Loading...
Res. No. 054-99-10678RESOLUTION NO.54-99-10678 A RESOLUTION OFTHE MAYOR AND CITY COMMISSION OFTHECITY OFSOUTHMIAMI.FLORIDA.RELATINGTORETAININGM.C.HARRY ASSOCIATES,INC.FOR THE PURPOSE OF STUDYING AND DEVELOPING A PRELIMINARY DESIGN FORAPEDESTRIAN OVERPASSCONNECTINGMETRORAILWITHTHEDOWNTOWN; AUTHORIZINGTHECITYMANAGERTODISBURSEAFIXEDLUMP SUM OF $23,500 IN PROFESSIONAL FEES FROM ACCOUNT NUMBER 001-0000-245.1000,ENTITLED "RESERVE FORPRIORYEAR ENCUMBRANCE,":AND PROVIDING FORANEFFECTIVEDATE. WHEREAS,the Engineering and Architectural firm,M.C.Harry Associates,Inc.was approved by the City Commission asa consultant for the City;and WHEREAS,the City requires engineering and architectural technical assistance;and WHEREAS,the City Commission desires to develop a safe,efficient and aesthetically pleasing pedestrian connection between the Metrorail station and the downtown area; NOW THEREFORE BEIT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI,FLORIDA: Section 1.The City Commission hereby authorizes theCity Manager to retain M.C. Harry Associates,Inc.to study and develop preliminary design for a pedestrian overpass for a fixed lump sum fee of $23,500 for professional services tobe disbursed from account #001- 0000-245.1000. Section 2.This resolution shalltake effect immediately upon approval. PASSED AND ADOPTED this 2nd day of March,1999. ATTEST: 6-£lLOC>f£± CITY CLERK READ AND APPROVED AS TO FORM: CITY ATTORNEY APPROVED: MAYOR COMMISSION VOTE: Mayor Robaina: Vice Mayor Oliveros: Commi ssioner Feliu: Commissioner Bethel: Commissioner Russell 5-0 Yea Yea Yea Yea Yea CITY OF SOUTH MIAMI INTER-OFFICE MEMORANDUM To:Mayor and City Commission Date:February 26.1999 From:Charles D.Scurr City Manager Agenda Item #_ Re:Study and de**&~_ SouthMiami Pedestrian Overpass REQUEST: A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI,FLORIDA,RELATING TO RETAINING M.C.HARRY ASSOCIATES,INC.FOR THE PURPOSE OF STUDYING AND DEVELOPING A PRELIMINARY DESIGN FOR A PEDESTRIAN OVERPASS CONNECTING METRO RAIL WITH THE DOWNTOWN; AUTHORIZING THE CITY MANAGER TO DISBURSE A FIXED LUMP SUM OF $23,500 IN PROFESSIONAL FEES FROM ACCOUNT NUMBER 001-0000-245.1000,ENTITLED "RESERVE FOR PRIOR YEAR ENCUMBRANCE,":AND PROVIDING FOR AN EFFECTIVE DATE. BACKGROUND &ANALYSIS: On,July1,1998,theCity of SouthMiamisubmittedagrantapplicationtotheDadeCounty MetropolitanPlanningOrganizationtorequestfundingtoconductafeasibilitystudyand preliminarydesign of apedestrianoverpassconnectingtheSouthMiamiMetrorailstationand the downtown area.OnOctober6,1998,the Governing Boardofthe Metropolitan Planning Organization (MPO)approvedtheawardof $19,000 totheCityofSouthMiamiwitha matching fundcommitment of $4,750fromtheCity. TheconceptualdesignpreparedbyM.C.Harry Associates,Inc.wouldidentifythebestlocation andthealignment of theoverpass,developpreliminarydesignandestablishabudgetforthefinal design and construction. M.C.Harry Associates Inc.,oneofthethree Architectural/Engineering firms,pre-selected by theCityhasbeenselectedforthisproject because oftheir experience withsimilar projects. Thematchinggrant of $4,750wouldbeallocatedfromthe$30,000inAccountNumber001- 0000-245.1000,entitled"ReserveforPriorYearEncumbrance,"whichhadbeenappropriated forlast year's charrette.Theremainingbalancewouldbe$25,250. RECOMMENDATION:Approval. attachments: 1)FeeproposalfromM.C.HarryAssociatesInc. 2)Resolution for adoption FEB.25.1999 6:33PM MC HfiRRY ASSOC NO.170 MCHARRYASSOCIATES PROPOSAL /WORK ORDER DATE:February 25,1999 To:City ofSouth Miami Attention:Subrata Basu,AIA,AICP Assistant City Manager /Planning Director 305-663D6344 /fax 305-666-4591 Study and Concept Design for South Miami US1 Pedestrian OverpassRE: P.1/1 We are pleased to confirm our proposal to provide professional Architectural and Engineering Services:Acceptance of this proposal shall serve as aWork Order authonzing MCHarry to provide the services indicated and for the compensation stated below. Scope of Work:......Study the best location and alignment for a pedestrian overpass to connect thei west side of US1 at the existing Metro Rail Station with the east side of US1 (downtown business area);make recommendations and develop preliminary conceptual desigrjs for the overpass;and provide conceptual cost estimate.The work will be completed bn a lump sum/fixed fee basis.The following is an estimate of the man-hours and tasks: —•Principal "Architect Drafting Hrtyrate *100 *§Z I 22. Data Collection Obtain Base Mops from City ScopeRevieww.Public Works Sunset Place/Metro Rail/FDOT Pevetop Bate Drawing Study Alternative* Study Alternatives /Develop Options Review w.City/Final Alignment IPrewntatton Material program Narrative Plan/Sections /Sketches Total Hrs 24 120 64 8 208 800 $13,930 Retmoureabte/Direct Expenses Total Estimate Lump Sum /Fixed Fee Proposal 40 40 3 80 Compensation:Lump Sum /Fixed Fee of $23,500.00,payable In direct proportion to the tasks and work completed Schedule:Commence upon approval;completion within 90 days ASSOCIATES,INC. James vy.Plersol,AIA,CCS Principal Accepted/Approved by Date E S 8 8 3 S o of 3 2 3 CO