Loading...
Res. No. 159-01-11307RESOLUTION NO.159-01-11307 RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI,FLORIDA,AUTHORIZING THE CITY MANAGER TO EXECUTE A PROFESSIONAL SERVICE WORK ORDER WITH KIMLEY-HORN AND ASSOCIATES,INC.FOR PROFESSIONAL ENGINEERING SERVICES FOR ENGINEERING ROUTE SURVEY,GEOTECHNICAL,DESIGN AND PERMITTING FOR THE NORTH-END DRAINAGE IMPROVEMENT,INAN AMOUNT NOTTO EXCEED SIXTY-SEVEN THOUSANDONEHUNDRED EIGHTY-FIVE DOLLARS, ($67,185.00);PROVIDING FOR AN EFFECTIVE DATE. WHEREAS,theCityCommission of theCity of SouthMiami,Florida,wishestodrainage improvementand roadway rehabilitation withinthearea;and WHEREAS,theCityCommissionoftheCityofSouthMiami,Florida,wishestousethe professionalservices of Kimley-HornandAssociates,Inc.,toprovideroutesurvey,geotechnicalservices, design&permitting andbid phase servicesfor North-end Drainage Improvement;and WHEREAS,the proposed streets to be improved are;SW 42nd Terrace between SW 62nd Avenue and SW 64th Avenue,SW 62nd Court between SW 40th Street and SW 44th Street,SW 63rd Avenue between SW 40th Street and SW 44th Street,SW 43rd Street between SW 62nd Court and SW 64th Avenue &SW 44th Street between SW 62nd CourtandSW 64th Avenue;and WHEREAS,the North-end DrainageImprovementisfundedthroughthe2001StateLegislative appropriation funds. NOW,THEREFORE,BEITDULYRESOLVEDBYTHECITY COMMISSION OFTHECITYOF SOUTH MIAMI,FLORIDA,that: Section 1:TheCityManageris execute aWorkOrderwith Kimley-Horn &Associates,Inc.forthe professional services in connection with on-site data collection route survey,geotechnical services,design &permitting andbid phase forthe North-end Drainage Improvement project,inan amount notto exceed $67,185.00. Section 2:Thatthe attached proposal,Professional Service Work Order,be made apartofthe resolution. Section 3.This resolution shalltakeeffectimmediatelyupon approval. PASSED AND ADOPTED this 16th dayof October 2001. ATTEST: &4ulZa-J CITY CLERK READ AND APPROVED AS TO FORM: /<<=>.<o^f/t*s? CITY ATTORNEY APPROVED: MAYOR COMMISSION VOTE: Mayor Robaina: Vice Mayor Feliu: Commissioner Russell: Commissioner Bethel: Commissioner Wiscombe: ^L^2 T$.4>/te£rJ 5-0 Yea Yea Yea Yea Yea CITY OF SOUTH MIAMI INTER-OFFICE MEMORANDUM To:Mayor and City Commission Date:October 11,2001 From:Charles D.Scurr City Manager Agenda Item # Comm Mtg.10-16-01 Re:Authorization to execute Professional Service Work Order for North-end Drainage Improvement REQUEST: A RESOLUTION OFTHEMAYORANDCITY COMMISSION OFTHECITYOFSOUTH MIAMI,FLORIDA,AUTHORIZING THE CITY MANAGER TO EXECUTE A PROFESSIONAL SERVICEWORKORDERWITHKIMLEY-HORNANDASSOCIATES, INC.FORPROFESSIONALENGINEERINGSERVICESFORENGINEERINGROUTE SURVEY,GEOTECHNICAL,DESIGN AND PERMITTING FOR THE NORTH-END DRAINAGE IMPROVEMENT,INAN AMOUNT NOTTOEXCEED SIXTY-SEVEN THOUSANDONEHUNDREDEIGHTY-FIVEDOLLARS,($67,185.00). BACKGROUND: This project will provide for much needed drainage and roadway improvement in the area designated as the North-end.The streets within the North-end Area are;SW 42nd Terrace between SW 62nd Avenue and SW 64th Avenue,SW 62nd Court between SW 40th Street and SW 44th Street,SW 63rd Avenue between SW 40th Street and SW 44th Street,SW 43rd Street between SW 62nd Court and SW 64th Avenue &SW 44th Street between SW 62nd Court and SW 64th Avenue.The streets willbe resurfaced with drainage improvement and pavement markings.This project will be funded from the 2001 State Legislative Appropriations.Kimley-Horn and Associates,Inc.is one oftheCity's approved Professional General Engineering Consultants. RECOMMENDATION: Itis recommended thatthe City Commission approve the funding forthe work tobe performed. Page2 of 2 Agenda Item... Oct.11,01 ATTACHMENTS: a Proposed Resolution a Professional Engineering ServicesWorkOrder •Map of the proposed projectarea PROFESSIONAL SERVICES WORK ORDER Date:September 26,2001 To:CityofSouthMiami Engineering &Construction Department 6130 Sunset Drive South Miami,Florida 33143 Project Name:North-end Drainage Improvements Funding Source:2000 Legislative Appropriations As per Professional Services Agreement Dated August 20,2001. Section 1-General Provisions Section 2-Professional Services 2.1 General Engineering Services Engineering Survey,onsite data collection,geotechnical services and professional engineering services required to prepare Design plans, Specifications,Contract Documents and Construction Observation Reports for proposed North-end Drainage Improvements.The design shall provide for minimal Drainage System Improvements and minor right-of-way repair along the following streets: Q • a a a SW 42nd Terrace between SW 62nd Avenue and SW 64th Avenue SW 62nd Court between SW 40th Street and SW 44th Street SW 63rd Avenue between SW 40th Street and SW 44th Street SW 43rd Street between SW 62nd Court and SW 64th Avenue SW 44,b Street between SW 62nd Court and SW 64th Avenue 2.2 Basic Services Perform a Route Survey in accordance with the City of South Miami requirements,which will include the location of all above ground improvements, establishing a base line with appropriate monumentation,locating all visible utilitiestoincludeinvertsofsanitarymanholesandexistingdrainagestructures. Boundaries of our survey will be to limits of the right-of-way.In addition we will obtain elevations immediately adjacent tothe houses.Sidewalks and driveways toeach individual lotwillbelocatedwithelevationstaken10feetintoprivate property.(SW 42nd Terrace and SW 63 Ave Only.Approximately 2600 linear feet of roadway.) 2.2.1 Phase1-Preliminary and Schematic Design Deleted from this Work Order 2.2.2Phase II-Study andDesign Development Deleted from this Work Order 2.2.3 Phase III-Final Design/Construction Documents Development A.Revise language as follows:Delete "From the approved Design Development Documents,"and insert "From the written direction of City staff. H.Delete this section I.Delete this section 2.2.4 PhaseIV-Bidding and Negotiation Phase D.Delete this section E.Delete this section 2.2.5 Phase V-General Administration of the Construction Contract 2.2.6 Phase VI-Post Construction Administration A.Delete this section The Total Fee for the services indicated in this Service Order isaLumpSum amount of $67.185.00. Company Name:JAkl&f-fo^/bUb A4SlGlitl*JUC> Signature: Name:M-4wmic*titr (President/Principal-in-charge) City of SouthMiami Approvedby: Date: