ELECTRICAL NOTES:
PART 1 - GENERAL:
1.- THE GENERAL AND SPECIAL CONDITION AND REQUIREMENTS OF THE CONTRACT AND
SPECIFICATION AS WELL AS PLANS AND SPECIFICATIONS OF OTHER DISCIPLINES AND
TRADES SHALL APPLY AND BE PART OF THE WORK HEREIN SPECIFIED. THESE SPECIFI-
CATION AND THE ACCOMPANYING PLANS ARE INTENDED TO PROVIDE FOR THE COMPLETE
FURNISHING AND INSTALLATION OF THE ELECTRICAL SYSTEMS.
2.- COMPLIANCE: WORKMANSHIP, MATERIALS AND INSTALLATION SHALL BE IN STRICT ACCORDANCE
WIITH THE LATEST EDITION OF 2004 FBC 2004 NEC NFPA NEMA IEEE• OTHER APPLICABLE NATIONAL,
STATE k LOCAL CODES, AND PERTAININU REGULATIdNS ESUBLISRED B$ AUTHORITIES
HAVING JURISDICTION, AND SHALL MEET THE REQUIREMENTS OF OTHER RECOGNIZED
STANDARDS WHERE "PART 1 - GENERAL" THE REQUIREMENTS ARE MORE STRINGENT
THAN THOSE CITED ABOVE.
3.- WORK SHALL BE PERFORMED BY A LICENSED ELECTRICAL CONTRACTOR IN A FIRST
CLASS MANNER AND SHALL BE COMPLETED AND FULLY OPERATIVE TO THE ACCEPTANCE
OF THE ARCHITECT /ENGINEER.
4.- MATERIALS: CONTRACTOR SHALL PROVIDE ALL NEW MATERIALS, BEARING THE UNDER -
wRI'IR S LABORATORY (UL) LABEL AS APPLICABLE. MATERIALS SHALL BE ACCEPTABLE
AND ABOVE STANDARD QUALITY NORMALLY USED FOR THE PURPOSE AS CALLED FOR
ON PLANS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE DELIVERY SCHEDULES
OF MATERIALS.
5.- DRAWINGS ARE DIAGRAMMATIC AND INTENDED TO SHOW APPROXIMATE EQUIPMENT
LOCATIONS AND ARRANGEMENTS, NOT TO SHOW EVERY MINOR DETAIL; PLANS SHALL
NOT BE SCALED TO DETERMINE EXACT LOCATION AND DIMENSIONS. PROVIDE ALL OFFSETS,
FITTINGS AND ACCESORIES REQUIRED FOR A COMPLETE, ACCEPTABLE, WORKING INSTALLATION.
6.- SUPPLEMENTAL MATERIALS OR MANUFACTURED PRODUCTS NECESSARY TO COMPLY
WITH THE INTENT OF THE CONTRACT DRAWINGS OR SPECIFICATIONS, BUT NOT NOTED
OR SPECIFIED ON THESE SECTIONS, SHALL BE PROVIDED AS REQUIRED TO COMPLETE
THE INATALLATION AT NOT ADDITIONAL COST TO THE OWNER.
7.- EXISTING CONDITION: BEFORE BIDDING CONTRACTOR SHALL VISIT THE JOB SITE AND
ASCERTAIN ALL EXISTING CONDITIONS, WfHICH WILL AFFECT HIS WORK. FAILURE TO DO
SO WILL NOT BE ACCEPTED AS A REASON FOR REQUESTING EXTRA PAY WHERE THE
EXISTING CONDITIONS RESULT IN EXTRA MATERIAL OR LABOR. ANY EXISTING CONDITION
FOUND BY THE CONTRACTOR WHICH WILL ADVERSELY AFFECT THE WORK SHALL IMMEDIA-
TELY BE BROUGHT TO THE ATTENTION OF THE ARCHITECT /ENGINEER. CORRECTION OF
ANY DEFECTS SHALL BE COMPLETED WITHOUT ADDITIONAL CHARGE AND SHALL INCLUDE
REPLACEMENTS OR REPAIR OF ANY OTHER PHASE OF THE INSTALLATION WHICH MAY
HAVE BEEN DAMAGED THEREBY.
8.- UTILITY COMPANIES: BEFORE SUBMITTING BID CONTRACTOR SHALL CHECK WITH ELECTRICAL,
TELEPHONE, CABLE TV AND OTHER UTILITY COMPANIES SUPPLIYING SERVICE TO THIS
INSTALLATION TO DETERMINE INSTALLATION STANDARDS AND EQUIPMENT REQUIREMENTS
AND COST TO BE INCLUDED IN THE BID. EXCEPT WHERE UTILITY REQUIREMENTS CHANGE
AFTER SUBMITTAL, NO EXTRA PAYMENT WILL IRE MADE TO THE CONTRACTOR FOR SUCH
ITEMS, PROVIDE TEMPORARY ELECTRICAL SERVICES FOR ALL TRADES.
9.- PERMITS: CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS, FEES. TAXES, INSPECTION,
TESTS, FINES AND OTHER ITEMS AS REQUIRED FOR THE INSTALLATION OF A COMPLETE
ELECTRICAL SYSTEM AS OUTLINED HERE IN AND SHOWN ON PLANS. PROVIDE ALL REQUIRED
INSURANCE FOR PROTECTION AGAINST PUBLIC LIABILITY AND PROPERTY DAMAGE FOR
THE DURATION OF THE WORK.
10.- INTERFERENCE: PLANS ARE GENERALLY DIAGRAMMATIC AND THE CONTRACTOR SHALL
COORDINATE HIS WORK WIITH THE WORK OF OTHER TRADES, SO THAT INTERFERENCES
WITH EXISTING CONDITIONS, CONDUITS, PIPING, EQUIPMENT, ARCHITECTURAL. STRUCTURAL
AND WORK WITH OTHER TRADES WILL BE AVOIDED.
11.- SUBMITTAL: PRIOR TO PLACING AN ORDER AND BEFORE INSTALLATION, SUBMIT FOR
REVIEW PROPERLY IDENTIFIED AND BOUND, SHOP DRAWINGS AND MANUFACTURER'S
LITERATURE GIVING SPECIFICATIONS, DETAILS, COMPLIANCE, UP APPROVAL, MATERIALS,
FINISHES, ACCESORIES AND INSTALLATION DIRECTIONS WHERE REQUIRED OF THE
EQUIPMENT SPECIFIED.
SUBSTITUTIONS: PRODUCTS AND MATERIALS CALLED OUT BY TRADE NAME AND /OR
CATALOG NUMBERS ESTABLISH A STANDARD OF QUALITY, APPEARANCE, PERFORMANCE
AND DIMENSION. CONTRACTOR SHALL BASE HIS PROPOSAL ON THOSE ITEMS AS THEY
SHALL BE CONSIDERED AS A STANDARD BASIS OF BIDDING. REQUEST FOR SUBSTITU-
TIONS SHALL BE SUBMITTED IN WIRITING TO THE ARCHITECT /ENGINEER, DEMOSTRATING
THAT PRODUCT IS OF COMPARABLE AND BASIC DESIGN, CONSTRUCTION STANDARDS AND
WARRANTIES, DIMENSIONS TO FIT WITHOUT CHANGE, AND DOES NOT CAUSE EXTRA WORK
FOR OTHER TRADES, CONTRACTOR SHALL BE RESPONSIBLE FOR PROVING EQUALITY OF
SUBSTITUTIONS; ARCHITECT /ENGINEER WILL, UNDER NO CIRCUMSTANCES, BE REQUIRED
TO PROVE SUCH ITEM IS OR IS NOT OF EQUAL QUALITY TO THE SPECIFIED ITEM..
CONTRACTOR SHALL PAY FOR ARCHITECT /ENGINEER EXPENSES INCURRED DUE TO
CONTRACTOR'S REQUESTED REVISIONS OR SUBSTITUTIONS.
3,- GUARANTEES: AFTER THE SYSTEM IS INSTALLED, THE CONTRACTOR SHALL CONDUCT AN
OPERATIVE TEST FOR APPROVAL AND ACCEPTANCE BY THE OWNER. ENTIRE ELECTRICAL
WORK, INCLUDING PARTS AND LABOR, SHALL BE GUARANTEED FOR A PERIOD OF ONE
(1) YEAR FROM DATE OF FINAL WRITTEN ACCEPTANCE THEREOF AGAINST DEFECTIVE
MATERIALS, CONSTRUCTION AND WORKMANSHIP. WHERE APPLICABLE, LONGER GUARANTEED
FOR CERTAIN COMPONENTS SHALL APPLY AS REQUIRED AND NOT IRE REDUCED IN ANY
WAY. CORRECTION OF ANY DEFECTS SHALL BE COMPLETED WITHOUT ADDITIONAL CHARGE
AND SHALL INCLUDE REPLACEMENTS AND /OR REPAIR OF ANY OTHER PHASE OF THE
INSTALLATION WHICH MAY HAVE BEEN DAMAGED THEREBY.
1 KAIC NOTE: THIS CONTRACTOR SHALL COORDINATE WITH FPL THE KAIC AVAILABBLE AND
INCREASE OR DECREASE THE KAIC ACCORDINGLY IN ALL DISCONNECTS, BREAKERS, ETC.
PART 2 -- PRODUCTS:
SHOP DRAWINGS: SUBMIT SHOP DRAWINGS OF THE FOLLOWING PRODUCTS:
A. WIRING, CABLING, CONDUITS, RACEWAYS, FLOOR AND OUTLET BOXES.
B. WIRING DEVICES: RECEPTACLES, OUTLETS, LIGHTSWITCHES, PLATES, TIME CLOCKS,
PHOTOCELLS. DIMMERS, PLUGMOLD.
C. LIGHTING FIXTURES. LAMPS, POLES AND BASES.
r DISCONNECT SW ►ITCHES SHALL BE CONTINOUS DUTTY, QUICK -MADE, QUICK -BRAKE ACTION, LOCKABLE
TYPE, AS MANUFACTURED BY GE, SQUARE -D. PROVIDE CURRENT LIMITING BUSS FUSES
FOR MAIN SERVICE, DISCONNECTS DUAL ELEMENT FUSES FOR MOTOR DRIVEN MECHANICAL
EQUIPMENT SIZED PER NAMEPLATE SIZING WITH EQUIPMENT BEFORE ACTUAL INSTALLATION.
CONDUCTORS SHALL BE THWf /THWPN SOFT-DRAWN 98% CONDUCTIVITY COPPER INSTALLED IN
CONDUIT, COLOR CODED PER "NEC" AND TRADE STANDARDS. MINIMUM SIZE SHALL RE #12
FOR POWER WIRING AND #14 FOR CONTROL CIRCUITS. PROVIDE #10 WIRES FOR 120V POWER
CIRCUIT HOMERUNS LONGER THAN 100 FEET.
4 CONDUIT SHALL BE "RGS" OR "IMC" HOT- DIPPED GALVANIZED FOR ALL EXTERIOR LOCATIONS,
WHERE EXPOSED TO PHYSICAL DAMAGE. ALL FITTING SHALL BE STEEL. "PVC" SCHEDULE
40 SHALL RE USED WHERE CONDUIT IS RUN IN CONCRETE SLABS; "PVC" MAY BE RUN
UNDERGROUND WHERE BURIED 18" BELOW FINISHED GRADE, 24" UNDER VEHICULAR TRAFFIC
AREAS. GREENFIELD TYPE FLEXIBLE METALLIC CONDUIT SHALL BE USED FOR MOTORS AND
VIBRATING EQUIPMENT CONNECTIONS, NOT TO EXCEED 18 "; PROVIDE "PVC" JACKETED TYPE
FOR EXTERIOR AND /OR MOISTURE EXPOSED LOCATIONS.
5 WIRING DEVICES SHALL BE SPECIFICATION GRADE, FLUSH MOUNTED, AS MANUFACTURED
BY HUBBELL OR SLATER. DIMMERS SHALL BE LUTRON OR APPROVED EQUAL, 600Wf MINIMUM.
SWITCHES SHALL BE GANGED TOGETHER IN THE SAME BOX. DIMMERS SHALL BE GROUPED
TOGETHER IN SEPARATE BOXES; 60OW DIMMERS MAY BE GANGED TOGETHER NO MORE THAN
TWO IN A BOX WHERE PREVIOUSLY APPROVED BY MANUFACTURER AND ENGINEER.
6.LIGHTING FIXTURES SHALL BE COMPLETE WITH ALL NECESSARY, BALLAST, WIRING, LAMP
HOLDERS REFLECTORS, GLASSWARE, POLES AND MOUNTING ACCESSORIES AS REQUIRED TO
PROVIDE A COMPLETE INSTALLATION. REFER TO ARCHITECTURAL DRAWINGS FOR COLOR,
FINISH AND EXACT MOUNTING DETAILS.
7•THIS CONTRACTOR SHALL COORDINATE WITH FP&L THE CONNECTION FOR THIS SERVICE
AND REVISE INTERRUPTING CAPACITY AVAILABLE PRIOR INSTALLATION OF ALL DISCONNECTING
DEVISES, AND INCREASE THE INTERRUPTING CAPACITY IN PANELS AND DISCONNECTING DEVISES
[F REQUIRED.
PART 3 - EXECUTION:
1.- CONDUIT RUNS, RACEWAYS AND PIPING SHALL DE CONCEALED IN WALLS, CEILINGS, SLABS
AND PARTITIONS; NO RACEWAYS SHALL DE EXPOSED WITHIN INTERIOR SPACES EXCEPT FOR
OPEN CEILING AREAS.
2.- ALL FEEDER SPLICES AND TERMINATIONS SHALL DE MADE MECHANICALLY USING COMPRESSION
TYPE SLEEVES OR LUGS AND CONNECTION TO PANELS AND SWITCHES AS MANUFACTURED BY
BUMDY SERVITS TYPE OR APPROVED EQUAL. ALL CABLES SHALL BE COPPER.
3,- GROUNDING AND BONDING SHALL COMPLY WITH "NEC 250 ". ALL METALLIC RACEWAYS SHALL
BE GROUNDED AND BONDED PER "NEC 250 ". NON- METALLIC RACEWAYS SHALL BE PROVIDED
WITH A GROUNDING CONDUCTOR SIZED PER "NEC 250.122 ".
4.- MOTORS, TRANSFORMERS AND MECHANICAL EQUIPMENT SHALL BE PROVIDED WITH GREENFIELD
FLEXIBLE CONNECTIONS, WfATERLIGHT WHERE EXPOSED TO MOISTURE AND WEATHER CONDITIONS.
5.- ELECTRICAL EQUIPMENT SPACE AND INSTALLATION SHALL BE ACCORDANCE WITH "NEC 110.26
AND 408 ". WIRING IN DUCTS, PLENUM AND OTHER AIR HANDLING SPACES SHALL COMPLY
WITH "NEC 300.22 ".
6.- ELECTRICAL COMPONENTS AND EQUIPMENT SHALL BE CLEARLY AND PERMANENTELY IDENTIFIED
BY CONTRACTOR, USING THE UNIT OR APARTMENT NUMBER. INDICATE CIRCUIT DESIGNATION
ON GLASS COVERED TYPED DIRECTORY HOLDER INSIDE ON PANELBOARD DOOR. MARK CONDUCTORS
WITH PREPRINTED ADHESIVE MARKERS AS MANUFACTURED BY W.H. BRADY Co. OR THOMAS Jc
BETTS.
7.- CONTRACTOR SHALL MAKE ALL NECEESSARY EXCAVATIONS, CUTTING AND REPATCHING AS
REQUIRED FOR THE PROPER EXECUTION OF THIS WORK. PROVIDE PACKING AND FIRE RATED
RETARDANT SEALER IN JOINTS AROUND SLEEVES, PIPING AND CONDUITS PENETRATING FIRE
RATED FLOORS AND WALLS.
8.- TELEPHONE, SPEAKER AND OTHER SYSTEMS: PROVIDE PULL WIRE IN EMPTY CONDUIT AS NOTED
ON PLANS. COORDINATE INSTALLATION WITH OWNER TO ASSURE INSTALLATION MEETS EQUIPMENT
VENDOR'S REQUIREMENTS.
9.- OUTLETS AND ANY OTHER EQUIPMENT INSTALLED IN DEMISED FIRE RATED PARTITIONS, CAN
NOT INSTALLED BACK -TO -BACK, BUT MUST BE MINIMUM 24" APART.
10.- RECEPTACLES SHALL BE GROUNDED TYPE. CONTRACTOR SHALL GROUND ALL RECEPTACLES AS PER
2004 NEC CODE SECTION 250.130 .
GENERAL NOTE: I
ELECTRICAL OUTLETS ON FIRE RATED AND /OR 4"
PARTITION WALL SHALL BE POSITIONED SO THEY
ARE NOT BACK --TO -BACK. INSTALL OUTLETS WITH A
MINIMUM DISTANCE OF 24" BETWEEN EACH BOX.
1 � R
CONN
SMOKE DETECTOR NOTE
ALL SMOKE DETECTORS SHALL BE 110V
WITH BATTETY BACK UP AND
INTERCONNECTED FROM AFCI (ARC FAULT
CIRCUIT) AHEAD OF ALL SWITCHES.
SMOKE DETECTORS MAY BE WITHIN 20FT
OF A COOKING APPLIANCE AND NOT
CLOSER THAN 3FT FROM THE DOOR TO
BATHROOM[, WASHER /DRYER, KITCHEN AND
A /C.
THE ACTIVATION OF ANY SMOKE
DETECTOR SHALL ACTIVATE THE OTHERS.
. - / 1 T1lT n A T TT T
NOTE
SMOKE DETECTOR SHALL BE HARDWIRE (110 VOLT TYPE)
TO A NON - SWITCHABLE AFCI (ARC FAULT CIRCUIT
CIRCUIT WITH BATTERY BACK -UP AND SHALL NO BE
CONNECTED ONTO THE LOAD SIDE OF GROUND FAULT CIRCUIT
SHALL BE INTERCONNECTED AS SHOWN IN PARALLEL UNIT
SMOKE DETECTOR CONNECTION DETAIL
SCALE : N.T.O.
ELECTRICAL RISER DIAGRAM
NO SCALE
ELECTRICAL GENERAL NOTES
SCALE: NTS
r
• iC' • U
• • 4
• v Y r
. ,...�
4 • • U
• • V
r i �
V • i V V •
• v r •ii f
f r • r • i i G •
f • i u •i • w
• • • . V v i
Yur ••• r•• • s
1 .(Y 4
.•r• UiU.0 ar• •�,�
•
.+a•r . rufFU • vv• . cn
ci- F
CONSULTING:
t
u
0
a
�y1
Z
M
Q
T�Thh
tz; a
4
M
A
o
N
4
W
CONSULTING:
`�f
u
�y1
h
M
T�Thh
tz; a
4
M
A
CD
.0
I:
a L�
rz
a
P
� � W
� z a
g o IL
IL M O
J �
4 to
m W co
V O
n
cc cc �
�r� 4c va
so
q
03
LO
sa
R•
`�f
r1(�•IIII.r�
row
SCAU AN SHOM
BRAvm DFG
rM 2m
MTE 11-W-0t
SHEET:
E-3
3 OF:3