Loading...
Res. No. 033-99-10657RESOLUTION NO. 33-99-10657 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA,AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT WITH MIRI CONSTRUCTION CORPORATION,TO PERFORM CITY-WIDE STREET PAVING AND THERMOPLASTIC MARKING AT A COST NOT TO EXCEED $40,000.00,AND CHARGING THE DISBURSEMENT TO "LOCAL OPTION GAS TAX - MAINTENANCE AND REPAIR OF STREETS AND PARKWAYS"ACCOUNT NO.112-1730-541-4640. WHEREAS,thepublicroadwaysunderthejurisdiction of theCityrequireperiodicmaintenance and/orreconstructioninordertoprovideforappropriatefunctionalityand safety,and; WHEREAS.MIRI Construction Corporationhasbeen awarded a competitive bid contract with theCityofCoralGablesforstreet construction (Resolution No.20621 andBidNo.DPW99-01). NOW,THEREFORE,BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI,FLORIDA: Section1.TheCityManagerisherebyauthorizedto enter intoa contract withMiri ConstructionCorporationtoperformCity-wideroadwayimprovementsbasedupontheaforementioned Citv of Coral Gables contract. Section 3.The contract withMIRI Construction Corporation isnotto exceed 40,000.00 for fiscal year 1998/99. PASSED AND ADOPTED this 16lh dayof February 1999. ATTEST: i^uS^\J^ CITY CLERK READ AND APPROVED AS TO FORM: ^^=x --CITY ATTORNEY C2&yJL APPROVED: MAYOR COMMISSION VOTE:5-0 Mayor Robaina:Yea Vice Mayor Oliveros:Yea Commissioner Feliu:Yea Commissioner Bethel:Yea Commissioner Russell:Yea CITY OF SOUTH MIAMI INTER-OFFICE MEMORANDUM TO:Mayor and Commission DATE:February 16,1999 FROM:Charles D.Scurr SUBJECT:Agenda Item #_^5___ City Manager s~\Commission Meeting -2/9/99 AUTHORIZATION OF THE CITY MANAGER TO ENTER INTO A CONTRACT WITH MIRI CONSTRUCTION CORPORATION TO PROVIDE STREET CONSTRUCTION SERVICES AT A COST NOT TO EXCEED $40,000.00,FOR FISCAL YEAR 1998/99. The attached resolution seeks approval to allow the City Manager to enter into a contract with MIRI Construction Corporation to provide street construction services for the City. BACKGROUND In November 1998,a resolution was passed naming Southeastern Engineering Contractors,Inc.. (Southeastern)as a street construction contractor for the City,based upon a competitive bid contract with the Miami-Dade County School Board.The attached resolution also names a street construction contractor for the City,MIRI Construction Corporation. A second contractor is sought forthe City for several reasons: 1)Contractors are not always available when the City needs work to be performed. Consequently,having a second pre-approved contractor greatly decreases the possibility that a commitment to another client will cause an unacceptable delay for a City project. 2)On larger and more complex projects,the two pre-approved contractors can be bid against each other,with the project being given to the contractor with the best and lowest proposal.This procedure allows for quick responsiveness and competition without having to develop and advertise a RFP for every street project during the fiscal year.It is also likely to result in lower cost for some projects. MIRI Construction Corporation has provided street construction services for the City of Coral Gables for the last five years.The City can bring this contractor on-board for this fiscal year through the competitive bid contract this firm has with Coral Gables (see attached). /continued... Mayor and City Commission MIRI PavingCorp.Resolution February 16th,1999 Page 2 of2 The resolution with Southeastern was for $51,900.00 with the disbursements to come from the Local Option Gas Tax "Maintenance and Repair of Streets and Parkways"account However a contract was provided to Southeastern for only $20,000.00 for certain reasons.The full amoiint of the resolution does not have to be extended to the contractor in fa first contract,since the resolution indicates a "not to exceed"amount,not a guaranteed amount. Should Southeastern perform well under the first contract,additional contracts can be extended to that vendor under the same resolution provided that the "not to exceed"amount is not surpassed,and money remains in that account.This approach to "as needed"paving projects provides flexibility.Even greater flexibility would be provided with a second pre-approved paving turn.This is needed in today's roadway construction environment,since often times one contractor is "tied up"with other projects and cannot provide the responsiveness we require. The total expenditure would not exceed $40,00.00,and the disbursement would come from "'count No.112-1730-541-4640 "Local Option Gas Tax -Maintenance and Repair of Streets and Parkways .This account currently has a balance of$44,507.00 for fiscal year 1998/99. The proposed contract with MIRI will help us to complete our annual schedule in a timely fashion,and possibly result in cost savings in the larger projects.Therefore,approval of this resolution is recommended. Attachments i RESOLUTION NO. 2 3 A RESOLUTION OF THE MAYOR AND CITY 4 COMMISSION OF THE CITY OF SOUTH MIAMI, 5 FLORIDA,AUTHORIZING THE CITY MANAGER 6 TO ENTER INTO A CONTRACT WITH MIRI 7 CONSTRUCTION CORPORATION,TO PERFORM 8 CITY-WIDE STREET PAVING AND 9 THERMOPLASTIC MARKING AT A COST NOT TO 10 EXCEED $40,000.00,AND CHARGING THE 11 DISBURSEMENT TO "LOCAL OPTION GAS TAX - 12 MAINTENANCE AND REPAIR OF STREETS AND 13 PARKWAYS"ACCOUNT NO.112-1730-541-4640. 14 15 WHEREAS,thepublicroadwaysunderthe jurisdiction of theCityrequireperiodic maintenance 16 and/or reconstruction in order to provide for appropriate functionality and safety,and: 17 18 WHEREAS,MIRI Construction Corporation hasbeen awarded a competitive bid contract with 19 the City of Coral Gables for street construction (Resolution No.20621 and BidNo.DPW99-01). 20 21 NOW,THEREFORE,BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF 22 THE CITY OF SOUTH MIAMI,FLORIDA: 23 24Section1.TheCityManagerisherebyauthorizedtoenterintoa contract withMiri 25ConstructionCorporationtoperformCity-wideroadwayimprovementsbasedupontheaforementioned 26 City of Coral Gables contract. 27 28Section3.ThecontractwithMIRIConstructionCorporationisnottoexceed40,000.00for 29fiscal year 1998/99. 30 31 PASSED AND ADOPTED this 16th day of February 1999. 32 33 APPROVED: 34 35 36 MAYOR 37 ATTEST: 38 39 40 CITY CLERK 41 42 43 READ AND APPROVED AS TO FORM: 44 45 46 CITY ATTORNEY 47 82/12/1999 10:56 3852613791 PUBLIC WORKS WIKX.CONSTRUCTION INC.3052332013 / «•$£$The City of Coral Gables 285 Araccn Avcnu* Gmai,Casus.Fuobida 3TO4 Miri Construction,Inc. 7340 SW121 St. Miami,FL 33156 Dear Sir/Madam. v./ November 6,1998 RE:Construction ofStreet Improvements at Various Locations in the City of Coral Gables.Florida DPW 9941 The contract for the above referenced project has been awarded by the City Commission of Coral outlined in the bid documents and the related addendum.Please fill in the twoizt naM S2ffi^PleasealSosubmitevidcncoofC^cean3[ For your review,we have attached acopy ofthe Bid Tabulation form. As soon as the Contracts are executed by the City,one copy will be returned to you and aw*.conjunction meeting will be set up,w you'and 8*** fh^J5?by.^FiMnCC DcPatmem ifvou nave not already done so to ensure that you have If you have any questions,please contact me or Thomas D.Springer,P.E.,at 305-4*0-5014. RAD.ksc End. H.C.Eads,Jr.,City Manager Donald Nelson,Finance Director Carmen Lizama-Gaspa,Purchasing Director Thomas D.Springer,P.B.,Engineering Div.Supv. Sury Nieves,Acting Engineering Technician Alberto rfelgado,P.B. Public Works Director c: RQBOKMM9 CO»AcCA*f*aom8A33D4-l549 005)460-5000 PAGE 81 P.01 82/12/1999 16:S6 3052613791 PUBLIC WORKS Pfl6E a2 "IHl .CONSTRUCTION IMC.SOS2332BJJ p.e2 CONTRACT Plans and Sp«cSc«k>i«rWa-TFIT"*prtbnn,he &IIow™8 work macawSee^Shth. CONSTOUCTIONOP STOEETIMPROVEMENTS AT VARIOUS LOCATIONS IN THE CITY OF CORAL GABLES.FLORIDA DPW99-01 ******tS,*3 ,3k *Utt,on5 wddeductons *p™***•*e *««* preceding calendarmonthby (he J£fiET**£2%X-f™0*'"6*?'**"**"**hich ii to be retained by the «r3S«^1P?9 (,0%)of **uw),,m «*«<*«*»»ato c^mcuonoffewockhLb^r^ST*,***!econd P"*™«»»**»>with the«»d«within thioy ^^^^^J^T*^aCSOaBL of"*«—*-*"cornet ^.^Sth^^^J.""-""**"""*•"-,*** 'TobedatedbytheCkyofCoral (Sables REV.9/98 I of2 82/12/1999 10:56 3052613791 PUBLIC WORKS MIRI CONSTRUCTION INC.3652332013 (Form of Contract) PASE 03 P.03 s^5S™-'»-~»ws WITNESSES:(If Sole Ownership or Partnership,Two (2)Witnesses Required.If Corporation,Secretary only will attest and affix seal). at (ZL THE CITYOFCORALGABLES CORAL GABUBS,FLORIDA City Manager Authority of Resolution No.2.9C>2 / passed and adopted by the CityCommission on ^/ffV -?n 19Q9. PRINCIPAL: Name ofFirm Signature of Authorized Officer Title ATTEST: Title-* 2 of2