Loading...
05-1525(2)-0104 z 0 H a 0 4" CONC. SLAB W -6X6 - # 10/ 10 WWM @ MIDDEPTH OVER VISQUEEN VAPOR BARRIER ON TERMITE TREATED COMPACTED SOIL TYP. C SC I I- WF -1 1 #5 IN BLOCK CELL FILLED WITH CONCRETE FROM THE BEAM TO FOOTING AT LEAST I • I� 5" EMBEDMENT AT EACH SIDE OF OPENING LL I Sc�. 4 I I f I I I �O I I I i I I I i l l l l l I I I I I I• 1 #5 IN BLOCK CELL FILLED WITH CONCRETE MARK ELEV, TOP OF FOOTIN FROM THE BEAM TO FOOTING AT LEAST I �_ REINFORCING 5" EMBEDMENT AT EACH CORNER CONTINUOUS TRANSVERSE I SEE PLAN I 4" CONC, SLAB W -GXG - # 10/ 10 WWM 2 #5 L @ MIDDEPTH OVER VISQUEEN 2 #5 2 #5 VAPOR BARRIER ON TERMITE TREATED a a COMPACTED SOIL TYP. I I @ OFEN G5 I �I 'iF.FIL L V.' /. TO _Ti I EXIST. EXIST. FOOTING FOUNDATION PLAN SCALE: 1 \4 " =1' -0" FOUNDATION NOTES I - FLOOR SHALL BE 4" THICK CONCRETE SLAB WITH FIBER MESH OVER G MIL VAPOR BARRIER, ON COMPACTED FILL. SEE GENERAL NOTES ON 5-3 FOR COMPACTING REQUIREMENTS. 2 - ELEVATION OF TOP MONOLITHIC FOOTINGS NOTED AS "FM" SHALL BE ± 0' -0 ". 3- COLUMN AND FOOTING CENTERLINES, SHALL COINCIDE UNLESS DIMENSIONED OTHERWISE. ±0' -0 ", SEE SURVEY PLOT FOR NGVD. 4- REFERENCE ELEVATION 5- PROVIDE ISOLATION JOINTS BETWEEN INTERIOR AND EXTERIOR SLABS ON GRADE: PROVIDE 112" FELT PAPER AT THE JOINT. G - COORDINATE SLAB ELEVATIONS, STEPS, AND SLOPES WITH ARCHITECTURAL DRAWINGS. 7- SEE ARCHITECTURAL DRAWINGS FOR THE ORIENTATION OF THE BUILDING. 5- WINDOWS, DOORS AND ROUGH OPENINGS ARE TO BE COORDINATED WITH THE WINDOW /DOOR TYPES AND LOCATIONS NOTED ON THE ARCHITECTURAL DRAWINGS AND WITH THE MANUFACTURERS. 9 - SEE ARCHITECTURAL DRAWINGS FOR WALKWAY SLAB LAYOUT. 10 - 0 FC INDICATES 1 #5 @ 42" VERTICAL REINFORCING BAR IN CELLS FILLED W/ GROUT ENDS OF REBARS SHALL•BE HOOKED INTO FOUNDATION, BEAM OR TIE BEAMS WITH A ACI STANDARD 90 HOOK. KEBARS SHALL BE PLACED AS SHOWN IN THE PLAN5.(f'5 = 1 500 psi) 1 1 - SPLICES IN REINFORCING BARS SHALL NOT BE LE55 THAN 48 BAR DIAMETERS ( #5 = 30 "), AND REINFORCING SHALL BE CONTINUOUS. 12 - RATIONAL ANALYSIS WAS PERFORMED TO DETERMINE THE STEEL REINFORCING FOR THE MONOLITHIC FOUNDATION, DESIGNED WAS BASED ON AN ALLOWABLE SOIL BEARING CAPACITY OF 2,000 PSF. 13- 1 #7 VERT. IN CONC. FILLED BLOCK CELL @ 24" OPEN AREA f'u =2500 psi 14- G" THICK CONCRETE SLAB VERIFY SIZE LOCATION W/ A/C CONTRACTOR TERMITE PROTECTION: (FBC 1816) TERMITE PROTECTION SHALL BE PROVIDED AS A PREVENTIVE TREATMENT TO NEW CONSTRUCTION AFTER ALL EXCAVATION, 13ACKFILLING AND COMPACTION IS COMPLETE. A CERTIFICATE OF COMPLIANCE SHALL BE ISSUED TO THE BUILDING DEPARTMENT BY THE LICENSED PEST CONTROL COMPANY THAT CONTAINS THE FOLLOWING STATEMENT: THE BUILDING HAS RECEIVED A COMPLETE TREATMENT FOR THE PREVENTION OF THE SUBTERRANEAN TERMITES. TREATMENT IS IN ACCORDANCE W/ RULES AND LAWS ESTABLISHED BY THE FLORIDA DEPT. OF AGRICULTURE AND CONSUMER SERVICES." 1. SOIL STATEMENT: 501L @ THIS SITE IS UNDISTURBED ROCK t SAND ADEQUATE TO SUPPORT THE DESIGN LOAD OF 2000 p5f. A LETTER WILL BE SUBMITTED BY ARCHITECT OR ENG. AFTER GROUND HAS BEEN BROKEN ATTESTING THAT SITE HAS BEEN OBSERVED t CONDITIONS ARE 51MILAR TO THOSE UPON WHICH DESIGN IS BASED. 2. SOIL COMPACTION REQUIREMENTS COMPACT FILL UP TO MINIMUM OF 95% OF PROCTOR MAXIMUM DRY DENSITY TO SUBMIT COMPACTION TESTS BEFORE STARTING CONST. WORKS. CONCRETE FOOTING SCHEDULE MARK ELEV, TOP OF FOOTIN SIZE THICK REINFORCING REMARKS CONTINUOUS TRANSVERSE WF- I G SEE PLAN I G" CONT. 12" 2 #5 #5 @ 24" O.C. 5EE PLAN 2 #5 2 #5 5C a a 24" O.C. I @ OFEN G5 CONCRETE BEAM SCHEDULE MARKS SIZE W D ELEV. TOP OF BEAM REINFORCING #3 TIES U.O.N. SPACING O.C. REMARK5 BOTT. TOP 5 "Ell "C" TB -1 a 12 5EE PLAN 2 #5 2 #5 5C a a 24" O.C. I @ OFEN G5 CONCRETE COLUMN SCHEDULE MARKS 51ZE W D ELEV. TOP OF BEAM REINFORCING TIES REMARKS TC a 12 5EE PLAN 4 #5 #3 @ a" 5C a a 5EE PLAN 4 #5 #3 @,51' a FULLY GROUTED ARCH (NON - SHRINK CONIC. FILLED STEEL GROUT) COLUMN, SEE PLAN do SCHEDULE STEEL BASE > SHOP WELDED TO SLAB -ON -GRADE COLUMN (SEE SCHEDULE) `� MIN. (SEE PLAN) TOP OF SLAB x x X x— ' — X x x x SEE PLAN l 5000 PSI -'f NON- SHRINK, - NON - METALLIC GROUT BED a r v `CONC. FOOTING (SEE SCHEDULE FOR SIZE REINF.) ANCHOR BOLTS (SEE SCHEDULE) STEEL COLUMN TO FOOTING DETAIL SCALE: N.T.S. MASONRY BLOCK WALL VERT. REINF. CENTEREI IN FILLED CELL (SEE PLAN) STD. HOOK . LADDER TYPE 7. REINS. (PLACED Y OTHER BLOCK COURSE) ' -L5 SAME 51ZE AS . BARS W cn I� J Iz S FOOTING NOTES: 1. HORIZ. REINF. SHALL BE EMBEDDED A MIN. OF 4" INTO ADJACENT CONCRETE COLUMNS (IF APPLICABLE). 2. LAPPING OF HORIZ. REINF. SHALL BE A MIN. OF I G" (ONE BLOCK LENGTH). TYP. COL. REINF. DETAIL SCALE: N.T.S. NEW 8X 12 CONC. START COL. W/ 2 #5 DOWELS X 3' -0" G" INTO EXIST. FTG W/ EPDXY GROUT. AND 2 #5 X 4' -0" X 1' -0" INTO NEW FOUNDATION EXISTING 8" u BLOCK WAL1- c° - C„ 2 #5 DOWELS x 2' -0 G" INTO EXIST. FTG. (3/4" DIAM. 2' -0„ HOLES) W/ EPDXY GROUT. EXIST. CONIC. � 4 —ter FTG, NEW CONC. FTG. SEE PLAN. EXIST. & NEW FOOTING CONN. N.T.S 3011 STIRRUP 4 @ 12" O.C. TOP t BOT BARS m 2 #5 CORNER BARS iull-4- TYP. CONT. FOR REINF. AT WALL &FTG. N.T.S a Q cc I EXISTING T6 #5 DOWEL, DRILL b" EXISTING T6 /FTG, AND SET IN EPDXY GROUT, EXISTING MASONRY WALL. ifs VERT. WHERE SHOWN ON PLAN NOCK -OUT EXISTING MASONRY WALL AND VSTALL #5 DOWELS AND #5 VERT. FILL V 13,000 PSI PUMP MIX GROUT OR 'EAROCK CONC. WITH a" SLUMP. EXISTING FTG. EXISTING CMU WALL 12" TO 16" 2' ---0" MAX. 6" 0 cv FNOT DOWNS IN EXISTING CMU WALLS (WHERE TIE DOWN/TIE COLS. STING): CORNERS: AS SHOWN ON PLAN DETAILS. 20' -0" O.C. ND WINDOW OPENINGS WHEN DOORS AND WINDOWS ARE TO D. TYP. FILLED CELL DETAIL N.T.S. •b•i • • • u • ry l+ r C • U 4 :J • C ii,' • � � • k • i l J „ • i i • i r • • s r • r • • r • + i u • • •••iiY i i•WC E • � u r • • • • •+ •••r -• R i G•r • U(:G• ti to • i V ti i ••Ri 4r (, p V - v G V • I • rS� PROPOSED NEW ADDITION FOR: Mr. & Mrs. GONZALES 4 ' " �, • � i i � 3'i. 7861 S.W. 68 th AVE. MIAMI, FL. 33143 PLAN & DETAILS DRAWN BY: I.G