Loading...
07-421-003BERMELLO AJAMIL & PARTNERS, INC. Architecture Engineering Planning Interior Design Landscape Architecture 2601 South Bayshore Drive 10th Floor Miami, Florida 33133 (305) 859 -2050 Fax (305) 860 -3700 STRUCTURAL ENGINNER: MEP ENGINEER: MEPENGINEER INFORMATION Smith, Seckman, Reid, Inc. C ONSLTL.TING ENG=N1E]ETZZS 600 West Hillsboro, Suite 300 Deerfield Beach, Florida 33441 Phone(954)421 -1260 Fax(954)421 -1466 ABBREVIATIONS +0 GENERAL NOTES GENERAL DEMOLITION NOTES - --- = - - DRAWING INDEX �RCHITEtiTIJF�E = A AC ACOUSTICAL L LAV LAVATORY 01. ALL WORK TO BE PERFORMED UNDER THIS CONTRACT SHALL COMPLY WITH CODES LISTED ON SHEET LS -1, THE FLORIDA 01. CONTRACTOR SHALL SUBMIT A SCHEDULE INDICATING PROPOSED SEQUENCE OF OPERATIONS FOR SELECTIVE DEMOLITION ADJ ADJUSTABLE LAM LAMINATED Ira BUILDING CODE (LATEST EDITION), CITY LABOR LAWS, CITY ORDINANCES CITY /COUNTY ZONING CODES, NATIONAL WORK TO OWNER'S REPRESENTATIVE AND ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO START OF WORK. INCLUDE - - AFF ABOVE FINISH FLOOR LT LIGHT ELECTRICAL CODE, N.F.P.A. 101, O.S.H.A., A.D.A. & ALL OTHER APPLICABLE CODES, RULES AND REGULATIONS. COORDINATION FOR SHUTOFF, CAPPING, AND CONTINUATION OF UTILITY SERVICES AS REQUIRED, TOGETHER WITH DETAILS COVER AGG AGGREGATE LTWT LIGHT WEIGHT FOR DUST AND NOISE CONTROL PROTECTION. INCLUDE SCHEDULE OF OPERATIONS TO INCLUDE HOURS PER DAY AND A.C. AIR CONDITIONING LF OR LIN FT LINEAR FEET DAYS OF WEEK TO BE WORKED. AO. INDEX ALUM ALUMINUM 02• THE CONTRACTOR SHALL FAMILIARIZE HIM/HERSELF WITH THE PROJECT THROUGH INSPECTION OF THE SITE, THE _ r B BM BEAM M MAT MATERIAL DRAWINGS AND SPECIFICATIONS, SO AS TO THOROUGHLY UNDERSTAND THE NATURE AND SCOPE OF THE WORK. ANY - PROVIDE DETAILED SEQUENCE OF DEMOLITION AND REMOVAL WORK TO ENSURE UNINTERRUPTED D1.0 DEMOLITION PLAN BILK BLOCK ML MATCH LINE AMBIGUITIES OR CONFLICTS WITH THE CONSTRUCTION DOCUMENTS SHALL BE REPORTED TO THE ARCHITECT IN WRITING PROGRESS OF OWNERS ON SITE OPERATIONS. BLKG BLOCKING MAX MECH MAXIMUM MECHANICAL PRIOR TO SUBMISSION OF BID. - COORDINATE WITH OWNER'S CONTINUING OCCUPATION OF PORTIONS OF EXISTING BUILDING AND WITH A1.0 NEW CONSTRUCTION FLOOR PLAN -PHASE A BOT BLDG BOTTOM BUILDING MET OR MTL METAL 03. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL REQUIRED PERMITS TO CARRY OUT THE WORK DESCRIBED OWNER'S PARTIAL OCCUPANCY OF COMPLETED REFURBISHED AREA. A2.0 EXISTING CEILING PLAN MIN MINIMUM IN THE CONSTRUCTION DOCUMENTS. ALL REQUIRED PERMITS SHALL BE OBTAINED PRIOR TO THE COMMENCEMENT OF BLKHD BULKHEAD MISC MISCELLANEOUS WORK. 02. CONTRACTOR SHALL SUBMIT PHOTOGRAPHS OR VIDEO OF EXISTING CONDITIONS OF STRUCTURE SURFACES, EQUIPMENT, AND A3.0 MILLWORK ELEVATIONS & SECTIONS C CAB CABINET MACH MANUF MACHINE MANUFACTURER 04. OMISSIONS: IN THE EVENT THAT CERTAIN FEATURES OF THE CONSTRUCTION ARE NOT FULLY SHOWN ON THE DRAWINGS, ADJACENT IMPROVEMENTS THAT MIGHT BE MISCONSTRUED AS DAMAGE RELATED TO REMOVAL OPERATIONS. CONTRACTOR SHALL ALSO SCHEDULE A SITE VISIT TO INCLUDE OWNER'S REPRESENTATIVE AND ARCHITECT FOR VERIFICATION OF THE A4.0 WALL TYPES & SCHEDULES CARP CLG CARPET CEILING N NOM NOMINAL THEN THEIR CONSTRUCTION SHALL BE OF THE SAME CHARACTER AS FOR SIMILAR CONDITIONS THAT ARE SHOWN OR NOTED AND SHALL BE INCLUDED AS PART OF THE BID SUBMISSION. WORKING CONDITION OF BUILDING SYSTEMS AFFECTED BY DEMOLITION WORK. FILE WITH ARCHITECT PRIOR TO START OF CEM CEMENT NIC NOT IN CONTRACT WORK. CA CENTER LINE NTS NOT TO SCALE 05. EXISTING ELECTRICAL, MECHANICAL, LIFE SAFETY AND FIRE PROTECTION FIXTURES INCLUDING BUT NOT LIMITED TO, 03. OCCUPANCY: OWNER WILL OCCUPY PORTIONS OF THE BUILDING IMMEDIATELY ADJACENT TO AREAS OF SELECTIVE CER CERAMIC O OFF OFFICE SURFACE/RECESSED LIGHT FIXTURES, LIGHT/EQUIPMENT SWITCHES, H.V.A.C. REGISTERS, THERMOSTATS, ACCESS PANELS, DEMOLITION. CONDUCT SELECTIVE DEMOLITION WORK IN MANNER THAT WILL MINIMIZE THE NEED FOR DISRUPTION OF C.T. CO CERAMIC TILE CLEAN OUT OPNG OPENING INTERCOM SPEAKERS, FIRE ALARM HORNS /STROBES /SWITCHES, HEAT /SMOKE DETECTORS, CONCEALED/ EXPOSED FIRE OWNER'S NORMAL OPERATIONS. ALL REQUESTS MUST BE MADE 72 HOURS IN ADVANCE PRIOR TO DEMOLITION ACTIVITIES CL OR CLOS CLOSET OD OUTSIDE DIAMETER SPRINKLER HEADS AND ASSOCIATED PIPING, DUCTWORK AND ORNAMENTAL FIXTURES ARE TO REMAIN. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL AS REQUIRED OF EXISTING FIXTURES TO ACCOMPLISH DEMOLITION WORK AND NEW THAT WILL AFFECT OWNER'S NORMAL OPERATIONS INCLUDING BUT NOT LIMITED TO LOUD LOISES AND PRODUCTS WITH COL CONC COLUMN CONCRETE OC OH OR OPP.HD. ON CENTER OPPOSITE HAND CONSTRUCTION WORK INDICATED IN THE CONSTRUCTION DOCUMENTS. FURTHER, THE CONTRACTOR SHALL BE STRONG ODORS. MECHANICAL CMU CONCRETE MASONRY UNIT RESPONSIBLE FOR THE REINSTALLATION OF EXISTING FIXTURES IN GOOD WORKING ORDER (TO MATCH ORIGINAL INSTALLATION ) UPON COMPLETION OF REPAIR WORK. 04. CONDITION OF STRUCTURES: OWNER ASSUMES NO RESPONSIBILITY FOR ACTUAL CONDITION OF ITEMS OR STRUCTURES TO CONST CONSTRUCTION P PR PAIR BE DEMOLISHED. CONDITIONS EXISTING AT TIME OF INSPECTION FOR BIDDING PURPOSES WILL BE MAINTAINED BY OWNER CONT CONTINUOUS PASS PASSENGER 06. ALL DIMENSIONS PROVIDED ARE APPROXIMATE, CONTRACTOR SHALL VERIFY DIMENSIONS WITH EXISTING FIELD CONDITIONS. INSOFAR AS PRACTICABLE. HOWEVER, MINOR VARIATIONS WITHIN STRUCTURE MAY OCCUR. CG CORNER GUARD PENT PENTHOUSE CU CUBIC PC PRECAST 05. PARTIAL DEMOL111ON AND REMOVAL- STORAGE OF REMOVED ITEMS ON SITE WILL NOT BE PERMITTED. D DEPT DEPARTMENT Pi PLAS PANEL JOINT PLASTER 07. CONTRACTOR SHALL PROVIDE A MINIMUM 72 HOUR WRITTEN REQUEST TO THE OWNER'S REPRESENTATIVE IN ADVANCE OF ANY ACTIVITY WHICH WILL AFFECT EXISTING BUILDING OPERATIONS. DETERMINE OWNER'S REPRESENTATIVE PRIOR TO 06. PROTECTIONS: PROVIDE TEMPORARY BARRICADES AND OTHER FORMS OF PROTECTION TO PROTECT OWNER'S PERSONNEL DIA DIAMETER POL POLISHED STARTING WORK. AND GENERAL PUBLIC FROM INJURY DUE TO SELECTIVE DEMOLITION WORK. ELECTRICAL DIM DN DIMENSION DOWN PMLD PNL PREMOULDED PANEL 08. CONTRACTOR SHALL PROTECT ALL EXISTING FLOOR SURFACES WITH A MEANS OF CONTAINMENT TO PREVENT SOILING OF A. PROVIDE PROTECTIVE MEASURES AS REQUIRED TO PROVIDE FREE AND SAFE PASSAGE OF OWNER'S PERSONNEL AND GENERAL PUBLIC TO OCCUPIED PORTIONS OF BUILDING. E -0.1 LEGEND, SCHEDULES, & DRAWING INDEX - ELECTRICAL DS DWG DOWN SPOUT DRAWING O QT QUARRY TILE THE FLOOR. IN ADDITION, THE CONTRACTOR SHALL PROVIDE SHEATHING OVER THE FLOOR AT ALL TRAFFIC AREAS AND THOSE AREAS EXPOSED TO EQUIPMENT, SCAFFOLDING AND CONSTRUCTION DEBRIS. B. PROTECT FROM DAMAGE EXISTING FINISH WORK THAT IS TO REMAIN IN PLACE AND BECOMES EXPOSED DURING E -1.1 2ND FLOOR PLAN - DEMOLITION -PHASE A- ELECTRICAL DF DRINKING FOUNTAIN QTM QUARRY TILE MINIATURES 09. ALL WALL /CEILING SURFACES WITHIN THE LIMITS OF CONSTRUCTION ARE TO BE REPAIRED/REPLACED TO MATCH EXISTING DEMOLITION OPERATIONS. E -2.1 2ND FLOOR PLAN -NEW WORK -PHASE A- LIGHTING E E.A. EA EXPOSED AGGREGATE EACH R RAD RADIUS ADJACENT SURFACES, THIS SHALL INCLUDE BUT NOT BE LIMITED TO, WATER AND OR MILDEW DAMAGE, CRACKED C. PROTECT FLOORS /CARPETS WITH SUITABLE COVERINGS WHEN NECESSARY. E -3.1 2ND FLOOR -NEW WORK -PHASE A -POWER EL ELEVATION GRADE) R REINF RISER REINFORCED WALLBOARD, DAMAGED TAPE JOINTS, ETC. ALL DAMAGED WALLBOARD SHALL BE REPLACED. D. CONSTRUCT TEMPORARY ELE ELEVATION FACADE) REQ D REQUIRED 10. ALL STAINED SURFACES ARE TO BE KILZ PRIMER COATED IN ADVANCE OF PAINT FINISH. INSULATED DUSTPROOF PARTITIONS WHERE REQUIRED TO SEPARATE AREAS WHERE NOISY OR EXTENSIVE DIRT OR DUST OPERATIONS ARE PERFORMED. EQUIP PARTITIONS WITH DUSTPROOF DOORS AND SECURITY E -4.1 2ND FLOOR -NEW WORK -PHASE A- SYSTEMS ELEV EQ ELEVATOR EQUAL RF RD ROOF ROOF DRAIN 11. THE CONTRACTOR SHALL PROVIDE A MEANS OF CONTAINMENT TO PREVENT DUST AND DEBRIS MIGRATION TO ADJACENT LOCKS. ALL TEMP. PART. ARE TO BE BEDDED AND RECEIVE ONE COAT OF FINISH PAINT. E -5.1 PARTIAL POWER RISER DIAGRAM & PANEL SCHEDULES EQUIP EQUIPMENT RM ROOM AREAS. CONTRACTOR SHALL NOT COMPROMISE THE EXISTING FIRE/FLAME SPREAD RATINGS OR MEANS OF EGRESS WITHIN E. TEMPORARY PARTITIONS ARE TO BE ANCHORED WITH TWO -WAY TAPE, SCREWS, NAILS, ETC. WILL NOT BE E -6.1 ELECTRICAL SPECIFICATIONS EXIST EXISTING RO ROUGH OPENING THE CONSTRUCTION AREAS AND ADJACENT AREAS AFFECTED BY CONSTRUCTION ACTIVITIES. PERMITTED. EXP.JT. OR EJ EXPANSION JOINT REFL OR REF REFLECTED EXP EXPOSED 12. THE CONTRACTOR SHALL MAINTAIN ALL COMPONENTS FOR MEANS OF EGRESS FREE OF OBSTRUCTIONS AND F. REMOVE PROTECTIONS AT COMPLETION OF WORK. EXT EXEC EXTERIOR ELECTRICAL S SECT SECTION ACCESSIBLE AT ALL TIMES. G. ROOMS UNDER CONSTRUCTION MUST BE BROUGHT TO A NEGATIVE PRESSURE BY USE OF SUITABLE FANS EQUIPED FIRE PROTECTION SHT SHEET 13. THE CONTRACTOR SHALL MAINTAIN ALL LIFE SAFETY AND FIRE PROTECTION SYSTEMS OPERATIONAL AT ALL TIMES. WITH HEPA FILTRATION UNITS EXHAUSTING TO THE EXTERIOR OF THE BUILDING.. F FT FEET SHT MET OR SM SHEET METAL FIN FINISH SIM SIMILAR 14. CONTRACTOR SHALL MAINTAIN ALL EXISTING FIRE RATINGS AT NEW CONSTRUCTION. H. CONTRACTOR SHALL REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT FE FIRE EXTINGUISHER SQ SQUARE CONTAMINATION OF DUCT SYSTEM. FEC FIRE EXTINGUISHER CABINET STD STANDARD 15. CONTRACTOR SHALL MAKE ALLOWANCES FOR ALL WORK WHICH IMPACTS THE DAILY OPERATIONS OF THE FACILITY AND FHC FIRE HOSE CABINET SS STAINLESS STEEL WHICH MUST BE ACCOMPLISHED AT THE TIMES OTHER THAN NORMAL WEEKDAY WORKING HOURS 07. DAMAGES: PROMPTLY REPAIR DAMAGES CAUSED TO ADJACENT FACILITIES BY DEMOLITION WORK. FL FD FLOOR FLOOR DRAIN STOR STORAGE 16. CONTRACTOR SHALL MAKE ALLOWANCES IN BID FOR ALL WORK STOPPAGES ORDERED BY THE OWNER DUE TO WORK 08. MAINTAIN EXISTING BUILDING SYSTEMS/UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST DAMAGE PLUMBING FLUOR FLUORESCENT STRUCT STRUCTURAL IMPACTING THE DAILY OPERATIONS OF THE FACILITY. DURING DEMOLITION OPERATIONS. FS FULL SIZE SUSP SPECS SUSPENDED SPECIFICATIONS 17. CONSTRUCTION ACTIVITY AFTER REGULAR WORKING HOURS MUST BE DONE MONDAY TO FRIDAY FROM 6:00 PM TO 6:00 - DO NOT INTERRUPT BUILDING SYSTEMS/UTILITIES SERVING OCCUPIED OR USED FACILITIES EXCEPT WHEN AUTHORIZED IN FV FVC FIELD VERIFY FIRE VALVE CABINET AM AND SATURDAY & SUNDAY 24 HOURS. WRITING BY AUTHORITIES HAVING JURISDICTION. PROVIDE TEMPORARY SERVICES DURING INTERRUPTIONS TO EXISTING T TEL TELEPHONE 18. ALL EQUIPMENT USED ON THE JOB SHALL BE OPERATED BY OSHA REGULATIONS. BUILDING SYSTEMS/UTILITIES AS ACCEPTABLE TO GOVERNING AUTHORITIES. G GALV GA GALVANIZED GAUGE TEMP T TEMPERED TOILET 19. CONTRACTOR AND ALL SUBCONTRACTORS SHALL FIELD CHECK AND VERIFY ALL EXISTING CONDITIONS AND SHALL BE - MAINTAIN FIRE PROTECTION SERVICES DURING SELECTIVE DEMOLITION OPERATIONS. GC GL GENERAL CONTRACTOR GLASS T TREADS RESPONSIBLE FOR THEIR PRESERVATION.. OWNER HAS THE RIGHT TO STOP WORK IF CONSTRUCTION ACTIVITY INTERFERES WITH PATIENT SAFETY OR NORMAL GR GRADE TYP O TYPICAL TELEPHONE RECEPTACLE 20. CONTRACTOR SHALL BE RESPONSIBLE OF INTERIM LIFE SAFETY MEASURES AS REQUIRED ON LIFE SAFETY DRAWINGS. OPERATIONS. DEMOLITION WORK IS TO BE COORDINATED WITH THE PHASING PLAN. DO NOT EXCEED THE LIMITS OF THE PHASE UNDER CONSTRUCTION, WITHOUT APPROVAL FROM THE OWNER. GYP GYP BD GYPSUM GYPSUM WALLBOARD THK THICK 21 09. ENVIRONMENTAL CONTROLS: USE WATER SPRINKLING, TEMPORARY DEBRIS ENCLOSURES, AND OTHER METHODS TO LIMIT DUST V VERT VERTICAL • PROVIDE WALK -OFF MATS AT ALL ENTRY EXITS OF THE CONSTRUCTION SITE. WALK -OFF MATS MUST BE CLEANED OR / AND DIRT MIGRATION. COMPLY WITH GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION. H HRDW HARDWARE VT VINYL TILE CHANGED AS NEEDED TO AVOID DISPERSION OF DUST OUTSIDE WORK AREA. HT HM HEIGHT HOLLOW METAL VB VAPOR BARRIER 22. CONTRACTOR MAY NEED TO PENETRATE OR OTHERWISE MODIFY FIRE RATED PARTITIONS. COORDINATE SCOPE OF - DO NOT USE WATER MIEN IT MAY CREATE HAZARDOUS OR OBJECTIONABLE CONDITIONS SUCH AS FLOODING, POLLUTION AND DAMAGE TO EXISTING FINISHES. HORIZ HORIZONTAL VWC VINYL WALL COVERING MECHANICAL, ELECTRICAL AND PLUMBING WITH LIFE SAFETY PLAN TO DETERMINE LOCATIONS. RATING OF THE WALL SHOULD BE PRESERVED AT ALL TIMES. FOLLOW DETAILS PROVIDED IN SHEETS A -8, A -9 AND A -10 FOR SEALING FIRE 10. IF UNANTICIPATED MECHANICAL, ELECTRICAL, OR STRUCTURAL ELEMENTS THAT CONFLICT WITH INTENDED FUNCTION OR IN INCH W VWC -GYP WALL COVERING - GYPSUM BOARD PENETRATIONS. ALL DUCTS CROSSING FIRE RATED ASSEMBLIES SHALL HAVE FIRE DAMPERS TO MATCH THE RATING OF DESIGN ARE ENCOUNTERED, INVESTIGATE AND MEASURE BOTH NATURE AND EXTENT OF THE CONFLICT. SUBMIT REPORT INCAND INCANDESCENT VWC -PLAS WALL COVERING - PLASTER THE WALL ALL ROOF AND FLOOR PENETRATIONS SHALL BE PROPERLY SEALED. TO OWNER'S REPRESENTATIVE IN WRITTEN, ACCURATE DETAIL. PENDING RECEIPT OF DIRECTIVE FROM OWNER'S ID INSIDE DIAMETER WC WET COLUMN REPRESENTATIVE, REARRANGE SELECTIVE DEMOLITION SCHEDULE AS NECESSARY TO CONTINUE OVERALL JOB PROGRESS INSUL INSULATION WP WATERPROOFING WITHOUT UNDUE DELAY. INT INTERIOR WD WOOD INV INVERT W/ W/0 WITH WITHOUT 11. REMOVE FROM BUILDING 31TE ON A DAILY BASIS, ALL DEBRIS, RUBBISH AND OTHER MATERIALS RESULTING FROM DEMOLITION OPERATIONS, TRANSPORT AND LEGALLY DISPOSE OF OFF SITE. DEBRIS REMOVAL TO BE DONE AFTER REGULAR J JT JOINT WC WATER COOLER WORKING HOURS. JST JOIST JC JANITOR'S CLOSET Y YD YARD - IF HAZARDOUS MATERIALS ARE ENCOUNTERED DURING DEMOLITION OPERATIONS COMPLY WITH APPLICABLE REGULATIONS, LAWS, AND ORDINANCES CONCERNING REMOVAL, HANDLING AND PROTECTION AGAINST EXPOSURE OR ENVIRONMENTAL POLLUTION. - BURNING OF REMOVED MATERIALS IS NOT PERMITTED ON PROJECT SITE. 12. UPON COMPLETION OF DEMOLITION WORK, REMOVE TOOLS, EQUIPMENT, AND DEMOLISHED MATERIALS FROM SITE. REMOVE PROTECTIONS AND LEAVE INTERIOR PER CONDITIONS DOCUMENTED IN SUBMITTED PHOTOGRAPHS/VIDEO. - REPAIR DEMOLITION PERFORMED IN EXCESS OF THAT REQUIRED. RETURN ELEMENTS OF CONSTRUCTION AND SURFACES TO REMAIN TO CONDITION EXISTING PRIOR TO START OF OPERATIONS. REPAIR ADJACENT CONSTRUCTION OR SURFACES SOILED OR DAMAGED BY SELECTIVE DEMOLITION WORK. ARCHITECTURAL SYMBOLS REFERENCE SYMBOLS VICINITY MAP PROJECT LOCATION INSULATION CONCRETE GRAVEL or CEMENT CONCRETE DOOR SYMBOL 1 DOOR NUMBER WALL CONSTRUCTION A WALL TYPE PROJECT a �, =I.__ _4_= Ij �. _ j � j i" PROJECT Blanket PRECAST CRUSHED MORTAR 1 H T_! 1 LOCATION R� - -� 1 �i 1 LOCATION STONE PLASTER DETAIL NUMBER NAME 0 F F I e ROOM EXTERIOR &INTERIOR �"""" � � f MD RT-6 ..a zo,� _.� ..`A r Pi �. < ROOM NAME \ _ 1 __ _ ,�' �" ; <,; , %;" EARTH TILE Ceramic or SOLID CONC. MAS. UNIT CONCRETE MASONRY MARBLE FINISH SCHEDULE ELEVATION SYMBOL P 1 0 ROOM NUMBER l ► S -_a s ._ _ - -� L -- �-.•» ; t /, /., - : - / ,� /� !r Asl Structural UNIT ! t 1 1. s CONSTRUCTION DETAIL 1 DETAIL NUMBER SYMBOL BUILDING. PARTIAL �JDETAIL NUMBER A- SHEET NUMBER &DETAIL SECTION 1 1 1 "$ o. It l P1 1 1 �' ���I tiJ _ ' t '�, - :a `.° _�I� _ /' Q �� o cV SHEET WOOD METAL Finished WOOD Blocking WOOD Blocking BRICK Large SYMBOL A _ 1 SHEET NUMBER - r i- -T• -_ $ Continuous Intermittent Scale TYPES COLUMN REFERENCE E10WINDOW CLASS CLASS Small Large INSULATION Rigid 10 WINDOW TYPE NUMBER OR LETTER Scale Scale��.''� GENERAL NOTES ABCDEFG NOTE TOP OF CONCRETE t � I ELEVATION 0.00 Rte 1 �• `- s STEEL STEEL PLYWOOD SLAB ELEVATION DETAIL NUMBER I PR t� ,I F7r Small Scale Large Scale g M N DRAWING TITLES 11 ABCDEF DRAWING REVISIONS / �'r-- REVISION NUMBER Adjacent Zoning Scan ClyofSotdi Had Zt nfng Hap SHEET NUMBER Lag UpdaW Nov 2001. C) BERMELLO AJAMIL & PARTNERS, INC. Architecture Engineering Planning Interior Design Landscape Architecture 2601 South Bayshore Drive 10th Floor Miami, Florida 33133 (305) 859 -2050 Fax (305) 860 -3700 STRUCTURAL ENGINNER: MEP ENGINEER: MEPENGINEER INFORMATION Smith, Seckman, Reid, Inc. C ONSLTL.TING ENG=N1E]ETZZS 600 West Hillsboro, Suite 300 Deerfield Beach, Florida 33441 Phone(954)421 -1260 Fax(954)421 -1466 REVISIONS: PROJECT NAME: SMH- ADVANCE TOWER OFFICES- 2ND FLOOR PHASE'A' PROJECT ADDRESS: 7400 S.W. 62nd Ave. South Miami, Florida 33143 KEY PLAN COMM. NO. 40030.100 SCALE: DATE: OCTOBER 16, 2006 DRAWN: CHECKED: CADD FILE: H:PROJECTS DRAWING TITLE: INDEX SHEET NO. A0.0 ' +0 . Ira 57'4 REVISIONS: PROJECT NAME: SMH- ADVANCE TOWER OFFICES- 2ND FLOOR PHASE'A' PROJECT ADDRESS: 7400 S.W. 62nd Ave. South Miami, Florida 33143 KEY PLAN COMM. NO. 40030.100 SCALE: DATE: OCTOBER 16, 2006 DRAWN: CHECKED: CADD FILE: H:PROJECTS DRAWING TITLE: INDEX SHEET NO. A0.0