06-2055-0031 SMH -2ND FLOOR ADVANCE TOWER OFFICES - DEMOLITION PLAN - PHASE B
D1.0 SCALE: 3/16" = V -0"
C.
GENERAL . ^N -NOTES:
A. ALL ITEMS NOT MARKED TO BE - 15EM6 LISHED' ARE =-
EXISTING TO REMAIN. CONTRACTOR RESPWSI;3Lx =
FOR PRESERVING THE EXISTING -CON -6I1ION5 OF- - -
THESE ITEMS. SEE GENERAL DEMOLITION NOTES
® INDEX SHEET A -0.0 ---- - --
B. ALL REMAINING DOORS TO BE;,SANDED.,ANO _REF.UFBISHEO,'
C. THE CONTRACTOR SHALL FIELD VERIFY ALL
CONDITIONS AND DIMENSIONS PRIOR TO ANY WORK.
D. THE CONTRACTOR SHALL COORDINATE WITH OWNER
OR OWNER REPRESENTATIVE TEMPORARY STORAGE
OF ANY TYPE OF EQUIPMENT, FURNITURE, ETC., TO
BE RELOCATED PRIOR TO ANY WORK.
E. REFER TO MEP DRAWINGS FOR MECHANICAL,
ELECTRICAL AND PLUMBING DEMOLITION,
REPLACEMENTS, RELOCATIONS AND ADDITIONS.
I NOTE THIS DRAWING I
O REMOVE EXISTING FLOOR FINISHES AND PREPARE EXISTING
CONCRETE SLAB TO RECEIVE NEW FLOOR, SEE FINISH
SCHEDULE FOR NEW FINISHES. PATCH CONCRETE TO
MATCH ADJACENT SURFACES. NOTIFY ARCHITECT IF THERE
ARE CRACKS GREATER THAN 1/8-.
O REMOVE PORTION FOR DOOR OPENING
LEGEND
D EXISTING COLUMN
WALL OR DOOR ASSEMBLY TO REMAIN
\ \� HATCHED AREA DEPICTS ARE NOT IN CONTRACT
BERMELLO AJAMIL & PARTNERS, INC.
Architecture Engineering Planning
Interior Design Landscape Architecture
2601 South Bayshore Drive 10th Floor
Miami, Florida 33133
(305) 859 -2050 Fax (305) 860 -3700
STRUCTURAL ENGINNER:
MEP ENGINEER:
MEPENGINEER INFORMATION
Smith, Seckman, Reid, Inc.
CONSULTING
IE:NGI1-T ==T2S
600 West Hillsboro, Suite 300
Deerfield Beach, Florida 33441
Phone(954)421 -1260 Fax(954)421 -1466
� ". t � •• Yom' �-i
\ 65.7
REVISIONS:
PROJECT NAME:
', � _ fr �• is
'9rt:?XK
4'b t
SMH- ADVANCE TOWER OFFICES- 2ND FLOOR
PROJECT ADDRESS:
7400 S.W. 62nd Ave.
South Miami, Florida 33143
KEY PLAN
COMM. NO. 40030.100
SCALE: AS SHOWN
DATE: OCTOBER 12, 2006
O REFERRED TO DEMOLITION NOTE DRAWN: AVFG
ACTION TO BE APPLIED
CHECKED:
ROOM ROOM NAME CADD FILE: H:PROJECTS
NOTE
DRAWING TITLE:
DEMOLITION PLAN
PH. B
SHEET NO.
D1.0