07-421-003BERMELLO AJAMIL & PARTNERS, INC.
Architecture Engineering Planning
Interior Design Landscape Architecture
2601 South Bayshore Drive 10th Floor
Miami, Florida 33133
(305) 859 -2050 Fax (305) 860 -3700
STRUCTURAL ENGINNER:
MEP ENGINEER:
MEPENGINEER INFORMATION
Smith, Seckman, Reid, Inc.
C ONSLTL.TING
ENG=N1E]ETZZS
600 West Hillsboro, Suite 300
Deerfield Beach, Florida 33441
Phone(954)421 -1260 Fax(954)421 -1466
ABBREVIATIONS
+0
GENERAL NOTES
GENERAL DEMOLITION NOTES
- --- = - - DRAWING INDEX
�RCHITEtiTIJF�E =
A AC ACOUSTICAL L LAV LAVATORY
01. ALL WORK TO BE PERFORMED UNDER THIS CONTRACT SHALL COMPLY WITH CODES LISTED ON SHEET LS -1, THE FLORIDA
01. CONTRACTOR SHALL SUBMIT A SCHEDULE INDICATING PROPOSED SEQUENCE OF OPERATIONS FOR SELECTIVE DEMOLITION
ADJ
ADJUSTABLE
LAM
LAMINATED
Ira
BUILDING CODE (LATEST EDITION), CITY LABOR LAWS, CITY ORDINANCES CITY /COUNTY ZONING CODES, NATIONAL
WORK TO OWNER'S REPRESENTATIVE AND ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO START OF WORK. INCLUDE
- -
AFF
ABOVE FINISH FLOOR
LT
LIGHT
ELECTRICAL CODE, N.F.P.A. 101, O.S.H.A., A.D.A. & ALL OTHER APPLICABLE CODES, RULES AND REGULATIONS.
COORDINATION FOR SHUTOFF, CAPPING, AND CONTINUATION OF UTILITY SERVICES AS REQUIRED, TOGETHER WITH DETAILS
COVER
AGG
AGGREGATE
LTWT
LIGHT WEIGHT
FOR DUST AND NOISE CONTROL PROTECTION. INCLUDE SCHEDULE OF OPERATIONS TO INCLUDE HOURS PER DAY AND
A.C.
AIR CONDITIONING
LF OR LIN FT
LINEAR FEET
DAYS OF WEEK TO BE WORKED.
AO. INDEX
ALUM
ALUMINUM
02•
THE CONTRACTOR SHALL FAMILIARIZE HIM/HERSELF WITH THE PROJECT THROUGH INSPECTION OF THE SITE, THE
_
r
B
BM
BEAM
M
MAT
MATERIAL
DRAWINGS AND SPECIFICATIONS, SO AS TO THOROUGHLY UNDERSTAND THE NATURE AND SCOPE OF THE WORK. ANY
- PROVIDE DETAILED SEQUENCE OF DEMOLITION AND REMOVAL WORK TO ENSURE UNINTERRUPTED
D1.0 DEMOLITION PLAN
BILK
BLOCK
ML
MATCH LINE
AMBIGUITIES OR CONFLICTS WITH THE CONSTRUCTION DOCUMENTS SHALL BE REPORTED TO THE ARCHITECT IN WRITING
PROGRESS OF OWNERS ON SITE OPERATIONS.
BLKG
BLOCKING
MAX
MECH
MAXIMUM
MECHANICAL
PRIOR TO SUBMISSION OF BID.
- COORDINATE WITH OWNER'S CONTINUING OCCUPATION OF PORTIONS OF EXISTING BUILDING AND WITH
A1.0 NEW CONSTRUCTION FLOOR PLAN -PHASE A
BOT
BLDG
BOTTOM
BUILDING
MET OR MTL
METAL
03.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL REQUIRED PERMITS TO CARRY OUT THE WORK DESCRIBED
OWNER'S PARTIAL OCCUPANCY OF COMPLETED REFURBISHED AREA.
A2.0 EXISTING CEILING PLAN
MIN
MINIMUM
IN THE CONSTRUCTION DOCUMENTS. ALL REQUIRED PERMITS SHALL BE OBTAINED PRIOR TO THE COMMENCEMENT OF
BLKHD
BULKHEAD
MISC
MISCELLANEOUS
WORK.
02. CONTRACTOR SHALL SUBMIT PHOTOGRAPHS OR VIDEO OF EXISTING CONDITIONS OF STRUCTURE SURFACES, EQUIPMENT, AND
A3.0 MILLWORK ELEVATIONS & SECTIONS
C
CAB
CABINET
MACH
MANUF
MACHINE
MANUFACTURER
04.
OMISSIONS: IN THE EVENT THAT CERTAIN FEATURES OF THE CONSTRUCTION ARE NOT FULLY SHOWN ON THE DRAWINGS,
ADJACENT IMPROVEMENTS THAT MIGHT BE MISCONSTRUED AS DAMAGE RELATED TO REMOVAL OPERATIONS. CONTRACTOR
SHALL ALSO SCHEDULE A SITE VISIT TO INCLUDE OWNER'S REPRESENTATIVE AND ARCHITECT FOR VERIFICATION OF THE
A4.0 WALL TYPES & SCHEDULES
CARP
CLG
CARPET
CEILING
N
NOM
NOMINAL
THEN THEIR CONSTRUCTION SHALL BE OF THE SAME CHARACTER AS FOR SIMILAR CONDITIONS THAT ARE SHOWN OR
NOTED AND SHALL BE INCLUDED AS PART OF THE BID SUBMISSION.
WORKING CONDITION OF BUILDING SYSTEMS AFFECTED BY DEMOLITION WORK. FILE WITH ARCHITECT PRIOR TO START OF
CEM
CEMENT
NIC
NOT IN CONTRACT
WORK.
CA
CENTER LINE
NTS
NOT TO SCALE
05.
EXISTING ELECTRICAL, MECHANICAL, LIFE SAFETY AND FIRE PROTECTION FIXTURES INCLUDING BUT NOT LIMITED TO,
03. OCCUPANCY: OWNER WILL OCCUPY PORTIONS OF THE BUILDING IMMEDIATELY ADJACENT TO AREAS OF SELECTIVE
CER
CERAMIC
O
OFF
OFFICE
SURFACE/RECESSED LIGHT FIXTURES, LIGHT/EQUIPMENT SWITCHES, H.V.A.C. REGISTERS, THERMOSTATS, ACCESS PANELS,
DEMOLITION. CONDUCT SELECTIVE DEMOLITION WORK IN MANNER THAT WILL MINIMIZE THE NEED FOR DISRUPTION OF
C.T.
CO
CERAMIC TILE
CLEAN OUT
OPNG
OPENING
INTERCOM SPEAKERS, FIRE ALARM HORNS /STROBES /SWITCHES, HEAT /SMOKE DETECTORS, CONCEALED/ EXPOSED FIRE
OWNER'S NORMAL OPERATIONS. ALL REQUESTS MUST BE MADE 72 HOURS IN ADVANCE PRIOR TO DEMOLITION ACTIVITIES
CL OR CLOS CLOSET
OD
OUTSIDE DIAMETER
SPRINKLER HEADS AND ASSOCIATED PIPING, DUCTWORK AND ORNAMENTAL FIXTURES ARE TO REMAIN. CONTRACTOR
SHALL BE RESPONSIBLE FOR REMOVAL AS REQUIRED OF EXISTING FIXTURES TO ACCOMPLISH DEMOLITION WORK AND NEW
THAT WILL AFFECT OWNER'S NORMAL OPERATIONS INCLUDING BUT NOT LIMITED TO LOUD LOISES AND PRODUCTS WITH
COL
CONC
COLUMN
CONCRETE
OC
OH OR OPP.HD.
ON CENTER
OPPOSITE HAND
CONSTRUCTION WORK INDICATED IN THE CONSTRUCTION DOCUMENTS. FURTHER, THE CONTRACTOR SHALL BE
STRONG ODORS.
MECHANICAL
CMU
CONCRETE MASONRY UNIT
RESPONSIBLE FOR THE REINSTALLATION OF EXISTING FIXTURES IN GOOD WORKING ORDER (TO MATCH ORIGINAL
INSTALLATION ) UPON COMPLETION OF REPAIR WORK.
04. CONDITION OF STRUCTURES: OWNER ASSUMES NO RESPONSIBILITY FOR ACTUAL CONDITION OF ITEMS OR STRUCTURES TO
CONST
CONSTRUCTION
P
PR
PAIR
BE DEMOLISHED. CONDITIONS EXISTING AT TIME OF INSPECTION FOR BIDDING PURPOSES WILL BE MAINTAINED BY OWNER
CONT
CONTINUOUS
PASS
PASSENGER
06.
ALL DIMENSIONS PROVIDED ARE APPROXIMATE, CONTRACTOR SHALL VERIFY DIMENSIONS WITH EXISTING FIELD CONDITIONS.
INSOFAR AS PRACTICABLE. HOWEVER, MINOR VARIATIONS WITHIN STRUCTURE MAY OCCUR.
CG
CORNER GUARD
PENT
PENTHOUSE
CU
CUBIC
PC
PRECAST
05. PARTIAL DEMOL111ON AND REMOVAL- STORAGE OF REMOVED ITEMS ON SITE WILL NOT BE PERMITTED.
D
DEPT
DEPARTMENT
Pi
PLAS
PANEL JOINT
PLASTER
07.
CONTRACTOR SHALL PROVIDE A MINIMUM 72 HOUR WRITTEN REQUEST TO THE OWNER'S REPRESENTATIVE IN ADVANCE OF
ANY ACTIVITY WHICH WILL AFFECT EXISTING BUILDING OPERATIONS. DETERMINE OWNER'S REPRESENTATIVE PRIOR TO
06. PROTECTIONS: PROVIDE TEMPORARY BARRICADES AND OTHER FORMS OF PROTECTION TO PROTECT OWNER'S PERSONNEL
DIA
DIAMETER
POL
POLISHED
STARTING WORK.
AND GENERAL PUBLIC FROM INJURY DUE TO SELECTIVE DEMOLITION WORK.
ELECTRICAL
DIM
DN
DIMENSION
DOWN
PMLD
PNL
PREMOULDED
PANEL
08.
CONTRACTOR SHALL PROTECT ALL EXISTING FLOOR SURFACES WITH A MEANS OF CONTAINMENT TO PREVENT SOILING OF
A. PROVIDE PROTECTIVE MEASURES AS REQUIRED TO PROVIDE FREE AND SAFE PASSAGE OF OWNER'S PERSONNEL AND
GENERAL PUBLIC TO OCCUPIED PORTIONS OF BUILDING.
E -0.1 LEGEND, SCHEDULES, & DRAWING INDEX - ELECTRICAL
DS
DWG
DOWN SPOUT
DRAWING
O
QT
QUARRY TILE
THE FLOOR. IN ADDITION, THE CONTRACTOR SHALL PROVIDE SHEATHING OVER THE FLOOR AT ALL TRAFFIC AREAS AND
THOSE AREAS EXPOSED TO EQUIPMENT, SCAFFOLDING AND CONSTRUCTION DEBRIS.
B. PROTECT FROM DAMAGE EXISTING FINISH WORK THAT IS TO REMAIN IN PLACE AND BECOMES EXPOSED DURING
E -1.1 2ND FLOOR PLAN - DEMOLITION -PHASE A- ELECTRICAL
DF
DRINKING FOUNTAIN
QTM
QUARRY TILE MINIATURES
09.
ALL WALL /CEILING SURFACES WITHIN THE LIMITS OF CONSTRUCTION ARE TO BE REPAIRED/REPLACED TO MATCH EXISTING
DEMOLITION OPERATIONS.
E -2.1 2ND FLOOR PLAN -NEW WORK -PHASE A- LIGHTING
E
E.A.
EA
EXPOSED AGGREGATE
EACH
R
RAD
RADIUS
ADJACENT SURFACES, THIS SHALL INCLUDE BUT NOT BE LIMITED TO, WATER AND OR MILDEW DAMAGE, CRACKED
C. PROTECT FLOORS /CARPETS WITH SUITABLE COVERINGS WHEN NECESSARY.
E -3.1 2ND FLOOR -NEW WORK -PHASE A -POWER
EL
ELEVATION GRADE)
R
REINF
RISER
REINFORCED
WALLBOARD, DAMAGED TAPE JOINTS, ETC. ALL DAMAGED WALLBOARD SHALL BE REPLACED.
D. CONSTRUCT TEMPORARY
ELE
ELEVATION FACADE)
REQ D
REQUIRED
10.
ALL STAINED SURFACES ARE TO BE KILZ PRIMER COATED IN ADVANCE OF PAINT FINISH.
INSULATED DUSTPROOF PARTITIONS WHERE REQUIRED TO SEPARATE AREAS WHERE NOISY
OR EXTENSIVE DIRT OR DUST OPERATIONS ARE PERFORMED. EQUIP PARTITIONS WITH DUSTPROOF DOORS AND SECURITY
E -4.1 2ND FLOOR -NEW WORK -PHASE A- SYSTEMS
ELEV
EQ
ELEVATOR
EQUAL
RF
RD
ROOF
ROOF DRAIN
11.
THE CONTRACTOR SHALL PROVIDE A MEANS OF CONTAINMENT TO PREVENT DUST AND DEBRIS MIGRATION TO ADJACENT
LOCKS. ALL TEMP. PART. ARE TO BE BEDDED AND RECEIVE ONE COAT OF FINISH PAINT.
E -5.1 PARTIAL POWER RISER DIAGRAM & PANEL SCHEDULES
EQUIP
EQUIPMENT
RM
ROOM
AREAS. CONTRACTOR SHALL NOT COMPROMISE THE EXISTING FIRE/FLAME SPREAD RATINGS OR MEANS OF EGRESS WITHIN
E. TEMPORARY PARTITIONS ARE TO BE ANCHORED WITH TWO -WAY TAPE, SCREWS, NAILS, ETC. WILL NOT BE
E -6.1 ELECTRICAL SPECIFICATIONS
EXIST
EXISTING
RO
ROUGH OPENING
THE CONSTRUCTION AREAS AND ADJACENT AREAS AFFECTED BY CONSTRUCTION ACTIVITIES.
PERMITTED.
EXP.JT.
OR EJ EXPANSION JOINT
REFL OR REF
REFLECTED
EXP
EXPOSED
12.
THE CONTRACTOR SHALL MAINTAIN ALL COMPONENTS FOR MEANS OF EGRESS FREE OF OBSTRUCTIONS AND
F. REMOVE PROTECTIONS AT COMPLETION OF WORK.
EXT
EXEC
EXTERIOR
ELECTRICAL
S
SECT
SECTION
ACCESSIBLE AT ALL TIMES.
G. ROOMS UNDER CONSTRUCTION MUST BE BROUGHT TO A NEGATIVE PRESSURE BY USE OF SUITABLE FANS EQUIPED
FIRE PROTECTION
SHT
SHEET
13.
THE CONTRACTOR SHALL MAINTAIN ALL LIFE SAFETY AND FIRE PROTECTION SYSTEMS OPERATIONAL AT ALL TIMES.
WITH HEPA FILTRATION UNITS EXHAUSTING TO THE EXTERIOR OF THE BUILDING..
F
FT
FEET
SHT MET OR SM
SHEET METAL
FIN
FINISH
SIM
SIMILAR
14.
CONTRACTOR SHALL MAINTAIN ALL EXISTING FIRE RATINGS AT NEW CONSTRUCTION.
H. CONTRACTOR SHALL REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
FE
FIRE EXTINGUISHER
SQ
SQUARE
CONTAMINATION OF DUCT SYSTEM.
FEC
FIRE EXTINGUISHER CABINET
STD
STANDARD
15.
CONTRACTOR SHALL MAKE ALLOWANCES FOR ALL WORK WHICH IMPACTS THE DAILY OPERATIONS OF THE FACILITY AND
FHC
FIRE HOSE CABINET
SS
STAINLESS STEEL
WHICH MUST BE ACCOMPLISHED AT THE TIMES OTHER THAN NORMAL WEEKDAY WORKING HOURS
07. DAMAGES: PROMPTLY REPAIR DAMAGES CAUSED TO ADJACENT FACILITIES BY DEMOLITION WORK.
FL
FD
FLOOR
FLOOR DRAIN
STOR
STORAGE
16.
CONTRACTOR SHALL MAKE ALLOWANCES IN BID FOR ALL WORK STOPPAGES ORDERED BY THE OWNER DUE TO WORK
08. MAINTAIN EXISTING BUILDING SYSTEMS/UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST DAMAGE
PLUMBING
FLUOR
FLUORESCENT
STRUCT
STRUCTURAL
IMPACTING THE DAILY OPERATIONS OF THE FACILITY.
DURING DEMOLITION OPERATIONS.
FS
FULL SIZE
SUSP
SPECS
SUSPENDED
SPECIFICATIONS
17.
CONSTRUCTION ACTIVITY AFTER REGULAR WORKING HOURS MUST BE DONE MONDAY TO FRIDAY FROM 6:00 PM TO 6:00
- DO NOT INTERRUPT BUILDING SYSTEMS/UTILITIES SERVING OCCUPIED OR USED FACILITIES EXCEPT WHEN AUTHORIZED IN
FV
FVC
FIELD VERIFY
FIRE VALVE CABINET
AM AND SATURDAY & SUNDAY 24 HOURS.
WRITING BY AUTHORITIES HAVING JURISDICTION. PROVIDE TEMPORARY SERVICES DURING INTERRUPTIONS TO EXISTING
T
TEL
TELEPHONE
18.
ALL EQUIPMENT USED ON THE JOB SHALL BE OPERATED BY OSHA REGULATIONS.
BUILDING SYSTEMS/UTILITIES AS ACCEPTABLE TO GOVERNING AUTHORITIES.
G
GALV
GA
GALVANIZED
GAUGE
TEMP
T
TEMPERED
TOILET
19.
CONTRACTOR AND ALL SUBCONTRACTORS SHALL FIELD CHECK AND VERIFY ALL EXISTING CONDITIONS AND SHALL BE
- MAINTAIN FIRE PROTECTION SERVICES DURING SELECTIVE DEMOLITION OPERATIONS.
GC
GL
GENERAL CONTRACTOR
GLASS
T
TREADS
RESPONSIBLE FOR THEIR PRESERVATION..
OWNER HAS THE RIGHT TO STOP WORK IF CONSTRUCTION ACTIVITY INTERFERES WITH PATIENT SAFETY OR NORMAL
GR
GRADE
TYP
O
TYPICAL
TELEPHONE RECEPTACLE
20.
CONTRACTOR SHALL BE RESPONSIBLE OF INTERIM LIFE SAFETY MEASURES AS REQUIRED ON LIFE SAFETY DRAWINGS.
OPERATIONS. DEMOLITION WORK IS TO BE COORDINATED WITH THE PHASING PLAN. DO NOT EXCEED THE LIMITS OF THE PHASE
UNDER CONSTRUCTION, WITHOUT APPROVAL FROM THE OWNER.
GYP
GYP BD
GYPSUM
GYPSUM WALLBOARD
THK
THICK
21
09. ENVIRONMENTAL CONTROLS: USE WATER SPRINKLING, TEMPORARY DEBRIS ENCLOSURES, AND OTHER METHODS TO LIMIT DUST
V
VERT
VERTICAL
•
PROVIDE WALK -OFF MATS AT ALL ENTRY EXITS OF THE CONSTRUCTION SITE. WALK -OFF MATS MUST BE CLEANED OR
/
AND DIRT MIGRATION. COMPLY WITH GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION.
H
HRDW
HARDWARE
VT
VINYL TILE
CHANGED AS NEEDED TO AVOID DISPERSION OF DUST OUTSIDE WORK AREA.
HT
HM
HEIGHT
HOLLOW METAL
VB
VAPOR BARRIER
22.
CONTRACTOR MAY NEED TO PENETRATE OR OTHERWISE MODIFY FIRE RATED PARTITIONS. COORDINATE SCOPE OF
- DO NOT USE WATER MIEN IT MAY CREATE HAZARDOUS OR OBJECTIONABLE CONDITIONS SUCH AS FLOODING,
POLLUTION AND DAMAGE TO EXISTING FINISHES.
HORIZ
HORIZONTAL
VWC
VINYL WALL COVERING
MECHANICAL, ELECTRICAL AND PLUMBING WITH LIFE SAFETY PLAN TO DETERMINE LOCATIONS. RATING OF THE WALL
SHOULD BE PRESERVED AT ALL TIMES. FOLLOW DETAILS PROVIDED IN SHEETS A -8, A -9 AND A -10 FOR SEALING FIRE
10. IF UNANTICIPATED MECHANICAL, ELECTRICAL, OR STRUCTURAL ELEMENTS THAT CONFLICT WITH INTENDED FUNCTION OR
IN
INCH
W
VWC -GYP
WALL COVERING - GYPSUM BOARD
PENETRATIONS. ALL DUCTS CROSSING FIRE RATED ASSEMBLIES SHALL HAVE FIRE DAMPERS TO MATCH THE RATING OF
DESIGN ARE ENCOUNTERED, INVESTIGATE AND MEASURE BOTH NATURE AND EXTENT OF THE CONFLICT. SUBMIT REPORT
INCAND
INCANDESCENT
VWC -PLAS
WALL COVERING - PLASTER
THE WALL ALL ROOF AND FLOOR PENETRATIONS SHALL BE PROPERLY SEALED.
TO OWNER'S REPRESENTATIVE IN WRITTEN, ACCURATE DETAIL. PENDING RECEIPT OF DIRECTIVE FROM OWNER'S
ID
INSIDE DIAMETER
WC
WET COLUMN
REPRESENTATIVE, REARRANGE SELECTIVE DEMOLITION SCHEDULE AS NECESSARY TO CONTINUE OVERALL JOB PROGRESS
INSUL
INSULATION
WP
WATERPROOFING
WITHOUT UNDUE DELAY.
INT
INTERIOR
WD
WOOD
INV
INVERT
W/
W/0
WITH
WITHOUT
11. REMOVE FROM BUILDING 31TE ON A DAILY BASIS, ALL DEBRIS, RUBBISH AND OTHER MATERIALS RESULTING FROM
DEMOLITION OPERATIONS, TRANSPORT AND LEGALLY DISPOSE OF OFF SITE. DEBRIS REMOVAL TO BE DONE AFTER REGULAR
J
JT
JOINT
WC
WATER COOLER
WORKING HOURS.
JST
JOIST
JC
JANITOR'S CLOSET
Y
YD
YARD
- IF HAZARDOUS MATERIALS ARE ENCOUNTERED DURING DEMOLITION OPERATIONS COMPLY WITH APPLICABLE
REGULATIONS, LAWS, AND ORDINANCES CONCERNING REMOVAL, HANDLING AND PROTECTION AGAINST EXPOSURE OR
ENVIRONMENTAL POLLUTION.
- BURNING OF REMOVED MATERIALS IS NOT PERMITTED ON PROJECT SITE.
12. UPON COMPLETION OF DEMOLITION WORK, REMOVE TOOLS, EQUIPMENT, AND DEMOLISHED MATERIALS FROM SITE. REMOVE
PROTECTIONS AND LEAVE INTERIOR PER CONDITIONS DOCUMENTED IN SUBMITTED PHOTOGRAPHS/VIDEO.
- REPAIR DEMOLITION PERFORMED IN EXCESS OF THAT REQUIRED. RETURN ELEMENTS OF CONSTRUCTION AND
SURFACES TO REMAIN TO CONDITION EXISTING PRIOR TO START OF OPERATIONS. REPAIR ADJACENT CONSTRUCTION OR
SURFACES SOILED OR DAMAGED BY SELECTIVE DEMOLITION WORK.
ARCHITECTURAL
SYMBOLS
REFERENCE SYMBOLS
VICINITY MAP
PROJECT LOCATION
INSULATION CONCRETE
GRAVEL or
CEMENT
CONCRETE
DOOR SYMBOL 1 DOOR NUMBER WALL CONSTRUCTION A WALL TYPE
PROJECT a �, =I.__ _4_= Ij �.
_
j � j i"
PROJECT
Blanket PRECAST
CRUSHED
MORTAR
1 H T_! 1
LOCATION R� - -� 1 �i 1
LOCATION
STONE
PLASTER
DETAIL NUMBER
NAME
0 F F I e ROOM EXTERIOR &INTERIOR
�"""" � � f MD
RT-6 ..a zo,� _.� ..`A
r Pi �.
<
ROOM
NAME
\
_ 1 __ _ ,�'
�"
; <,; , %;"
EARTH TILE
Ceramic or
SOLID CONC.
MAS. UNIT
CONCRETE
MASONRY
MARBLE
FINISH
SCHEDULE ELEVATION SYMBOL P
1 0 ROOM NUMBER
l ► S -_a s ._ _ - -�
L -- �-.•» ;
t
/, /.,
- : - /
,� /�
!r
Asl
Structural
UNIT
! t 1 1. s
CONSTRUCTION DETAIL
1 DETAIL NUMBER
SYMBOL
BUILDING. PARTIAL �JDETAIL NUMBER A- SHEET NUMBER
&DETAIL SECTION
1 1 1 "$ o. It
l P1 1 1 �' ���I
tiJ _
'
t '�, - :a `.° _�I� _
/' Q
�� o cV
SHEET WOOD
METAL Finished
WOOD
Blocking
WOOD
Blocking
BRICK
Large
SYMBOL
A _ 1 SHEET NUMBER
- r
i- -T• -_
$
Continuous
Intermittent
Scale
TYPES COLUMN REFERENCE
E10WINDOW
CLASS CLASS
Small Large
INSULATION
Rigid
10 WINDOW TYPE NUMBER OR LETTER
Scale Scale��.''�
GENERAL NOTES ABCDEFG NOTE TOP OF CONCRETE
t � I
ELEVATION 0.00
Rte 1 �• `-
s
STEEL STEEL
PLYWOOD
SLAB ELEVATION
DETAIL NUMBER
I PR t� ,I F7r
Small Scale Large Scale
g
M
N
DRAWING TITLES 11 ABCDEF DRAWING REVISIONS / �'r-- REVISION NUMBER
Adjacent Zoning
Scan ClyofSotdi Had Zt nfng Hap
SHEET NUMBER
Lag UpdaW Nov 2001.
C)
BERMELLO AJAMIL & PARTNERS, INC.
Architecture Engineering Planning
Interior Design Landscape Architecture
2601 South Bayshore Drive 10th Floor
Miami, Florida 33133
(305) 859 -2050 Fax (305) 860 -3700
STRUCTURAL ENGINNER:
MEP ENGINEER:
MEPENGINEER INFORMATION
Smith, Seckman, Reid, Inc.
C ONSLTL.TING
ENG=N1E]ETZZS
600 West Hillsboro, Suite 300
Deerfield Beach, Florida 33441
Phone(954)421 -1260 Fax(954)421 -1466
REVISIONS:
PROJECT NAME:
SMH- ADVANCE TOWER OFFICES- 2ND FLOOR
PHASE'A'
PROJECT ADDRESS:
7400 S.W. 62nd Ave.
South Miami, Florida 33143
KEY PLAN
COMM. NO. 40030.100
SCALE:
DATE: OCTOBER 16, 2006
DRAWN:
CHECKED:
CADD FILE: H:PROJECTS
DRAWING TITLE:
INDEX
SHEET NO.
A0.0
'
+0
.
Ira
57'4
REVISIONS:
PROJECT NAME:
SMH- ADVANCE TOWER OFFICES- 2ND FLOOR
PHASE'A'
PROJECT ADDRESS:
7400 S.W. 62nd Ave.
South Miami, Florida 33143
KEY PLAN
COMM. NO. 40030.100
SCALE:
DATE: OCTOBER 16, 2006
DRAWN:
CHECKED:
CADD FILE: H:PROJECTS
DRAWING TITLE:
INDEX
SHEET NO.
A0.0