Loading...
06-2055-002BERMELLO AJAMIL & PARTNERS, INC. Architecture Engineering Planning Interior Design Landscape Architecture 2601 South Bayshore Drive 10th Floor Miami, Florida 33133 (305) 859 -2050 Fax (305) 860 -3700 STRUCTURAL ENGINNER: MEP ENGINEER: MEPENGINEER INFORMATION Smith, Seckman, Reid, Inc. CONSULTING ]ENGIN]E]ETzz S 600 West Hillsboro, Suite 300 Deerfield Beach, Florida 33441 Phone(954)421 -1260 Fax(954)421 -1466 p.. w _t , REVISIONS: PROJECT NAME: SMH- ADVANCE TOWER OFFICES- 2ND FLOOR PHASE W PROJECT ADDRESS: 7400 S.W. 62nd Ave. South Miami, Florida 33143 KEY PLAN COMM. NO. 40030.100 SCALE: DATE: November 09, 2006 DRAWN: CHECKED: CADD FILE: H:PROJECTS DRAWING TITLE: INDEX SHEET NO. AOmO 10 ABBREVIATIONS GENERAL NOTES GENERAL DEMOLITION NOTES DRAWING INDEX A AC ACOUSTICAL L LAV LAVATORY 01. ALL WORK TO BE PERFORMED UNDER THIS CONTRACT SHALL COMPLY WITH CODES LISTED ON SHEET LS -1, THE FLORIDA 01. CONTRACTOR SHALL SUBMIT A SCHEDULE INDICATING PROPOSED SEQUENCE OF OPERATIONS FOR SELECTIVE DEMOLITION ARCHITECTURE ADJ ADJUSTABLE LAM LAMINATED BUILDING CODE (LATEST EDITION), CITY LABOR LAWS, CITY ORDINANCES CITY /COUNTY ZONING CODES, NATIONAL WORK TO OWNER'S REPRESENTATIVE AND ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO START OF WORK. INCLUDE - AFF ABOVE FINISH FLOOR LT LIGHT ELECTRICAL CODE, N.F.P.A. 101, O.S.H.A., A.D.A. & ALL OTHER APPLICABLE CODES, RULES AND REGULATIONS. COORDINATION FOR SHUTOFF, CAPPING, AND CONTINUATION OF UTILITY SERVICES AS REQUIRED, TOGETHER WITH DETAILS COVER AGG AGGREGATE LTWT LIGHT WEIGHT FOR DUST AND NOISE CONTROL PROTECTION. INCLUDE SCHEDULE OF OPERATIONS TO INCLUDE HOURS PER DAY AND - - , ------ A.C. AIR CONDITIONING LF OR LIN FT LINEAR FEET DAYS OF WEEK TO BE WORKED. A0.0 INDEX ALUM ALUMINUM 02• THE CONTRACTOR SHALL FAMILIARIZE HIM /HERSELF WITH THE PROJECT THROUGH INSPECTION OF THE SITE, THE B BM BEAM M MAT MATERIAL DRAWINGS AND SPECIFICATIONS, SO AS TO THOROUGHLY UNDERSTAND THE NATURE AND SCOPE OF THE WORK. ANY - PROVIDE DETAILED SEQUENCE OF DEMOLITION AND REMOVAL WORK TO ENSURE UNINTERRUPTED D1.0 DEMOLITION PLAN ML MATCH LINE AMBIGUITIES OR CONFLICTS WITH THE CONSTRUCTION DOCUMENTS SHALL BE REPORTED TO THE ARCHITECT IN WRITING PROGRESS OF OWNER'S ON SITE OPERATIONS. BLK BLKG BLOCK BLOCKING MAX MECH MAXIMUM MECHANICAL PRIOR TO SUBMISSION OF BID. - COORDINATE WITH OWNER'S CONTINUING OCCUPATION OF PORTIONS OF EXISTING BUILDING AND WITH A1.0 NEW CONSTRUCTION FLOOR PLAN -PHASE B BOT BOTTOM MET OR MTL METAL 03. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL REQUIRED PERMITS TO CARRY OUT THE WORK DESCRIBED OWNER'S PARTIAL OCCUPANCY OF COMPLETED REFURBISHED AREA. A2.0 EXISTING CEILING PLAN BLDG BUILDING MIN MINIMUM IN THE CONSTRUCTION DOCUMENTS. ALL REQUIRED PERMITS SHALL BE OBTAINED PRIOR TO THE COMMENCEMENT OF BLKHD BULKHEAD MISC MISCELLANEOUS WORK. 02. CONTRACTOR SHALL SUBMIT PHOTOGRAPHS OR VIDEO OF EXISTING CONDITIONS OF STRUCTURE SURFACES, EQUIPMENT, AND A3.0 ENLARGED TOILET ROOM, ELEVATIONS & DETAILS C CAB CABINET MACH MANUF MACHINE MANUFACTURER 04. OMISSIONS: IN THE EVENT THAT CERTAIN FEATURES OF THE CONSTRUCTION ARE NOT FULLY SHOWN ON THE DRAWINGS, ADJACENT IMPROVEMENTS THAT MIGHT BE MISCONSTRUED AS DAMAGE RELATED TO REMOVAL OPERATIONS. CONTRACTOR SHALL ALSO SCHEDULE A SITE VISIT TO INCLUDE OWNER'S REPRESENTATIVE AND ARCHITECT FOR VERIFICATION OF THE A4.0 WALL TYPES, SCHEDULES & DETAILS CARP CARPET THEN THEIR CONSTRUCTION SHALL BE OF THE SAME CHARACTER AS FOR SIMILAR CONDITIONS THAT ARE SHOWN OR WORKING CONDITION OF BUILDING SYSTEMS AFFECTED BY DEMOLITION WORK. FILE WITH ARCHITECT PRIOR TO START OF CLG CEILING N NOM NOMINAL NOTED AND SHALL BE INCLUDED AS PART OF THE BID SUBMISSION. WORK A5.0 MISCELLANEOUS DETAILS CEM CEMENT NIC NOT IN CONTRACT CA CENTER LINE NTS NOT TO SCALE 05. EXISTING ELECTRICAL, MECHANICAL, LIFE SAFETY AND FIRE PROTECTION FIXTURES INCLUDING BUT NOT LIMITED TO, 03. OCCUPANCY. OWNER WILL OCCUPY PORTIONS OF THE BUILDING IMMEDIATELY ADJACENT TO AREAS OF SELECTIVE A6.0 WALL PENETRATIONS CER CERAMIC SURFACE/RECESSED LIGHT FIXTURES, LIGHT/EQUIPMENT SWITCHES, H.V.A.C. REGISTERS, THERMOSTATS, ACCESS PANELS, DEMOLITION. CONDUCT SELECTIVE DEMOLITION WORK IN MANNER THAT WILL MINIMIZE THE NEED FOR DISRUPTION OF C.T. CERAMIC TILE O OFF OFFICE INTERCOM SPEAKERS, FIRE ALARM HORNS /STROBES /SWITCHES, HEAT /SMOKE DETECTORS, CONCEALED/ EXPOSED FIRE OWNER'S NORMAL OPERATIONS. ALL REQUESTS MUST BE MADE 72 HOURS IN ADVANCE PRIOR TO DEMOLITION ACTIVITIES A7.0 UL RA11INGS CO CLEAN OUT CL OR CLOS CLOSET OPNG OD OPENING OUTSIDE DIAMETER SPRINKLER HEADS AND ASSOCIATED PIPING, DUCTWORK AND ORNAMENTAL FIXTURES ARE TO REMAIN. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL AS REQUIRED OF EXISTING FIXTURES TO ACCOMPLISH DEMOLITION WORK AND NEW THAT WILL AFFECT OWNER'S NORMAL OPERATIONS INCLUDING BUT NOT LIMITED TO LOUD LOISES AND PRODUCTS WITH COL COLUMN OC ON CENTER CONSTRUCTION WORK INDICATED IN THE CONSTRUCTION DOCUMENTS. FURTHER, THE CONTRACTOR SHALL BE STRONG ODORS. CONC CMU CONCRETE CONCRETE MASONRY UNIT OH OR OPP.HD. OPPOSITE HAND RESPONSIBLE FOR THE REINSTALLATION OF EXISTING FIXTURES IN GOOD WORKING ORDER (TO MATCH ORIGINAL 04. CONDITION OF STRUCTURES: OWNER ASSUMES NO RESPONSIBILITY FOR ACTUAL CONDITION OF ITEMS OR STRUCTURES TO MECHANICAL CONST CONSTRUCTION P PR PAIR INSTALLATION) UPON COMPLETION OF REPAIR WORK. BE DEMOLISHED. CONDITIONS EXISTING AT TIME OF INSPECTION FOR BIDDING PURPOSES WILL BE MAINTAINED BY OWNER M -0.1 HVAC LEGEND, NOTES, DRAWING INDEX, AND DETAILS CONT CONTINUOUS PASS PASSENGER 06. ALL DIMENSIONS PROVIDED ARE APPROXIMATE, CONTRACTOR SHALL VERIFY DIMENSIONS WITH EXISTING FIELD CONDITIONS. INSOFAR AS PRACTICABLE. HOWEVER, MINOR VARIATIONS WITHIN STRUCTURE MAY OCCUR. CG CU CORNER GUARD CUBIC PENT PC PENTHOUSE PRECAST 05. PARTIAL DEMOU71ON AND REMOVAL- STORAGE OF REMOVED ITEMS ON SITE WILL NOT BE PERMITTED. M -0.2 HVAC SCEDULES, SPECIFICATIONS, AND DETAILS Pi PLAS PANEL JOINT PLASTER 07. CONTRACTOR SHALL PROVIDE A MINIMUM 72 HOUR WRITTEN REQUEST TO THE OWNER'S REPRESENTATIVE IN ADVANCE OF 06. PROTECTIONS: PROVIDE TEMPORARY BARRICADES AND OTHER FORMS OF PROTECTION TO PROTECT OWNERS PERSONNEL M -2.1 2ND FLOOR PLANS - DEMOLITION AND NEW WORK -PHASE B -HVAC D DEPT DEPARTMENT POL POLISHED ANY ACTIVITY WHICH WILL AFFECT EXISTING BUILDING OPERATIONS. DETERMINE OWNER'S REPRESENTATIVE PRIOR TO AND GENERAL PUBLIC FROM INJURY DUE TO SELECTIVE DEMOLITION WORK. DIA DIAMETER STARTING WORK. DIM DIMENSION PMLD PNL PREMOULDED PANEL A. PROVIDE PROTECTIVE MEASURES AS REQUIRED TO PROVIDE FREE AND SAFE PASSAGE OF OWNER'S PERSONNEL AND DN DOWN 08. CONTRACTOR SHALL PROTECT ALL EXISTING FLOOR SURFACES WITH A MEANS OF CONTAINMENT TO PREVENT SOILING OF GENERAL PUBLIC TO OCCUPIED PORTIONS OF BUILDING. DS DOWN SPOUT O QT QUARRY TILE THE FLOOR. IN ADDITION, THE CONTRACTOR SHALL PROVIDE SHEATHING OVER THE FLOOR AT ALL TRAFFIC AREAS AND ELECTRICAL DWG DRAWING QTM QUARRY TILE MINIATURES THOSE AREAS EXPOSED TO EQUIPMENT, SCAFFOLDING AND CONSTRUCTION DEBRIS. B. PROTECT FROM DAMAGE EXISTING FINISH WORK THAT IS TO REMAIN IN PLACE AND BECOMES EXPOSED DURING DF DRINKING FOUNTAIN 09. ALL WALL /CEILING SURFACES WITHIN THE LIMITS OF CONSTRUCTION ARE TO BE REPAIRED /REPLACED TO MATCH EXISTING DEMOLITION OPERATIONS. E -0.1 LEGEND, SCHEDULES & DRAWING INDEX E E.A. EXPOSED AGGREGATE R RAD RADIUS ADJACENT SURFACES, THIS SHALL INCLUDE BUT NOT BE LIMITED TO, WATER AND OR MILDEW DAMAGE, CRACKED C. PROTECT FLOORS /CARPETS WITH SUITABLE COVERINGS WHEN NECESSARY. E -1.1 2ND FLOOR PLAN - DEMOLITION -PHASE B- ELECTRICAL EA EACH R RISER WALLBOARD, DAMAGED TAPE JOINTS, ETC. ALL DAMAGED WALLBOARD SHALL BE REPLACED. EL ELE ELEVATION (GRADE) ELEVATION (FACADE) REINF REQ D REINFORCED REQUIRED 10. ALL STAINED SURFACES ARE TO BE KILZ PRIMER COATED IN ADVANCE OF PAINT FINISH. D. CONSTRUCT TEMPORARY INSULATED DUSTPROOF PARTITIONS WHERE REQUIRED TO SEPARATE AREAS WHERE NOISY OR EXTENSIVE DIRT OR DUST OPERATIONS ARE PERFORMED. EQUIP PARTITIONS WITH DUSTPROOF DOORS AND SECURITY E -2.1 2ND FLOOR PLAN -NEW WORK -PHASE B- LIGHTING ELEV EQ ELEVATOR EQUAL RF RD ROOF ROOF DRAIN 11. THE CONTRACTOR SHALL PROVIDE A MEANS OF CONTAINMENT TO PREVENT DUST AND DEBRIS MIGRATION TO ADJACENT LOCKS. ALL TEMP. PART. ARE TO BE BEDDED AND RECEIVE ONE COAT OF FINISH PAINT. E -3.1 2ND FLOOR PLAN -NEW WORK -PHASE B -POWER & SYSTEMS EQUIP EQUIPMENT RM ROOM AREAS. CONTRACTOR SHALL NOT COMPROMISE THE EXISTING FIRE/FLAME SPREAD RATINGS OR MEANS OF EGRESS WITHIN E TEMPORARY PARTITIONS ARE TO BE ANCHORED WITH TWO -WAY TAPE, SCREWS, NAILS, ETC. WILL NOT BE E -4.1 PARTIAL POWER RISER DIAGRAM & PANEL SCHEDULES EXIST EXISTING RO ROUGH OPENING THE CONSTRUCTION AREAS AND ADJACENT AREAS AFFECTED BY CONSTRUCTION ACTIVITIES. PERMITTED. EXP.JT. EXP OR EJ EXPANSION JOINT EXPOSED REFL OR REF REFLECTED 12. THE CONTRACTOR SHALL MAINTAIN ALL COMPONENTS FOR MEANS OF EGRESS FREE OF OBSTRUCTIONS AND F. REMOVE PROTEC11ONS AT COMPLETION OF WORK. E -5.1 ELECTRICAL SPECIFICATIONS EXT ELEC EXTERIOR ELECTRICAL 8 SECT SECTION ACCESSIBLE AT ALL TIMES. G. ROOMS UNDER CONSTRUCTION MUST BE BROUGHT TO A NEGATIVE PRESSURE BY USE OF SUITABLE FANS EQUIPED SHT SHEET 13. THE CONTRACTOR SHALL MAINTAIN ALL LIFE SAFETY AND FIRE PROTECTION SYSTEMS OPERATIONAL AT ALL TIMES. WITH HEPA FILTRATION UNITS EXHAUSTING TO THE EXTERIOR OF THE BUILDING.. FIRE PROTECTION F FT FIN FEET FINISH SHT MET OR SM SIM SHEET METAL SIMILAR 14. CONTRACTOR SHALL MAINTAIN ALL EXISTING FIRE RATINGS AT NEW CONSTRUCTION. H. CONTRACTOR SHALL REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT FP -2.1 2ND FLOOR PLAN -NEW WORK -PHASE B -FIRE PROTECTION FE FIRE EXTINGUISHER SQ STD SQUARE STANDARD 15. CONTRACTOR SHALL MAKE ALLOWANCES FOR ALL WORK WHICH IMPACTS THE DAILY OPERATIONS OF THE FACILITY AND CONTAMINATION OF DUCT SYSTEM. FEC FIRE EXTINGUISHER CABINET SS STAINLESS STEEL WHICH MUST BE ACCOMPLISHED AT THE TIMES OTHER THAN NORMAL WEEKDAY WORKING HOURS 07. DAMAGES: PROMPTLY REPAIR DAMAGES CAUSED TO ADJACENT FACILITIES BY DEMOLITION WORK. FHC FIRE HOSE CABINET FL FLOOR STL STE AGE 16. CONTRACTOR SHALL MAKE ALLOWANCES IN BID FOR ALL WORK STOPPAGES ORDERED BY THE OWNER DUE TO WORK 08. MAINTAIN EXISTING BUILDING SYSTEMS /UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST DAMAGE PLUMBING FD FLOOR DRAIN STRUCT STRUCTURAL IMPACTING THE DAILY OPERATIONS OF THE FACILITY. DURING DEMOLITION OPERATIONS. FLUOR FS FLUORESCENT FULL SIZE SUSP SPECS SUSPENDED SPECIFICATIONS 17. CONSTRUCTION ACTIVITY AFTER REGULAR WORKING HOURS MUST BE DONE MONDAY TO FRIDAY FROM 6:00 PM TO 6:00 - DO NOT INTERRUPT BUILDING SYSTEMS UTILITIES SERVING OCCUPIED OR USED FACILITIES EXCEPT WHEN AUTHORIZED IN P -2.1 2ND FLOOR PLAN -NEW WORK -PHASE B- PLUMBING FV FIELD VERIFY AM AND SATURDAY & SUNDAY 24 HOURS. WRITING BY AUTHORITIES HAVING JURISDICTION. PROVIDE TEMPORARY SERVICES DURING INTERRUPTIONS TO EXISTING FVC FIRE VALVE CABINET BUILDING SYSTEMS/UTTLITIES AS ACCEPTABLE TO GOVERNING AUTHORITIES. T TEL TELEPHONE 18. ALL EQUIPMENT USED ON THE JOB SHALL BE OPERATED BY OSHA REGULATIONS. Q GALV GA GALVANIZED GAUGE TEMP T TEMPERED TOILET 19. CONTRACTOR AND ALL SUBCONTRACTORS SHALL FIELD CHECK AND VERIFY ALL EXISTING CONDITIONS AND SHALL BE - MAINTAIN FIRE PROTECTION SERVICES DURING SELECTIVE DEMOLITION OPERATIONS. GC GENERAL CONTRACTOR T TREADS RESPONSIBLE FOR THEIR PRESERVATION.. OWNER HAS THE RIGHT TO STOP WORK IF CONSTRUCTION ACTIVITY INTERFERES WITH PATIENT SAFETY OR NORMAL GL GR GLASS GRADE TR TR TELEPHONE RECEPTACLE 20. CONTRACTOR SHALL BE RESPONSIBLE OF INTERIM LIFE SAFETY MEASURES AS REQUIRED ON LIFE SAFETY DRAWINGS. OPERATIONS. DEMOLITION WORK IS TO BE COORDINATED WITH THE PHASING PLAN. DO NOT EXCEED THE LIMITS OF THE PHASE UNDER CONSTRUCTION, WITHOUT APPROVAL FROM THE OWNER. GYP GYPSUM THK THICK GYP BD GYPSUM WALLBOARD 21 • PROVIDE WALK -OFF MATS AT ALL ENTRY/EXITS OF THE CONSTRUCTION SITE. WALK -OFF MATS MUST BE CLEANED OR 09. ENVIRONMENTAL CONTROLS: USE WATER SPRINKLING, TEMPORARY DEBRIS ENCLOSURES, AND OTHER METHODS TO LIMIT DUST AND DIRT MIGRATION. COMPLY WITH GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION. H HRDW HARDWARE V VERT VERTICAL CHANGED AS NEEDED TO AVOID DISPERSION OF DUST OUTSIDE WORK AREA. HT HEIGHT VT VINYL TILL - DO NOT USE WATER WHEN IT MAY CREATE HAZARDOUS OR OBJECTIONABLE CONDITIONS SUCH AS FLOODING, HM HOLLOW METAL VB VAPOR BARRIER 22. CONTRACTOR MAY NEED TO PENETRATE OR OTHERWISE MODIFY FIRE RATED PARTITIONS. COORDINATE SCOPE OF POLLUTION AND DAMAGE TO EXISTING FINISHES. HORIZ HORIZONTAL VWC VINYL WALL COVERING MECHANICAL, ELECTRICAL AND PLUMBING WITH LIFE SAFETY PLAN TO DETERMINE LOCATIONS. RATING OF THE WALL SHOULD BE PRESERVED AT ALL TIMES. FOLLOW DETAILS PROVIDED IN SHEETS A -8, A -9 AND A -10 FOR SEALING FIRE 10. IF UNANTICIPATED MECHANICAL, ELECTRICAL, OR STRUCTURAL ELEMENTS THAT CONFLICT WITH INTENDED FUNCTION OR IN INCH W VWC -GYP WALL COVERING - GYPSUM BOARD PENETRATIONS. ALL DUCTS CROSSING FIRE RATED ASSEMBLIES SHALL HAVE FIRE DAMPERS TO MATCH THE RATING OF DESIGN ARE ENCOUNTERED, INVESTIGATE AND MEASURE BOTH NATURE AND EXTENT OF THE CONFLICT. SUBMIT REPORT INCAND INCANDESCENT VWC -PLAS WALL COVERING - PLASTER THE WALL. ALL ROOF AND FLOOR PENETRATIONS SHALL BE PROPERLY SEALED. TO OWNER'S REPRESENTATIVE IN WRITTEN, ACCURATE DETAIL. PENDING RECEIPT OF DIRECTIVE FROM OWNER'S ID INSIDE DIAMETER WC WET COLUMN REPRESENTATIVE, REARRANGE SELECTIVE DEMOLITION SCHEDULE AS NECESSARY TO CONTINUE OVERALL JOB PROGRESS INSUL INSULATION WP WATERPROOFING WITHOUT UNDUE DELAY. INT INTERIOR WD WOOD INV INVERT W/ WITH 11. REMOVE FROM BUILDING SITE ON A DAILY BASIS, ALL DEBRIS, RUBBISH AND OTHER MATERIALS RESULTING FROM W/O WITHOUT DEMOLITION OPERATIONS. TRANSPORT AND LEGALLY DISPOSE OF OFF SITE. DEBRIS REMOVAL TO BE DONE AFTER REGULAR J JT JOINT WC WATER COOLER WORKING HOURS. JST JOIST JC JANITOR'S CLOSET Y YD YARD - IF HAZARDOUS MATERIALS ARE ENCOUNTERED DURING DEMOLITION OPERATIONS COMPLY WITH APPLICABLE REGULATIONS, LAWS, AND ORDINANCES CONCERNING REMOVAL, HANDLING AND PROTECTION AGAINST EXPOSURE OR ENVIRONMENTAL POLLUTION. - BURNING OF REMOVED MATERIALS IS NOT PERMITTED ON PROJECT SITE. 12. UPON COMPLETION OF DEMOLITION WORK, REMOVE TOOLS, EQUIPMENT, AND DEMOLISHED MATERIALS FROM SITE. REMOVE PROTECTIONS AND LEAVE INTERIOR PER CONDITIONS DOCUMENTED IN SUBMITTED PHOTOGRAPHS/VIDEO. - REPAIR DEMOLITION PERFORMED IN EXCESS OF THAT REQUIRED. RETURN ELEMENTS OF CONSTRUCTION AND SURFACES TO REMAIN TO CONDITION EXISTING PRIOR TO START OF OPERATIONS. REPAIR ADJACENT CONSTRUCTION OR SURFACES SOILED OR DAMAGED BY SELECTIVE DEMOLITION WORK. ARCHITECTURAL SYMBOLS REFERENCE SYMBOLS VICINITY MAP PROJECT LOCATION „ //A <. DOOR WALL CONSTRUCTION A SYMBOL 1 DOOR NUMBER WALL TYPE PROJECT _ PROJECT M � _ INSULATION CONCRETE Blanket PRECAST GRAVEL or CRUSHED CEMENT MORTAR CONCRETE L_74'// h-� LOCATION ' t t '" LOCATION - - _ F77 STONE rt' PLASTER DETAIL NUMBER ROOM NAME OFFI- ROOM NAME EXTERIOR & INTERIOR 1't 1 t "--F 1 1 t l I 7x EARTH TILE Ceramic or a SOLID CONC. MAS. UNIT CONCRETE MASONRY MARBLE FINISH SCHEDULE 1 ROOM NUMBER ELEVATION SYMBOL p 1 1 1 t 1 PR SR Structural UNIT �. CONSTRUCTION DETAIL 1 DETAIL NUMBER SYMBOL i BUILDING. PARTIAL DETAIL NUMBER 1 SHEET NUMBER DETAIL SECTION � 1m�� C SHEET WOOD WOOD WOOD BRICK SYMBOL A -1 SHEET NUMBER METAL Finished Blocking Blocking Large GLASS GLASS Small Large Continuous INSULATION Rigid Intermittent Scale WINDOW TYPES WINDOW TYPE COLUMN REFERENCE NUMBER OR LE1lER��,.' 1 O _J ��! _ Scale Scale �.... GENERAL NOTES ABCDEFG -NOTE TOP OF CONCRETE ELEVATION 0.00 ....�.�.1 - --i 0 STEEL STEEL PLYWOOD SLAB ELEVATION DETAIL NUMBER r..... 1 t� flf7F� � F��� Smolt Scale Large Scale N N DRAWING 1111) =S 1 SCALE: DRAWING REVISIONS 1 REVISION NUMBER -I SCALE. Adjacent Zoning o Som City tr #SOA Wad Z0ttttlg ft SHEET NUMBER Lad UpQ(atodNt3Y2MI. n BERMELLO AJAMIL & PARTNERS, INC. Architecture Engineering Planning Interior Design Landscape Architecture 2601 South Bayshore Drive 10th Floor Miami, Florida 33133 (305) 859 -2050 Fax (305) 860 -3700 STRUCTURAL ENGINNER: MEP ENGINEER: MEPENGINEER INFORMATION Smith, Seckman, Reid, Inc. CONSULTING ]ENGIN]E]ETzz S 600 West Hillsboro, Suite 300 Deerfield Beach, Florida 33441 Phone(954)421 -1260 Fax(954)421 -1466 p.. w _t , REVISIONS: PROJECT NAME: SMH- ADVANCE TOWER OFFICES- 2ND FLOOR PHASE W PROJECT ADDRESS: 7400 S.W. 62nd Ave. South Miami, Florida 33143 KEY PLAN COMM. NO. 40030.100 SCALE: DATE: November 09, 2006 DRAWN: CHECKED: CADD FILE: H:PROJECTS DRAWING TITLE: INDEX SHEET NO. AOmO 10