13-12-011XISTING
IC TANK
SITE PLAN
LOCATION
FIXTURE CONNECTION SCHEDULE
ITEM
WASTE
UNITS
WATER
COLD
HOT
WC
3"
3
1/2 )p
to
LAVATORY
1-1/4
1
1/2"
1/2
HOSE BIBB
0
1/2 if
co
SHOWER
2„
2
1/2))
1 /2"
KITCHEN SINK
1-1/2"
2
1/2"
1/22$
WASHER
2„
2
1 /2"
1/2"
DISWASHER
1 -1 /2"
2
1/2$1
1/2"_
COLD WATER
HOT WATER
SANITARY
01.- WATER CLOSE (WC) 1.5 GLS.
PER FLUSH.
02. ALL SANITARY LINES SHALL
BE SLOPED AS FOLLOW:
2,, OR LESS AT 1/4 )) PER FT.
3" OR LONGER AT 1/8' PER FT.
03.- PROVIDE ANTI SCALD VALVES AT
SHOWERS AND TUB
PLUMBING NOTES FOR CPVC
WATER SERVICE PIPE: AS PER TABLE 605.3 OF 2007 FLORIDA BUILDING CODE: PLUMBING
WATER DISTRIBUTION PIPE: AS PER TABLE 605.4 2007 FLORIDA BUILDING CODE: PLUMBING
STANDARD ASTMD 2846, ASTMF 441, ASTMF 442, CSA 13137.6
PIPE FITTING: 605.5 (CPVC) ASTMF 437, ASTMF 438, ASTMF 439, CSAB ""137.6
JOINTS AND CONNECTIONS.
- JOINT SURFACES SHALL BE CLEAN & FREE FROM MOISTURE AND APPROVED PRIMER
SHALL BE APPLIED.
JOINTS BETWEEN CPVC PLASTIC PIPES OR FITTINGS SHALL COMPLY WITH
SECTION 605.16.1 TROUGH 605.16.3
- THE SOLVENT CEMENT IS USED ONLY FOR JOINING 1/2" THROUG 2" DIAMETER
CPVC PIPE AND FITTINGS.
- THE CPVC AND FITTINGS ARE MANUFACTURED IN ACCORDANCE WITH ASTM D 2846
5. HANGER SPACING:
CPVC PIPE OR TUBING 1" AND SMOLER (3' -0 ")
CPVC PIPE OR TUBING 1 1/4" AND LARGER (4' -0 ")
6. PLASTIC PIPE, FITTINGS AND COMPONENTS SHALL BE THIRD -PARTY CERTIFIED
AS CONFORMING TO NSF 14
TALL PLUMBING PRODUCTS AND MATERIALS SHALL COMPLY WITH REFERENCES STANDARDS
SPECIFICATIONS AND PERFORMANCE CRITERIA OF FBC 2007 EDITION: PLUMBING
AND IDENTIFIED IN ACCORDANCE WITH SECTION 303.1
PLUMBING SPECIFICATIONS
1 THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS AND EQUIPMENT
SHOWN OR INDICATED FOR A COMPLETE PLUMBING SYSTEM IN ACCORDANCE
WITH THESE DRAWINGS AND WITH THE LOCAL PLUMBING CODES AND FLORIDA
BUILDING CODE 2007 EDITION: PLUMBING
2 CONTRACTOR SHALL COORDINATE HIS WORK WITH ALL TRADES IN ORDER TO
AVOID CONFLICTS.. NO CHANGES WILL BE ACCEPTED UNLESS A PRIOR WRITTEN
APPROVAL HAS BEEN ISSUED FROM THE ARCHITECT /ENGINEER.
3 CONTRACTOR SHALL COORDINATE HIS WORK WITH CORRESPONDING UTILITY
COMPANIES IPA ORDER TO VERIFY THE POINTS OF CONNECTION.
4 CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF ALL EQUIPMENT AND
THEIR CORRESPONDING SHOP DRAWINGS BEFORE ROUGH -IN.
5 PROVIDE ALL EXCAVATION, BACKFILL AND COMPACTION REQUIRED BY ALL
PLUMNING WORK.
6 PROVIDE COMPLETE ACCESS TO ALL SYSTEM. LOCATE CLEAN -OUTS ON WALLS
AND OR FLOORS AS NECESSARY, FOR ACCES.AND OF USE PROVIDE PANELS,
WHERE NECESSARY FOR THE WATER DISTRIBUTION SYSTEM.
7 PLUMBING CONTRACTOR TO PROVIDE ALL FLASHING AND PITCH PANS AS
REQUIRED AT ALL ROOF PENETRATIONS TO ROOFING CONTRACTOR.
8 BUILDING DRAINAGE SYSTEM DISIGN BASE ON 1/8 FT. MINIMUM FALL, ANY
DEVIATIONS SHALL BE APPROVED BY THE ARCHITECT AND ENGINEER.
9 CONTRACTOR TO PROVIDE 1" MINIMUM WATER PIPE CAPPED AT EVERY
ELECTRICAL SAITCHGRAR ROOM OR METER ROOM TO BE USED AS GROUND
(IF APPLICABLE).
10 ALL VALVES UNDERGROUND TO BE INSTALLED IN PROCAST CONCRETE BOXES,
BROOKS OR EQUAL.
11 ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND AS FOLLOWS:
A SANITARY WASTE AND VENT PIPES AND FITTINGS SHALL BE PVC OR DWV
(ASTM -D- 2662)
B AC CONDENSATE DRAIN SHALL BE SCHEDULE 40 P.V.C.
C HOT AND COOLD WATER LINES SHALL BE CHORINATED POLYVINYL CHORIDE
(CPVC) PLASTIC PIPES.
D PROVIDE DI ELECTRIC COUPLINGS AS REQUIRED FOR CONNECTION TO
DIFFERENT MATERIALS SHUT -OFF VALVES AT FIXTURES AND EQUIPMENT
REQUIRING WATER SOPPY.
E INSULATE ALL HOT WATER LINES WITH 1/2" FIBERGLASS WITH SELF
SEALING UNIVERSAL JACKET.
F PLUMBING FIXTURES- AMERICAN STANDARD, KO
G FLOOR AND ROOF DRAINS, IF USED, JOSAN OR a L l O :"�A 2Pk'V
SHALL BE RESEALED.
H ELECTRICAL WATER HEATERS- GLASSLINED, 5 Y A .
SMITH OR EQUAL.
I VALVES - 125 PSI NIBCO SCOTT OR EQUAL.
K HOSE BIBBS CHICAGO 952, OR EQUAL,
L ALL EXPOSED PIPENG AT FIXTURES AND EQUIPM NAT SH LL BB CHR e
PLATE ESCUTCHEONS AS REQUIRED. -128 %3MIA.Gran
12 PERFORM THE FOLLOWING TESTS: gg , d h esi
A WATER PIPING SHALL BE SUBJECTED TO HIDROS'TATIC PRESSURE TEST 0
100 PSG. FOR A PERIOD OF TIME SUFFICIENT T4 EXAMINE ENTIRE SYSTEM
BUT NOT LESS THAN ONE HOUR,
B DRAINAGE PIPING- BEFORE INSTALLATION OF ANY DRAIN , "' f '"`lCR
SYSTEM SHALL BE CAPPED AND ALL LINES FILLED WITH WATER TO
HIGHEST POINT AND ALLOWED TO STAND UNTIL INSPECTION IS MADE AND
WATER LEVEL REMAINS CONSTANT.
C CORRECT ALL DEFECTS DISCLOSED BY ABOVE TEST,
13 STERILIZE ALL WATER LINES WITH MIXTURE OF (2) TWO POUNDS OF
CHLORINATED LIME TO EACH 1000 GALLONS OF WATER (50 PPM OF AVAILABLE
CHLORINE). RETAIN MIXTURE IN PIPES 24 HOURS AND FLUSH THOROUGHLY WITH
POTABLE WATER BEFORE PLACING IN SERVICE.
14 COMPLETE SYSTEM, FIXTURES AND EQUIPMENT SHALL BE GIVEN AN IN-
SERVICE TEST AFTER COMPLETION OF THE INSTALLATION.
15 PLUMBING CONTRACTOR SHALL FURNISH A WRITTEN GUARANTEE THAT ALL
PLUMBING WORK SHALL BE FREE FROM DEFECTS OF MATERIALS & WORKMANSHIP
FOR A PERIOD OF ONE YEAR, FROM DATE OF FINAL ACCEPTANCE, AND THAT HE
WILL, AT THIS EXPENSE REPAIR AND REPLACE ALL WORK WICH BECOMES
DEFECTIVES DURING GUARANTEE PERIOD.
uj
¢
to
M
N M
0
co
U-
1 i
M
z
u_
Dui
R
JU
<
00 o
W
ry
w
.0
0
®
o
: ,
W
U
10L
0't
w
o`
a
n mm �A
t?
PLUMBING NOTES FOR CPVC
WATER SERVICE PIPE: AS PER TABLE 605.3 OF 2007 FLORIDA BUILDING CODE: PLUMBING
WATER DISTRIBUTION PIPE: AS PER TABLE 605.4 2007 FLORIDA BUILDING CODE: PLUMBING
STANDARD ASTMD 2846, ASTMF 441, ASTMF 442, CSA 13137.6
PIPE FITTING: 605.5 (CPVC) ASTMF 437, ASTMF 438, ASTMF 439, CSAB ""137.6
JOINTS AND CONNECTIONS.
- JOINT SURFACES SHALL BE CLEAN & FREE FROM MOISTURE AND APPROVED PRIMER
SHALL BE APPLIED.
JOINTS BETWEEN CPVC PLASTIC PIPES OR FITTINGS SHALL COMPLY WITH
SECTION 605.16.1 TROUGH 605.16.3
- THE SOLVENT CEMENT IS USED ONLY FOR JOINING 1/2" THROUG 2" DIAMETER
CPVC PIPE AND FITTINGS.
- THE CPVC AND FITTINGS ARE MANUFACTURED IN ACCORDANCE WITH ASTM D 2846
5. HANGER SPACING:
CPVC PIPE OR TUBING 1" AND SMOLER (3' -0 ")
CPVC PIPE OR TUBING 1 1/4" AND LARGER (4' -0 ")
6. PLASTIC PIPE, FITTINGS AND COMPONENTS SHALL BE THIRD -PARTY CERTIFIED
AS CONFORMING TO NSF 14
TALL PLUMBING PRODUCTS AND MATERIALS SHALL COMPLY WITH REFERENCES STANDARDS
SPECIFICATIONS AND PERFORMANCE CRITERIA OF FBC 2007 EDITION: PLUMBING
AND IDENTIFIED IN ACCORDANCE WITH SECTION 303.1
PLUMBING SPECIFICATIONS
1 THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS AND EQUIPMENT
SHOWN OR INDICATED FOR A COMPLETE PLUMBING SYSTEM IN ACCORDANCE
WITH THESE DRAWINGS AND WITH THE LOCAL PLUMBING CODES AND FLORIDA
BUILDING CODE 2007 EDITION: PLUMBING
2 CONTRACTOR SHALL COORDINATE HIS WORK WITH ALL TRADES IN ORDER TO
AVOID CONFLICTS.. NO CHANGES WILL BE ACCEPTED UNLESS A PRIOR WRITTEN
APPROVAL HAS BEEN ISSUED FROM THE ARCHITECT /ENGINEER.
3 CONTRACTOR SHALL COORDINATE HIS WORK WITH CORRESPONDING UTILITY
COMPANIES IPA ORDER TO VERIFY THE POINTS OF CONNECTION.
4 CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF ALL EQUIPMENT AND
THEIR CORRESPONDING SHOP DRAWINGS BEFORE ROUGH -IN.
5 PROVIDE ALL EXCAVATION, BACKFILL AND COMPACTION REQUIRED BY ALL
PLUMNING WORK.
6 PROVIDE COMPLETE ACCESS TO ALL SYSTEM. LOCATE CLEAN -OUTS ON WALLS
AND OR FLOORS AS NECESSARY, FOR ACCES.AND OF USE PROVIDE PANELS,
WHERE NECESSARY FOR THE WATER DISTRIBUTION SYSTEM.
7 PLUMBING CONTRACTOR TO PROVIDE ALL FLASHING AND PITCH PANS AS
REQUIRED AT ALL ROOF PENETRATIONS TO ROOFING CONTRACTOR.
8 BUILDING DRAINAGE SYSTEM DISIGN BASE ON 1/8 FT. MINIMUM FALL, ANY
DEVIATIONS SHALL BE APPROVED BY THE ARCHITECT AND ENGINEER.
9 CONTRACTOR TO PROVIDE 1" MINIMUM WATER PIPE CAPPED AT EVERY
ELECTRICAL SAITCHGRAR ROOM OR METER ROOM TO BE USED AS GROUND
(IF APPLICABLE).
10 ALL VALVES UNDERGROUND TO BE INSTALLED IN PROCAST CONCRETE BOXES,
BROOKS OR EQUAL.
11 ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND AS FOLLOWS:
A SANITARY WASTE AND VENT PIPES AND FITTINGS SHALL BE PVC OR DWV
(ASTM -D- 2662)
B AC CONDENSATE DRAIN SHALL BE SCHEDULE 40 P.V.C.
C HOT AND COOLD WATER LINES SHALL BE CHORINATED POLYVINYL CHORIDE
(CPVC) PLASTIC PIPES.
D PROVIDE DI ELECTRIC COUPLINGS AS REQUIRED FOR CONNECTION TO
DIFFERENT MATERIALS SHUT -OFF VALVES AT FIXTURES AND EQUIPMENT
REQUIRING WATER SOPPY.
E INSULATE ALL HOT WATER LINES WITH 1/2" FIBERGLASS WITH SELF
SEALING UNIVERSAL JACKET.
F PLUMBING FIXTURES- AMERICAN STANDARD, KO
G FLOOR AND ROOF DRAINS, IF USED, JOSAN OR a L l O :"�A 2Pk'V
SHALL BE RESEALED.
H ELECTRICAL WATER HEATERS- GLASSLINED, 5 Y A .
SMITH OR EQUAL.
I VALVES - 125 PSI NIBCO SCOTT OR EQUAL.
K HOSE BIBBS CHICAGO 952, OR EQUAL,
L ALL EXPOSED PIPENG AT FIXTURES AND EQUIPM NAT SH LL BB CHR e
PLATE ESCUTCHEONS AS REQUIRED. -128 %3MIA.Gran
12 PERFORM THE FOLLOWING TESTS: gg , d h esi
A WATER PIPING SHALL BE SUBJECTED TO HIDROS'TATIC PRESSURE TEST 0
100 PSG. FOR A PERIOD OF TIME SUFFICIENT T4 EXAMINE ENTIRE SYSTEM
BUT NOT LESS THAN ONE HOUR,
B DRAINAGE PIPING- BEFORE INSTALLATION OF ANY DRAIN , "' f '"`lCR
SYSTEM SHALL BE CAPPED AND ALL LINES FILLED WITH WATER TO
HIGHEST POINT AND ALLOWED TO STAND UNTIL INSPECTION IS MADE AND
WATER LEVEL REMAINS CONSTANT.
C CORRECT ALL DEFECTS DISCLOSED BY ABOVE TEST,
13 STERILIZE ALL WATER LINES WITH MIXTURE OF (2) TWO POUNDS OF
CHLORINATED LIME TO EACH 1000 GALLONS OF WATER (50 PPM OF AVAILABLE
CHLORINE). RETAIN MIXTURE IN PIPES 24 HOURS AND FLUSH THOROUGHLY WITH
POTABLE WATER BEFORE PLACING IN SERVICE.
14 COMPLETE SYSTEM, FIXTURES AND EQUIPMENT SHALL BE GIVEN AN IN-
SERVICE TEST AFTER COMPLETION OF THE INSTALLATION.
15 PLUMBING CONTRACTOR SHALL FURNISH A WRITTEN GUARANTEE THAT ALL
PLUMBING WORK SHALL BE FREE FROM DEFECTS OF MATERIALS & WORKMANSHIP
FOR A PERIOD OF ONE YEAR, FROM DATE OF FINAL ACCEPTANCE, AND THAT HE
WILL, AT THIS EXPENSE REPAIR AND REPLACE ALL WORK WICH BECOMES
DEFECTIVES DURING GUARANTEE PERIOD.
c0
�P
uj
¢
to
M
0
c0
�P
,
REVISIONS
2:
3.
4:
5:
F BER 11, 2012
WN
V MAV
-12/87
LUMBING
LAN AND NOTES"
P-1:.
M
0
co
U-
M
z
u_
Dui
oz
W
Q
w
.0
0
U)
j
W
W
U
10L
0't
w
o`
t?
,
REVISIONS
2:
3.
4:
5:
F BER 11, 2012
WN
V MAV
-12/87
LUMBING
LAN AND NOTES"
P-1:.