05-192(3)-027MECHANICAL SPECIFICATIONS PART I - GENERAL 1.1 GENERAL, TWE GENERAL AND SPECIAL CONDITIONS AND REQUIREMENTS -- OF THE CONTRACT AND SPECIFICATIONS AS WELL AS PLANS AND SPECIFICATIONS OF OTHER DISCIPLINES AND TRADES SMALL APPLY AND BE PART OF THE WORK HEREBY SPECIFIED. THESE SPECIFICATIONS AND THE ACCOMPANYING PLANS ARE INTENDED TO PROVIDE FOR THE COMPLETE FURNISHING AND INSTALLATION OF THE MECHANICAL R SYSTEMS. 'PROVIDE' MEANS 'FURNISH AND INSTALL% ! v� 1.2 COMPLIANCE- WORKMANSHIP, MATERIALS AND INSTALLATION SHALL BE IN STRICT ACCORDANCE WITH THE LATEST EDITION OF NFPA, ASHRAE, ASME, ASPE, ASTM, NEC, IEEE, OSHA, MRS, HEALTH AGENCIES, AND OTHER APPLICABLE NATIONAL, STATE, AND LOCAL CODES AND PERTAINING REGULATIONS ESTABLISHED BY RULING AUTHORITIES HAVING JURISDICTION. CONTRACTOR SHALL ALSO MEET REQUIREMENTS OF OTHER RECOGNIZED STANDARDS. WHERE SUCH REQUIREMENTS ARE MORE STRINGENT THAN THOSE CITED ABOVE 1.3 WORKMANSHIP, ALL WORK SHALL BE PERFORMED BY CONTRACTORS LICENSED IN THEIR RESPECTIVE DISCIPLINES. WORK SHALL BE DONE IN A FIRST CLASS MANNER, FULLY OPERATIVE, AND TO THE ACCEPTANCE L OF THE ARCHITECT /ENGINEER. CONTRACTOR SHALL PROVIDE FOR ALL NECESSARY LABOR AND MATERIALS REQUIRED FOR COMPLETION OF THE WORK INCLUDING BUT NOT LIMITED TO CONNECTIONS TO RELATED WORK SUCH AS CONNECTION TO EXISTING SYSTEMS. 1.4 MATERIALS, CONTRACTOR SHALL PROVIDE ALL NEW MATERIALS OF AMERICAN MANUFACTURE, BEARING THE UNDERWRITER'S LABORATORY (UL) LABEL AS APPLICABLE MATERIALS SHALL BE ACCEPTABLE AND ABOVE STANDARD QUALITY NORMALLY USED FOR THE PURPOSE AS CALLED FOR ON PLANS. SUPPLEMENTAL MATERIALS, PRODUCTS AND COMPONENTS NECESSARY TO COMPLY WITH THE INTENT OF THE CONTRACT DRAWINGS AND /OR SPECIFICATIONS, BUT NOT NOTED OR SPECIFIED ON THESE SECTIONS, SHALL BE PROVIDED BY CONTRACTOR AS REQUIRED FOR COMPLETION OF THE WORK AT NO ADDITIONAL COST TO THE OWNER. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVISIONS AND COORDINATION OF DELIVERY OF MATERIALS. EQUIPMENT MARRED DURING SHIPMENT OR INSTALLATION SHALL BE TOUCHED LP AND REFINISHED TO FACTORY FINISH, REPLACED W4-E12E NOT ACCEPTABLE 1.5 PERMITS E INSURANCE, CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS, FEES, TAXES, INSPECTIONS, TESTS, FINES AND OTHER ITEMS AS REQUIRED FOR THE INSTALLATION OF COMPLETE MECHANICAL SYSTEMS AS OUTLINED HEREIN AND SHOWN ON PLANS. PROVIDE ALL REQUIRED INSURANCE FOR PROTECTION AGAINST PUBLIC LIABILITY AND PROPERTY DAMAGE FOR THE DURATION OF THE WORK. 1.6 EXISTING CONDITIONS, BEFORE BIDDING CONTRACTOR SHALL VISIT THE `-' JOB SITE AND ASCERTAIN ALL EXISTING CONDITIONS WHICH WILL AFFECT HIS WORK. FAILURE TO DO SO WILL NOT BE ACCEPTED AS A REASON FOR REQUESTING EXTRA PAY WHERE THE EXISTING CONDITIONS RESULT IN EXTRA MATERIAL OR LABOR. ANY EXISTING CONDITION FOUND BY THE CONTRACTOR WHICH WILL ADVERSELY AFFECT THE WORK SHALL IMMEDIATELY BE BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINE -P. CORRECTION OF ANY DEFECTS SHALL BE COMPLETED WITHOUT ADDITIONAL CHARGE AND SHALL INCLUDE REPLACEMENTS OR REPAIR OF ANY OTHER PHASE OF THE INSTALLATION WHICH MAY HAVE BEEN DAMAGED THEREBY. 1.7 UTILITY COMPANIES, BEFORE SUBMITTING BID CONTRACTOR SHALL CHECK WITH WATER, SEWER, GAS, ELECTRICAL, TELEPHONE, CABLE TV AND OTHER UTILITY COMPANIES SUPPLYING SERVICE TO THIS INSTALLATION TO DETERMINE INSTALLATION STANDARDS AND EQUIPMENT REQUIREMENTS AND COSTS TO BE INCLUDED IN THE BID. EXCEPT WHERE UTILITY REQUIREMENTS CHANGE AFTER SUBMITTAL, NO EXTRA PAYMENT WILL BE MADE TO THE CONTRACTOR FOR SUCH ITEMS. PROVIDE TEMPORARY SERVICES FOR ALL TRADES AS REQUIRED. 1.8 PLANS, DRAWINGS ARE GENERALLY DIAGRAMMATIC, INTENDED TO SHOW APPROXIMATE EQUIPMENT LOCATIONS AND ARRANGEMENTS, NOT TO SHOW EVERY MINOR DETAIL. PLANS SHALL NOT BE SCALED TO DETERMINE EXACT LOCATION AND DIMENSIONS. G 1.9 INTERFERENCE, CONTRACTOR SHALL COORDINATE HIS WORK WITH THE WORK OF OTI-E12 TRADES SO TWAT INTERFERENCES WITH EXISTING CONDITIONS, CONDUITS, PIPING, EQUIPMENT, ARCHITECTURAL, STRUCTURAL MEMBERS WILL BE AVOIDED. 1.10 SHOP DRAWINGS, PRIOR TO PLACING AN ORDER AND BEFORE INSTALLATION, SUBMIT FOR REVIEW PROPERLY IDENTIFIED AND BOUND SWOP DRAWINGS AND MANUFACTURER'S LITERATURE GIVING SPECIFICATIONS, DETAILS, COMPLIANCE, UL APPROVAL, MATERIALS, FINISHES, ACCESSORIES AND INSTALLATION DIRECTIONS WHERE REQUIRED OF THE EQUIPMENT SPECIFIED. FACTORY CERTIFIED PRINTS SMALL BE FURNISHED FOR ALL MAJOR ITEMS OF EQUIPMENT AND SPECIFIED. SUBMISSION OF EQUIPMENT FOR APPROVAL SHALL BE MADE COMPLETE AND ALL AT THE SAME TIME 1.11 SUBSTITUTIONS, PRODUCTS AND MATERIALS CALLED OUT BY TRADE NAME AND /OR CATALOG NUMBERS ESTABLISH A STANDARD OF QUALITY, APPEARANCE, PERFORMANCE AND DIMENSION. CONTRACTOR SMALL BASE HIS PROPOSAL ON THOSE ITEMS AS THEY SHALL BE CONSIDERED AS A STANDARD BASIS OF BIDDING. REQUESTS FOR SUBSTITUTIONS SHALL BE SUBMITTED IN WRITING TO THE ARCHITECT /ENGINEER, DEMONSTRATING THAT PRODUCT IS OF COMPARABLE AND BASIC DESIGN, CONSTRUCTION STANDARDS AND WARRANTIES, DIMENSIONS TO FIT WITHOUT CHANGE, AND DOES NOT CAUSE EXTRA WORK FOR OTHER TRADES. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVING EQUALITY OF SUBSTITUTIONS, ARCHITECT/ENGIN®2 WILL, UNDER NO CIRCUMSTANCES. BE REQUIRED TO PROVE SUCH ITEM IS OR IS NOT OF EQUAL QUALITY TO THE SPECIFIED ITEM. ARCHITECT /ENGINEER EXPENSES INCLJRRED DUE TO CONTRACTOR'S REQUESTED REVISIONS OR SUBSTITUTIONS SHALL BE PAID BY CONTRACTOR. 1.12 GUARANTEES, AFTER THE SYSTEM IS INSTALLED, T14E CONTRACTOR SHALL CONDUCT AN OPERATIVE TEST FOR APPROVAL AND ACCEPTANCE BY THE ARCHITECT /OWNER. ENTIRE MECHANICAL WORK, INCLUDING PARTS AND LABOR, SHALL BE GUARANTEED FOR A PERIOD OF ONE (1) YEAR FROM DATE OF FINAL WRITTEN ACCEPTANCE THEREOF AGAINST DEFECTIVE MATERIALS, CONSTRUCTION AND WORKMANSHIP. WHERE APPLICABLE, LONGER GUARANTEES FOR CERTAIN COMPONENTS SHALL APPLY AS REQUIRED AND NOT BE REDUCED IN ANY WAY. CORRECTION OF ANY DEFECTS SHALL BE COMPLETED WITHOUT ADDITIONAL CHARGE TO THE OWNER AND SHALL INCLUDE REPLACEMENTS AND /OR REPAIR OF ANY OTHER PHASE OF THE INSTALLATION WHICH MAY HAVE BEEN DAMAGED THEREBY. 1.13 RECORD DRAWINGS, MAINTAIN A COMPLETE SET OF PRINTS FOR INDICATING ALL CHANGES. USE COLORED PENS TO MARK CHANGES AT THE TIME OF EXECUTION AND DELIVER THE SET TO ARCHITECT/ENGINEER UPON COMPLETION. CONTRACTOR SHALL STAMP 'AS BUILT' ON PRINTS AND PLANS, DATE AND SIGN IN INK. WORK SHALL NOT BE CONSIDERED COMPLETED UNTIL SUCH PLANS ARE REVIEWED AND APPROVED BY ARCHITECT /ENGINEER. C PART 2 - PRODUCTS PLUMBING 2.1 PIPE MATERIALS AND SERVICE SCHEDULE, A. CAST IRON SOIL PIPE, STANDARD WEIGHT, BELL & SPIGOT OR NO- HUB, PVC SCHEDULE 40 NSF PW /DWV. SERVICE, ALL SOIL, WASTE, GREASY WASTE AND VENT LINES INSIDE BUILDING, ALL RAINWATER, SOIL WASTE AND GREASY WASTE TO UTILITY PIPES OUTSIDE OF BUILDING SUCH AS MANHOLE, PUBLIC SEWER, GREASE INTERCEPTOR OR SOAKAGE PIT AS REQUIRED. WI-ERE APPROVED BY OWNER/ENGINEER AND RULING AUTHORITIES, PVC MAY BE USED EXCEPT IN RETURN AIR PLENUMS. B. COPPER DRAINAGE TUBE (DWV) ASTM 8306. SERVICE, SANITARY WASTE ARMS AND CLEAR WATER WASTES ABOVE THE SLAB. C. SEAMLESS COPPER WATER TUBE, ASTM B88 HARD DRAWN TEMPER, TYPE L ABOVE GRADE, TYPE K BELOW GRADE. SERVICE, HOT AND COLD WATER SYSTEMS. D. PVC HIGH IMPACT SCHEDULE 40 NSF PW /DWV. SERVICE, RAIN WATER LEADERS SYSTEM AND DRAINAGE SYSTEMS. E BRASS PIPE OR TUBE, CI -ROME PLATE. SERVICE, EXPOSED BRANCHES AT FIXTURES AND EQUIPMENT. F. GALVANIZED STEEL PIPE, SCHEDULE 40, ASTM A120. SERVICE, ALL GAS PIPING. 2.2 FITTINGS SHALL PROVIDE FOR PERMANENT WATERTIGHT JOINTS AND CONNECTIONS. 4 A. PRESSURE TYPE, I. THREADED STEEL PIPE, WATER SERVICE AND GAS PIPING, MALLEABLE IRON, 150 LB BANDED, GALVANIZED. 2. COPPER PIPE, WATER PIPING, WROUGHT COPPER, SOLDER - JOINT TYPE, NO LEAD. 3. UNIONS, GALVANIZED MAI I FABLE IRON OR BRASS GROUND JOINT UNIONS FOR PIPING TWO (2) INCHES IN DIAMETER OR SMALLER. 4. PVC SCHEDULE 80 ASTM D2467 B. NON - PRESSURE TYPE, I. CAST -IRON SOIL PIPE, FITTING OF SAME WEIGHT AND MANUFACTURE AS PIPE. CAULK SOLID OR A POSITIVE -SEAL ONE PIECE ELASTOMERIC COMPRESSION TYPE GASKET MAY BE USED FOR BELL AND SPIGOT JOINTS. JOINTS FOR HUBLESS PIPE SHALL BE MADE WITH APPROVED NEOPRENE GASKETS AND STAINLESS STEEL RETAINING SLEEVES. 2. THREADED DRAINAGE PIPE SHALL BE A MAXIMUM OF (2) TWO INCHES IN SIZE 3. COPPER TUBE, DRAINAGE TYPE WROUGHT COPPER SOLDER- JOINT 95/5. 23 PIPING PROTECTION, A. PAINT ALL UININSLLATED COPPER AND STEEL PIPING RUN UNDERGROUND WITH TWO COATS OF ASPHALTIC PAINT OR WRAP WITH TWO LAYERS OF 6 MIL POLYETHYLENE. B. SPIRALLY WRAP ALL PIPE LINES EMBEDDED IN CONCRETE WITH ONE LAYER OF 30 LB FELT. C. COAT ALL EXPOSED THREADS ON GALVANIZED STEEL PIPE WITH TWO COATS OF ZINC CHROMATE AFTER ASSEMBLY. D. CLOSE ALL PIPE OPENINGS WITH CAPS OR PLUGS DURING INSTALLATION. E. PROVIDE PACKING AND FIRE RATED RETARDANT SEALER IN JOINTS AROUND PIPING PENETRATING FIRE RATED FLOORS AND WALLS. 24 CLEANOUT COVER IN FINISHED AREAS OR AT STACKS, A. WALLS: JOSAM 58750, JR. SMITH 4710, ZURN 1460 -9. B. TILE FLOORS, JOSAM 58480 FERRULE WITH 58640 -2 PLATE, J.R. SMITH 4283 WITH 4930 ALL BRONZE, ZURN 1450 -8 WITH 1460 -10 POLISHED BRONZE TOP. C. CONCRETE FLOORS OR BLACK TOP, JOSAM 58360 -2. 25 PROVIDE DIELECTRIC FITTINGS FOR JOINING DISSIMILAR METALS AS MANUFACTURED BY EPCO OR APPROVED EQUAL. 26 VALVES SHALL BE FULL PORT, SCREWED AND /OR SOLDERED VALVE BODIES FOR PIPING SYSTEMS 2' DIAMETER AND SMALLER, MATERIAL SHALL BE ALL BRONZE, SCREWED ENDS, SWEAT TYPE ENDS FOR COPPER. MANUFACTURER'S NAME AND VALVE RATING SHALL BE CAST IN VALVE BODY. MANUFACTURER SHALL BE CRANE, NIBCO AND STOCKWAM. MINIMUM WORKING PRESSURE SMALL BE 125 PSIG STEAM. GAS VALVES SHALL BE CRANE 254, PLUG TYPE 27 VALVE BOXES SHALL BE PRECAST, BROOKS CO. ONE FOR EACH VALVE. SIZE SHALL PROVIDE A MINIMUM OF 2' ANNULAR CLEARANCE AROUND THE HANDLE AND INCLUDE THE VALVE BOX EXTENSIONS REQUIRED FOR WORKING ACCESS FROM FINISH GRADE TO VALVE BODY. 28 EXTERIOR HOSE BIBBS SHALL BE 3/4' WALL HYDRANT, THREADED HOSE END AND KEY HANDLE, WITH INTEGRAL VACUUM BREAKER AND NICKALOY FINISH JOSAM 71050 HYDRANSAN I., J.R. SMITH 5610 OR ZURN 1310. 29 WATER HEATER, PROVIDE WATER HEATERS AS SPECIFIED ON PLANS. UNLESS OTHERWISE NOTED ON PLANS, TERMINATE PRESSURE AND TEMPERATURE RELIEF VALVE LINE OUTSIDE OF BUILDING, POINTING DOWN 6 INCHES ABOVE GRADE CONNECTIONS TO WATER HEATER SHALL BE PROVIDED WITH UNIONS AT EACH LINE. PROVIDE VALVE AT COLD WATER LINE AND HEAT EXPANSION LOOP AT HOT WATER LINE 210 FLOOR DRAINS, A. TOILETS, JOSAM 30003 -5A WITH NICKALOY TOP, J.R. SMITH 2O10A, OR ZURN Z415. B. OTHER AREAS, JOSAM 32123 -40 -2 WITH SATIN BRONZE GRATING, JR. SMITH 2110B WITH BRONZE TOP, ZURN Z550Y WITH POLISHED BRONZE. 211 DOOR CLEANOUTS SHALL BE JOSAM 56020, J.R. SMITH 4045, ZURN 1405 -3. 212 FUNNEL DRAINS SHALL BE JOSAM 30003 -7E2 WITH SATIN BRONZE TOP, J.R. SMITH 3510 WITH POLISHED BRONZE TOP, ZURN Z415 WITH Z414 FUNNEL, POLISHED BRONZE 213 PROVIDE REDUCED P12ESSL92E BACKFLOW P12EVENTE12 OR TYPE AS REQUIRED BY UTILITY COMPANY AT POINT OF SERVICE IN MAIN WATER LINE. 214 PLUMBING FIXTURES SHALL BE PROVIDED COMPLETE WITH ALL CHROME PLATED TRIM AND FITTINGS UNLESS OTHERWISE NOTED. ALL EXPOSED TRIM TO BE CHROME PLATED. FIXTURES SHALL BE AS MANUFACTURED BY AMERICAN STANDARDS, KHOLER OR ELJER. FLUSH VALVES SHALL BE SLOAN, ROYAL OR DELANY. FAUCETS AND HOSE BIBBS SHALL BE CHICAGO, AMERICAN STANDARD OR KHOLER. FIXTURES SHALL BE 'WHITE" UNLESS OTHERWISE NOTED, SELECTED BY ARCHITECT /OWNER, PROVIDED BY CONTRACTOR. HVAC 21 EQUIPMENT, CONTRACTOR SMALL PROVIDE FOR A COMPLETE HVAC SYSTEM AS SPECIFIED ON PUNS INCLUDING BUT NOT LIMITED TO HVAC EQUIPMENT OF THE CAPACITIES SHOWN, DUCTWORK AND AIR DISTRIBUTION, FLUID SYSTEMS, REFRIGERANT AND RELATED SYSTEM LINES, TEMPERATURE AND HUMIDITY CONTROLS, FILTERS, MOTOR STARTERS, RELAYS, CONTACTORS AND ANY OTHER COMPONENTS REQUIRED. SUBMIT SHOP DRAWINGS OF EQUIPMENT AND COMPONENTS AS REQUIRED. A. ROOFTOP EQUIPMENT: PROVIDE MANUFACTURER'S RECOMMENDED INSTALLATION COMPONENTS FOR EQUIPMENT NOTED ABOVE AS REQUIRED, INCLUDING RECOMMENDED ASSEMBLED CURBS, WITH WATERTIGHT INSULATION INSTALLED ON THE EXTERIOR BY THE ROOFING CONTRACTOR. PROVIDE LEVELING FRAMES TO COMPENSATE FOR ROOF PITCH. DESIGN SHALL COMPLY WITH THE NATIONAL ROOFING CONTRACTORS ASSOCIATION REQUIREMENTS. B. AIR HANDLING AND CONDENSING UNIT, INSTAI I ED ON APPROVED BASES WITH VIBRATION ISOLATORS, CONDENSATE DRAIN PAN WITH DUAL CONDENSATE DRAINS, AND STRUCTURAL SUPPORT AS NOTED ON PLANS. CONDENSING UNIT SHALL BE MOUNTED ON SUPPORT FRAME RECOMMENDED BY MANUFACTURER AND APPROVED BY RULING AUTHORITIES. C. HVAC EQUIPMENT SHALL PROVIDED WITH NON - CYCLING RELAY, BIRD SCREEN, RAIN HOOD, AND MANUAL OUTSIDE AIR DAMPERS AS REQUIRED. 22 FILTERS, THROWAWAY TYPE LOCATED IN AIR HANDLER OR AT RETURN AIR GRILL UNLESS OTHERWISE NOTED. FURNISH ONE (1) SPARE SET TO OWNER. 23 REFRIGERANT PIPING, 'K' COPPER WITH WROUGHT COPPER SOLDER FITTINGS. INSULATE ALL REFRIGERANT SUCTION LINES WITHIN BUILDING SPACES WITH 3/4' Al2MAFLEX OR APPROVED EQUAL, UNLESS OTHERWISE NOTED. 24 CONDENSATE DRAIN, 'M' TYPE COPPER, PVC MAY BE USED FOR OTHER THAN AIR PLENUM INSTALLATIONS WHERE ALLOWED BY RULING AUTHORITIES. CONNECT PIPING FROM UNIT THROUGH A 3 -INCH VENTED TRAP TO DRYWELL, NEAREST ROOF STORM DRAIN OR AS NOTED ON DRAWINGS. INSULATE CONDENSATE RUNS WITHIN ATTIC AND OTHER NON - CONDITIONED SPACES. 25 THERMOSTATS, HEAT /OFF /COOL AND FAN/AUTO /ON SWITCHES, TYPE AS REQUIRED PER SELECTED HVAC EQUIPMENT MANUFACTURER AND FULLY COMPATIBLE WITH HVAC SYSTEM COMPONENTS USED. MANUFACTURERS SHALL BE HONEYWELL, BARBER - COLEMAN OR APPROVED EQUAL. MOUNT 5' -6' ABOVE FLOOR OR TO MATCH EXISTING UNLESS OTHERWISE NOTED. PROVIDE TAMPERPROOF KEYED BOX AT EACH LOCATION. 26 AIR DISTRIBUTION ACCESSORIES, TITUS, AIR GUIDE, METAL -AIRE, OR APPROVED EQUAL DIFFUSERS SHALL BE ELECTROSTATICALLY PAINTED ALUMINUM AND SHALL BE SUPPLIED WITH MATCHING METAL MOUNTING BOOTS, COMPLETELY INSULATED. UNLESS OTHERWISE NOTED, SUPPLY REGISTERS SHALL BE INSTALLED WITH OPPOSITE BLADE DAMPERS. PROVIDE ADDITIONAL CONTROLS, CONNECTORS, PLENUM BOXES, ROUND TO SQUARE NECK CONNECTORS AND ADDITIONAL COMPONENTS REQUIRED FOR COMPLETE INSTALLATION. 27 DUCTWORK, PROVIDED IN ACCORDANCE WITH LATEST EDITION OF SMACNA 'LOW VELOCITY DUCT CONSTRUCTION STANDARDS ", ASHRAE, ASTM, NFPA, AND APPLICABLE PROVISIONS OF THE MECHANICAL CODE. A. GALVANIZED SWEET METAL, SUPPLY AND RETURN DUCTWORK, EXHAUST AND OUTSIDE AIR. DUCTWORK ABOVE ROOF SHALL BE WEATHERPROOFED AND PAINTED. INSULATION SHALL BE 2' THICK RIGID ON INTERIOR, INSTALLED IN AN APPROVED MANNER. B. NON - METALLIC DUCT, WHERE PREVIOUSLY APPROVED BY ARCHITECT /OWNER, AND RULING AUTHORITIES, AND FOR AREAS OTHER THAN THE KITCHEN, AIR CONDITIONING UNIT SUPPLY AND RETURN AIR DUCTS MAY BE UL APPROVED 2' THICK FIBROUS GLASS DUCT BOARD TYPE 475. STAPLE AND TAPE ALL SEAMS AND SECTIONS AND APPLY TAPE WITH ROBIN -AIRE NEAT GUN SET AT APPROXIMATELY 400- DEGREE F., INSTALLED PER MANUFACTURER'S INSTRUCTIONS. C. FLEXIBLE DUCT, FACTORY INSULATED, 2' MINIMUM FLEXIBLE DUCTWORK, CLASS 1 AIR DUCT, UL 181 APPROVED, SIMILAR TO OWENS- CORNING MODEL NO. INL -25, CERTIFIED CERTAFLEX OR APPROVED EQUAL DUCTWORK SHAM HAVE RESILIENT CORE OF CONTINUOUS INNER AIR BARRIER, JACKETED WITH A REINFORCED VAPOR JACKET. FIRE WAZARD CLASSIFICATION SHALL WAVE A FLAME SPREAD OF 25, SMOKE RATING OF 50, IN ACCORDANCE WITH ASTM C518 -70, ASTM E -84, AND UL 723 STANDARDS. 2.8 DUCTWORK INSTALLATION, A. DUCTWORK SIZES SHOWN ARE INSIDE DIMENSIONS. B. EXHAUST AND OUTSIDE AIR INTAKES SHALL BE GALVANIZED METAL IN ACCORDANCE WITH SMACNA STANDARDS, SCREENED WITH A CORROSION - RESISTANT MATERIAL NOT LARGER THAN 1/2' MESW. OUTDOOR AIR INTAKE SMALL BF A MINIMUM OF TEN (10) FEET FROM EXWAUSTS, FLUES, PLUMBING VENTS AND OTHER SOURCES OF EXHAUST. C. LONGITUDINAL SEAMS SHALL BE PITTSBURGH LOCK OR APPROVED EQUAL LATERAL SEAMS SHALL BE SLIP DRIVE OR STANDING. SLIP SEAMS AND SHEET METAL SCREWS NOT PERMITTED. D. JOINTS AND SEAMS SHALL BE SEALED WITH FOSTER 30 -02 DUCT SEALANT APPLIED ABOVE 32 DEGREES FAHRENHEIT. E DUCTS SMALL BE INDEPENDENTLY SUPPORTED TO PREVENT SAGGING, KINKING AND OTHER PHYSICAL DAMAGE. WHERE PREVIOUSLY APPROVED BY ENGINEER, USE OF FLEXIBLE DUCTS SHALL BE RESTRICTED ONLY FOR INDIVIDUAL BRANCH LENGTHS, MAXIMUM 10 FEET LONG. 2.9 DUCT INSULATION= A. AIR CONDITIONING DUCTS SHALL BE EXTERNALLY INSULATED WITH R -6 2 -INCH BY 1 -1/2" LB FIBROUS GLASS FLEXIBLE BLANKET WITH UL APPROVED FIRE RESISTING ALUMINUM FOIL VAPOR SEAL FACING, B. ROUND DUCTS SHALL BE WRAPPED WITH 12-6 2 -INCH BY 3/4LB BLANKET AS NOTED ABOVE. JOINTS SMALL BE SEALED WITH FIRE RESISTING MASTIC AND 3 -INCH WIDE FOIL BACKED TAPE. 2.10 AIR CONDITIONING SUPPLY DUCT ELBOWS SHALL BE PROVIDED WITH APPROVED TURNING VANES. RECTANGULAR ELBOWS EQUAL TO OR GREATER THAN 45- DEGREES SHALL HAVE DOUBLE THICKNESS TURNING VANES. ROUND ELBOWS INSIDE RADIUS SHALL BE NOT LESS THAN 1.5 TIMES TWE WIDTH OF TWE DUCT. 211 BRANCH TAKE -OFFS AND SUPPLY AIR REGISTERS SHALL BE PROVIDED WITH SPIN COLLARS AND MANUAL VOLUME BALANCING DAMPERS ALL ADJUSTING AND CONTROL HARDWARE SHALL BE ACCESSIBLE. 2.12 PROVIDE CLAMPED FLEXIBLE CONNECTIONS BETWEEN DUCT AND FAN, DUCT AND MOTOR EQUIPMENT, DUCT AND COLLARS, AND DUCT AND SIMILAR EQUIPMENT THAT COULD TRANSMIT AND CAUSE VIBRATION AND NOISE. 2.13 FIRE DAMPERS, PROVIDE IN ALL DUCTS PENETRATING FIRE RATED CEILINGS AND PARTITIONS AS REQUIRED BY CODES. DAMPER INSTALLATION SHALL IN NO WAY INTERFERE WITH AIR FLOW, REDUCE DUCT CROSS SECTIONAL AREA, OR AFFECT HVAC SYSTEM EXTERNAL STATIC PRESSURE. PROVIDE ACCESS DOORS AT EACH DAMPER LOCATION. 2.14 DUCT MOUNTED SMOKE DETECTORS SHALL BE IONIZATION TYPE, 24V, WITH SAMPLING TUBE TO MATCH DUCT SIZE LOCATE IN SUPPLY DUCTS OF AIR CONDITIONING UNITS AS NOTED ON PLANS. A. DETECTORS IN SUPPLY DUCT SMALL BE MOUNTED 6 FEET FROM UNIT, IN RETURN AIR DUCTS DETECTORS SHALL BE MOUNTED BEFORE OUTSIDE AIR INTAKE. B. DETECTORS SHALL BE MOUNTED IN DUCT BY WVAC CONTRACTOR, FURNISHED AND WIRED BY ELECTRICAL CONTRACTOR AS PART OF THE FIRE ALARM SYSTEM C. ACTIVATION OF DETECTORS) SHALL SHUT DOWN THE A/C UNIT(S), AND SET OFF VISUAL AND AUDIBLE DEVICES AS REQUIRED BY FIRE MARSHALL. PART 3 - EXECUTION PLUMBING 3.1 CONTRACTOR SHALL VERIFY AT SITE LOCATION, ELEVATION AND SIZE OF ALL EXISTING MAINS, WATER, SEWER, VENT, AND GREASY WASTE FOR CONNECTION OF NEW SERVICES, PRIOR TO INSTALLATION OF PIPING. 3.2 ALL SANITARY DRAIN LINES SHALL SLOPE AT A MINIMUM OF 1/8" PER FOOT. FIELD COORDINATE INVERT ELEVATION WITH EXISTING SANITARY AND GREASE WASTE STUB -OUT. 3.3 PROVIDE CONTROL VALVES TO ALL BRANCHES, GROUP OF FIXTURES, AND TO EACH PIECE OF EQUIPMENT. PROVIDE INDIVIDUAL STOPS TO EACH PLUMBING FIXTURE SUPPLY. 3.4 PROVIDE CLEANOUTS AT FOOT OF EACH SANITARY, GREASY WASTE, STORM DRAINAGE AND SOIL STACKS, AS WELL AS CHANGE OF DIRECTION OF HORIZONTAL LINES GREATER THAN 45 -DEGREES, IN HORIZONTAL RUNS AT MINIMUM 75 -FOOT INTERVALS, AND AS NOTED ON DRAWINGS. 3.5 FLOOR DRAINS SHALL BE PROVIDED WITH AUTOMATIC TRAP SEALS. HOSE BIBBS SHALL BE PROVIDED WITH VACUUM EIREAKERS. MAIN WATER LINES SHALL BE PROVIDED WITH BACKFLOW P12EVENTE12S IN ACCORDANCE WITH RULING AUTHORITIES. , 3.6 HANGERS SHALL BE MALLEABLE OR WROUGHT IRON SPLIT RING WITH ADJUSTERS. SUPPORT SERVICE PIPE LARGER THAN 1 -1/2' AT 10 FEET, I- 1/2' AND SMALLER AT 8 FEET, HORIZONTAL SOIL PIPE AT 5 FEET AND COPPER TUBE AT 6 FEET. . 3.7 PROVIDE ACCESS PANELS FOR VALVES AND OTHER 12EOUIRED COMPONENTS. 3.8 ALL SYSTEMS AND EQUIPMENT SHALL BE DEMONSTRATED TO BE FUNCTIONING SATISFACTORILY AND SHALL' ME ET THE APPROVAL OF THE GOVERNING AUTHORITIES AND OWNER BEFORE ACCEPTANCE. 3.9 PROVIDE OWNER WITH A BOUND COPY OF ALL APPLICABLE OPERATION OR MAINTENANCE INSTRUCTIONS, LITERATURE AND INFORMATION PERTAINING TO OTHER EQUIPMENT. , 3.10 CONTRACTOR SHALL GUARANTEE THAT ALL PIPE WORK SHALL OPERATE WITHOUT VIBRATION, PULSATION OR OBJECTIONABLE NOISES. 3.11 PLUMBING WORK SHALL NOT INTERFERE WITH CLEARANCES REQUIRED FOR GENERAL CONSTRUCTION AND OTHE12 CONTRACTOR'S INSTALLATION. PLUMBING WORK THAT INTERFERES WITH THE WORK OF OTHER CONTRACTORS SHALL BE CHANGED AT PLUMBING CONTRACTOR'S EXPENSE. 3.12 AT THE COMPLETION OF THE WORK, THIS CONTRACTOR SHALL REMOVE ALL RUBBISH CAUSED BY HIS WORK, AND THOROUGHLY CLEAN ALL RELATED EQUIPMENT. EXISTING EQUIPMENT NOT IN USE AFTER COMPLETION OF THE WORK SHALL BE REMOVED FROM THE JOB SITE 3.13 TEST ALL SANITARY, GREASY WASTE, STORM WATER AND OTI-E12 SOIL PIPING WITH WATER AT 10 FOOT HEAD ABOVE THE HIGHEST OUTLET IN THE SYSTEM DURING A 4-HOUR PERIOD. 3.14 MATERIALS AND EQUIPMENT SHALL BE NEW AND PROVIDED BY THIS CONTRACTOR UNLESS OTHERWISE NOTED AS TO BE RELOCATED. 3.15 HOT WATER INSTALLED IN CONDITIONED SPACES SHALL BE INSULATED. HORIZONTAL RAIN WATER LEADER AND CONDENSATE DRAIN PIPING SHALL BE INSULATED WITH 2' FIBERGLASS LOW PRESSURE INSULATION WITH ALL SERVICE JACKET INSTALLED PER MANUFACTURERS RECOMMENDATIONS. EXTEND INSULATION THROUGH WALLS TO I 1 2 ( 3 1 4 1 5 1 6 1 7 1 8 ( 9 I Il OUTLETS. COVER ALL FITTINGS WITH PLASTIC INSULATION CEMENT TO FULL THICKNESS OF ADJACENT PIPE COVERINGS AND FINISH WITH STANDARD VAPOR BARRIER WHITE RETARDANT JACKET. INSTALL THREE (3) METAL BANDS PER SECTION. 3.16 NO INSULATION SHALL BE INSTALLED UNTIL SYSTEM HAS BEEN CHECKED AND FOUND FREE FROM LEAKS. 3.17 TRAPS SHALL BE SELF CLEANING, EACH FIXTURE SHALL BE INDIVIDUALLY TRAPPED UNLESS OTHERWISE NOTED. 3.18 HORIZONTAL AND VERTICAL RUNS OF WATER AND SOIL PIPE SHALL BE PROVIDED WITH ONE LAYER OF 30 LB. FELT AT ALL HANGERS AT CONTACT SURFACE TO PIPE TO REDUCE VIBRATION. 3.19 AIR CHAMBERS SHALL BE PROVIDED AT EACH FIXTURE ON RISERS AND ENDS OF SUPPLY LINES FOR PROTECTION AGAINST WATER HAMMER. SIZE SHALL BE SAME AS SUPPLY LINE, 3/4' MINIMUM. RISER SHALL BE 20 PIPE DIAMETERS LONG BUT IN NO CASE LESS THAN 18' LONG. 3.20 EQUIPMENT CONNECTIONS SHALL BE MADE WITH UNIONS, FLANGE JOINTS OR OTHER FITTINGS WHICH WILL ALLOW DISCONNECTION AND REMOVAL OF EQUIPMENT. PROVIDE VALVES IN SUPPLY LINES TO EACH PIECE OF EQUIPMENT ON SUPPLY SIDE OF UNION CONNECTION. TESTS SHALL BE IN COMPLIANCE WITH APPROVED GOVERNING BUILDING CODE BUT IN NO CASE SHALL HYDROSTATIC PRESSURE APPLIED BE LESS THAN 100 PSIG FOR FOUR (4) HOURS WITHOUT ANY LEAKS DURING THESE CONDITIONS. 3.21 WATER, SANITARY AND OTHER PLUMBING LINES SHALL BE CONCEALED IN WALLS, CEILINGS, SLABS AND PARTITIONS, NO PIPING SHALL BE EXPOSED WITHIN INTERIOR SPACES UNLESS OTHERWISE NOTED ON DRAWINGS. 3.22 PLUMBING COMPONENTS AND EQUIPMENT SHALL BE CLEARLY AND PERMANENTLY IDENTIFIED. 3.23 BEFORE COMMENCING WORK CONTRACTOR SHALL COORDINATE WITH ARCHITECT /OWNER EXTENT OF WORK WITHIN AND OUTSIDE SPACE TO DETERMINE PROVISIONS REQUIRED. 3.24 CONTRACTOR SHALL MAKE ALL NECESSARY EXCAVATIONS, CUTTING AND REPATCPING AS NECESSARY FOR THE PROPER EXECUTION OF THIS WORK. 3.25 ANY EXISTING EQUIPMENT OR DEVICES INADVERTENTLY DISCONNECTED SHALL BE RECONNECTED AND MADE OPERABLE AT NO ADDITIONAL COST. 3.26 WHERE WORK ON EXISTING PIPING IS REQUIRED, SPECIAL ATTENTION SHALL BE GIVEN TO CONDITIONS OF EXISTING STORM DRAIN, SANITARY, GREASY WASTE, CONDENSATE LINES AND OTHER PIPING. REROUTE EXISTING PIPING TO SUIT NEW WALL AND PARTITION LAYOUT. 3.27 A MINIMUM SEPARATION OF 10 FEET SHALL BE MAINTAINED BETWEEN SANITARY DRAIN LINES AND DOMESTIC WATER? SERVICE LINES BELOW GRADE UNLESS PERMITTED OTHERWISE BY LOCAL AUTHORITIES. 3.28 VENT TERMINALS SHALL BE LOCATED A MINIMUM OF 10 FEET AWAY FROM ANY BUILDING OPENINGS FOR OUTSIDE AIR SUCH AS DOORS, WINDOWS, FRESH AND OUTSIDE AIR DUCT INTAKES. 3.29 ABOVE GRADE HOT AND COLD WATER PIPING INSTALLED BELOW BLANKET AND /OR ROOF INSULATION SHALL BE INSULATED WITH 3/4' FIBERGLASS LOW PRESSURE INSULATION WITH ALL SERVICE JACKET INSTALLED PER MANUFACTURER'S RECOMMENDATIONS. EXTEND INSULATION THROUGH WALLS TO OUTLETS. COVER ALL FITTINGS WITH PLASTIC INSULATION CEMENT TO FULL THICKNESS OF ADJACENT PIPE COVERINGS AND FINISH WITH STANDARD VAPOR BARRIER WHITE RETARDANT JACKET. INSTALL THREE (3) METAL BANDS PER SECTION. 3.30 ABOVE GRADE HOT AND COLD WATER PIPING LOCATED OUTSIDE OF BUILDING INSULATION ENVELOP SHALL BE INSULATED IN ACCORDANCE WITH LOCAL STANDARDS. HORIZONTAL RAIN WATER LEADER RUNS SHALL BE INSULATED WITH 2' FIBERGLASS BLANKET WITH UL APPROVED FOIL VAPOR SEAL FACING. 3.31 GAS SYSTEM, A. ENTIRE GAS SYSTEM PIPING, EQUIPMENT AND APPLIANCE INSTALLATION SHALL COMPLY WITH NFPA -54. FIELD COORDINATE INSTALLATION WITH EXISTING GAS COMPANY REPRESENTATIVES. REFER TO PLUMBING SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS B. GAS LINES SHALL BE GALVANIZED THREADED STEEL PIPE, SCHEDULE 40, ASTM A120. WHERE PREVIOUSLY APPROVED BY ENGINEER AND RULING AUTHORITIES, GAS TUBING MAY BE USED FOR INTERIOR LOCATIONS ONLY FOR EXPOSED BRANCH CONNECTIONS AFTER SHUT -OFF VALVE SERVING EQUIPMENT. MAXIMUM LENGTH OF TUBING SHALL BE SIX FEET. C. GAS LINES SHALL BE RUN EXPOSED OUTSIDE THE BUILDING OR RUN IN ACCESSIBLE SPACES WITHIN BUILDING UNLESS OTHERWISE NOTED. NO LINE SHALL BE ENCASED IN CONCRETE. RUN HORIZONTAL LINES WITH A PITCH DOWN TO DIRT POCKETS. VERTICAL BRANCHES SHALL BE ELBOWED OUT HORIZONTALLY WITH SLOPE TOWARDS THE MAIN LINE BEFORE TURNING DOWN. DIRT POCKETS SHALL BE FULL LINE SIZE WITH A SIX (6) INCH MINIMUM NIPPLE WITH A SCREW CAP AT THE BOTTOM PROVIDE DIRT POCKETS AT THE POINT OF SERVICE LOAD AND AT ALL VERTICAL DROPS. ALL DIRT POCKETS SHALL BE ACCESSIBLE D. APPLIANCES AND EQUIPMENT SHALL BE PROVIDED WITH A MANUAL SHUTOFF VALVE UPSTREAM OF THE EQUIPMENT UNION AND NOT MORE THAN SIX FEE=T FROM THE POINT OF CONNECTION TO THE EQUIPMENT. PROVIDE EMERGENCY SHUT -OFF VALVE AS NOTED ON PLANS NEAR POINT OF CONNECTION TO THE EXISTING GAS LINE. E. BEFORE CONNECTING EQUIPMENT TO GAS LINES, CONTRACTOR SHALL TEST ENTIRE SYSTEM AT 30 PSIG FOR A PERIOD OF 24 HOURS. ANY PRESSURE INDICATING LEAKS SHALL BE CORRECTED ACCORDINGLY AND THE SYSTEM RETESTED BEF=ORE PROCEEDING WITH THE INSTALLATION. 3.32 STERILIZATION, IMMEDIATELY AFTER WATER PIPING SYSTEM HAS BEEN THOROUGHLY FLUSHED OUT, STERILIZE THE LINES, OPEN AND CLOSE ALL VALVES WHILE SYSTEM IS BEING CI- LORINATED. AFTER STERILIZING AGENT HAS BEEN APPLIED FOR 24 HOURS, TEST FOR RESIDUAL CHLORIDE AT ENDS OF THE LINES, REPEAT TI-E PROCESS UNTIL TEST SHOWS RESIDUAL CHLORINE CONTENT ESTABLISHED BY RULING AUTHORITIES. FLUSH OUT THE SYSTEM UNTIL ALL TRACES OF THE CI- EMICAL USED ARE REMOVED. MAKE NECESSARY CONNECTIONS TO STERILIZED PIPING. 3.33 A FINAL BACTERIOLOGICAL TEST OF THE POTABLE WATER SYSTEM SHALL BE MADE BY A LABORATORY APPROVED BY THE STATE OF FLORIDA HEALTH DEPARTMENT AND DELIVERED TO THE ARCHITECT /OWNER AT THE TIME OF FINAL INSPECTION. HVAC 3.1 TEST E BALANCE, CONTRACTOR SHALL PROVIDE AND PAY FOR AN NEBB OR AABC CERTIFIED INDEPENDENT CONTRACTOR REGULARLY AND EXCLUSIVELY ENGAGED IN THIS WORK TO ADJUST, TEST AND BALANCE ALL SYSTEMS AS SHOWN ON PLANS. A. START -UP AND TEST SYSTEM OPERATION IN ALL MODES IN CONJUNCTION WITH PLUMBING, ELECTRICAL AND OTP52 RELATED CONTRACTORS. B. CLEAN UNIT BY VACUUMING ALL CONSTRUCTION INSIDE AND OUTSIDE UNIT, CLEAN AND POLISH ALL CHROME AND ENAMEL FINISHES. LUBRICATE UNIT PER MANUFACTURER'S INSTRUCTIONS. C. MEASURE AND RECORD BLOWER AMPS AND BLOWER NAMEPLATE AMPS, RECORD BLOWER MOTOR RPM, TOTAL SUPPLY CFM OF OUTSIDE AIR TO CFM SHOWN, RECORD COMPRESSOR AND CONDENSER FAN AMPS, RECORD HEATER AMPS ON EACH STAGE. CLEAN OR REPLACE FILTER PER MANUFACTURER'S INSTRUCTIONS. CHECK REFRIGERANT CHARGE AND PROPER OPERATIONS OF SAFETY CONTROLS. D. AFTER COMPLETION, PROVIDE THREE (3) CERTIFIED COPIES OF REPORT, INCLUDING WORKSHEET AND SUBSTANTIATING DATA, TO ARCHITECT /OWNER AND ONE (1) CERTIFIED COPY TO ENGINEER. E. CONTRACTOR SMALL PROVIDE A REPRESENTATIVE, TOOLS AND INSTRUMENTS SO THAT ALL SUBMITTED DATA MAY BE VERIFIED AT FINAL INSPECTION. F. PROVIDE COMPETENT START -UP ENGINEER TO SUPERVISE STARTING OF EQUIPMENT AND INSTRUCT OWNER'S REPRESENTATIVE OF OPERATION AND MAINTENANCE OF EQUIPMENT. 3.2 VIBRATION ISOLATION, HVAC AND RELATED SYSTEMS COMPONENTS SHALL BE PROVIDED WITH VIBRATION ISOLATION DEVICES AS PER 10 1 f l 12 I�3 1 14 I It) MANUFACTURER'S RECOMMENDATIONS. 3.3. ALL EXTERNAL EQUIPMENT COMPONENTS SHALL BE FACTORY FINISH PAINTED FOR WEATHER PROTECTION AND IN ACCORDANCE WITH ARCHITECTURAL PLANS. 3.4 CONTRACTOR SHALL MAKE ALL NECESSARY EXCAVATIONS, CUTTING AND 12EPATCWING AS NECESSARY FOR THE PROPER EXECUTION OF THIS WORK. 3.5 VOLUME CONTROL DAMPERS SMALL BE PROVIDED WHERE INDICATED AND SHALL BE EQUIPPED WITH LOCKING ADJUSTMENTS, READILY ACCESSIBLE 3.6 CONTRACTOR SHALL GUARANTEE THAT ALL PIPE AND DUCTWORK SHALL OPERATE FREE OF VIBRATIONS, RATTLES, PULSATIONS OR OBJECTIONABLE NOISES. 3.7 UNLESS OTHERWISE NOTED AS EXISTING TO REMAIN OR BE RELOCATED, ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND PROVIDED BY THIS CONTRACTOR. EXISTING EQUIPMENT REMOVAL FROM THE JOB SITE AND /OR DISPOSAL SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. COORDINATE WITH OWNER BEFORE COMMENCING WORK. 3.8 ANY EXISTING EQUIPMENT OR DEVICES INADVEE12TENTLY DE- ENERGIZED OR DISCONNECTED SHALL BE RE- ENERGIZED AND MADE OPERABLE AT NO ADDITIONAL COST. 3.9 HVAC SYSTEM COMPONENTS AND EQUIPMENT SHALL BE CLEARLY AND PERMANENTLY IDENTIFIED WITH 2' HIGH LETTERS ON TWO SIDES OF THE UNITS AND AREA AND /OR COMPONENT BEING SERVICE AS APPLICABLE. 3.10 EQUIPMENT SHALL BE SUPPORTED FROM STRUCTURAL MEMBERS. NO WEIGHT SHALL BE PLACED ON T14E ROOFING MATERIALS, INSULATION, CEILING GRID, ROOF DECKING OR SIMILAR COMPONENTS. <' , , ,,ittlt S AllE [u ,ALA cl jc_� FLA. REG. RA 9688 ,. ENTERED FEB 0 9 100 13 I 14 I 15 N L I a G i� w C 1• "A z w LL AA,�- -- AZZF, ARCHITECTURE INC. 7166 SW 47th Street Miami, Florida 88156 AA26000646 Tel (805) 888 -2666 Fax (805) 668 -2688 lrmaiL• jans0bellsoatInet 0 W� V3 V3 cy.) l--i O • M 0 U °f a 0 z a 0 z 0 m z z O W CO "o to Cn CV - °z 0 [U,, i--� U U) 1- U U J I� z z 0 DRAWN BY: ISSUE DATE: M.S. 0I -19 -05 CHECKED BY: SCALE: J.S.A. AS NOTED PROJECT NO. 04256 DRAWING NO. M -4 SHEET OF z w LL