06-2055-002BERMELLO AJAMIL & PARTNERS, INC.
Architecture Engineering Planning
Interior Design Landscape Architecture
2601 South Bayshore Drive 10th Floor
Miami, Florida 33133
(305) 859 -2050 Fax (305) 860 -3700
STRUCTURAL ENGINNER:
MEP ENGINEER:
MEPENGINEER INFORMATION
Smith, Seckman, Reid, Inc.
CONSULTING
]ENGIN]E]ETzz S
600 West Hillsboro, Suite 300
Deerfield Beach, Florida 33441
Phone(954)421 -1260 Fax(954)421 -1466
p..
w _t ,
REVISIONS:
PROJECT NAME:
SMH- ADVANCE TOWER OFFICES- 2ND FLOOR
PHASE W
PROJECT ADDRESS:
7400 S.W. 62nd Ave.
South Miami, Florida 33143
KEY PLAN
COMM. NO. 40030.100
SCALE:
DATE: November 09, 2006
DRAWN:
CHECKED:
CADD FILE: H:PROJECTS
DRAWING TITLE:
INDEX
SHEET NO.
AOmO
10
ABBREVIATIONS
GENERAL NOTES
GENERAL DEMOLITION NOTES
DRAWING INDEX
A
AC
ACOUSTICAL
L
LAV
LAVATORY
01.
ALL WORK TO BE PERFORMED UNDER THIS CONTRACT SHALL COMPLY WITH CODES LISTED ON SHEET LS -1, THE FLORIDA
01. CONTRACTOR SHALL SUBMIT A SCHEDULE INDICATING PROPOSED SEQUENCE OF OPERATIONS FOR SELECTIVE DEMOLITION
ARCHITECTURE
ADJ
ADJUSTABLE
LAM
LAMINATED
BUILDING CODE (LATEST EDITION), CITY LABOR LAWS, CITY ORDINANCES CITY /COUNTY ZONING CODES, NATIONAL
WORK TO OWNER'S REPRESENTATIVE AND ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO START OF WORK. INCLUDE
-
AFF
ABOVE FINISH FLOOR
LT
LIGHT
ELECTRICAL CODE, N.F.P.A. 101, O.S.H.A., A.D.A. & ALL OTHER APPLICABLE CODES, RULES AND REGULATIONS.
COORDINATION FOR SHUTOFF, CAPPING, AND CONTINUATION OF UTILITY SERVICES AS REQUIRED, TOGETHER WITH DETAILS
COVER
AGG
AGGREGATE
LTWT
LIGHT WEIGHT
FOR DUST AND NOISE CONTROL PROTECTION. INCLUDE SCHEDULE OF OPERATIONS TO INCLUDE HOURS PER DAY AND
- - , ------
A.C.
AIR CONDITIONING
LF OR LIN FT
LINEAR FEET
DAYS OF WEEK TO BE WORKED.
A0.0 INDEX
ALUM
ALUMINUM
02•
THE CONTRACTOR SHALL FAMILIARIZE HIM /HERSELF WITH THE PROJECT THROUGH INSPECTION OF THE SITE, THE
B
BM
BEAM
M
MAT
MATERIAL
DRAWINGS AND SPECIFICATIONS, SO AS TO THOROUGHLY UNDERSTAND THE NATURE AND SCOPE OF THE WORK. ANY
- PROVIDE DETAILED SEQUENCE OF DEMOLITION AND REMOVAL WORK TO ENSURE UNINTERRUPTED
D1.0 DEMOLITION PLAN
ML
MATCH LINE
AMBIGUITIES OR CONFLICTS WITH THE CONSTRUCTION DOCUMENTS SHALL BE REPORTED TO THE ARCHITECT IN WRITING
PROGRESS OF OWNER'S ON SITE OPERATIONS.
BLK
BLKG
BLOCK
BLOCKING
MAX
MECH
MAXIMUM
MECHANICAL
PRIOR TO SUBMISSION OF BID.
- COORDINATE WITH OWNER'S CONTINUING OCCUPATION OF PORTIONS OF EXISTING BUILDING AND WITH
A1.0 NEW CONSTRUCTION FLOOR PLAN -PHASE B
BOT
BOTTOM
MET OR MTL
METAL
03.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL REQUIRED PERMITS TO CARRY OUT THE WORK DESCRIBED
OWNER'S PARTIAL OCCUPANCY OF COMPLETED REFURBISHED AREA.
A2.0 EXISTING CEILING PLAN
BLDG
BUILDING
MIN
MINIMUM
IN THE CONSTRUCTION DOCUMENTS. ALL REQUIRED PERMITS SHALL BE OBTAINED PRIOR TO THE COMMENCEMENT OF
BLKHD
BULKHEAD
MISC
MISCELLANEOUS
WORK.
02. CONTRACTOR SHALL SUBMIT PHOTOGRAPHS OR VIDEO OF EXISTING CONDITIONS OF STRUCTURE SURFACES, EQUIPMENT, AND
A3.0 ENLARGED TOILET ROOM, ELEVATIONS & DETAILS
C
CAB
CABINET
MACH
MANUF
MACHINE
MANUFACTURER
04.
OMISSIONS: IN THE EVENT THAT CERTAIN FEATURES OF THE CONSTRUCTION ARE NOT FULLY SHOWN ON THE DRAWINGS,
ADJACENT IMPROVEMENTS THAT MIGHT BE MISCONSTRUED AS DAMAGE RELATED TO REMOVAL OPERATIONS. CONTRACTOR
SHALL ALSO SCHEDULE A SITE VISIT TO INCLUDE OWNER'S REPRESENTATIVE AND ARCHITECT FOR VERIFICATION OF THE
A4.0 WALL TYPES, SCHEDULES & DETAILS
CARP
CARPET
THEN THEIR CONSTRUCTION SHALL BE OF THE SAME CHARACTER AS FOR SIMILAR CONDITIONS THAT ARE SHOWN OR
WORKING CONDITION OF BUILDING SYSTEMS AFFECTED BY DEMOLITION WORK. FILE WITH ARCHITECT PRIOR TO START OF
CLG
CEILING
N
NOM
NOMINAL
NOTED AND SHALL BE INCLUDED AS PART OF THE BID SUBMISSION.
WORK
A5.0 MISCELLANEOUS DETAILS
CEM
CEMENT
NIC
NOT IN CONTRACT
CA
CENTER LINE
NTS
NOT TO SCALE
05.
EXISTING ELECTRICAL, MECHANICAL, LIFE SAFETY AND FIRE PROTECTION FIXTURES INCLUDING BUT NOT LIMITED TO,
03. OCCUPANCY. OWNER WILL OCCUPY PORTIONS OF THE BUILDING IMMEDIATELY ADJACENT TO AREAS OF SELECTIVE
A6.0 WALL PENETRATIONS
CER
CERAMIC
SURFACE/RECESSED LIGHT FIXTURES, LIGHT/EQUIPMENT SWITCHES, H.V.A.C. REGISTERS, THERMOSTATS, ACCESS PANELS,
DEMOLITION. CONDUCT SELECTIVE DEMOLITION WORK IN MANNER THAT WILL MINIMIZE THE NEED FOR DISRUPTION OF
C.T.
CERAMIC TILE
O
OFF
OFFICE
INTERCOM SPEAKERS, FIRE ALARM HORNS /STROBES /SWITCHES, HEAT /SMOKE DETECTORS, CONCEALED/ EXPOSED FIRE
OWNER'S NORMAL OPERATIONS. ALL REQUESTS MUST BE MADE 72 HOURS IN ADVANCE PRIOR TO DEMOLITION ACTIVITIES
A7.0 UL RA11INGS
CO CLEAN OUT
CL OR CLOS CLOSET
OPNG
OD
OPENING
OUTSIDE DIAMETER
SPRINKLER HEADS AND ASSOCIATED PIPING, DUCTWORK AND ORNAMENTAL FIXTURES ARE TO REMAIN. CONTRACTOR
SHALL BE RESPONSIBLE FOR REMOVAL AS REQUIRED OF EXISTING FIXTURES TO ACCOMPLISH DEMOLITION WORK AND NEW
THAT WILL AFFECT OWNER'S NORMAL OPERATIONS INCLUDING BUT NOT LIMITED TO LOUD LOISES AND PRODUCTS WITH
COL
COLUMN
OC
ON CENTER
CONSTRUCTION WORK INDICATED IN THE CONSTRUCTION DOCUMENTS. FURTHER, THE CONTRACTOR SHALL BE
STRONG ODORS.
CONC
CMU
CONCRETE
CONCRETE MASONRY UNIT
OH OR OPP.HD.
OPPOSITE HAND
RESPONSIBLE FOR THE REINSTALLATION OF EXISTING FIXTURES IN GOOD WORKING ORDER (TO MATCH ORIGINAL
04. CONDITION OF STRUCTURES: OWNER ASSUMES NO RESPONSIBILITY FOR ACTUAL CONDITION OF ITEMS OR STRUCTURES TO
MECHANICAL
CONST
CONSTRUCTION
P
PR
PAIR
INSTALLATION) UPON COMPLETION OF REPAIR WORK.
BE DEMOLISHED. CONDITIONS EXISTING AT TIME OF INSPECTION FOR BIDDING PURPOSES WILL BE MAINTAINED BY OWNER
M -0.1 HVAC LEGEND, NOTES, DRAWING INDEX, AND DETAILS
CONT
CONTINUOUS
PASS
PASSENGER
06.
ALL DIMENSIONS PROVIDED ARE APPROXIMATE, CONTRACTOR SHALL VERIFY DIMENSIONS WITH EXISTING FIELD CONDITIONS.
INSOFAR AS PRACTICABLE. HOWEVER, MINOR VARIATIONS WITHIN STRUCTURE MAY OCCUR.
CG
CU
CORNER GUARD
CUBIC
PENT
PC
PENTHOUSE
PRECAST
05. PARTIAL DEMOU71ON AND REMOVAL- STORAGE OF REMOVED ITEMS ON SITE WILL NOT BE PERMITTED.
M -0.2 HVAC SCEDULES, SPECIFICATIONS, AND DETAILS
Pi
PLAS
PANEL JOINT
PLASTER
07.
CONTRACTOR SHALL PROVIDE A MINIMUM 72 HOUR WRITTEN REQUEST TO THE OWNER'S REPRESENTATIVE IN ADVANCE OF
06. PROTECTIONS: PROVIDE TEMPORARY BARRICADES AND OTHER FORMS OF PROTECTION TO PROTECT OWNERS PERSONNEL
M -2.1 2ND FLOOR PLANS - DEMOLITION AND NEW WORK -PHASE B -HVAC
D
DEPT
DEPARTMENT
POL
POLISHED
ANY ACTIVITY WHICH WILL AFFECT EXISTING BUILDING OPERATIONS. DETERMINE OWNER'S REPRESENTATIVE PRIOR TO
AND GENERAL PUBLIC FROM INJURY DUE TO SELECTIVE DEMOLITION WORK.
DIA
DIAMETER
STARTING WORK.
DIM
DIMENSION
PMLD
PNL
PREMOULDED
PANEL
A. PROVIDE PROTECTIVE MEASURES AS REQUIRED TO PROVIDE FREE AND SAFE PASSAGE OF OWNER'S PERSONNEL AND
DN
DOWN
08.
CONTRACTOR SHALL PROTECT ALL EXISTING FLOOR SURFACES WITH A MEANS OF CONTAINMENT TO PREVENT SOILING OF
GENERAL PUBLIC TO OCCUPIED PORTIONS OF BUILDING.
DS
DOWN SPOUT
O
QT
QUARRY TILE
THE FLOOR. IN ADDITION, THE CONTRACTOR SHALL PROVIDE SHEATHING OVER THE FLOOR AT ALL TRAFFIC AREAS AND
ELECTRICAL
DWG
DRAWING
QTM
QUARRY TILE MINIATURES
THOSE AREAS EXPOSED TO EQUIPMENT, SCAFFOLDING AND CONSTRUCTION DEBRIS.
B. PROTECT FROM DAMAGE EXISTING FINISH WORK THAT IS TO REMAIN IN PLACE AND BECOMES EXPOSED DURING
DF
DRINKING FOUNTAIN
09.
ALL WALL /CEILING SURFACES WITHIN THE LIMITS OF CONSTRUCTION ARE TO BE REPAIRED /REPLACED TO MATCH EXISTING
DEMOLITION OPERATIONS.
E -0.1 LEGEND, SCHEDULES & DRAWING INDEX
E
E.A.
EXPOSED AGGREGATE
R
RAD
RADIUS
ADJACENT SURFACES, THIS SHALL INCLUDE BUT NOT BE LIMITED TO, WATER AND OR MILDEW DAMAGE, CRACKED
C. PROTECT FLOORS /CARPETS WITH SUITABLE COVERINGS WHEN NECESSARY.
E -1.1 2ND FLOOR PLAN - DEMOLITION -PHASE B- ELECTRICAL
EA
EACH
R
RISER
WALLBOARD, DAMAGED TAPE JOINTS, ETC. ALL DAMAGED WALLBOARD SHALL BE REPLACED.
EL
ELE
ELEVATION (GRADE)
ELEVATION (FACADE)
REINF
REQ D
REINFORCED
REQUIRED
10.
ALL STAINED SURFACES ARE TO BE KILZ PRIMER COATED IN ADVANCE OF PAINT FINISH.
D. CONSTRUCT TEMPORARY INSULATED DUSTPROOF PARTITIONS WHERE REQUIRED TO SEPARATE AREAS WHERE NOISY
OR EXTENSIVE DIRT OR DUST OPERATIONS ARE PERFORMED. EQUIP PARTITIONS WITH DUSTPROOF DOORS AND SECURITY
E -2.1 2ND FLOOR PLAN -NEW WORK -PHASE B- LIGHTING
ELEV
EQ
ELEVATOR
EQUAL
RF
RD
ROOF
ROOF DRAIN
11.
THE CONTRACTOR SHALL PROVIDE A MEANS OF CONTAINMENT TO PREVENT DUST AND DEBRIS MIGRATION TO ADJACENT
LOCKS. ALL TEMP. PART. ARE TO BE BEDDED AND RECEIVE ONE COAT OF FINISH PAINT.
E -3.1 2ND FLOOR PLAN -NEW WORK -PHASE B -POWER & SYSTEMS
EQUIP
EQUIPMENT
RM
ROOM
AREAS. CONTRACTOR SHALL NOT COMPROMISE THE EXISTING FIRE/FLAME SPREAD RATINGS OR MEANS OF EGRESS WITHIN
E TEMPORARY PARTITIONS ARE TO BE ANCHORED WITH TWO -WAY TAPE, SCREWS, NAILS, ETC. WILL NOT BE
E -4.1 PARTIAL POWER RISER DIAGRAM & PANEL SCHEDULES
EXIST
EXISTING
RO
ROUGH OPENING
THE CONSTRUCTION AREAS AND ADJACENT AREAS AFFECTED BY CONSTRUCTION ACTIVITIES.
PERMITTED.
EXP.JT.
EXP
OR EJ EXPANSION JOINT
EXPOSED
REFL OR REF
REFLECTED
12.
THE CONTRACTOR SHALL MAINTAIN ALL COMPONENTS FOR MEANS OF EGRESS FREE OF OBSTRUCTIONS AND
F. REMOVE PROTEC11ONS AT COMPLETION OF WORK.
E -5.1 ELECTRICAL SPECIFICATIONS
EXT
ELEC
EXTERIOR
ELECTRICAL
8
SECT
SECTION
ACCESSIBLE AT ALL TIMES.
G. ROOMS UNDER CONSTRUCTION MUST BE BROUGHT TO A NEGATIVE PRESSURE BY USE OF SUITABLE FANS EQUIPED
SHT
SHEET
13.
THE CONTRACTOR SHALL MAINTAIN ALL LIFE SAFETY AND FIRE PROTECTION SYSTEMS OPERATIONAL AT ALL TIMES.
WITH HEPA FILTRATION UNITS EXHAUSTING TO THE EXTERIOR OF THE BUILDING..
FIRE PROTECTION
F
FT
FIN
FEET
FINISH
SHT MET OR SM
SIM
SHEET METAL
SIMILAR
14.
CONTRACTOR SHALL MAINTAIN ALL EXISTING FIRE RATINGS AT NEW CONSTRUCTION.
H. CONTRACTOR SHALL REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
FP -2.1 2ND FLOOR PLAN -NEW WORK -PHASE B -FIRE PROTECTION
FE
FIRE EXTINGUISHER
SQ
STD
SQUARE
STANDARD
15.
CONTRACTOR SHALL MAKE ALLOWANCES FOR ALL WORK WHICH IMPACTS THE DAILY OPERATIONS OF THE FACILITY AND
CONTAMINATION OF DUCT SYSTEM.
FEC
FIRE EXTINGUISHER CABINET
SS
STAINLESS STEEL
WHICH MUST BE ACCOMPLISHED AT THE TIMES OTHER THAN NORMAL WEEKDAY WORKING HOURS
07. DAMAGES: PROMPTLY REPAIR DAMAGES CAUSED TO ADJACENT FACILITIES BY DEMOLITION WORK.
FHC
FIRE HOSE CABINET
FL
FLOOR
STL
STE AGE
16.
CONTRACTOR SHALL MAKE ALLOWANCES IN BID FOR ALL WORK STOPPAGES ORDERED BY THE OWNER DUE TO WORK
08. MAINTAIN EXISTING BUILDING SYSTEMS /UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST DAMAGE
PLUMBING
FD
FLOOR DRAIN
STRUCT
STRUCTURAL
IMPACTING THE DAILY OPERATIONS OF THE FACILITY.
DURING DEMOLITION OPERATIONS.
FLUOR
FS
FLUORESCENT
FULL SIZE
SUSP
SPECS
SUSPENDED
SPECIFICATIONS
17.
CONSTRUCTION ACTIVITY AFTER REGULAR WORKING HOURS MUST BE DONE MONDAY TO FRIDAY FROM 6:00 PM TO 6:00
- DO NOT INTERRUPT BUILDING SYSTEMS UTILITIES SERVING OCCUPIED OR USED FACILITIES EXCEPT WHEN AUTHORIZED IN
P -2.1 2ND FLOOR PLAN -NEW WORK -PHASE B- PLUMBING
FV
FIELD VERIFY
AM AND SATURDAY & SUNDAY 24 HOURS.
WRITING BY AUTHORITIES HAVING JURISDICTION. PROVIDE TEMPORARY SERVICES DURING INTERRUPTIONS TO EXISTING
FVC
FIRE VALVE CABINET
BUILDING SYSTEMS/UTTLITIES AS ACCEPTABLE TO GOVERNING AUTHORITIES.
T
TEL
TELEPHONE
18.
ALL EQUIPMENT USED ON THE JOB SHALL BE OPERATED BY OSHA REGULATIONS.
Q
GALV
GA
GALVANIZED
GAUGE
TEMP
T
TEMPERED
TOILET
19.
CONTRACTOR AND ALL SUBCONTRACTORS SHALL FIELD CHECK AND VERIFY ALL EXISTING CONDITIONS AND SHALL BE
- MAINTAIN FIRE PROTECTION SERVICES DURING SELECTIVE DEMOLITION OPERATIONS.
GC
GENERAL CONTRACTOR
T
TREADS
RESPONSIBLE FOR THEIR PRESERVATION..
OWNER HAS THE RIGHT TO STOP WORK IF CONSTRUCTION ACTIVITY INTERFERES WITH PATIENT SAFETY OR NORMAL
GL
GR
GLASS
GRADE
TR
TR
TELEPHONE RECEPTACLE
20.
CONTRACTOR SHALL BE RESPONSIBLE OF INTERIM LIFE SAFETY MEASURES AS REQUIRED ON LIFE SAFETY DRAWINGS.
OPERATIONS. DEMOLITION WORK IS TO BE COORDINATED WITH THE PHASING PLAN. DO NOT EXCEED THE LIMITS OF THE PHASE
UNDER CONSTRUCTION, WITHOUT APPROVAL FROM THE OWNER.
GYP
GYPSUM
THK
THICK
GYP BD
GYPSUM WALLBOARD
21 •
PROVIDE WALK -OFF MATS AT ALL ENTRY/EXITS OF THE CONSTRUCTION SITE. WALK -OFF MATS MUST BE CLEANED OR
09. ENVIRONMENTAL CONTROLS: USE WATER SPRINKLING, TEMPORARY DEBRIS ENCLOSURES, AND OTHER METHODS TO LIMIT DUST
AND DIRT MIGRATION. COMPLY WITH GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION.
H
HRDW
HARDWARE
V
VERT
VERTICAL
CHANGED AS NEEDED TO AVOID DISPERSION OF DUST OUTSIDE WORK AREA.
HT
HEIGHT
VT
VINYL TILL
- DO NOT USE WATER WHEN IT MAY CREATE HAZARDOUS OR OBJECTIONABLE CONDITIONS SUCH AS FLOODING,
HM
HOLLOW METAL
VB
VAPOR BARRIER
22.
CONTRACTOR MAY NEED TO PENETRATE OR OTHERWISE MODIFY FIRE RATED PARTITIONS. COORDINATE SCOPE OF
POLLUTION AND DAMAGE TO EXISTING FINISHES.
HORIZ
HORIZONTAL
VWC
VINYL WALL COVERING
MECHANICAL, ELECTRICAL AND PLUMBING WITH LIFE SAFETY PLAN TO DETERMINE LOCATIONS. RATING OF THE WALL
SHOULD BE PRESERVED AT ALL TIMES. FOLLOW DETAILS PROVIDED IN SHEETS A -8, A -9 AND A -10 FOR SEALING FIRE
10. IF UNANTICIPATED MECHANICAL, ELECTRICAL, OR STRUCTURAL ELEMENTS THAT CONFLICT WITH INTENDED FUNCTION OR
IN
INCH
W
VWC -GYP
WALL COVERING - GYPSUM BOARD
PENETRATIONS. ALL DUCTS CROSSING FIRE RATED ASSEMBLIES SHALL HAVE FIRE DAMPERS TO MATCH THE RATING OF
DESIGN ARE ENCOUNTERED, INVESTIGATE AND MEASURE BOTH NATURE AND EXTENT OF THE CONFLICT. SUBMIT REPORT
INCAND
INCANDESCENT
VWC -PLAS
WALL COVERING - PLASTER
THE WALL. ALL ROOF AND FLOOR PENETRATIONS SHALL BE PROPERLY SEALED.
TO OWNER'S REPRESENTATIVE IN WRITTEN, ACCURATE DETAIL. PENDING RECEIPT OF DIRECTIVE FROM OWNER'S
ID
INSIDE DIAMETER
WC
WET COLUMN
REPRESENTATIVE, REARRANGE SELECTIVE DEMOLITION SCHEDULE AS NECESSARY TO CONTINUE OVERALL JOB PROGRESS
INSUL
INSULATION
WP
WATERPROOFING
WITHOUT UNDUE DELAY.
INT
INTERIOR
WD
WOOD
INV
INVERT
W/
WITH
11. REMOVE FROM BUILDING SITE ON A DAILY BASIS, ALL DEBRIS, RUBBISH AND OTHER MATERIALS RESULTING FROM
W/O
WITHOUT
DEMOLITION OPERATIONS. TRANSPORT AND LEGALLY DISPOSE OF OFF SITE. DEBRIS REMOVAL TO BE DONE AFTER REGULAR
J
JT
JOINT
WC
WATER COOLER
WORKING HOURS.
JST
JOIST
JC
JANITOR'S CLOSET
Y
YD
YARD
- IF HAZARDOUS MATERIALS ARE ENCOUNTERED DURING DEMOLITION OPERATIONS COMPLY WITH APPLICABLE
REGULATIONS, LAWS, AND ORDINANCES CONCERNING REMOVAL, HANDLING AND PROTECTION AGAINST EXPOSURE OR
ENVIRONMENTAL POLLUTION.
- BURNING OF REMOVED MATERIALS IS NOT PERMITTED ON PROJECT SITE.
12. UPON COMPLETION OF DEMOLITION WORK, REMOVE TOOLS, EQUIPMENT, AND DEMOLISHED MATERIALS FROM SITE. REMOVE
PROTECTIONS AND LEAVE INTERIOR PER CONDITIONS DOCUMENTED IN SUBMITTED PHOTOGRAPHS/VIDEO.
- REPAIR DEMOLITION PERFORMED IN EXCESS OF THAT REQUIRED. RETURN ELEMENTS OF CONSTRUCTION AND
SURFACES TO REMAIN TO CONDITION EXISTING PRIOR TO START OF OPERATIONS. REPAIR ADJACENT CONSTRUCTION OR
SURFACES SOILED OR DAMAGED BY SELECTIVE DEMOLITION WORK.
ARCHITECTURAL
SYMBOLS
REFERENCE SYMBOLS
VICINITY MAP
PROJECT LOCATION
„ //A
<.
DOOR
WALL CONSTRUCTION A
SYMBOL 1 DOOR NUMBER WALL TYPE
PROJECT _
PROJECT
M � _
INSULATION CONCRETE
Blanket PRECAST
GRAVEL or
CRUSHED
CEMENT
MORTAR
CONCRETE
L_74'//
h-�
LOCATION ' t
t
'"
LOCATION
- - _
F77
STONE
rt'
PLASTER
DETAIL NUMBER
ROOM NAME OFFI- ROOM NAME EXTERIOR & INTERIOR
1't 1 t "--F 1
1 t l
I 7x
EARTH TILE
Ceramic or
a
SOLID CONC.
MAS. UNIT
CONCRETE
MASONRY
MARBLE
FINISH
SCHEDULE 1 ROOM NUMBER ELEVATION SYMBOL p
1
1 1 t 1
PR SR
Structural
UNIT
�.
CONSTRUCTION DETAIL 1 DETAIL NUMBER
SYMBOL
i
BUILDING. PARTIAL DETAIL NUMBER
1 SHEET NUMBER
DETAIL SECTION
� 1m��
C
SHEET WOOD
WOOD
WOOD
BRICK
SYMBOL
A -1 SHEET NUMBER
METAL Finished
Blocking
Blocking
Large
GLASS GLASS
Small Large
Continuous
INSULATION
Rigid
Intermittent
Scale
WINDOW TYPES WINDOW TYPE COLUMN REFERENCE NUMBER OR LE1lER��,.'
1 O
_J
��! _
Scale Scale
�....
GENERAL NOTES ABCDEFG -NOTE TOP OF CONCRETE ELEVATION 0.00
....�.�.1 - --i
0
STEEL STEEL
PLYWOOD
SLAB ELEVATION
DETAIL NUMBER
r.....
1 t� flf7F� � F���
Smolt Scale Large Scale
N
N
DRAWING 1111) =S 1 SCALE: DRAWING REVISIONS 1 REVISION NUMBER
-I SCALE.
Adjacent Zoning
o
Som City tr #SOA Wad Z0ttttlg ft
SHEET NUMBER
Lad UpQ(atodNt3Y2MI.
n
BERMELLO AJAMIL & PARTNERS, INC.
Architecture Engineering Planning
Interior Design Landscape Architecture
2601 South Bayshore Drive 10th Floor
Miami, Florida 33133
(305) 859 -2050 Fax (305) 860 -3700
STRUCTURAL ENGINNER:
MEP ENGINEER:
MEPENGINEER INFORMATION
Smith, Seckman, Reid, Inc.
CONSULTING
]ENGIN]E]ETzz S
600 West Hillsboro, Suite 300
Deerfield Beach, Florida 33441
Phone(954)421 -1260 Fax(954)421 -1466
p..
w _t ,
REVISIONS:
PROJECT NAME:
SMH- ADVANCE TOWER OFFICES- 2ND FLOOR
PHASE W
PROJECT ADDRESS:
7400 S.W. 62nd Ave.
South Miami, Florida 33143
KEY PLAN
COMM. NO. 40030.100
SCALE:
DATE: November 09, 2006
DRAWN:
CHECKED:
CADD FILE: H:PROJECTS
DRAWING TITLE:
INDEX
SHEET NO.
AOmO
10