11-434-0041. GENERAL CONTRACTOR TO SUBMIT 910 TO OWIGR ON A.I.A.
FORM #A-1• 7 AND TO INCLUDE -BREAMM- COSTS • MAJOR
CATEGORIES, PLUS *EXCLUSIONSO
2. THE A.I.A. GENERAL CONDITION% THE SUPPLEMENTAL GENERAL
11NDITIONS AND GENERAL REQUIREMENTS AS AMENDED BY OWNER
;*11ALL BE CONSIDERED AN INCLUSIVE PART OF THESE SPECWICA71ONS
AND OR DRAWINGS. ALL SUBCONTRACTORS AS WELL AS
THE GENERAL 0ON7RACTOR SHALL BE GOVERNED BY ALL APPLICABLE
=-TIONS, OF THESE DOCUMENTS WITH RUERENCE •
THEIR RESPECTIVE AREA OF WORK. IT SHALL BE THE
RESPONSIBILITY OF THE GENERAL CONTRAC70R TO ADVISE AND INFORM
HIS SUBCONTRACTORS AND SUPPLIERS OF ALL OF THESE REQUIREMENTS.
& THE GENERAL CONTRACTOR. ALL SUBCONTRACTORS AND ALL MAAX",
;YJPPUERS SHALL SUBMITTO THE • **R WITHIN 30 DAYS AFTER
COMPLETION ALL ORELEASE OF LIENSr FOR ALL VM PERFORMED
1i4i-1.-.1 M RNAL PAYMENT.
I
q ffpj�3
An INTERIOR ELEVATION
Sum 11'emill-cr
•
Oddu do &pm
4mmumom
MINX FL =55
ft M&M.40
3♦ a I • . � ► I
I 04,M8111 ISSUE
dam
7Y
1
I 04,M8111 ISSUE
dam