05-839-008j
EXIST ELA
ROOF
LASHING 3X(o P.T. LJOOD JOIST
r- 9 24" O /C.
USP HANGER, SUH3ro DADS COUNTY
N.O.A. 97- 1215.01 (8) 1God 9 HEADER
(4) lod w JOIST
(2) 2X6 LEDGER W/ "" 0 EXP. BOLT 9
24" C.C. EMB. MIN S"
EXISTING
WALL
NEW ROOF 3 "X3' -2ro CAA.
/ NAILED 4" O.C.
OVERLAP (o' MIN.
METAL DRIP
1'X2" PT, OVER
1'Xh' WD FASCIA
ON 2'X4" BACKING
NEW 8 -1.
SEE SCHED
NEW STEEL COL
SEE SCNED
4' CONIC SLAB
EX15T i
�h
- I EL 0'-o'
EX16TINr-;;
— CONC FTG
o
• • SEE SCNED
r74_'�GECT I ON
N.T.S.
SEAM STEEL fi L. DEMENT DIAGfRAM
NOTF6
I. WHERE NECESSARY CONT. TOP BARS SHALL BE
LAPPED 24 BAR PIA IN MIDDLE 1/3 OF SPAN
2- { = L -I OR L -2 WHICHEVER 15 GREATER
3. 1 BARS SCHEDULED ARE 1/2 AT EA. FACE
4. BOTTOM BARS SHALL BE EXTENDED 12 13AR DIA
BEYOND FACE OF SUPPORT
z
SEE PLAN tL
lli
EL. SEE PLAN
b -1 I —� �_� . -I 11` �- I 1 =1 I =I
11 I 1=1 I I
I_
� 1 111,-111 ,1 -L1 III I -111 Iil_�.kl ,I
- — VAPOR BARRIER
2#5
aX'T"
T�'F'_ TI41CKENED FzDC:zE F-DETAL
N.T.S.
DRILL 1'0 X 8' HOLE INTO
EXIST FOOTING
THROUCsHLY CLEAN OUT
AND pRY FILL W/ HILTI
'C -1001 EPDXY INSERT 1
*5 MAR X 3O LONG: AT
EACH NEW E50TTOM BAR-
EXIST FOOTINGI NEW FOOTING
F�
I
5EE SCHED-
NEW CONC. I
SEE 5CNED1
STIRR
4912
TOP 4
2*5 C
USF HURRICANE STRAW
30,
U STEEL COL.
3 SCHEDULE
T 'rF. TIE7 5At"-1 COfPNR [�)FTAIL_
N.T.S.
Ti'f'f G,4L 7DETAIL. EXf ,5T FOOTING.
N.T.S.
BASE PL SEE SCNED W/
(4) 3/4' A30'1 A.B_
UJ/ MIN e' EME3EpD
At 5Tp. NOOK
DROP CONC. SLAB
A1zOUND STEEL
COLUMN TYP.
TOP OF FOOTING -
C. BEAM
CAP fi LATE SEE SCNED
W/ (4) 5 /8 "DIAXB "LC:x
HEADED STUDS OR *5
BENT BAF'_S
STEEL COLUMN
1-1/2"+/- NON &H1 -INK
GROUT. TYP.
T'�'F. GT EL COLUMN CONN. DETAL
NEW CONC, SEAM EM
16" INTO EXIST. WALL
`' TOi=' SAj�—' NOOK
O FILL CELL MIN. 20II
I- L._ L._J 1t( INTO, INFILLED
CELL AND NOOK AT END MIN. 2411
[DETAIL N.T.S.
i
j � E PEON
GEORGE E.
P
ARCHITECT, A.I.A.
AR# 0007999
ARCHITECTURE
PLANNING
INTERIORS
4143 SW 74 CT. SUITE D
MIAMI, FL. 33155
PII. (305) 269 -9335
FAX. (305) 269 -9457
r iONS EY
�I
0 6 -23 -2005
DRAWN:
W
CHECKED: G.E.P.
DATE_
3/08/04
co
AS SHOWN.
JOB NUMMIt:
S
SHEET:
i
li
i
I
'y
OF: I
S-3
SHEETS
�
�
Q
O
DRAWN:
D.G.P.
CHECKED: G.E.P.
DATE_
3/08/04
SCALE:
AS SHOWN.
JOB NUMMIt:
S
SHEET:
i
li
i
I
'y
OF: I
S-3
SHEETS