08-1279(2)-013GENERAL PLUMBING NOTES
1. ALL WORK TO BE DONE IN ACCORDANCE WITH THE 2004 FLORIDA
BUILDING CODE AND LOCAL ORDINANCES.
2. BUILDING DRAINAGE SYSTEM TO BE SLOPED AT 1/8" PER FT. MIN. FALL. ANY
DEVIATIONS SHALL BE APPROVED BY ARCHITECT /ENGINEER.
3. PROVIDE CLEANOUTS EVERY 75 FT. AND AT BASE OF EVERY WASTESTACK.
ALL CLOSEOUTS TO BE FLUSH MOUNTED.
4. MATERIALS SHALL BE ALL NEW AND AS FOLLOWS:
A. DRAINAGE WASTE AND VENT PIPING INCLUDING GREASE
WASTE; PVC DRAINAGE WASTE AND PIPING (DWV) CONFORMING TO
ASTM D -2665, NO HUB CAST IRON CISPI STANDARD 301 ABOVE
GROUND AND CAST IRON HUB, PLAIN END ASTM A -74 WITH NEO-
PRENE GASKETS UNDERGROUND.
B. WATER PIPING: COPPER TYPE "L" ASTM B -88 ABOVE GROUND AND
COPPER TYPE "K" ASTM B -88 UNDERGROUND.
C. CONDENSATE DRAIN PIPING: COPPER TYPE "M" ASTM B -88 INSIDE
THE BUILDING AND PVC SCHEDULE 40 ABOVE ROOF AND UNDERGROUND.
PROVIDE 1/2" ARMAFLEX PIPE INSULATION TO ALL CONDENSATE DRAIN
PIPING.
D. FLOOR DRAINS (IF REQUIRED): JOSAM SERIES 30,000 OR EQUAL EXCEPT AT
TRANSFORMER VAULT WHICH SHALL BE JOSAM SERIES 32,000 OR EQUAL.
KITCHEN FLOOR DRAIN: JOSAM 35420 -50, 12" SQUARE NIKALOY TOP, SATIN
FINISH, 1/2" PRIMER CONNECTION, BRONZE SEDIMENT BUCKET.
E. FLOOR CLEANOUTS: JOSAM SERIES 56020 OR EQUAL.
F. WALL CLEANOUTS: JOSAM SERIES 58750 WITH ACCESS COVER OR EQUAL.
G. VALVES: 125 PSI NIBCO SCOTT, STOCKHAM OR EQUAL.
H. HOSE BIBBS: CHICAGO 837 OR EQUAL WITH VACUUM BREAKER.
I. ELECTRIC WATER HEATER: GLASS- LINED, P & T RELIEF VALVE, 5 YEAR
WARRANTY MINIMUM.
5. PERFORM THE FOLLOWING TEST:
A. WATER PIPING SHALL BE SUBJECTED TO HYDROSTATIC PRESSURE TEST OF
100 PSIG FOR A PERIOD OF TIME SUFFICIENT TO EXAMINE ENTIRE SYSTEM
BUT NOT LESS THAN ONE HOUR.
B. DRAINAGE SYSTEM: BEFORE INSTALLATION OF ANY DRAINS, THE END OF THE
SYSTEM SHALL BE CAPPED & ALL LINES FILLED WITH WATER TO HIGHEST
POINT & ALLOWED TO STAND UNTIL INSPECTION IS MADE AND WATER LEVELS
REMAIN CONSTANT.
C. CORRECT ALL DEFECTS DISCLOSED BY ABOVE TESTS.
D. COMPLETE SYSTEM FIXTURE & EQUIPMENT SHALL BE GIVEN AN IN- SERVICE
TEST AFTER COMPLETION OF THE INSTALLATION.
E. STERILIZE ALL WATER LINES WITH A MIXTURE OF (2) POUNDS OF CHLORINATED
LIME TO EACH 1000 gal. OF WATER (50 PPM OF AVALIBLE CHLORINE.) RETAIN
MIXTURE IN PIPES FOR 24 HOURS AND FLUSH THROUGHLY WITH POTABLE WATER
BEFORE PLACING IN SERVICE.
6. PLUMBING CONTRACTOR SHALL FURNISH A WRITTEN GUARANTEE THAT ALL PLUMBING
WORK SHALL BE FREE FROM DEFECTS OF MATERIALS AND WORKMANSHIP FOR A PERIOD
OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE, AND THAT HE WILL, AT HIS EXPENSE,
REPAIR AND REPLACE ALL WORK WHICH BECOMES DEFECTIVE DURING GUARANTEE PERIOD.
7. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF EXISTING UTILITIES AND POINTS OF
CONNECTION BEFORE COMMENCING ANY WORK.
8. PLUMBING CONTRACTOR SHALL PAY ALL FEES, INSPECTION AND CONNECTION
CHARGES REQUIRED.
9. SUBMIT SHOP DRAWINGS TO ENGINEER FOR APPROVAL OF ALL EQUIPMENT,
MATERIALS AND LAYOUTS PRIOR INSTALLATION.
10.OFFSET PIPING AS REQUIRED TO CLEAR BUILDING STRUCTURE, DUCTWORK, ETC.
AS SHOWN ON DRAWINGS AND AS REQUIRED BY FIELD CONDITIONS.
11. PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL A/C CONDESATE DRAIN
AND TRAP. SEE A/C PLANS FOR LOCATION OF UNITS AND DARINS.
12.PLUMBING CONTRACTOR SHALL VERIFY ALL SPACE CONDITIONS AND DIMENSIONS
AT JOB SITE PRIOR TO FABRICATION AND INSTALLATION OF MATERIALS AND EQUIPMENT.
13. COORDINATE WORK WITH OTHER TRADES.
14. FURNISH AND INSTALL FIXTURES AS SPECIFIED IN SCHEDULE IF PROVIDED, OTHERWISE
PROVIDE SHOP DRAWINGS.
15.EACH BATHROOM GROUP AND KITCHEN SHALL BE PROVIDE WITH AIR CHAMBERS OR SHOCK
ABSORBER AS PER S.F.B.C.
16. PROVIDE SHUT -OFF VALVE FOR EACH FIXTURE, JUST BEFORE CONNECTING TO FIXTURE.
17.WHEREVER DISSIMILAR METALS ARE TO BE JOINED, A DIELECTRIC FITTING
SHALL BE PROVIDED TO CONNECT BOTH TYPES OF PIPES.
18. MECHANICAL CONTRACTOR SHALL COORDINATE AND VERIFY HEIGHT AND LOCATION OF
STUB -UPS.
19. REFER TO SUPPLIER DRAWING AND SPECIFICATIONS FOR ADDITIONAL
INFORMATION AND COORDINATION OF EQUIPMENT TERMINATION DETAILS.
20. PROVIDE AT REFRIGERATOR LOCATION: 1/2" C.W. LINE TO 1/4" PETCOCK 6" ABOVE
FLOOR . FURNISH 48" OF 1/4" SOFT COPPER TUBING FOR CONNECTION TO REFRIGERATOR .
21. PROVIDE ANTI SCALD AT ALL TUB AND SHOWERS.
PLUMBING SYMBOLS
S - - - -
-.4 COLD WATER PIPE
S- - - -i HOT WATER PIPE
WATER HAMMER ARRESTOR
n AIR CHAMBER
HB HOSE BIBB W / VACUUM BREAKER
AND SHUT -OFF VALVE
SANITARY LINE
�-- C.D. CONDENSATE LINE
WCO WALL CLEANOUT
FCO FLOOR CLEANOUT
GATE VALVE ( SHUT -OFF
VALVE )
THERMAL
EXPANSION BY
AMTROL MODEL
ST -5.
(1800- 736 -1149
5 CW
UNION FITTING
(TYPICAL)--- -
DIELECTRIC FITTIG
(TYPICAL)
WATER HEATER
80 GALS. WITH
6.0 KW HEATING ELEMENT
DRAIN PAN
FLOOR
a-
ATE VALVE
(TYP.)
�-- HEAT TI
0.90EF
FERYux.
PITCH DOWN
TOWARD DRAIN
DRAIN PAN
SEE MECHANICAL DRAWINGS
- FOR UNIT SUPPORTS.
DRAIN LINE SHALL BE AT LEAST THE
SAME SIZE AS THE NIPPLE ON THE
DRAIN PAN
1/2" * TOTAL AHU PLUMBING - -f--- -MECHANICAL
TOTAL STATIC PRESSURE.
TYPICAL CONDENSATE DRAIN TRAP
N.T.S.
TO COLD 'WATER
SYSTEM
- D4-- -- c
H
HOT WATER SYSTEM TO J
BE FULLY INSULATED.
TEMPERATURE & PRESSURE
RELIEF VALVE
AIR GAP FITTING
((-',AP ®2xO OF DRAIN PIPE)
3/4" MIN.
3/4" EMERGENCY DRAIN - PRESSURE RELIEF & DRAIN PAN LINNES
TO BLDG. EXTERIOR, 6° ABOVE GRADE
AND TURNED DOWN
WATER HEATER DIAGRAM
N.T.S.
• THE TANK OR WATER HEATER SHALL BE
INSTALLED IN A GALVANIZED STEEL OR
OTHER METAL PAN OF EQUAL COROSION
RESISTANCE HAVING A MINIMUM THICKNESS
OF 24 GAGE, 0.0278 INCH (0.70 mm).
ELECTRIC WATER HEATHERS SHALL BE
ISNTALLED IN A METAL PAN AS HERE IN
REQUIRED OR IN A HIGH - IMPACT PLASTIC
PAN OF AT LEAST 0.0825 INCH (1.59 mm)
THICKNESS.
THE PAN SHALL NOT BE LESS THAN 1
INCHES (38 mm) DEEP AND SHALL BE OF
SUFFICIENT SIZE AND SHAPE TO RECEIVE
ALL DRIPPING OR CONDENSATE FROM THE
TANK OR WATER HEATHER. THE PAN SHALL
BE DRAINED BY AN INDIRECT WASTE PIPE
HAVING A MINIMUM DIAMETER OF j INCH.
NO FLAMABLE METERIAL
SUCH AS PVC PERMITTED
AT W/H CLOSET (CPVC IS
PERMITTED)
PLUMBING FIXTURE CONNECTION SCHEDULE
MARK
DESCRIPTION
FU'S
WASTE
C.W.
H.W.
REMARKS /SPECS
P -1
WATER CLOSET
3
3"
1/2"
-
FLOOR MOUNTED„ FLUSH TANK
P -2
BATHTUB
2
2"
1/2"
1/2"
PRESSURE BALANCING FAUCET
P -2A
SHOWER
2
2"
1/2"
1/2"
PRESS. BALANCING FAUCET.
P -3
LAVATORY
1
1 1/2"
1/2"
1/2"
COUNTERTOP
P -4
KITCHEN SINK
2
1 1/2"
1/2"
1/2"
COUNTER TOP
P -5
DISH WASHER
1 1/2"
1/2"
1/2"
-- - - - - --
P-6
WASHER (RESIDENTIAL)
2
2"
1/2"
1/2"
WATER SUPPLY VALVE & DRAIN IN RECESSED
BOX WALL MOUNTED.
P -7
REFRIGERATOR
--
--
1/2
--
---- - - - - --
P-8
BIDDET
2
2"
1/2"
1/2"
---- - - - - --
P-9
LUNDRY SINK
2
1/2"
1/2"
1/2"
---- - - - - --
P -10
JICE MAKER
--
I --
1 1/2"
--
NOTE : CONTRACTOR TO COORDINATION PLUMBING FIXTURE SELECTION, WITH OWNER/ ARtCHITECT FOR FIXTURE AND
FAUCET STYLE & COLOR.
PLUMBING NOTES AND DETAILS
N.T.S.
PROVIDE EXTRA HEAVY PATTERN FULL OPENING
IRON BODY TRAP SCREW FERRULE & ALL BRASS
CLEANOUT WITH COUNTERSUNK HEAD
FINISH GRADE PROVIDE POURED CONC.
BLOCK WHEN C.O. IS
NOT IN PAVED AREA
I N1,30, ono o.o•
12 "x12 "x8"
POURED CONC.
BLOCK WHEN
CLEANOUT IS
NOT IN
PAVED AREA -
GCO
r 1
FINISH GRAVE
-MINIMUM 1" I
LONG SWEEP. USE SHORT
SWEEP WHERE REQUIRED
COMBINATION "Y" &
1/8" BEND
r
- •-SAME SIZE AS
SEWER- MAX.
SIZE 4"
FCO
STAINLESS STEEL COVER
SCREWED TO THREADED
C.O. PLUG
FACE OF WALL
TYCO
TYPICAL CLEANOUT DB'PAIL
Y.T.S.
0
ITEM
DESCRIPTION
LOAD
A
COOK TOP
72,000. BTUS HR
B
POOLE UIPMENT
250 000. BTUS HR
r
TOTAL LOAD
322,000. BTUS /HR
■s■
I.m
CONSU
i!T NG
N
i
�_
0
I
r
IN
Nil
cq
w
t`
n
Im
y�
h
I
coo
c
N
el i
I
tn
I
�"00
r�
V
in
w
A�
A
H
iµ
p
CONSU
i!T NG
N
�_
0
I
r
IN
Nil
cq
w
t`
n
Im
y�
h
I
coo
c
N
0.
I
tn
I
�"00
r�
V
in
w
A�
A
'3 t
_ _L
k -'k ".i
r-
r;:
*�.swb
i+r
,4-1
VIM
I
III
b
4Y
if
I AD
M
M
Ate iowN
Q
r
a
Nil
ow
-
'3 t
_ _L
k -'k ".i
r-
r;:
*�.swb
i+r
,4-1
VIM
I
III
b
4Y
if
I AD
M
M
Ate iowN
Q
r
a
ow
-
IL
Im
�
I
coo
c
o
}0)..�
of
tn
W
in
w
Icc
'3 t
_ _L
k -'k ".i
r-
r;:
*�.swb
i+r
,4-1
VIM
I
III
b
4Y
if
[7
" �1
I AD
scus
Ate iowN
DRAWN^
r
As
D+►n
-
y�H�EE
��4
OF: 3-,
[7
" �1