09-724-002®� i
20' ASPHALT PAYMENT
__ SW 62ND-AVENUE----A
IMkSITE PLAN _N<__:::�
NW, I I i SCALE 1/160"
LOT COVERAGE
Area
Utility Building
285
SF
Slab in front of Uti;ity Building
21
SF to be partially removed
Terrace at back
278
SF
Metal Shed SA x7.4'
40
SF
Conc. slab south side
0
SF to be removed
Pool Area +Spa
4r 259
SF
Driveway Area
315
SF
Pool pavers deck
313
SF
Pavers walkway at front
96
SF
Pool Equipment slab
25
SF
(HRS)
TTI
POOL CAPACITY
'TOTAL 3098 SF
Lot Area = 6900 SF
Percentage covered = 3098 x 100 = 44.90 %
6900
Percentage of green area = 100 44.90 = 55.10 %
PIPING LEGEND:
2" SKIMMER LINE
2" SPA RETURN LINE
2" SPA HYDROTHERAPY SUPPLY LINE
A
EXISTING ONE STORY RES.
POOL PIPING PLAN,
1,
1.5 HP POOL WITH HAIR &
LINT STRAINER
60 TDH SELF PRIMING
11OV, V*1A
vs
'Ivly� .
It >_11 - cl�
It
A
M
EQUIPMENT SCHEMATIC
N.T.S.
CARTRIDGE FILTER
00 SQ.FT.
SALT
CHLORIDE
SYSTEM
3 PORT
M mr�
--------------------- --
FLOTATION ANALYSIS
POOIJ SPA AREA
POOL PUMP S17F
POOLAREA
!WALLS PERIMETER
HP
SF
I
. S • A A0- tA
DEPTH OF POOL AT DEEP END
... .......
AVERAGE POOL WATER DEPTH.
(GA UM IN)
S F
POOL + SPA AREA
ri
HP
SF
P66L PERMETtR
...
.... . ..
CARTRIDGE FILTER
Slok P E RI M E T E R
SF,
F T
TOTAL PERIMETER
'225
90:
(GAUMI N&PM)
POOL TURNOVER
.......... ..........
AVERAGE POOL DEPTH
1.931
(HRS)
TTI
POOL CAPACITY
10427.12
(GALLONS)
'SPA AVERAGE DEPTH
. .... .....
3.00:
SF
FT
,SPA CAPACITY
9 22 8
FT
•
(GALLNS)
t6TAL CAPACITY (0660 SPAJ
ii�4
CUBIC-FEET
(GALLONS)
M mr�
--------------------- --
FLOTATION ANALYSIS
POOIJ SPA AREA
POOL PUMP S17F
---------------
!WALLS PERIMETER
HP
POOL PU MP CAP A C ITY ',MAD
,AVERAGE WALLS HEIGHT
DEPTH OF POOL AT DEEP END
... .......
AVERAGE POOL WATER DEPTH.
(GA UM IN)
SPA PUMP SIZE
ri
HP
SPA PUMP CAPACITY (HEAD 40 171)
...
.... . ..
CARTRIDGE FILTER
'INICIAL WATER HEAD
SF,
FILTRATION RATE
'225
90:
(GAUMI N&PM)
POOL TURNOVER
1.931
(HRS)
�SPA TURNOVER
STAIRS UPLIFT RESISTING PRESSURE
BENCHS STAIRS AREA
SF
BENCHES STAIRS PERIMETER
FT
!BENCHES STAIRS VOLUME
CUBIC-FEET
SPA VOLUME
CUBIC-YARD
ITO TAL OF VOLUME OF CONC.
CUBIC-YARD
iDECK PERIMETER
M mr�
--------------------- --
FLOTATION ANALYSIS
POOIJ SPA AREA
a to]:K*1200161 I&TITI-11 4 0:1 11ATI-11% 04] 112
---------------
!WALLS PERIMETER
na Sax
,AVERAGE WALLS HEIGHT
DEPTH OF POOL AT DEEP END
... .......
AVERAGE POOL WATER DEPTH.
I F M; WIT 1 14 Fol 1110101
ri
ge-jim,13no 34FT-1-1024M
RIIIIIIIIII]�
FLOOD CRITERIA • LEVEL (NGVD)
'INICIAL WATER HEAD
14g:1,521airi -.Z*1Tj:4-.4Q*T_jXNA1I1A;21 • F; W
13113MIA&I MTT
UPLIFTPRESSURE
N IF-1:1
POOIJ SPA AREA
!WALLS PERIMETER
,AVERAGE WALLS HEIGHT
I F M; WIT 1 14 Fol 1110101
ME 13 Ba
iSLAB THICKNESS
��B UPLIFT RESISTING PRESSURE
;WALLS UPLIFT RESISTING PRESSURE
STAIRS UPLIFT RESISTING PRESSURE
TOTAL UPLIFT RESISTING PRESSURE
:CHECKING UPLIFT PRESSURE VS TOTAL UPLIFT
:RESISTING FORCE
•
r-IM141 9
LEVEL AT MA
DEPTH