06-2055-011HVAC GENERAL NOTES I. HVAC DRAWINGS ARE DIAGRAMMATICAL IN NATURE AND REPRESENT EXISTING CONDITIONS BASED ON DRAWINGS AND SITE OBSERVATIONS. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL ACTUAL CONDITIONS INCLUDING, DUCTWORK AND PIPING LOCATIONS AND SIZES. 2. DUE TO DRAWINGS BEING DIAGRAMMATICAL IN NATURE RISERS AND DROPS ARE NOT SHOWN - CONTRACTOR SHALL INCLUDE THESE IN THE BID - WHERE POSSIBLE ALL RISERS AND DROPS SHALL BE CONSTRUCTED USING 45 DEGREE OR LONG RADIUS ELBOWS. 3. PROVIDE AND INSTALL NECESSARY DUCTWORK TRANSITIONS AND PIPING INCREASERS /REDUCERS AS REQUIRED FOR EQUIPMENT CONNECTIONS. CONSULT MANUFACTURER'S DATA FOR ACTUAL DUCTWORK AND PIPING CONNECTIONS SIZES, INCLUDING, BUT NOT LIMITED TO THOSE SHOWN. 4. PROVIDE MANUAL VOLUME DAMPERS AT ALL LOW PRESSURE BRANCH DUCTS TO INDIVIDUAL DIFFUSERS AND GRILLES AND TO ALL LOW PRESSURE BRANCH DUCTS TO REHEAT COILS. PROVIDE DAMPERS AS CLOSE AS POSSIBLE TO BRANCH CONNECTION TO MAIN. SEE DIFFUSER AND GRILLE SCHEDULE AND SPECIFICATIONS FOR ADDITIONAL INFORMATION. 5. SCHEDULE NEW CONSTRUCTION WORK WITH THE OWNER WELL IN ADVANCE. CONSTRUCTION WORK AND DEMOLITION SHALL BE PERFORMED OR REPLACED TO THE SATISFACTION OF THE OWNER AT NO ADDITIONAL COST TO THE OWNER. 6. ALL FINISHES AND SURFACES TO REMAIN WHICH ARE DAMAGED DURING CONSTRUCTION WORK SHALL BE REPAIRED OR REPLACED TO THE SATISFACTION OF THE OWNER AT NO ADDITIONAL COST TO THE OWNER. 7. DO NOT BLOCK TUBE PULL OR SERVICE SPACE ON EQUIPMENT WITH PIPING, DUCTWORK. ETC.. (FLANGED OR REMOVABLE SECTIONS MAY BE USED IN SOME INSTANCES WHERE TIGHT CLEARANCES EXISTS). B. NO PIPING, DUCTWORK, OR CONDUIT SHALL BE INSTALLED UNTIL IT IS COORDINATED WITH ALL OTHER TRADES AFFECTED. PROVIDE ALL OFFSETS REQUIRED TO AVOID INTERFERENCE WITH OTHER TRADES; EXISTING CONDITIONS AND WITH THE STRUCTURE, INCLUDING, BUT NOT LIMITED TO, THOSE SHOWN. 9. IF NO SIZE IS SHOWN FOR DUCT SERVING DIFFUSER OR GRILLES, USE SIZE SHOWN ON DIFFUSER AND GRILLE SCHEDULE. 10. DUCTWORK ROUTED PARALLEL TO A WALL, RATED OR CORRIDOR SHALL BE INSTALLED WITH MINIMUM 6' CLEARANCE TO ALLOW FOR INSPECTION OF WALL PENETRATIONS. CONTRACTOR SHALL PROVIDE 12' CLEARANCE WHERE POSSIBLE, COORDINATE. 11. REFER TO DETAIL SHEETS AND SPECIFICATIONS FOR ADDITIONAL INSTALLATION REQUIREMENTS. 12. CONTRACTOR SHALL SUBMIT A COMPLETE LIST OF EQUIPMENT AND ITEMS TO BE REMOVED TO THE OWNER. ALL ITEMS THAT THE OWNER WISHES TO RETAIN SHALL BE TURNED OVER TO OWNER AND THE REMAINDER SHALL BE REMOVED FROM THE SITE AND DISPOSED OF IN A PROPER MANNER BY CONTRACTOR. 13. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PERFORM ALL WORK NECESSARY TO PREPARE THE STRUCTURE FOR THE INSTALLATION AND /OR DEMOLITION WORK OF THE MECHANICAL SYSTEMS. ALL HOLES, OPENINGS AND ANY DAMAGED MATERIALS OR SURFACES SHALL BE REPAIRED AND FINISHED TO MATCH EXISTING. 14. ALL DEMOLITION WORK SHALL COMPLY WITH NFPA 241 AND THE REQUIREMENTS OF THE OWNER. 15. PROVIDE TEMPORARY FILTERS ON ALL RETURN AIR GRILLES AND TRANSFER OPENINGS IN THE WORK AREA. 16. EXISTING SYSTEMS SHOWN ON THE DRAWINGS ARE BASED ON AVAILABLE RECORD DRAWINGS. THIS INFORMATION IS ONLY PARTIALLY VERIFIED. THE CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY AND INVESTIGATE ALL CONDITIONS THAT AFFECTS THE WORK PRIOR TO SUBMITTING THE BID. 17. FRONT OF PA CONTROL PANELS TO PROVIDE FOR 3' -0' MIN. CLEARANCE IN 18. UNLESS OTHERWISE NOTED ON PLANS LOW RETURN AIR GRILLES AND LOW EXHAUST GRILLES SHALL BE 6' M 8' AFF TO BOTTOM OF GRILLE. 19. ALL DIFFUSERS IN SAME SPACE SHALL HAVE THE SAME FULL FACE SIZE USING LARGEST SIZE REQUIRED FROM DIFFUSER AND GRILLE SCHEDULE. 20. PROVIDE CLEAR ACCESS TO FIRE DAMPERS, SMOKE DAMPERS, AND VALVES. 21. PROVIDE MANUFACTURERS CERTIFIED DATA (NOA) OR CALCULATIONS ON ALL EXTERIOR MOUNTED EQUIPMENT DURING SUBMITTAL PHASE WHICH INDICATES THAT THE EQUIPMENT CAN WITHSTAND A WIND LOA6 REQUIRED BY THE FSBC. SUSPEND EXHAUSTER FROM SHEET NO. YES NO DUCT SMOKE DETECTOR(S) AUTOMATIC TEMP. STRUCTURE WITH BAND IRON FIRE DAMPERS) X V.F.D. SMOKE DAMPER(S) VARIABLE FREQUENCY DRIVE STRIPS AT EACH CORNER MARINE LIGHT X FIRE RATED ROOF /FLOOR CEILING ASSEMBLY ACCESS DOOR X DUCTWORK - SEE X SMOKE CONTROL X PLANS FOR SIZE. ' 1/2' WIDE COPPER STRAP NOTE: ® ATTACH HANGER TO BLDG.STRUCTURE BACKDRAFT DAMPER INSULATION PIPE ,: = . • ` - INSTALL MINIMUM 2' SECTION: O OF INSULATION UNDER HANGER FOR LIQUID LINE CEILING ASSEMBLY (SEE ARCH. DWG'S) CEILING EXHAUSTER WITH REMOVABLE EXHAUST GRILLE FOR ACCESS TO AND SERVICE OF BLOWER ASSEMBLY CEILING MOUNTED EXHAUST FAN REFRIGERANT PIPING HANGER MECHANICAL DEMOLITION NOTES 1. FOR EQUIPMENT AND SYSTEMS TO REMAIN IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE CONDITION OF, EXACT SIZES AND LOCATION OF EXISTING DUCT AND PIPING ETC. BEFORE DEMOLITION WORK IS BEGUN. REPORT ANY DISCREPANCIES BETWEEN PLANS AND ACTUAL FIELD CONDITIONS TO THE OWNER AND ENGINEER PRIOR TO THE COMMENCEMENT OF DEMOLITION WORK. 2. REMOVE THE INDICATED HVAC ITEMS AS SHOWN ON PLANS, THIS INCLUDES ALL HANGERS, STRAPS AND RELATED MATERIAL. AS DIRECTED THIS MATERIAL SHALL BE REMOVED FROM THE SITE OR TURNED OVER TO THE OWNER (AS DIRECTED BY THE OWNER). 3. CAP AND SEAL AIR TIGHT ALL POINTS AT WHICH DUCTWORK IS REMOVED FROM DUCTWORK THAT WILL REMAIN. 4. PATCH AND MATCH OPENINGS IN WALLS TO MAINTAIN THE INTEGRITY OF THE WALL WHERE AIR DEVICES, DUCTS, PIPING, ETC. HAVE BEEN REMOVED. (MAINTAIN THE EXISTING RATINGS). 5. CONTRACTOR SHALL VERIFY CLEARANCE REQUIREMENTS AND INDICATE ROUTING OF NEW DUCTWORK BEFORE FABRIC TION BEGINS AS RISES AND DROPS MAY BE NECESSARY DUE TO EXISTING FIELD CONDITIONS. 6. ALL DEMOLITION WORK SHALL COMPLY WITH NFPA 241 AND THE REQUIREMENTS OF THE OWNER. DUCT AND PIPE INSULATION nI IPTWnolr 1. INTERIOR SUPPLY AND RETURN AIR DUCTWORK IN CEILING SPACE (WITH ROOF INSULATION >R12): 2' THICK. R -6.0 MIN, FIBERGLASS. PIPING 1. REFRIGERANT PIPING: A� ARMAFLEX SS -SELF SEALING, REFRIGERANT SUCTION 14 THICKNESS; MINIMUM K =0.27 HVAC DESIGN REQUIRES SHEET NO. YES NO DUCT SMOKE DETECTOR(S) AUTOMATIC TEMP. X FIRE DAMPERS) X V.F.D. SMOKE DAMPER(S) VARIABLE FREQUENCY DRIVE X FIRE RATED ENCLOSURE MARINE LIGHT X FIRE RATED ROOF /FLOOR CEILING ASSEMBLY ACCESS DOOR X FIRE STOPPING (SEE ARCH.) X SMOKE CONTROL X TEST & BALANCE NOTES -- 1. PRECONSTRUCTION: PRIOR TO COMMENCEMENT OF ANY HVAC WORK AN INDEPENDENT AABC OR NEBB CERTIFIED T &B CONTRACTOR SHALL MEASURE AND DOCUMENT, IN A TYPED REPORT THE AIRFLOW QUANTITIES PROVIDED OR EXHAUSTED BY ALL EXISTING EQUIPMENT AND DUCTS TO REMAIN THAT SERVE OR ARE SERVED FROM THE RENOVATED AREA. SUBMIT TYPE WRITTEN DATA TO ENGINEER FOR REVIEW. THE FOLLOWING INFORMATION IS REQUIRED: - AIR FLOW OF ALL AIR DEVICES IN RENOVATED AREA(S). - AIR FLOW (TRAVERSE) AT MAINS AND BRANCH DUCTS SERVING THE RENOVATED AREA(S). - AIR FLOW AT UNITS (TRAVERSE) AT MAINS AND BRANCH DUCTS SERVING THE RENOVATED AREA(S). - SUCTION AND DISCHARGE STATIC AT UNITS SERVING THE RENOVATED AREA(S). - MEASURED FAN RPM, MOTOR AMPERAGE FOR ALL UNITS SERVING THE RENOVATED AREA(S). - PROVIDE EXISTING UNIT AND MOTOR NAME PLATE DATE. - WATERFLOW TO COILS AS APPLICABLE. 2. FINAL CONSTRUCTION: UPON COMPLETION OF THE HVAC RENOVATION WORK, THE SAME CONTRACTOR SHALL REBALANCE THE NEW AND EXISTING EQUIPMENT AND DUCTS TO PROVIDE INDICATED AIR QUANTITIES TO THE RENOVATED SPACE. ANY ADDITION OF DAMPERS, ADJUSTMENTS, (FAN SPEED, CHANGE OUT OF PULLEYS, ETC.) REQUIRED FOR THIS SHALL BE INCLUDED IN THIS CONTRACTORS PROPOSAL. 3. FINAL REPORT: SUBMIT FINAL TEST AND BALANCE REPORT TO ENGINEER FOR REVIEW AND ACCEPTANCE ONE WEEK PRIOR TO FINAL AHCA INSPECTION FOR EACH PHASE. AHU OPERATION DURING CONSTRUCTION THE USE OF NEW OR EXISTING AIR HANDLING UNITS DURING CONSTRUCTION IS PROHIBITED UNLESS APPROVED BY THE OWNER AND THE PROCEDURES OUTLINED IN THIS PARAGRAPH ARE FOLLOWED RIGIDLY. 1. THE CONTRACTOR SHALL PROTECT THE INTERIOR OF ALL DUCTWORK AND AIR HANDLING UNITS FROM THE ACCUMULATION OF DIRT AND DUST USUALLY ASSOCIATED WITH THE FINISHING STAGES OF THE CONSTRUCTION WORK. 2. DUCTWORK STORED ON SITE AWAITING INSTALLATION SHALL BE CAREFULLY EXAMINED AND THOROUGHLY CLEANED BEFORE PLACEMENT IN ITS FINAL LOCATION. THE ENDS OF DUCTWORK SHALL BE CLOSED DURING CONSTRUCTION. 3. THE AIR HANDLING UNITS WILL BE ALLOWED TO OPERATE DURING THE FINISHING STAGES OF THE GENERAL WORK PROVIDED THE PRE - FILTERS ARE IN PLACE AND THE ENDS OF ALL RETURN AIR INLETS ARE COVERED WITH ROLL -UP FILTER MATERIAL. 4. WHEN THE SPACE IS TURNED OVER TO THE OWNER, THE CONTRACTOR SHALL REMOVE ALL FILTERS USED DURING CONSTRUCTION AND REPLACE THEM WITH NEW FILTERS. 5. USE OF NEW AHU'S DURING CONSTRUCTION IS NOT ALLOWED. HVAC LEGEND DUCTWORK ® SUPPLY DUCTWORK RETURN OR EXHAUST DUCTWORK ® FD FIRE DAMPER ® SD SMOKE DAMPER ® FSD COMBINATION FIRE & SMOKE DAMPER E1 340 SUPPLY DIFFUSER & AIR QUANTITY 120 R. RETURN GRILLE & AIR QUANTITY 160 E. EXHAUST GRILLE & AIR QUANTITY OT THERMOSTAT (ADJUST.) THERMOSTAT IN OR RETURN AIR FROM SPACE THERMOSTAT (CON - T C CEALED / KEY OPER.) OH �- HUMIDISTAT 1000 10 REHEAT BOX & SYMBOL CM ciinf-_ REHEAT COIL RISE IN DUCTWORK DROP IN DUCTWORK +7 CONICAL TEE CONN. +_ - �- BELLMOUTH CONN. 450 THROAT TAP BRANCH CONNECTION W RADIUS ELBOW R /W =1.5 a ro TURNING VANES IN ELBOW M.V.D. SHEET NO. MANUAL VOL. DAMPER A.T.C. �- AUTOMATIC TEMP. HVAC SCHEDULES, SPECIFICATIONS, AND DETAILS M -2.1 CONTROL PANEL V.F.D. VARIABLE FREQUENCY DRIVE M.L. MARINE LIGHT A.D. ACCESS DOOR [qD DUCT SMOKE DETECTOR HVAC DRAWING INDEX SHEET NO. DESCRIPTION M -0.1 HVAC LEGEND, NOTES, DRAWING INDEX, AND DETAILS M -0.2 HVAC SCHEDULES, SPECIFICATIONS, AND DETAILS M -2.1 2ND FLOOR PLANS - DEMOLITION AND NEW WORK - PHASE B - HVAC BERMELLO AJAMIL & PARTNERS, INC. Architecture Engineering Planning Interior Design Landscape Architecture 2601 South Bayshore Drive 10th Floor Miami, Florida33133 (305) 859 -2050 Fax (305) 860 -3700 3 ENGINEER: ENGINEER INFORMATION Sm th SS11 Secan Reid, Inc. 600 West Hillsboro, Suite 300 Deerfield Beach, FL 33441 _(954) 421 -1260 FAX: (954) 421 -1466 www.ssr- inc.com Firm Certification - EB- 0000867 AMed Esquivel PE - 48869 Bruce W. Peek PE - 36901 Donald Netinho PE - 48484 Nelson R. Long PE - 82294 Jahn E. Moulder PE - 39200 SSR JOB # 0632086.0 REVISIONS: PROJECT NAME: SMH - ADVANCE TOWER OFVICES - 2ND FLOOR PROJECT ADDRESS: 7400 S.W. 62nd Ave. South Miami, Florida 33143 _ ;i COMM. NO. 40030.100 SCALE: DATE: NOVEMBER 9, 2006 DRAWN: CHECKED: CADD FILE: DRAWING TITLE: HVAC LEGEND, NOTE; DRAWING INDEX, AND DETAILS SHEET NO. M -0.1