Loading...
Ord. No. 25-83-1185ORDINANCE NO.?5-ft3-llftfi ANORDINANCEOFTHECITYOFSOUTHMIAMI, FLORIDA,AMENDING SECTION 7-3 OF CHAPTER 7 OFTHE CITYCODE BY INCREASING THE httS hUR BUILDING,PLUMBING,ELECTRICAL,MECHANICAL AND SIGN PERMITS,ESTABLISHING THE CONDITIONS AND AMOUNT FOR QUADRUPLE FEES,REINSPECTION FEES AND OTHER FEES,REPEALING ALL ORDINANCES IN CONFLICTTHEREWITHANDPROVIDINGWHENTHIS ORDINANCE SHALL TAKE EFFECT. BE IT ORDAINED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTHMIAMI,FLORIDA: Section 1.That Section 7-3 nf Chanter 7of the City Code be, and the same 1s hereby amended to read as follows: Section 7-3.Building,Plumbing,Electrical,Mechanical and Sign Permits and Fees. The Building Department of the City shall Issue all building and other permits prescribed 1n said code,collect the fees prescribed herein and make the necessary Inspections: (A)BUILDINGPERMIT FEES: (Fees listed here do not Include plumbing,electrical or mechanical installations.) (1)NEWBUILDINGAND/ORADDITIONS: For each 100 sq.ft.or fractional part of floorarea $6.25 Minimum fee 30.00 Except that for buildings for storage and Industrial uses ~of the^SroupEana^r——**~~^^~-~~-~~~«»n~~.— Occupancies as defined In the South Florida Building Code,the fee shall be: For each 100 sq.ft.or fractional part of floor area up to 20,000 sq.ft 6.25 For each additional 100 sq.ft.,or fractional part of floor area thereafter 4.25 Minimumfee 25.00 Except that for greenhouses and buildings for agricultural uses (non-residential)when locatedonthepremisessoused,screen enclosures and trailer additions: For each 100 sq.ft.or fractional part offloorarea 5.25 Minimum fee ''25.00 (2)NEW CONSTRUCTION OTHER THAN AS SPECIFIED HEREIN: (WATER TOWERS,PYLONS,BULK STORAGE-TANK FOUNDATIONS,SEA WALLS,BULKHEADS,UNUSUAL LIMITED-USE BUILDINGS,FREE-STANDING RIGID CANOPIES,MARQUEES ANDSIMILAR CONSTRUCTION) For each $1,000 of estimated cost or fractional part 5.50 Minimum fee 20.00 i 1 (Except for each service station underground storage tank and each approved fallout shelter whichconforms to the specifications established by the Civil Defense and Mobilization Agency andtheSouthFlorida Building Code) For each $1,000 of estimated cost or fractional part $ Minimum fee (3)ALTERATIONS AND REPAIRS TO BUILDINGS AND OTHER STRUCTURES: Upto$1,000ofestimatedcostor fractional part Foreachadditional$1,000of estimated cost or fractional part *:...... Interior completion of space in new building: While under prime contractor. Each additional $1,000 over first $1,000 .... Forfirst $1,000 , (4)INSTALLATION OF EXTERIOR OPERABLE WINDOWS AND EXTERIORSLIDINGGLASSDOORSINNEWBUILDINGS OR ADDITIONS EXCEEDINGTWO STORIES IN HEIGHT ANDTHEINSTALLATION,ALTERATIONANDREPAIR OFSUCHWINDOWSANDDOORSIN EXISTING BUILDINGS OF ANY HEIGHT,AS FOLLOWS: New installation or replacement for each --••----—wlndoV^oE door unit-up-to the fIrst^•m—l-*...,:.— 100 units* For each additional unit Minimum fee *Unit is the opening between structural columns. (5)INSTALLATION OF CURTAIN WALLS,INCLUDING WINDOWS ANDDOORSTHEREINANDTHE ALTERATION,REPAIROR REPLACEMENT OF STORE FRONTS AND SIMILAR FIXED GLASS: For each additional 100 sq.ft.or fractional part thereof .... Minimum fee -2- 5.50 20.00 15.00 7.50 7.50 15.00 2.00 1.00 15.00 6.25 20.00 1 (6)MOVING BUILDINGS OR OTHER STRUCTURES: ..a $60.00Perbuildingorstructure For each 100 sq.ft.or fractional part thereof (does not include cost of new foundation or repairs to building or g ^ structure).... 45.00 Minimum fee (7)CONCRETE SLABS:(OTHER THAN PAVING) (Where separate installation not covered by prior permit) For first 1,000 sq.ft.or fractional ^SQ part thereof For each additional 1,000 sq.ft.or ^g ^ fractional part thereof 20.00 Minimum (8)PAVING: (On other than public rights-of-way) For first 1,000 sq.ft.or fractional part of area 15.00 For each additional 1,000 sq.ft.or &^ 10.00 Driveway Aprons Asphalt paving for driveway (Swale only)....12.50 Area Drains (Under drives -not in ^4 oo right-of-way) (9)ROOFING:(Including re-roofing) For first 2,000 sq.ft.or fractional part ^qq ofarea For each additional 1,000 sq.ft.or 1Q 00 additional part of area (10)FENCES AND/OR WALLS: For each 100 lineal t> 15.00 For each additional 100 lineal feet or ?5Q fraction thereof Temporary Fences 15.00 -3- 1 (11)AWNINGS AND CANOPIES: For first $1,000 of estimated cost $15.00 For each additional $1,000 or fractional part thereof 7.50 Utility Sheds 15.00 (12)SWIMMING POOLS: For the first 20,000 gallon capacity or fractional part thereof 50.00 For each additional 1,000 gallon capacity or fractional part thereof 5.00 (13)TEMPORARY PLATFORMS AND TEMPORARY BLEACHERS TO BE USED FOR PUBLIC ASSEMBLY: For each 100sq.ft.or fractional part of platform area 15.00 For 100 lineal feetor fractional part of seats..7.50 (14)DEMOLITION OF BUILDINGS: Forthefirst 1,500 sq.ft.or fractional partoffloorarea 30.00 For each additional 1,000 sq.ft.or fractional partoffloorarea 7.50 Minimum fee 25.00 (15)DEMOLITION OF SIGMSl-FENCES AND7-QR WALLS AND STRUCTURES OTHER THAN ABOVE: For each $100 or fractional part of estimated cost up to $1,000 5.00 For each additional $1,000 or fractional part of estimated cost •2.50 Minimum fee 20.00 (16)COMPLETION PERMIT FEE: (Tobechargedonlywhenworkhas commenced and previous permit expired) For first $1,000 of estimated cost ........25.00 For each additional $1,000 or fractional partof estimated cost 12.50 .4. t\:r.i'rvr."i..«*. (B)PLUMBING PERMIT FEES: (1)ROUGHING-IN OR PLUGGED OUTLETS FOR: BATH TUBS,CLOSETS,DOCTORS,DENTISTS AND HOSPITAL STERILIZERS,AUTOCLAVES, AUTOPSY TABLES AND OTHER FIXTURES, APPURTENANCES OR OTHER APPLIANCES HAVING WATER SUPPLY OR WASTE OUTLET, OR BOTH,DRINKING FOUNTAINS,FIXTURES DISCHARGING INTO TRAPS OR SAFE WASTE PIPES,FLOOR DRAINS,LAUNDRY TUBS, LAVATORIES,SAFE WASTE PIPES,SHOWERS, SINKS,SLOP SINKS,URINALS: For first roughing-in or plugged outlet $4.00 For each additional outlet 4.00 Fixtures set on new roughlng-in or plugged outlets or replaced onold roughing-in: First fixture 4-00 Each additional fixture 4.00 (2)SEPTIC TANKS,SETTLING TANKS,GAS AND OIL INTERCEPTORS,GREASE TRAPS AND SOAKAGE PITS: (Including dralntile forsame) 1,200 gallon capacity or less 20.00 Over 1,200 gallon capacity 25.00 Each Septic Tank Drainfield Relay: __First 3^00 sqwflye jEeftEr t..t ?«?t ?,«,..*«*•*,--15.00 Each additional 100 square feet or fractional part thereof 5.00 Septic Tank Destruction (Where being abandoned)15.00 (3)SEWER: Each building storm sewerandeach building sewer where connection is made toa septic tank,toa collector lineorto an existing sewerortoa city seweror soakage pit or to a building drain outside a building 15.00 SEWER REPAIRS: Up to $100.00 10.00 Over$100.00(eachadditional $100).5.00 SEWER CAPPING 12.50 -5- n 1 (4)WATER DRAINAGE: RAIN WATER ROOF INLET (Each)$4.00 AREA,YARD,SIDEWALK OR RAINWATER DRAIN FOR WHICH NO OTHER FEE IS PROVIDED: Catch Basin 5.00 Each inlet 2.50 Soakage pits(Upto200cu.ft.)10.00 Over 200 cu.ft.(Each additional 200 cu.ft 5.00 Gas &Oil Intercepter 10.00 (5)CONDENSATE DRAIN: Per outlet 4.00 (6)WATER PIPING: Water service connection toa municipal or private water supply system (for first meter on each lot)10.00 Additional meter on same lot 5.00 Water connection to or outlets for appliance or installations not covered by fixtures orotherpermit .....5.00 Irrigation system and underground sprinkler system,etc 15.00 Solar waterheater installations or repairs ....10.00 ~..-^SolLUT-waturhear«r booster connection ,.....-~»~r —7.50* Swimming pool piping installations,not including wells 12.00 Water connection to pool .5.00 Swimming poolpiping replacement or repair work (each Job).Feeonlyfor jobs costing more than $25.00 (material and labor)unless hydraulic orpipingsystemonlesserjob affected 10.00 Repairs to water piping 10.00 SwimmingPool Heater 5.00 (7)WELLS: All wells 15.00 (8)MINIMUM PLUMBING PERMITFEE 20.00 -6- 1 (9)NATURAL GAS &LIQUIFIED PETROLEUM: Forthe first outlet (including cylinders and regulators)*5.50 For each additional outlet 3.00 For the first appliance (does notinclude warmairheating units)(SeeFeeSectionD (2)for heating)4-0° For each additional appliance or replacement....4.00 For first meter 10.00 For eachadditional meter 5.00 5.00 For change from master to an individual meter For majorrepairsto gas pipewhereno fixturesor appliance installationis involved 3.75 L.P.Gas tanks -Underground &Above 10.00 Change of Company-(no additional appliances or outlets)7.50 MINIMUM PERMIT FEE 20.00 (10)WATERTREATMENT PLANTS,PUMPING STATION, SEWAGE TREATMENT PLANT AND LIFT STATIONS: Water treatment plant (Interior plant piping).50.00 Sewage treatment plant (Interior piant^rping)".'""..50.00 Lift station (Interior station piping)50.00 (11)WATERANDGAS MAINS:(Onprivateproperty and other than public utility easements) Minimum fee per job 15.00 (12)STORM AND SANITARY UTILITY AND/OR COLLECTOR LINES:(On private property other than public utility easements) Minimum fee per job 15.00 (13)(a)TEMPORARY TOILETS -WATER BORNE For each Installation 7.50 (b)CHEMICAL TOILETS Foreach installation 7.50 -7- (14)MISCELLANEOUS: Siphon-breakers on old installations, required when repair of unapproved water closet is made,each $7.50 (C)ELECTRICAL PERMIT FEES: (1)ROUGH WIRING OUTLETS:(Light receptacle, switch,sign and also telephone and other low voltage outlets) 1 through 10 outlets 8.00 For each additional outlet ••..«85 (2)SERVICES:(The following fees shall be charged for each service and for each subfeed in new installations only.No charge will be made for aubfeeds In existing installations) Temporary for construction 10.00 100 ampere and under 6.00 Over 100 ampere to 200 ampere 7.00 Over 200 ampere to 400 ampere 8.00 Over 400 ampere to600 ampere 9.00 Over 600 ampere to 800 ampere 10.00 For each additional 100 ampere (over 800 ampere)1.60 Service repair and/or meter change 5.00 (3)SWITCHBOARDS:(By amperes,sameas "SERVICES" shown in Item C-2 above) (4)EQUIPMENT OUTLETS OR PERMANENT CONNECTIONS: n Compactor 3.25 Range,3.25 Range top 3.25 Oven 3.25 Waterheater 3.25 Spaceheater 3.25 WashingMachine 3.25 Dryer 3.25 Fan (with fractional HPmotor)3.25 GarbageDisposal •3.25 Dishwasher 3.25 DeepFreezer 3.25 Refrigerator 3.25 Time Clock 3.25 (Motors) Each upto1HP 3.25 Each over 1HP through 3HP 4.30 Each over 3HP through 5HP 5.50 Eachover5HP through 8HP 6.60 -8- n Each over 8HP through 10HP $7.70 Each over 10HP through 25HP 14.80 Each over 25HP through 100HP 16.50 Each over 100 HP 22.00 (Air conditioners -electrical work except wall andwindow units -per ton 6.00 Window through wallunits 5.00 (5)MACHINE OUTLETS OR PERMANENT CONNECTIONS: X-Ray -portable (Dentist)10.00 X-Ray -Stationary (Doctor 15.00 Diathermy 10.00 (6)GENERATORS AND TRANSFORMERS,COMMERCIAL HEATING EQUIPMENT AND STRIP HEATERS: Each up to 5 KVA or KW 5.50 Each generator or transformer over 5KVAorKW through 10KVAorKW 8.25 Each generator or transformer over 10KVAorKWthrough15KVAorKW 11.00 Eachgeneratorortransformerover15KVA or KW through 20 KVA or KW 16.50 Eachgeneratoror transformer over20KVA orKW through 25 KVA orKW 22.00 Eachgeneratorortransformerover25KVA orKWor over 33.00 Generators and transformers,where located onthe same floor,feefor largest,plus $1.00 for each additional. Tn—i^mRrmewTN^— Up to 25 amperes 5.00 Over 25 amperes to 50 amperes 7.50 Over 50 amperes,$3.50 plus 2.50 For each additional 50 amperes or fractional part thereof (8)SPECIALPURPOSEOUTLETS:(Commercial) Popcorn,doughnut,drink machines,coin music machines,toasters,coffee urn, deep fryer,telephone booths,refrigerators, display cases,etc.,each 5.00 Auto Painting,Spray Booth -Bake Ovens,each...30.00 (9)SIGNS: First100bulbs 11.00 Each additional 100bulbsor fraction thereof ...6.50 Transformers (Neon)orballast,forfirst 5.90 -9- n Each additional transformer or ballast $3.50 Time clock 3.50 Sign repairs,connection and reconnection 11.00 (10)FIXTURES: Lights -1 through 10 sockets 5.50 1 through 10 fluorescent tubes 5.50 Each additional -60 Light fixture heads,each 6.50 Floor lights,each 5-50 (11)COMBINATION: Light fixtures and outlets up through 10-one inspection Parking lights,each (12)STREAMERS OR FESTOON LIGHTS: First 10 lights or less Each additional 10 or less (13)PLUGMOLD: First 25 feet Each 5 feet thereafter (14)TEMPORARY WORK ON CIRCUSES,CARNIVALS,ETC.: 5.50 5.50 5.50 5.50 5.50 2.50 ""Tqu^pneTn^Po'»«-t"*rf*rT"i ..—,->.-6~r00 ServiceasperItem G(2) Outlets as per Items G(l)and (13) Minimum fee 50.00 (15)MINIMUM PERMIT FEE INCLUDING REPAIR WORK NOT ELSEWHERE CLASSIFIED 20.00 (16)FIRE DETECTION,LIFE SAFETY SYSTEMS,INTERCOM Installation,Central System 15.00 Head or target area,each 2.00 Smoke Detector,each 2.00 2.00Speaker,each Bell alarm station,each 2.00 Proximity Station,each 2.00 -10- n (17)MASTER TELEVISION AND RADIO RECEIVING ANTENNAI: TV and radio antenna devices,wall outlets, suppressors,splitters,lightning arrestors, receivers,input devices,audio amplifiers, ground connections,etc.: 1 through 5 devices $10.00 Each additional device .75 ID)MECHANICAL PERMIT FEES: (1)AIR CONDITIONING AND REFRIGERATION: (Includes all component parts of the system except that water,electric and gas lines and connections are fee'd separately) (Where BTU rating isnot known,substitute one horsepower for one tonor 12,000 BTU's for one ton) For each ton capacity or fractional part thereof 6.00 Duct work only: For the first $1,000 of estimated cost or fractional part thereof 11.00 Each additional $1,000 of estimated cost or fractional part thereof 6.00 Minimum fee 15.00 (2)FURNACES AND HEATING EQUIPMENT,INCLUDING COMMERCIAL DRYERS,OVENS AND OTHER FIRED OBJECTS NOT ELSEWHERE CLASSIFIED (includes all component parts ofthe system except fuel and electrical lines): For the first 200,000 BTU per hour or fractional part 11.00 For each additional 100,000 BTUper hour orfractional part 6.00 Except for unvented spaceheaters and vented wall heaters (no duct work): Firstsuchunit 11.00 Foreachadditionalsuchunit 6.00 -11- 1 (3)ELEVATORS,ESCALATORS ANDOTHERLIFTINGAPPARATUS: Theseservices provided by Metropolitan Dade Countyandsubjecttocountypermitfees. (4)AMUSEMENT RIDESANDDEVICES: For each portable or temporary unit $30.00 Foreachpermanentunitinstalledoraltered...150.00 Semiannual inspection (permanent installation only): Foreachrideordeviceatanyone location ..10.00 (5)BOILERS AND PRESSURE VESSELS: These services provided by Metropolitan Dade County and subject to county fees. (6)FIRE SPRINKLER SYSTEM Fire sprinkler system connection to city water 15.00 Water supply to firepump 15.00 Per sprinkler head .75 Minimum permit fee 20.00 Fire control system,including standpipe, Siamese connections,and pumps: Each standpipe 11.00 Each hose rack 5.50 Standby for emergencypotablewatersupply outlet 11.00 .__«_.-—............ CO*and Dry Powder Systems for estimated cost up to $1,000 6.00 For each additional $1,000 or fractional part thereof 3.00 (7)STORAGE TANKS FOR FLAMMABLE LIQUIDS 25.00 (8)INTERNAL COMBUSTION ENGINES: Stationary 25.00 (9)OTHER FEES: Pressure and process piping,sheet metal and duct work and other mechanical lines: For estimated costsupto $1,000 11.00 For each additional $1,000 or fractional partthereof 5.50 -12- (E)SIGN PERMIT FEES: (1)TEMPORARY SIGNS: (a)Special Sales for new business siqns (30 days only)$20.00 (b)Construction on the premises (during active construction),or Real Estate "For Sale" signs larger than six (6)square feet 20.00 (2)POINT OF SALE SIGNS: (OCCUPANT USE,PRODUCTS SOLD) (a)Detached sign 25.00 (b)Flat sign 20.00 (c)Hanging sign 20.00 (d)Project Identification sign 20.00 (e)Projecting sign 20.00 (f)Low profile landscape sign 25.00 (g)Window or door Identification sign 20.00 (h)Name plate signs N/C (F)QUADRUPLE FEES,REINSPECTION FEES ANDOTHER: (1)Quadruple Fees: Whenworkforwhicha permit 1s required1scommenced without the obtaining ofa permit,the fees as specified herein shall be quadrupled,and,iftheworkto be done 1s valued at $1,000 ormore,an additional feeofFive HundredDollars($500.00)shall also be paid.Likewise, forsignswithavalueof less than$1,000the fees as specified herein shallbe quadrupled,andan additional fee —-—of—$^OOr"Sha44-be-pa44^uTi>e,payffleivtH>4^^<iiHrquadruple_fee,a6~— wellasanadditional fees,shallnotrelieveanyperson,firm, or corporation fromfully complying withalloftherequire mentsofall applicable regulationsandcodes,norshall1t relieve them from being subject toanyofthe penalties set forth therein. (2)REINSPECTION FEES: When extra Inspection trips are necessary due to: a.Wrong address being given on call for Inspection; b.Prior rejection of work due to faulty construction; c.Work not being ready for inspection at time specified; d.Failure to call for final or other Inspections; e.Required corrections not being made or completed at time sped fled. A fee of twenty ($20.00)dollars for each such reinspectlon maybecharged. The payment of reinspectlon fees may be required before any further permits will be issued to the person or firm owning -13- n same,andfurtherinspectionsmaybe refused untilpaymentof reinspection feeshavebeenmade. Reinspectionofexistingbuildingsby all divisionsto determine compliance with the SouthFloridaBuildingCode,butnot annual inspections as required by 305.1(d)ata fee of twenty-five ($25.00)dollars. Section 2.All Ordinances orpartsof ordinances in conflict therewith be,andthesameare hereby repealed. Section 3.This ordinance shalltake effect immediately atthe timeofitspassage. PASSED and ADOPTED this 16th day of August »1983. APPROVED: ATTEST: CITY Clerk vsssz Passedon1st Reading:7/26/83 Passed on 2nd Reading:8/16/83 MAYOR -14-