Ord. No. 21-83-1181ORDINANCE NO.21-83-1181
AN ORDINANCE OF THE CITY OF SOUTH MIAMI,FLORIDA,
AMENDING THECODEOF ORDINANCES BYADDINGTHERETO
SECTIONS TO BE NUMBERED SECTION 7-12 AND 7-13,
THEREBY MAKING IT UNLAWFUL TO CONSTRUCT UTILITIES
OR PUBLIC WORKS IN RIGHT OF WAYS WITHOUT PERMIT;
ESTABLISHING FEE SCHEDULES FOR SAID PERMITS;
PROVIDING FOR SEVERABILITY AND PROVIDING FORAN
EFFECTIVE DATE.
BE IT RESOLVED BY THE MAYOR AND THE CITY COMMISSION OF THE CITY OF SOUTH
MIAMI,FLORIDA:
Section 1.That Section 7-12.and 7-13 of the Code of Ordinances of the City
of South Miami,Florida,read as follows:
Section 7-12.It shall be unlawful for any person,corporation,
partnership,association or other legal entity to construct
utilities or other public works in canal,road and/or street
right-of-ways and easements in the City of South Miami without
first having obtained a permit therefor.
Section 7-13.Utility permit fees shall be paid to the City of
South Miami,Florida:
A (1)For installation or repair of sanitary and storm sewers
water!ines,gas lines,and other underground utilities:
For 100 lineal feet or less $30.00
For each additional 100 lineal feet or fraction 15.00
(2)For slab covered trenches,consisting of catch basin
and seepage trench or French drains;
For the installation consisting of one or two catch
basins,and seepage trench or saokage pit of lengths
nottoexceed100 lineal feet 30.00
for each additional 100 lineal feet or fraction 15.50
(3)For installation of poles or down guys for overhead
utilities:
For each pole or unit 11.50
(4)For construction or replacement of sidewalks,curb
and gutter:
For 100 lineal feet or less 30.00
For each additional 100 lineal feet or fraction 15.00
(5)For construction of driveways:
For driveway width of 20 feet or less 15.00
For driveway width greater than 20 feet but
less than 40 feet (each driveway)25.00
For driveway width greater than 40 feet (each drive)50.00
(6)For construction of street pavements:
(a)One lane to two lane pavements
(width of pavement 0 to 24 feet)
For100linealfeetofless 75.00
Foreach additional lineal footorfraction 35.00
(b)Three or more lanes of pavement
(aggregate width greater than 24 feet)
For100 lineal feet or less 100.00
Foreach additional 100 lineal feetorfraction 50.00
(7)For paving or parkways and shoulders:
For100 lineal feetor less 50.00
Foreach additional 100 lineal feet or fraction 25.00
(8)For construction of curb separators:
For100 lineal feetorless 30.00
Foreach additional 100 lineal feetorfraction 15.00
(9)For erection of street name signs:
Each sign 10.00
(10)For construction of bridges:
For bridge roadway area of 1000 square feet or less 250.00
For each additional 100 square feet 50.00
(11)For installation of permanent-type traffic barricades,
guardrails and guideposts:
Foreach100linealfeetorless 30.00
(12)For construction of street or driveway culvert
crossing of canals an drainage ditches (not
controlled by DERM):
For each lineal foot pipe 2.00 per
or fraction of
B Penalty Fees:
When work for which a permit is required is commenced prior to
obtaining a permit,a penalty fee will be imposed.The penalty fee
will be $500.00 plus quadruple the original permit fee.
Payment of such penalty fee shall not relieve any person,firm,or
corporation from fully complying with all of the requirements of all
applicable regulations and codes,nor shall it relieve them from
being subject to any of the penalties therein.
Section 2.Ordinances and parts of Ordinances in conflict herewith be,and the
same are hereby repealed.
Section 3.This Ordinance shall take effect immediately at the time of its passage,
PASSED AND ADOPTED this 2nd day of August ,1983.
APPROVED:
ATTEST:
Passed on 1st Reading:7/19/8V
Passed on 2nd Reading:8/02/83
-2-
MAY0R