Loading...
07-421-010DEMOLITION NOTES IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO REMOVE EXISTING EQUIPMENT AS REQUIRED TO ACCOMPLISH THE NEW WORK AS SHOWN OR REASONABLY IMPLIED. THE MECHANICAL ANDLELECTRICAL WORKNSHOWNCONTTHEUOTH §RPDRAAWIING§ OFRTHISOSETTTON, DETERMINE THE EXTENT OF DEMOLITION REQUIRED. WHEN REMOVING ELECTRICAL EQUIPMENT AND SYSTEMS ALL PRECAUTIONS SHALL BE TAKEN TO PREVENT STRUCTURAL DAMAGE TO THE BUILDING. tHE CONTRACTOR SHALL COORDINATE INSTALLATION OF ANY STRUCTURAL SUPPORTS REQUIRED. TEMPORARY OR PERMANENT. THE CONTRACTOR SHALL EXERCISE CARE SO THAT ONLY THAT CONSTRUCTION INDICATED OR REASONABLY IMPLIED TO BE REMOVED SHALL BE DEMOLISHED. THE EXISTING CONSTRUCTION TO REMAIN SHALL BE LEFT INTACT AND UNDAMAGED. THE CONTRACTOR SHALL PROTECT ALL ADJACENT SURFACES AND MATERIALS AS REQUIRED TO PREVENT DAMAGE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL DEMOLITION AND CONSTRUCTION DEBRIS GENERATED FROM WORK ON ALL FLOORS. TAKING CARE TO PREVENT EXCESSIVE LOADING OF FLOOR ASSEMBLIES. THE CONTRACTOR SHALL MAINTAIN CONTINUITY OF CIRCUITS WHERE EXISTING EQUIPMENT IS TO BE REMOVED AND DOWN STREAM DEVICES MAY BE EFFECTED. THE CONTRACTOR SHALL COORDINATE ALL POWER INTERRUPTIONS WITH OWNER. SEE SPECIFICATIONS. WHEN EXISTING ELEMENTS OF ELECTRICAL EQUIPMENT AND SYSTEMS ARE REMOVED ALL REMAINING OPENINGS IN THE SLAB AND WALLS SHALL BE FILLED IN BY THE CONTRACTOR. REMOVE ALL MI SCELLANEOUS FIXTURES AND EQUIPMENT RETAINING ITEMS TO BE IDENTIFIED FOR SALVAGE AND STORAGE AT THE DIRECTION OF THE OWNER. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION TO MAINTAIN THE INTEGRITY AND OPERATION OF EXISTING LIFE SAFETY AND EMERGENCY EGRESS EQUIPMENT. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION TO MAINTAIN ACCESS TO ALL MEANS OF EGRESS CORRIDORS, DOORWAYS AND STAIRS. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION TO PERMIT EFFECTED AREAS TO CONTINUE TO FUNCTION TO THE GREATEST EXTENT POSSIBLE. THIS EFFORT SHALL INCLUDE SCHEDULED COORDINATION WITH OWNER OF ELECTRICAL SHUTDOWNS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL FLUORESCENT AND HID TYPE LAMPS AND PROPER DISPOSAL OF SAID LAMPS AND SHALL PROVIDE VERIFICATION OF LAMP DISPOSAL TO THE OWNER UPON REQUEST. REMOVE ALL LIGHTING FIXTURES RECEPTACLES AND DEVICES IN THE AREA OF DEMOLITION AND PULL ALL CIRCUITS BACK TO NEXT ACTIVE DEVICE OR SOURCE OF POWER PROVIDE PANEL SCHEDULES TO THE ENGINEER INDICATING THE CIRCUITS MADE SPARE BY DEMOLITION AND THE EXISTING CIRCUITS THAT REMAIN ACTIVE. IT SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION MANAGER (CM), GENERAL CONTRACTOR (GC), AND THE SUB - CONTRACTORS (SC) TO STUDY ALL THE DRAWINGS AND DETAILS SO THAT THE INSTALLATION OF ALL NEW WORK CAN BE FULLY COORDINATED. THE CM, GC, AND SC SHALL VISIT THE SITE, INCLUDING DOING AN ABOVE CEILING INSPECTION, DURING BIDDING TO SATISFY HIM /HER SELF THAT ALL PROVISIONS HAVE BEEN MADE FOR ALL ASPECTS OF THIS PROJECT. IF DISCREPANCIES EXIST BETWEEN DRAWINGS AND /OR SITE CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE GENERAL CONTRACTOR IN WRITING PRIOR TO BID DUE DATE. FAILURE TO DO SO WILL NOT BE ALLOWED AS A BASIS FOR ADDITIONAL COMPENSATION TO CORRECT A DIFFICULTY OF DIFFERENCE FROM CONDITIONS INFERRED OR INDICATED ON THE DRAWINGS. DRAWINGS ARE DIAGRAMMATIC AND DO NOT INDICATE ALL DEVICES TO BE DEMOLISHED. CONTRACTOR SHALL VISIT JOB SITE PRIOR TO BID TO FIELD CONFIRM ALL REQUIREMENTS. LIMIT OF DEMOLITION DISCONNECT AND REMOVE ALL EXISTING ELECTRICAL FIXTURES, POWER AND SYSTEMS DEVICES, FCU'S POWER CONNECTIONS, ETC. AND HERE OR ON OTHER DRAWINGS. REFER TO ELECTRICAL SPECIFICATION SECTION 16010 FOR OTHER REQUIREMENTS. ALL EXISTING RACEWAYS PASSING THROUGH THIS AREA FEEDING OTHER AREAS CONNECTIONS TO ALL EXISTING ELECTRICAL EQUIPMENT IN THESE AREAS UNLESS OTHERWISE NOTED SHALL REMAIN INTACT AND OPERATIONAL. PROVIDE SUPPORTS FOR ALL EXISTING RACEWAYS IF THEY ARE NOT PROPERLY SUPPORTED. ALL OTHER RACEWAYS SHALL BE REMOVED. GENERAL NOTES: A. ALL EXISTING LIGHT FIXTURES AND FIRE ALARM DEVICES SHALL REMAIN. KEYED NOTES: O RELOCATE EXISTING EXIT SIGN. REFER TO SHEET E -2.1 FOR NEW LOCATION. 2ND FLOOR PLAN - DEMOLITION - PHASE A - ELECTRICAL 0' 2' 4' 8' 16' 24' -' — ` - o O i. s,r' •,• O ', O • iii_ i!L_ :i:�L i i ' i I ro o �Ll/ ................ 1.... . .....! .. W/.............. . ' ::..i :..,v ` $............ VJ/....... ;. Q -1 -017 ❑o 0 0 0 0 0 0 0 ❑ ❑ ❑ ❑ ❑ a Fo ! i I I i I o o 9 a oa000aoo 0 o a a i :............ ; F ; a� IL --hUU,I � • O o ' ❑ ❑ Q a: Efl Fo a a a a l O.. —.._.� I. EXISTING EXISTING I f� I PANEL B PANEL M I I TO REMAIN TO REMAIN ❑o ❑o o a ❑o 0 0 o I� f ❑:: ❑�,.: ❑ooaao o a l U. I ! I i 41 07 - f ! I ' ....................................................................... ............................... F ................................................................................................................... ............................. +I ! ............. m -rg O� \ ............ ® ® F --- bX aI - - - f i ....... y:,. ..... .. ...... ................: II - ! I ' I : : I • i — — -- - : ` f', .........., i , i• i : 1 I NHAWa-DADE, COUNTY kIRF, PARTYM NT F DEMOLITION LEGEND L DESCRIPTION EXISTING TO REMAIN EXISTING TO BE REMOVED —� REMOVE EXISTING TO THIS POINT BERMELLO AJAMIL & PARTNERS, INC. Architecture Engineering Planning Interior Design Landscape Architecture 2601 South Bayshore Drive 10th Floor Miami, Florida 33133 (305) 859 -2050 Fax (305) 860 -3700 3 ENGINEER: ENGINEER INFORMATION Sm th SS11 Secran Reid, Inc. 600 West Hillsboro, Suite 300 Deerfield Beach, FL 33441 (954) 421 -1260 FAX- (954) 421 -1466 www.ssr- inc.com Firm Certification - EB- 0000857 Alfred Eequivel PE - 46863 Bruoe W. Peek PE - 35901 Donald Netinho PE - 48464 Nelson R. Long PE - 52294 John E. Moulder PE - 33200 SSR JOB # 0632086.0 `A`lo. �5E383. •,xrN �l• 1 , REVISIONS: PROJECT NAME: SMH - ADVANCE TOWER OFFICES - 2ND FLOOR PROJECT ADDRESS: 7400 S.W. 62nd Ave. South Miami, Florida 33143 KEY PLAN COMM. NO. 40030.100 SCALE: DATE: OCTOBER 16, 2006 DRAWN: CHECKED: CADD FILE: DRAWING TITLE: 2ND FLOOR PLAN - DEMOLITION - PHASE A - - ELECTRICAL - SHEET NO. E -1.1