIC PIPE, FITTINGS AND COMPONENTS SHALL BE THIRD -PARTY CERTIFIED AS CONFORMING TO NSF 14 TALL PLUMBING PRODUCTS AND MATERIALS SHALL COMPLY WITH REFERENCES STANDARDS SPECIFICATIONS AND PERFORMANCE CRITERIA OF FBC 2007 EDITION: PLUMBING AND IDENTIFIED IN ACCORDANCE WITH SECTION 303.1 PLUMBING SPECIFICATIONS 1 THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS AND EQUIPMENT SHOWN OR INDICATED FOR A COMPLETE PLUMBING SYSTEM IN ACCORDANCE WITH THESE DRAWINGS AND WITH THE LOCAL PLUMBING CODES AND FLORIDA BUILDING CODE 2007 EDITION: PLUMBING 2 CONTRACTOR SHALL COORDINATE HIS WORK WITH ALL TRADES IN ORDER TO AVOID CONFLICTS.. NO CHANGES WILL BE ACCEPTED UNLESS A PRIOR WRITTEN APPROVAL HAS BEEN ISSUED FROM THE ARCHITECT /ENGINEER. 3 CONTRACTOR SHALL COORDINATE HIS WORK WITH CORRESPONDING UTILITY COMPANIES IPA ORDER TO VERIFY THE POINTS OF CONNECTION. 4 CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF ALL EQUIPMENT AND THEIR CORRESPONDING SHOP DRAWINGS BEFORE ROUGH -IN. 5 PROVIDE ALL EXCAVATION, BACKFILL AND COMPACTION REQUIRED BY ALL PLUMNING WORK. 6 PROVIDE COMPLETE ACCESS TO ALL SYSTEM. LOCATE CLEAN -OUTS ON WALLS AND OR FLOORS AS NECESSARY, FOR ACCES.AND OF USE PROVIDE PANELS, WHERE NECESSARY FOR THE WATER DISTRIBUTION SYSTEM. 7 PLUMBING CONTRACTOR TO PROVIDE ALL FLASHING AND PITCH PANS AS REQUIRED AT ALL ROOF PENETRATIONS TO ROOFING CONTRACTOR. 8 BUILDING DRAINAGE SYSTEM DISIGN BASE ON 1/8 FT. MINIMUM FALL, ANY DEVIATIONS SHALL BE APPROVED BY THE ARCHITECT AND ENGINEER. 9 CONTRACTOR TO PROVIDE 1" MINIMUM WATER PIPE CAPPED AT EVERY ELECTRICAL SAITCHGRAR ROOM OR METER ROOM TO BE USED AS GROUND (IF APPLICABLE). 10 ALL VALVES UNDERGROUND TO BE INSTALLED IN PROCAST CONCRETE BOXES, BROOKS OR EQUAL. 11 ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND AS FOLLOWS: A SANITARY WASTE AND VENT PIPES AND FITTINGS SHALL BE PVC OR DWV (ASTM -D- 2662) B AC CONDENSATE DRAIN SHALL BE SCHEDULE 40 P.V.C. C HOT AND COOLD WATER LINES SHALL BE CHORINATED POLYVINYL CHORIDE (CPVC) PLASTIC PIPES. D PROVIDE DI ELECTRIC COUPLINGS AS REQUIRED FOR CONNECTION TO DIFFERENT MATERIALS SHUT -OFF VALVES AT FIXTURES AND EQUIPMENT REQUIRING WATER SOPPY. E INSULATE ALL HOT WATER LINES WITH 1/2" FIBERGLASS WITH SELF SEALING UNIVERSAL JACKET. F PLUMBING FIXTURES- AMERICAN STANDARD, KO G FLOOR AND ROOF DRAINS, IF USED, JOSAN OR a L l O :"�A 2Pk'V SHALL BE RESEALED. H ELECTRICAL WATER HEATERS- GLASSLINED, 5 Y A . SMITH OR EQUAL. I VALVES - 125 PSI NIBCO SCOTT OR EQUAL. K HOSE BIBBS CHICAGO 952, OR EQUAL, L ALL EXPOSED PIPENG AT FIXTURES AND EQUIPM NAT SH LL BB CHR e PLATE ESCUTCHEONS AS REQUIRED. -128 %3MIA.Gran 12 PERFORM THE FOLLOWING TESTS: gg , d h esi A WATER PIPING SHALL BE SUBJECTED TO HIDROS'TATIC PRESSURE TEST 0 100 PSG. FOR A PERIOD OF TIME SUFFICIENT T4 EXAMINE ENTIRE SYSTEM BUT NOT LESS THAN ONE HOUR, B DRAINAGE PIPING- BEFORE INSTALLATION OF ANY DRAIN , "' f '"`lCR SYSTEM SHALL BE CAPPED AND ALL LINES FILLED WITH WATER TO HIGHEST POINT AND ALLOWED TO STAND UNTIL INSPECTION IS MADE AND WATER LEVEL REMAINS CONSTANT. C CORRECT ALL DEFECTS DISCLOSED BY ABOVE TEST, 13 STERILIZE ALL WATER LINES WITH MIXTURE OF (2) TWO POUNDS OF CHLORINATED LIME TO EACH 1000 GALLONS OF WATER (50 PPM OF AVAILABLE CHLORINE). RETAIN MIXTURE IN PIPES 24 HOURS AND FLUSH THOROUGHLY WITH POTABLE WATER BEFORE PLACING IN SERVICE. 14 COMPLETE SYSTEM, FIXTURES AND EQUIPMENT SHALL BE GIVEN AN IN- SERVICE TEST AFTER COMPLETION OF THE INSTALLATION. 15 PLUMBING CONTRACTOR SHALL FURNISH A WRITTEN GUARANTEE THAT ALL PLUMBING WORK SHALL BE FREE FROM DEFECTS OF MATERIALS & WORKMANSHIP FOR A PERIOD OF ONE YEAR, FROM DATE OF FINAL ACCEPTANCE, AND THAT HE WILL, AT THIS EXPENSE REPAIR AND REPLACE ALL WORK WICH BECOMES DEFECTIVES DURING GUARANTEE PERIOD. c0 �P uj ¢ to M 0 c0 �P , REVISIONS 2: 3. 4: 5: F BER 11, 2012 WN V MAV -12/87 LUMBING LAN AND NOTES" P-1:. M 0 co U- M z u_ Dui oz W Q w .0 0 U) j W W U 10L 0't w o` t? , REVISIONS 2: 3. 4: 5: F BER 11, 2012 WN V MAV -12/87 LUMBING LAN AND NOTES" P-1:.